Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014 Bahan Bangunan dan Upah Kerja ZONA 1 ZONA 2 ZONA 3 1 2 3 4 XIX BAHAN BANGUNAN DAN UPAH KERJA 1 Bahan Pengisi 1 Tanah Urug M3 126.900 130.950 135.000 Laterit M3 137.341 141.724 146.108 Tanah Timbunan di datangkan M3 82.642 85.280 87.918 Tanah Pilihan ( Quary) M3 90.908 93.809 96.710 Galian tanah biasa (Manual) M3 82.372 85.001 87.630 Galian tanah biasa (alat ) M3 29.133 30.063 30.993 Galian tanah berbatu (manual ) M3 50.321 51.927 53.533 Galian Tanah berlumpur M3 35.316 36.443 37.571 Timbunan Sirtu M3 260.899 269.226 277.553 2 Pasir Halus M3 243.766 251.545 259.325 Kasar M3 125.000 229.458 236.555 Pasir Beton/ Pasang M3 130.000 150.000 270.000 3 Kerikil Halus M3 549.364 566.897 584.430 Kasar M3 500.000 630.000 667.920 4 Batu Kali Bulat M3 523.204 539.902 556.600 Split M3 477.424 492.661 507.898 Puru M3 327.003 337.439 347.875 Keduk M3 2.054 2.119 2.185 Belah M3 265.494 273.967 282.440 5 Batu Bata Kwalitet I Buah 750 1.339 1.380 Kwalitet II Buah 700 1.004 1.035 Kecil Buah 550 837 863 Besar Buah 1.297 1.339 1.380 Batako Semen M3 11.475 11.841 12.207 Kerikil M3 483.964 499.409 514.855 Palimanan M2 243.766 251.545 259.325 6 Agregat - Agregat Kelas A M3 519.820 536.410 553.000 - Agregat Kelas B M3 517.000 533.500 550.000 - Agregat Kelas C M3 263.200 271.600 280.000 -Agregat Kelas C2 M3 267.900 276.450 285.000 7 Batu Pecah - Batu Pecah ( Split ) 1 - 2 cm M3 483.964 499.409 514.855 - Batu Pecah ( Split ) 2 - 3 cm M3 568.984 587.143 605.303 - Batu Pecah ( Split ) 3- 5 cm M3 392.403 404.927 417.450 - Batu Pecah ( Split ) 5 - 7 cm M3 510.124 526.404 542.685 - Batu Belah / Kerakal M3 353.163 364.434 375.705 - Gravel M3 390.565 403.030 415.495 - Shipping M3 340.083 350.936 361.790 - Filler ( Abu Batu ) Kg 1.297 1.339 1.380 - Kapur M3 95.128 98.164 101.200 8 Semen PC Zak 70.000 75.000 98.000 9 Semen Putih Zak 90.000 95.000 128.800 10 Aspal - Aspal Ac ( AC10, AC40, AC60 ) Kgm3/ ton 14.864 15.338 15.813 - Aspal MC ( MC800, MC6000 ) Kg 12.486 12.884 13.283 - Aspal Emulasi ( RS1, RS2, CRS1, SRS2, CRS4) Kg 28.776 29.695 30.613 - Aspal Grade PEN 60/70 ex Pertamina Kg 17.004 17.547 18.090 - Butonic Aspal Kg 15.458 15.952 16.445 - Aspal SHELL PEN 60/70 Kg 13.945 14.390 14.835 - Aspal Cement Kg 13.160 13.580 14.000 11 Lempeng Rumput M3 7.000 M2= 4500 Buah 15.134 15.617 16.100 12 BAHAN ATAP a. Atap Genteng Vlam Buah 13.783 14.223 14.663 Kodok Buah 5.567 5.745 5.923 Munier Buah 13.783 14.223 14.663 Beton Pres Buah 12.486 12.884 13.283 Ekatana Buah 88.318 91.136 93.955 Plentong'S' Buah 26.160 26.995 27.830 Multi Color 8 Daun Keping 15.675 16.175 16.675 Multi Color 2 daun Keping 51.726 53.377 55.028 Metal Keping 61.476 63.438 65.401 5 NO URAIAN BARANG SPESIFIKASI SATUAN PAGU DANA Sumber : Dinas Pekerjaan Umum (Hrt) 125

Standar Biaya Umum

Embed Size (px)

DESCRIPTION

Standar Biaya Umum

Citation preview

Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014Bahan Bangunan dan Upah KerjaZONA 1 ZONA 2 ZONA 31 2 3 4XIX BAHAN BANGUNAN DAN UPAH KERJA1 Bahan Pengisi1TanahUrug M3 126.900130.950135.000 Laterit M3 137.341141.724146.108 Tanah Timbunan di datangkan M3 82.64285.28087.918 Tanah Pilihan ( Quary) M3 90.90893.80996.710 Galian tanah biasa (Manual) M3 82.37285.00187.630 Galian tanah biasa (alat ) M3 29.13330.06330.993 Galian tanah berbatu (manual ) M3 50.32151.92753.533 Galian Tanah berlumpurM3 35.31636.44337.571 Timbunan Sirtu M3 260.899269.226277.5532PasirHalus M3 243.766251.545259.325 KasarM3 125.000229.458236.555 Pasir Beton/ Pasang M3 130.000150.000270.0003KerikilHalus M3 549.364566.897584.430 KasarM3 500.000630.000667.9204Batu KaliBulat M3 523.204539.902556.600 Split M3 477.424492.661507.898 Puru M3 327.003337.439347.875 Keduk M3 2.0542.1192.185 Belah M3 265.494273.967282.4405Batu BataKwalitet I Buah 750 1.3391.380 Kwalitet II Buah 700 1.0041.035 Kecil Buah 550 837 863 Besar Buah 1.2971.3391.380 Batako Semen M3 11.47511.84112.207 Kerikil M3 483.964499.409514.855 Palimanan M2 243.766251.545259.3256Agregat- Agregat Kelas A M3 519.820536.410553.000- Agregat Kelas B M3 517.000533.500550.000- Agregat Kelas C M3 263.200271.600280.000-Agregat Kelas C2 M3 267.900276.450285.0007Batu Pecah- Batu Pecah ( Split ) 1 - 2 cm M3 483.964499.409514.855- Batu Pecah ( Split ) 2 - 3 cm M3 568.984587.143605.303- Batu Pecah ( Split ) 3- 5 cm M3 392.403404.927417.450- Batu Pecah ( Split ) 5 - 7 cm M3 510.124526.404542.685- Batu Belah / Kerakal M3 353.163364.434375.705- Gravel M3 390.565403.030415.495- Shipping M3 340.083350.936361.790- Filler ( Abu Batu ) Kg 1.2971.3391.380- Kapur M3 95.12898.164101.2008Semen PCZak 70.00075.00098.0009Semen Putih Zak 90.00095.000128.80010Aspal- Aspal Ac ( AC10, AC40, AC60 ) Kgm3/ ton 14.86415.33815.813- Aspal MC ( MC800, MC6000 ) Kg 