Stages of Project Cycle Delf

Embed Size (px)

Citation preview

  • 8/9/2019 Stages of Project Cycle Delf

    1/12

    Construction

    Project Cycle

    Engr. Delfin B ViloriaProject Engineer III

  • 8/9/2019 Stages of Project Cycle Delf

    2/12

    Construction Stage

    Yes

    No

    Yes

    No

  • 8/9/2019 Stages of Project Cycle Delf

    3/12

    CONSTRUCTION STAE

    Yes

    No

    UCT! Control of "or#

    ! Control of $aterials

    ! Docu%entation

    ! Billings & Pa'%ents

    ! Ot(er $anage%ent Control

    CONST

  • 8/9/2019 Stages of Project Cycle Delf

    4/12

    CO$P)ETION STAE

  • 8/9/2019 Stages of Project Cycle Delf

    5/12

    *lo+ C(art of Variation Or,er Processing

    START

    Contractor-s "ritten Co%%unication of Clai%

    giving full and detailed particulars of any change

    Investigation by Project Engineer

    on the authenticity & need for

    variation order

    Secure PreClearance fro% Regional

    Director/District Engineer

    on Request for Variation Order

  • 8/9/2019 Stages of Project Cycle Delf

    6/12

    Preparation of proposedVariation Order

    by the Project Engineer with complete

    documents

    Submission of Proposed

    Variation Order

    to Regional Director/District

    Engineer for approval

    Con,uct ont(es0ot in1estigation an,

    0re0aration of re0ort of 1erification

    by the technical staff of RO/DEO

    *lo+ C(art of Variation Or,er Processing

  • 8/9/2019 Stages of Project Cycle Delf

    7/12

    Review of Estimated

    Quantities and Costs

    pproval of Variation

    Order

    END

    Processing ofProposed Variation

    Order

    *lo+ C(art of Variation Or,er Processing

  • 8/9/2019 Stages of Project Cycle Delf

    8/12

    Suggested Inspection

    !re"uencies*RE2UENCY INSPECTION ACTIVITIES

    ONE TI$E

    Check Contractors equipment upon mobiliation!

    "nspect materials at suppliers facilities for source approval!

    "nspect laboratory and testing facilities for approval prior to

    use!

    Check initial layout# closing error and survey!

    "nspect centerline survey and stakeout!

    Revie$ office and recording procedures of Contractor!

    %inal Check on pavement surface for te&ture and ride '

    markings!

    %inal check on finish stuctures!

    %inal check on drainage!

    %inal acceptance checks on utility# lightning and signing!

    %inal measurement of $ork for payment!

    Check erection plans# false$ork plans and shop dra$ings!

  • 8/9/2019 Stages of Project Cycle Delf

    9/12

    Suggested Inspection

    !re"uencies*RE2UENCY INSPECTION ACTIVITIES3CRITICA)

    POINT

    "nspect sub(grade# sub(base and base before placing the

    ne&t structured layer!

    "nspects forms# false$ork and reinforcement before

    placing concrete!

    Check bearing surface before placing foundations!

    Check all materials to be covered before backfill

    operations!

    Check e&cavations before placing sod for compliance $ith

    plan and adequate drainage!

    "nspect other miscellaneous critical points in specialied

    situations!

  • 8/9/2019 Stages of Project Cycle Delf

    10/12

    Suggested Inspection

    !re"uencies*RE2UENCY INSPECTION ACTIVITIESSPOT C4EC5 Check construction layout and elevations!

    "nspect fill material aggregates and stockpile forcontamination and proper handling!

    "spect stockpiles of other materials )such as pipes and

    reinforcing steel* for damage!

    "nspect backfilling and embankment operations for

    compliance $ith specifications! "nspect drainage structures# manholes# catch basins# pipe

    laying and other minorstructures for proper materials#

    conformance $ith plans and damage!

    "nspect sub(base for line# level# moisture content and

    compaction! Check for all required test and samples!

    Check safety requirements# traffic control# false$ork#

    shoring of e&cavations# scaffolding#etc!

    "nspect conrete during curing!

  • 8/9/2019 Stages of Project Cycle Delf

    11/12

    Suggested Inspection

    !re"uencies*RE2UENCY INSPECTION ACTIVITIESCONTINUOUS +tructural concrete production!

    ,ile driving operations!

    ,lacing of structural concrete!

    One Ti%e

    Critical Point

    S0ot C(ec#

    *re6uenc'

    Continuous

  • 8/9/2019 Stages of Project Cycle Delf

    12/12

    #$an% youEngr. Delfin B Viloria

    Project Engineer III