12.48612.88413.283- Aspal Emulasi ( RS1, RS2, CRS1, SRS2, CRS4) Kg 28.77629.69530.613- Aspal Grade PEN 60/70 ex Pertamina Kg 17.00417.54718.090- Butonic Aspal Kg 15.45815.95216.445- Aspal SHELL PEN 60/70 Kg 13.94514.39014.835 - Aspal Cement Kg 13.16013.58014.00011Lempeng Rumput M3 7.000 M2= 4500 Buah 15.13415.61716.10012BAHAN ATAPa. Atap Genteng Vlam Buah 13.78314.22314.663Kodok Buah 5.5675.7455.923Munier Buah 13.78314.22314.663Beton Pres Buah 12.48612.88413.283Ekatana Buah 88.31891.13693.955Plentong'S' Buah 26.16026.99527.830Multi Color 8 Daun Keping15.67516.17516.675Multi Color 2 daun Keping51.72653.37755.028Metal Keping61.47663.43865.4015NO URAIANBARANG SPESIFIKASI SATUANPAGU DANASumber : Dinas Pekerjaan Umum (Hrt)125Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014Bahan Bangunan dan Upah KerjaZONA 1 ZONA 2 ZONA 31 2 3 4 5NO URAIANBARANG SPESIFIKASI SATUANPAGU DANAKeramik Buah 20.32320.97121.620Mars 1 X 4 ( 38.5 X 80 ) Buah 43.13244.50845.885S.Roof 1 X 4 ( 38.5 x 80 ) Buah 101.992105.247108.503Mars 1 X 4 ( 38.5 X 80 ) Buah 62.75264.75566.758Venus 1 X 4 Buah 39.24040.49341.745Dextrabond Buah 41.24042.55643.873Nok Atap Dextrabond ( Berpasir ) Keping51.13152.76353.590Nok Model U Mars Keping32.10633.13054.395Nok Model U MarsDextrabond Keping17.67418.23834.155Nok ModelC MarsKeping21.13421.80818.803Nok ModelC Mars Dextrabond Keping34.75435.86322.483Nok Samping Mars Keping35.99737.14636.973Nok Samping Dextrabond Keping35.99737.14638.29513 FlashingTembok Mars Keping3.8924.0164.140 Tembok Dextrabond Keping32.70033.74434.78814Bumbungan Atap GentengGenteng Metal U Buah 24.80925.60126.393 Genteng Plentong "S" Buah 6.5406.7496.958 Genteng Metal ( sakura Rout ) Buah 41.24042.55643.873 Genteng Metal Bag SampingBuah 6.5406.7496.958 (sakura Rout)15AsbesMotif Genteng Lembar 117.721121.478125.235 Gel Besar Lembar 104.641107.980111.320 Gel Kecil Lembar 105.938109.319112.70016 Seng Gelombang BJLS 306 kaki Kodi 600.000700.0001.391.500 7 kaki Kodi 700.000800.0001.600.225 17 Seng Gelombang BJLS 206 kaki Kodi 500.000540.0001.005.675 7 kaki Kodi 590.000630.0001.220.725 9 kaki Kodi 790.000840.0001.600.225 18Seng platBJLS 18 Lembar 85.02187.73490.448 BJLS 20 Lembar 104.641107.980111.320 BJLS 25 Lembar 146.476151.150155.82519Seng plastikKwalitet I Lembar 242.576200.000258.060 Kwalitet II Lembar 94.53370.000100.56820Ijuk Kg 60.15862.07863.998382.66321 Atap Rangka Baja Ringan Zincalum m2 359.703371.183382.66322 Steel Deck Tebal 3 mm Kg 12.22012.61013.00023 Kerosen / Minyak Tanah Liter 11.28011.64012.00024 Kawat BetonKg 17.39017.94518.50025 Kawat Bronjong Kg 16.92017.46018.00026 Sirtu M3 300.800310.400320.00027 Geotextile M2 300.800310.400320.00028 Gebalan Rumput M2 15.04015.52016.00029 Baja Tulangan (polos) U24 Kg 12.69013.09513.500Baja Tulangan (Ulir) D32 Kg 19.74020.37021.00030 Kapur M3 158.860163.930169.00031 Chipping M3 423.000436.500450.000Kg 217 224 231 32 Cerucuk Kayu Dolken Btg 8.4608.7309.00033 Pipa Baja Bergelombang Kg 39.01040.25541.50034 Tiang Pancang Baja Dia.8 Inci L:4 Meter M; 3.995.000 4.122.500 4.250.000 35 Tiang Pancang Beton Pratekan M3 3.572.000 3.686.000 3.800.000 36 Kawat Las Dos 120.320124.160128.00037 Minyak Fluks Liter 1.739.000 1.794.500 1.850.000 38 Bunker Oil Liter 1.7861.8431.90039 Asbuton Halus Ton 508.540524.770541.00040 Baja Prategang Kg 17.39017.94518.500Sumber : Dinas Pekerjaan Umum (Hrt)126Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014Bahan Bangunan dan Upah KerjaZONA 1 ZONA 2 ZONA 31 2 3 4 5NO URAIANBARANG SPESIFIKASI SATUANPAGU DANA41 Greser Kg 23.50024.25025.00042 Pemancangan M 150.400155.200160.0002 Bahan Cetak Buah 27.94428.83629.7281Roster20 x 20 cm Buah 48.37549.91951.4632Conblok20 x 30 cm Buah 14.26914.72515.1803Batako Buah 11.29611.65712.0184Glassblok Buah 62.42864.42066.4135Ventilasi 1/2 Ling Buah 227.118234.367241.6156Tiang tears Ukur Buah 1.210.504 1.249.137 1.287.770 7Astrod65 cm Buah 49.94251.53653.1308Patok Tanah Besar Panjang 1.5 M, Lebar 18cm x 18 cmBuah 399.970412.735425.5003 Bahan Lantai/Lapisan Dinding1 Ubin PC Abu - abuM2 94.15597.160100.165WarnaM2 85.02187.73490.448BadakM2 223.659230.797237.9352 Tegel Teraso 30 x 30 cmM2 66.69868.82670.95530 x 20 cmM2 159.556164.648169.74020 x 20 cm 4.1624.2954.4283 Tegel 10 x 20 cm 4.1624.2954.4284 Tegel Plin 40 x 60 cm ( mar - mar ) 71.34673.62375.90010 x 10 Cm ( teraso ) 5.9466.1356.3255 Tegel Porselin 11x 11 cm 2.9733.0683.1636 KeramikMasterina Kw I 30 x 30 cmM2 178.365184.058189.750 Masterina Kw II 30 x 30 cmM2 118.315122.091125.868Keramik 30/30 cm ( garuda)M2 74.53576.91479.29340/40 cm ( mulia)M2 92.26395.20898.15320 x 20 Cm (roman )M2 68.69870.89073.08320 x 20 Cm (garuda )M2 63.45565.48067.505Lantai biasa 30 x 30 M2 89.61592.47595.335Lantai biasa 20 x 25 M2 41.24042.55643.873 Cincin keramikM' 49.07750.64452.2107 Porselin Putih 10 x 10cmM2 79.77882.32484.87011 x 11cmM2 89.61592.47595.33515 x 15cmM2 106.641110.044113.44890.4488 Porselin Warna 10 x 10cmM2 103.290106.586109.88311 x 11cmM2 103.290106.586109.88315 x 15cmM2 62.15864.14166.1259 Marmer 30 x 20cmM2 62.15864.14166.12530 x 30cmM2 226.902234.143241.38540 x 60cmM2 329.597340.116350.635Ezenza 30 x 30 cmM2 529.150546.037562.925Ezenza 40 x 40 cmM2 336.840347.590358.340Ezenza 60 x 60 cmM2 254.467262.589270.7104 Bahan Langit-langit1 Eternit 100 x 100 cm Lembar 100.155103.351106.548Kembang Lembar 37.29538.48539.6752 Triplek 3 mm Lembar 82.37285.00187.6304 mm Lembar 107.235110.658114.0809 mm Lembar 178.581184.281189.9804 Takwod 3 mm Lembar 164.798170.058175.3185 Formika 3 x 56 Ft Lembar 8.5408.8129.0856 Lis ProfilM 27.45728.33429.2107 Lambro Siring Remin 1 x 9 cmM 45.18646.62848.0705 Bahan Besi1 Besi Beton Polos 4 mm x 6 m Batang 20.00080.00624.4956 mm x 12 m Batang 35.00045.00068.9438 mm x 12 m Batang 136.74760.000145.4752 Besi Beton Polos 10 mm x12 m Batang 158.25870.000168.3604 mm x12 m Batang 44.69946.12647.5536 mm x 12 m Batang 64.80666.87468.9439 mm x 12 m Batang 129.979134.128138.27610 mm x 12 m Batang 143.989148.585153.180Ikat beton Kg 33.29534.35735.420Duri Rol 53.13154.82756.523Nyamuk M 55.45557.22558.995Sumber : Dinas Pekerjaan Umum (Hrt)127Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014Bahan Bangunan dan Upah KerjaZONA 1 ZONA 2 ZONA 31 2 3 4 5NO URAIANBARANG SPESIFIKASI SATUANPAGU DANAAyakan Pasir M 198.255204.583210.910Kawat Ayam M 21.29617.00022.655Harmonika M 44.53745.95947.380Bronjong 3 mm Kg 18.26918.85219.435Bronjong 4 mm Kg 18.26918.85219.435Las Dos 9.1349.4269.7183 Gerobak Dorong Dinding besi buah 450.000570.000953.178Dinding plastik buah 470.000540.000802.8734 Beton K - 250 M3 1.874.239 1.934.055 1.993.871 K - 225 M3 1.454.864 1.501.296 1.547.728 K - 175 M3 1.254.688 1.294.731 1.334.775 K - 125 M3 1.180.962 1.218.653 1.256.343 K - 350 M3 1.454.864 1.501.296 1.547.728 K - 400 M3 2.068.000 2.134.000 2.200.000 K - 300 M3 1.880.000 1.940.000 2.000.000 5 Mobilisasi Alat Drumix M3 29.72830.67631.6256 Bahan Pipa1 Pipa GIPPipa GIP Diameter 12,5 mm m1 14.86415.33815.813Pipa GIP Diameter 20 mm m1 20.80921.47322.138Pipa GIP Diameter 25 mm m1 29.72830.67631.625Pipa GIP Diameter 40 mm m1 41.61942.94744.275Pipa GIP Diameter 50 mm m1 59.45561.35363.250Pipa GIP Diameter 63 mm m1 59.45561.35363.250Pipa GIP Diameter 75 mm m1 65.40167.48869.575Pipa GIP Diameter 100 mm m1 107.019110.435113.850Pipa GIP Diameter 150 mm m1 225.929233.140240.350Pipa GIP Diameter 200 mm m1 321.057331.304341.550Pipa GIP Diameter 250 mm m1 481.586496.955512.325Pipa GIP Diameter 300 mm m1 722.378745.433768.488Pipa GIP Diameter 350 mm m1 1.308.010 1.349.755 1.391.500 Pipa GIP Diameter 400 mm m1 1.902.560 1.963.280 2.024.000 2 Pipa HDPE PE. 100PN 10Pipa HDPE Dia 20 mmm1 8.3788.6458.913Pipa HDPE Dia 25 mmm1 11.94512.32612.708Pipa HDPE Dia 32 mmm1 16.64717.17917.710Pipa HDPE Dia 40 mmm1 34.53835.64036.743Pipa HDPE Dia 50 mmm1 44.86246.29347.725Pipa HDPE Dia 63 mmm1 56.91558.73160.548Pipa HDPE Dia 75 mmm1 80.10282.65985.215Pipa HDPE Dia 90 mmm1 113.883117.518121.153Pipa HDPE Dia 100 mmm1 95.93999.001102.063Pipa HDPE Dia 110 mmm1 170.312175.747181.183Pipa HDPE Dia 125 mmm1 216.038222.933229.828Pipa HDPE Dia 140 mmm1 271.709280.381289.053Pipa HDPE Dia 150 mmm1 305.653315.408325.163Pipa HDPE Dia 160 mmm1 356.460367.836379.213Pipa HDPE Dia 180 mmm1 449.804464.160478.515Pipa HDPE Dia 200 mmm1 555.202572.921590.640Pipa HDPE Dia 225 mmm1 701.839724.238746.638Pipa HDPE Dia 250 mmm1 862.692890.225917.758Pipa HDPE Dia 280 mmm1 1.083.000 1.117.564 1.152.128 Pipa HDPE Dia 300 mmm1 1.244.177 1.283.885 1.323.593 Pipa HDPE Dia 315 mmm1 1.371.249 1.415.012 1.458.775 Pipa HDPE Dia 350 mmm1 1.492.591 1.540.227 1.587.863 Pipa HDPE Dia 355 mmm1 1.740.626 1.796.178 1.851.730 Pipa HDPE Dia 400 mmm1 2.203.727 2.274.058 2.344.390 Pipa HDPE Dia 450 mmm1 2.721.796 2.808.662 2.895.528 Pipa HDPE Dia 500 mmm1 3.367.693 3.475.173 3.582.653 Pipa HDPE Dia 560 mmm1 4.221.197 4.355.916 4.490.635 Pipa HDPE Dia 630 mmm1 5.343.761 5.514.307 5.684.853 Pipa HDPE Dia 710 mmm1 6.781.762 6.998.201 7.214.640 Pipa HDPE Dia 800 mmm1 8.604.003 8.878.599 9.153.195 3 Aksesoris Pipa HDPECoupling Dia 20 mm, HDPE Buah 49.18650.75552.325Coupling Dia 25 mm, HDPE Buah 59.45561.35363.250Coupling Dia 32 mm, HDPE Buah 75.94078.36480.788End Cap Dia 20 mm, HDPE Buah 25.94426.77227.600End Cap Dia 25 mm, HDPE Buah 35.13336.25437.375End Cap Dia 50 mm, HDPE Buah 111.884115.454119.025Sumber : Dinas Pekerjaan Umum (Hrt)128Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014Bahan Bangunan dan Upah KerjaZONA 1 ZONA 2 ZONA 31 2 3 4 5NO URAIANBARANG SPESIFIKASI SATUANPAGU DANAEnd Cap Dia 75 mm, HDPE Buah 360.622372.131383.640End Cap Dia 100 mm, HDPE Buah 758.213782.412806.610End Cap Dia 150 mm, HDPE Buah 834.046860.664887.283End Cap Dia 200 mm, HDPE Buah 875.772903.722931.673End Cap Dia 250 mm, HDPE Buah 919.553948.900978.248Dop/Cap Dia 400 mm (HDPE) Buah 1.149.427 1.186.111 1.222.795 Stub End Dia 50 mm, HDPE Buah 21.24221.92022.598Stub End Dia 75 mm, HDPE Buah 95.66998.722101.775Stub End Dia 100 mm, HDPE Buah 104.425107.757111.090Stub End Dia 150 mm, HDPE Buah 164.420169.668174.915Stub End Dia 200 mm, HDPE Buah 358.946370.402381.858Stub End Dia 250 mm, HDPE Buah 517.799534.325550.850Stub End Dia 300 mm, HDPE Buah 1.006.357 1.038.475 1.070.593 Stub End Dia 350 mm, HDPE Buah 1.725.222 1.780.282 1.835.343 Stub End Dia 400 mm, HDPE Buah 1.725.222 1.780.282 1.835.343 Bend 90, Dia 50 mm, HDPE Buah 104.749108.092111.435Bend 90, Dia 75 mm, HDPE Buah 155.556160.520165.485Bend 90, Dia 100 mm, HDPE Buah 392.727405.261417.795Bend 90, Dia 150 mm, HDPE Buah 1.006.249 1.038.363 1.070.478 Bend 90, Dia 200 mm, HDPE Buah 1.426.812 1.472.348 1.517.885 Bend 90, Dia 250 mm, HDPE Buah 2.586.238 2.668.778 2.751.318 Bend 90, Dia 300 mm, HDPE Buah 4.778.615 4.931.124 5.083.633 Bend 90, Dia 400 mm, HDPE Buah 5.067.782 5.229.520 5.391.258 Bend 45, Dia 50 mm, HDPE Buah 95.93999.001102.063Bend 45, Dia 75 mm, HDPE Buah 139.071143.509147.948Bend 45, Dia 100 mm, HDPE Buah 331.381341.957352.533Bend 45, Dia 150 mm, HDPE Buah 796.643822.068847.493Bend 45, Dia 200 mm, HDPE Buah 1.362.384 1.405.865 1.449.345 Bend 45, Dia 250 mm, HDPE Buah 2.090.546 2.157.265 2.223.985 Bend 45, Dia 300 mm, HDPE Buah 3.820.200 3.942.121 4.064.043 Tee 400 x 200 mm (HDPE) Buah 5.798.430 5.983.486 6.168.543 Tee 250 x 250 mm (HDPE) Buah 2.616.128 2.699.622 2.783.115 Tee 250 x 200 mm (HDPE) Buah 3.424.013 3.533.290 3.642.568 Tee 250 x 150 mm (HDPE) Buah 3.424.013 3.533.290 3.642.568 Tee 200 x 200 mm (HDPE) Buah 1.375.518 1.419.418 1.463.318 Tee 200 x 150 mm (HDPE) Buah 1.789.704 1.846.822 1.903.940 Tee 200 x 100 mm (HDPE) Buah 829.602856.079882.556Tee 150 x 150 mm (HDPE) Buah 1.046.949 1.080.362 1.113.775 Tee 150 x 100 mm (HDPE) Buah 1.028.139 1.060.952 1.093.765 Tee 150 x 75 mm (HDPE) Buah 1.028.139 1.060.952 1.093.765 Tee 100 x 100 mm (HDPE) Buah 359.541371.015382.490Tee 100 x 75 mm (HDPE) Buah 455.155469.681484.208Tee 100 x 50 mm (HDPE) Buah 439.913453.953467.993Tee 75 x 75 mm (HDPE) Buah 157.177162.194167.210Tee 75 x 50 mm (HDPE) Buah 286.843295.998305.153Tee 50 x 50 mm (HDPE) Buah 110.100113.614117.128Reducer Dia 400 x 300 mm (HDPE) Buah 2.639.748 2.723.995 2.808.243 Reducer Dia 250 x 200 mm (HDPE) Buah 844.639871.596898.553Reducer Dia 250 x 150 mm (HDPE) Buah 844.639871.596898.553Reducer Dia 200 x 150 mm (HDPE) Buah 433.049446.869460.690Reducer Dia 200 x 100 mm (HDPE) Buah 433.049446.869460.690Reducer Dia 150 x 100 mm (HDPE) Buah 227.226234.478241.730Reducer Dia 150 x 75 mm (HDPE) Buah 207.660214.288220.915Reducer Dia 100 x 75 mm (HDPE) Buah 99.884103.072106.260Reducer Dia 100 x 50 mm (HDPE) Buah 83.99486.67489.355Reducer Dia 75 x 50 mm (HDPE) Buah 60.64462.58064.5154 Aksesoris PIPA Gate Valve 50 mm Buah 1.970.717 2.033.612 2.096.508 Gate Valve 75 mm Buah 2.746.821 2.834.486 2.922.150 Gate Valve 100 mm Buah 3.470.388 3.581.145 3.691.903 Gate Valve 150 mm Buah 5.998.739 6.190.188 6.381.638 Gate Valve 200 mm Buah 9.262.008 9.557.604 9.853.200 Gate Valve 250 mm Buah 11.577.510 11.947.005 12.316.500 Gate Valve 300 mm Buah 19.000.737 19.607.144 20.213.550 Gate Valve 350 mm Buah 23.018.814 23.753.457 24.488.100 Gate Valve 400 mm Buah 28.773.518 29.691.821 30.610.125 Water Meter Dia 25 mm Buah 504.773520.883536.993Water Meter Dia 50 mm Buah 757.186781.352805.518Water Meter Dia 75 mm Buah 4.389.509 4.529.599 4.669.690 Water Meter Dia 100 mm Buah 5.852.696 6.039.484 6.226.273 Water Meter Dia 150 mm Buah 14.008.030 14.455.095 14.902.160 Water Meter Dia 200 mm Buah 15.528.565 16.024.158 16.519.750 Sumber : Dinas Pekerjaan Umum (Hrt)129Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014Bahan Bangunan dan Upah KerjaZONA 1 ZONA 2 ZONA 31 2 3 4 5NO URAIANBARANG SPESIFIKASI SATUANPAGU DANAWater Meter Dia 250 mm Buah 22.159.419 22.866.635 23.573.850 Water Meter Dia 300 mm Buah 41.118.375 42.430.664 43.742.953 Water Meter Dia 350 mm Buah 46.770.384 48.263.056 49.755.728 Water Meter Dia 400 mm Buah 56.193.461 57.986.869 59.780.278 Air Valve Double Dia 150 mm Buah 10.882.859 11.230.185 11.577.510 Air Valve Double Dia 100 mm Buah 7.899.948 8.152.074 8.404.200 Air Valve Double Dia 75 mm Buah 6.878.403 7.097.927 7.317.450 Air Valve Double Dia 50 mm Buah 5.243.931 5.411.291 5.578.650 Air Valve SingelDia 150 mm Buah 10.215.450 10.541.475 10.867.500 Air Valve SingelDia 100 mm Buah 5.788.755 5.973.503 6.158.250 Air Valve SingelDia 75 mm Buah 3.153.169 3.253.802 3.354.435 Air Valve SingelDia 50 mm Buah 2.982.911 3.078.111 3.173.310 Air Valve SingelDia 25 mm Buah 1.342.170 1.385.005 1.427.840 Check Valve Dia 350 mm Buah 38.975.347 40.219.241 41.463.135 Check Valve Dia 300 mm Buah 21.954.137 22.654.801 23.355.465 Check Valve Dia 250 mm Buah 17.284.541 17.836.176 18.387.810 Check Valve Dia 200 mm Buah 8.853.390 9.135.945 9.418.500 Check Valve Dia 150 mm Buah 5.334.735 5.504.993 5.675.250 Check Valve Dia 100 mm Buah 3.178.140 3.279.570 3.381.000 Check Valve Dia 75 mm Buah 1.668.524 1.721.774 1.775.025 Check Valve Dia 50 mm Buah 1.191.803 1.229.839 1.267.875 Gibolt Joint 350 mm Buah 3.200.841 3.302.996 3.405.150 Giboult Joint 300 mm Buah 2.684.393 2.770.065 2.855.738 Giboult Joint 250 mm Buah 1.708.250 1.762.769 1.817.288 Giboult Joint 200 mm Buah 1.317.793 1.359.850 1.401.908 Giboultt Joint 150 mm Buah 442.670456.797470.925Giboult Joint 100 mm Buah 160.691165.819170.948Giboult Joint 75 mm Buah 133.449137.708141.968Giboult Joint 50 mm Buah 115.775119.470123.165Check Valve Dia 200 mm Buah 8.853.390 9.135.945 9.418.500 Check Valve Dia 150 mm Buah 5.334.735 5.504.993 5.675.250 Check Valve Dia 100 mm Buah 3.178.140 3.279.570 3.381.000 Check Valve Dia 75 mm Buah 1.668.524 1.721.774 1.775.025 Check Valve Dia 50 mm Buah 1.191.803 1.229.839 1.267.875 Gibolt Joint 350 mm Buah 3.200.841 3.302.996 3.405.150 Giboult Joint 300 mm Buah 2.684.393 2.770.065 2.855.738 Giboult Joint 250 mm Buah 1.708.250 1.762.769 1.817.288 Giboult Joint 200 mm Buah 1.317.793 1.359.850 1.401.908 Giboultt Joint 150 mm Buah 442.670456.797470.925Giboult Joint 100 mm Buah 160.691165.819170.948Giboult Joint 75 mm Buah 133.449137.708141.968Giboult Joint 50 mm Buah 115.775119.470123.165Blind Flange Dia 50 mm Buah 210.255216.965223.675Blind Flange Dia 75 mm Buah 355.325366.665378.005Blind Flange Dia 100 mm Buah 457.155471.745486.335Blind Flange Dia 150 mm Buah 1.033.382 1.066.362 1.099.343 Blind Flange Dia 200 mm Buah 1.359.790 1.403.187 1.446.585 Blind Flange Dia 250 mm Buah 1.740.410 1.795.955 1.851.500 Blind Flange Dia 300 mm Buah 2.846.327 2.937.167 3.028.008 Blind Flange Dia 400 mm Buah 3.130.954 3.230.878 3.330.803 All Flange Dia 50 mm (GIP/Steel) Buah 221.335228.399235.463All Flange Dia 75 mm (GIP/Steel) Buah 359.324370.792382.260All Flange Dia 100 mm (GIP/Steel) Buah 433.000446.819460.638Tee All Flange Dia 250 x 100 mm Buah 1.608.690 1.660.031 1.711.373 Tee All Flange Dia 200 x 100 mm Buah 795.562820.952846.343Tee All Flange Dia 150 x 75 mm Buah 528.717545.591562.465Tee All Flange Dia 100 x 50 mm Buah 335.867346.586357.305Tee All Flange Dia 75 x 50 mm Buah 251.873259.912267.950Bend All Flange 450 Dia 200 mm (GIP/Steel) Buah 2.634.721 2.718.808 2.802.895 Bend All Flange 450 Dia 150 mm (GIP/Steel) Buah 1.658.578 1.711.512 1.764.445 Bend All Flange 450 Dia 100 mm (GIP/Steel) Buah 926.471956.039985.608Bend All Flange 450 Dia 75 mm (GIP/Steel) Buah 732.107755.472778.838Bend All Flange 450 Dia 50 mm (GIP/Steel) Buah 488.072503.648519.225Loose Flange Dia 300 mm Buah 542.122559.423576.725Loose Flange Dia 250 mm Buah 403.754416.639429.525Loose Flange Dia 150 mm Buah 373.431385.349397.268Loose Flange Dia 100 mm Buah 262.737271.122279.508ScreenND 200 mm Buah 85.12987.84690.563ScreenND 150 mm Buah 64.10366.14968.195ScreenND 100 mm Buah 51.07752.70754.338Pressure Gauge Dia 150 mm Buah 170.258175.691181.125Pressure Gauge Dia 200 mm Buah 255.386263.537271.688Sumber : Dinas Pekerjaan Umum (Hrt)130Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014Bahan Bangunan dan Upah KerjaZONA 1 ZONA 2 ZONA 31 2 3 4 5NO URAIANBARANG SPESIFIKASI SATUANPAGU DANAPressure Gauge Dia 250 mm Buah 278.087286.962295.838Fiet Kran Diameter 0,5" Buah 53.88855.60857.328Fiet Kran Diameter 0,75" Buah 112.370115.956119.543Fiet Kran Diameter 1" Buah 40.59241.88743.183Fiet Kran Diameter 2" Buah 56.75358.56460.375Fiet Kran Diameter 3" Buah 90.80493.70296.600Fiet Kran Diameter 4" Buah 113.505117.128120.750Lem Paralon Buah 312.139322.101332.063sealtape Kaleng 159.718164.815169.913 Double Nipple ND. /4" Buah 7.3517.5857.820 Tee GI ND. 3/4" x 3/4" Buah 9.0809.3709.660 Bend ND. 3/4" F - F Buah 5.6755.8566.038 Conn S Elbow PE ND. 3/4"F - M Buah 55.61757.39259.168Knie Screw (GI) dia. 3/4" Buah 53.88855.60857.328 Feet Kran ND. 3/4" Buah 54.48256.22157.960 Dop drat dalam ND. 3/4" Buah 14.16114.61315.065 Meter air ND. 1/2", Slumberger / Unit 510.773527.074543.375 ( termasuk capnuts tail peces ) Buah 6.8107.0287.245 Clamp sadle ND. 2" x 1/2" Buah 7.9458.1998.453 Box meter (plate) termasuk kunci Buah 113.505117.128120.7505 Aksesoris Pipa PVCFlangeSocket Dia 200 mm (PVC) Buah 1.318.982 1.361.077 1.403.173 FlangeSocket Dia 150 mm (PVC) Buah 835.451862.114888.778FlangeSocket Dia 100 mm (PVC) Buah 513.421529.807546.193FlangeSocket Dia 75 mm (PVC) Buah 351.974363.207374.440FlangeSocket Dia 50 mm (PVC) Buah 226.091233.307240.523FlangeSpigot Dia 200 mm (PVC) Buah 1.236.772 1.276.244 1.315.715 FlangeSpigot Dia 150 mm (PVC) Buah 775.942800.706825.470FlangeSpigot Dia 100 mm (PVC) Buah 488.288503.871519.455FlangeSpigot Dia 75 mm (PVC) Buah 333.164343.797354.430FlangeSpigot Dia 50 mm (PVC) Buah 213.173219.977226.780Bend 90 Dia 200 mm (PVC) Buah 1.280.282 1.321.142 1.362.003 Bend 90 Dia 150 mm (PVC) Buah 629.953650.058670.163Bend 90 Dia 100 mm (PVC) Buah 271.980280.660289.340Bend 90 Dia 75 mm (PVC) Buah 144.638149.254153.870Bend 90 Dia 50 mm (PVC) Buah 73.50875.85478.2006 Mur/Baut Perlengkapan PipaMur/Baut dan Ring Dia 50 mm (GIP/Steel) Buah 29.61930.56531.510Mur/Baut dan Ring Dia 75 mm (GIP/Steel) Buah 29.61930.56531.510Mur/Baut dan Ring Dia 100 mm (GIP/Steel) Buah 59.45561.35363.250Mur/Baut dan Ring Dia 150 mm (GIP/Steel) Buah 65.61767.71169.805Mur/Baut dan Ring Dia 200 mm (GIP/Steel) Buah 235.982243.514251.045Mur/Baut dan Ring Dia 250 mm (GIP/Steel) Buah 354.028365.326376.625Mur/Baut dan Ring Dia 400 mm (GIP/Steel) Buah 442.129456.240470.3507 Pipa Steel Pipa Steel Dia 50 mm m' 123.180127.111131.043Pipa Steel Dia 75 mm m' 205.228211.778218.328Pipa Steel Dia 100 mm m' 580.821599.358617.895Pipa Steel Dia 150 mm m' 609.900629.365648.830Pipa Steel Dia 200 mm m' 626.548646.544666.540Pipa Steel Dia 250 mm m' 789.400814.594839.788Pipa Steel Dia 300 mm m' 907.824936.797965.770Reducer All Flange 200 x 150 mm m' 363.973375.589387.205Reducer All Flange 200 x 100 mm m' 343.920354.896365.873Reducer All Flange 200 x 75 mm m' 325.867336.267346.668Reducer All Flange150 x 100 mm m' 330.191340.729351.268Reducer All Flange 150 x 75 mm m' 330.894341.455352.0158 Pengadaan street BoxStreet Box 100 mm Unit 343.650354.617365.585Street Box 75 mm Unit 256.413264.597272.780Street Box 50 mm Unit 248.792256.732264.6739 Mur/baut/Ring untuk koneksi PipaDia 50 mm Unit 32.64633.68834.730Dia 75 mm Unit 65.13067.20969.288Dia 100 mm Unit 218.578225.554232.530Dia 150 mm Unit 251.495259.521267.548Dia 200 mm Unit 276.736285.568294.400Dia 250 mm Unit 386.620398.959411.298Sumber : Dinas Pekerjaan Umum (Hrt)131Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014Bahan Bangunan dan Upah KerjaZONA 1 ZONA 2 ZONA 31 2 3 4 5NO URAIANBARANG SPESIFIKASI SATUANPAGU DANADia 300 mm Unit 502.665518.708534.750Dia 400 mm Unit 655.518676.439697.36010 Pipa PVC Tekanan 8 kg/cm2Pipa PVC, dia 2" panjang 4 m Batang 93.93996.93799.935Pipa PVC, dia 3" panjang 4 m Batang 104.857108.204111.550Pipa PVC, dia 4" panjang 4 m Batang 199.769206.144212.520Pipa PVC, dia 6" panjang 4 m Batang 574.335592.665610.995Pipa PVC, dia 8" panjang 4 m Batang 923.931953.418982.905Ljoint PVC, dia 1/2 " Buah 6.8647.0837.303Ljoint PVC, dia 3/4 " Buah 6.8647.0837.303Ljoint PVC, dia 1" Buah 6.8647.0837.303Ljoint PVC, dia 1 1/4" Buah 9.99910.31810.638Ljoint PVC, dia 1 1/2" Buah 12.48612.88413.283Ljoint PVC, dia 2" Buah 18.75519.35419.953Ljoint PVC, dia 3" Buah 47.40248.91550.428Ljoint PVC, dia 4" Buah 78.64381.15383.663Ljoint PVC, dia 6" Buah 174.798180.376185.955Ljoint PVC, dia 8" Buah 449.480463.825478.170Ljoint PVC, dia 1/2 " Buah 14.97215.45015.928Ljoint PVC, dia 3/4 " Buah 16.21516.73317.250Ljoint PVC, dia 2 " Buah 22.43123.14723.863Ljoint PVC, dia 3 " Buah 27.45728.33429.210Ljoint PVC, dia 4 " Buah 62.42864.42066.413Ljoint PVC, dia 6 " Buah 89.88592.75495.623Ljoint PVC, dia 8 " Buah 169.771175.189180.60811 Pipa PVC Tekanan 5 kg/cm2Pipa, PVC Dia. 1 1/4", Panjang 4 M Batang 31.67332.68433.695Pipa, PVC Dia. 1 1/2" Panjang 4 m Batang 59.99661.91063.825Pipa, PVC Dia. 2", panjang 4 m Batang 65.34667.43269.518Pipa, PVC Dia. 2 1/2 ", panjang 4 m Batang 103.560106.865110.170Pipa, PVC Dia. 3 ", panjang 4 m Batang 144.962149.589154.215Pipa, PVC Dia. 4 ", panjang 4 m Batang 217.659224.606231.553Pipa, PVC Dia. 5 ", panjang 4 m Batang 342.839353.781364.723Pipa, PVC Dia. 6 ", panjang 4 m Batang 492.882508.612524.343Pipa, PVC Dia. 8 ", panjang 4 m Batang 822.425848.672874.920Pipa, PVC Dia. 10 ", panjang 4 m Batang 1.217.963 1.256.834 1.295.705 Pipa, PVC Dia. 12 ", panjang 4 m Batang 1.710.250 1.764.833 1.819.415 12 Pipa PVC Tekanan 10 kg/cm2Pipa, PVC Dia. 1/2 ", panjang 4 m Batang 32.10633.13034.155Pipa, PVC Dia. 3/4 ", panjang 4 m Batang 64.32066.37268.425Pipa, PVC Dia. 1", panjang 4 m Batang 56.21258.00659.800Pipa, PVC Dia. 1 1/4 ", panjang 4 m Batang 75.94078.36480.788Pipa, PVC Dia. 1 1/2 ", panjang 4 m Batang 98.966102.124105.283Pipa, PVC Dia. 2 ", panjang 4 m Batang 140.584145.071149.558Pipa, PVC Dia. 2 1/2", panjang 4 m Batang 181.068186.846192.625Pipa, PVC Dia. 3 ", panjang 4 m Batang 275.925284.731293.538Pipa, PVC Dia. 4 ", panjang 4 m Batang 426.617440.232453.848Pipa, PVC Dia. 5 ", panjang 4 m Batang 558.445576.267594.090Pipa, PVC Dia. 6 ", panjang 4 m Batang 838.532865.293892.055Pipa, PVC Dia. 8 ", panjang 4 m Batang 1.268.175 1.308.649 1.349.123 Pipa, PVC Dia. 10 ", panjang 4 m Batang 1.932.342 1.994.012 2.055.683 Pipa, PVC Dia. 12 ", panjang 4 m Batang 2.741.427 2.828.919 2.916.412 13 Pipa Galvanis(1) pipagalvanis dia 1/2 M 84.75087.45590.160(2) pipagalvanis dia 3/4 M 82.04884.66687.285(3) pipagalvanis dia 1" M 170.906176.361181.815(3) pipagalvanis dia 2" M 239.279246.916254.553(4) pipagalvanis dia 3" M 460.739475.444490.148(4) pipagalvanis dia 4" M 787.446812.577837.708(5) pipagalvanis dia 6" M 1.572.585 1.622.774 1.672.963 14 Pipa Ssumur Bor (1) Pipa sumur black steel dia 4 " M 580.821599.358617.895(2) Pipa sumur black steel dia 8 " M 626.548646.544666.540(3) Pipa sumur black steel dia 11 " M 848.423875.500902.578(4) Pipa sumur black steel dia 12 " M 1.383.626 1.427.784 1.471.943 (5) Pipa screen low cabon dia 3" ( schedule ) M 827.560853.971880.383(6) Pipa screen low cabon dia 4" ( schedule ) M 1.018.140 1.050.634 1.083.128 (7) Pipa sumur black steel dia 6 "( schedule) M 1.592.475 1.643.299 1.694.123 Sumber : Dinas Pekerjaan Umum (Hrt)132Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014Bahan Bangunan dan Upah KerjaZONA 1 ZONA 2 ZONA 31 2 3 4 5NO URAIANBARANG SPESIFIKASI SATUANPAGU DANA(8) Pipa sumur black steel dia 3 "( schedule) M 1.213.909 1.252.651 1.291.393 (9) Pipa sumur black steel dia 4 "( medium) M 1.631.607 1.683.680 1.735.753 (10) Pipa sumur black steel dia 6 "( medium) M 1.827.431 1.885.753 1.944.075 (11) Reduserdia 12 " - 6" Buah 522.123538.787555.450(12) Reduserdia 10 " - 6" Buah 391.592404.090416.588(13) Reduserdia 6 " - 4" Buah 314.517324.555334.593(14) Reduserdia6" - 3" Buah 300.842310.444320.045(15) Centralizer Buah 7.179.191 7.408.314 7.637.438 (16) Centralizer Pack m3 6.983.422 7.206.297 7.429.173 (17) Pengadaan bottom plug Buah 3.915.923 4.040.899 4.165.875 (18)Tutup sumur + kunci Buah 652.654673.483694.31315 Pipa Baja (1) Pipa Baja klasApi OD 207 ID 200 M 535.149552.228569.308(2) Pipa Baja klasApi OD 156 ID 150 M 378.512390.592402.673(3) Pipa Screen Stenless Stell OD 156 ID 150 M 2.284.261 2.357.163 2.430.065 16 Pipa-pipa Lainnya(1) Pipa leiding (dia 1/2) Batang 28.70129.61730.533(2) Pipa leiding (dia 3/4) Batang 35.88937.03538.180(3) Saringan /screen PVC 4 " Batang 14.97215.45015.928(4) Paralon 1/2', panjang 4 m Batang 37.83539.04340.250(5) Paralon 3/4', panjang 4 m Batang 46.32147.79949.278(6) Paralon 1, panjang 4 m Batang 52.86154.54856.235(7) Paralon 2', panjang 4 m Batang 53.51055.21756.925(8) Paralon 3', panjang 4 m Batang 96.58799.670102.753(9) Paralon 4', panjang 4 m Batang 177.500183.165188.830(10) Pipa Tembaga Kg 208.849215.515222.180(11) Pipa Paracous Kg 43.02444.39745.770(12) Pipa Baja Kg 8.4328.7018.970(13) Pipa Baja Bergelombang Kg 18.91819.52120.1257 Bahan PenggantungKunci Tanam ( DM) Double siagg Buah 253.711261.808269.905Tunggal Buah 101.992105.247108.503Kunci Tanam (LN) Buah 239.333246.972254.610Engsel Kuningan 5 - 10 cm Buah 36.59237.76038.928Engsel Pintu Ring ilon 5 - 10 cm Buah 33.99735.08236.168Engsel Pintu kupu - kupu 5 - 10 cm Buah 30.05231.01131.9705 - 10 cm Buah 41.83543.17044.505Engsel Pintu 4" H Nilon 5 - 10 cm Buah 20.91721.58522.253Engsel Pintu 3" H Nilon Buah 19.62020.24620.873GrendelGrendel 2' Buah 8.8649.1479.430Grendel 3' Buah 9.78310.09510.408Grendel 4' Buah 11.45911.82412.190Grendel 5 ' Buah 15.02615.50515.985Grendel Pintu Buah 33.99735.08236.168Grendel Jendela Buah 20.26920.91621.563Tarikan Jendela Buah 16.32316.84417.365Handle pintuBuah 253.711261.808269.905Hak Angin Biasa Kg 22.21522.92423.633Paku Kecil Kg 40.53841.83143.125Paku Seng Besar Kg 20.26920.91621.563Paku Putih persegi / Bulian Kg 62.10364.08566.068Paku Asbes Kg 43.78145.17846.575Paku Beton Kg 61.45563.41665.378Baut 16 mm Buah 11.08011.43411.788Besi Baut angker Buah 27.45728.33429.210Mur/Baut 12 mm Buah 24.16624.93725.708Baut 1/2 + Palt = 3 mm Buah 27.45728.33429.210Baut 1/2 Buah 11.72912.10312.478Baut 1/4 Buah 11.08011.43411.788Baut 1 Buah 4.5404.6854.830Baut 1,2 Buah 5.2325.3995.5668 Bahan SantAir 1 Closet Jongkok Keramik Buah 410.240423.332436.425Toto Buah 293.978303.360312.743Teraso Buah 307.653317.471327.2902 Closet Duduk Komplet Buah 1.230.719 1.269.997 1.309.275 Jongkok Buah 211.930218.694225.458Sumber : Dinas Pekerjaan Umum (Hrt)133Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014Bahan Bangunan dan Upah KerjaZONA 1 ZONA 2 ZONA 31 2 3 4 5NO URAIANBARANG SPESIFIKASI SATUANPAGU DANAJongko (keramik KIA) Buah 293.978303.360312.743Jaongko ( TOTO ) Buah 410.240423.332436.425Jongkok 9Amerika Sytandar) Buah 341.866352.777363.6883 Wastafel KIA Buah 540.122557.360574.598Toto Buah 717.892740.804763.715Amerika standar 9lengkap) Buah 2.598.184 2.681.104 2.764.025 4 Urinair KIA Buah 1.572.585 1.622.774 1.672.963 Toto Buah 1.299.092 1.340.552 1.382.013 5 Bak Cuci Logam Plat Buah 615.359634.998654.638Keramik Buah 683.733705.554727.3756 Tempat Sabu Keramik Buah 94.31797.327100.3387 Bak Mandi Komplet dengan shouver Lux Buah 6.540.050 6.748.775 6.957.500 8 Tempat air fiber glass Kaps 500 liter Buah 1.268.770 1.309.262 1.349.755 Kaps 1000 Liter Buah 1.765.814 1.822.169 1.878.525 Kaps 2000 Liter Buah 3.466.227 3.576.851 3.687.475 9 Bahan Finising1 Amplas BesiLembar 10.43210.76511.098Kayu Lembar 16.32316.84417.3652 Cat Mini Kg 16.32316.84417.3653 Spritus Botol 129.450133.581137.7134 Thiner Botol 14.10014.55015.0005 Fitur Botol 32.70033.74434.7886 Sirlak Kg 135.990140.330144.6707 Dempul Kg 39.24040.49341.7458 Cat Mengkilat Clotek Kg 62.10364.08566.068Platono Kg 64.04966.09368.1389 Cat Tembok Vinilex Galon 177.879183.556189.233Metrolit /5 lietr Galon 327.003337.439347.87510 Cat Marka (Non Thermoplas) Kg 27.26028.13029.00011 Cat Marka (Thermoplastic) Kg 65.33067.41569.50011 Thiner Khusus marka Liter 26.16026.99527.83010 Kaca1 Kaca Polos 3 MM M2 170.041175.468180.8955 MM M2 222.362229.458236.5552 Kaca Rybend 3 MM M2 198.796205.140211.4855 MM M2 234.091241.562249.03310 MM M2 357.054368.450379.84511 Galian dengan Ekcavator1 Excavator Semi Long Arm Ukuran Kecil M3 M3 28.53829.44930.3602 Excavator Semi Long Arm Ukuran Menengah M3 M3 30.80931.79232.7753 Excavator Semi Long Arm Ukuran Panjang M3 M3 34.26835.36136.4554 Excavator Semi Long Arm Super Long M3 M3 36.37637.53738.69812 Rehabilitasi Jaringan Air1 Kategori Ringan Ha 2.711.148 2.797.674 2.884.200 2 Kategori Sedang Ha 2.711.148 2.797.674 2.884.200 3 Kategori Berat Ha 7.277.292 7.509.546 7.741.800 4 Kategori Sedang A (Kurang dari 2000 Ha) Ha 12.778.069 13.185.879 13.593.690 5 Pembangunan Tanggul Type Standar (3mx5m) Km 159.800164.900170.00013 Pengeboran Tanah/Sumur Uji(Termasuk Penelitian) 1 Paket Sondir Titik 1.123.700 1.159.562 1.195.425 2 Paket Geosismik m 1.123.700 1.159.562 1.195.425 3 Paket Geoteknik m 1.273.526 1.314.171 1.354.815 4 Paket Boring 1.273.526 1.314.171 1.354.815 14 Pemberuntukan Hasil Galian1 Type 4 m' M' 7.5137.7537.9932 Type 3 m' M' 6.2706.4706.6703 Type 2 m' M' 4.2704.4064.5434 Type 1 m' M' 2.8112.9002.99015 Pintu Air1 Pintu Air 1,5 m x 2,5 x 3 m Unit 45.661.440 47.118.720 48.576.000 2 Pintu Air 1,3 m x 1,5 x 3 m Unit 42.807.600 44.173.800 45.540.000 3 Pintu Air 1,0 m x 1,5 x 2,85 m Unit 39.953.760 41.228.880 42.504.000 Sumber : Dinas Pekerjaan Umum (Hrt)134Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014Bahan Bangunan dan Upah KerjaZONA 1 ZONA 2 ZONA 31 2 3 4 5NO URAIANBARANG SPESIFIKASI SATUANPAGU DANA4 Pintu Air 1,0 m x 1,2 x 3 m Unit 38.526.840 39.756.420 40.986.000 5 Pintu Air 0,6 m x 0,6 x 3 m Unit 34.246.080 35.339.040 36.432.000 6 Pintu Air Tersier Unit 28.538.400 29.449.200 30.360.000 16 Pintu Flap1 L.0.55 m X T.0.6 m Ha 39.953.760 41.228.880 42.504.000 2 L.20 m X T.1.0 m Ha 52.082.580 53.744.790 55.407.000 3 L.2.00 m X T.0.6 m Ha 57.790.260 59.634.630 61.479.000 17 Pemancangan Tiang Pancang1 Pemancangan Tiang Pancang Baja M' 1.384.112 1.428.286 1.472.460 2 Pemancangan Tiang Pancang Beton Pratekan M3 642.114662.607683.1003 Pemancangan Tiang Pancang Dolken Batang 99.884103.072106.26018 Gorong-Gorong1 Pengadaan dan Pemasangan Gorong2 ( 0,40 m) m 224.740231.912239.0852 Pengadaan dan Pemasangan Gorong2 ( 0,60 m) m 277.493286.349295.2053 Pengadaan dan Pemasangan Gorong2 ( 0,80 m) m 296.789306.261315.7334 Pengadaan dan Pemasangan Gorong2 ( 1,00 m) m 297.491306.986316.4805 Pengadaan dan Pemasangan Gorong2 ( 1,20 m) m 749.133773.042796.95019 Upah1 Crew Jam 14.16114.61315.0652 Kepala Tukang Batu O - H 113.559117.183120.808Jam 14.16114.61315.0653 Kepala Tukang Besi O - H 113.559117.183120.808Jam 14.16114.61315.0654 Kepala Tukang Kayu O - H 113.559117.183120.808Jam 14.16114.61315.0655 Mandor O - H 90.64293.53596.428Jam 11.29611.65712.0186 Pekerja O - H 74.31976.69179.063Jam 9.2439.5389.8337 Pekerja terlatih ( Skil Labour ) O - H 74.31976.69179.0638 Pekerja terlatih ( Superintendent ) O - H 71.07673.34475.6139 Mekanik O - H 120.099123.932127.765Jam 14.97215.45015.92810 Pembantu Mekanik O - H 87.39990.18892.978Jam 10.91811.26711.61511 Pembantu Sopir O - H 74.31976.69179.063Jam 11.28011.64012.00012 Sopir O - H 76.91379.36881.82313 Tukang anyaman O - H 93.93996.93799.93514 Tukang Batu O - H 93.93996.93799.93515 Tukang Besi O - H 93.93996.93799.93516 Tukang Cat O - H 93.93996.93799.93517 Tukang Gali O - H 93.93996.93799.93518 Tukang Kayu Konstruksi O - H 93.93996.93799.93519 Tukang Las O - H 120.099123.932127.76520 Tukang Listrik O - H 113.559117.183120.808Jam 14.16114.61315.06521 Tukang mentagetereksi O - H 101.344104.578107.81322 Tukang Pancang O - H 74.31976.69179.06323 Tukang Pipa O - H 103.722107.032110.34324 Tukang Tebas/Rintis O/M 21.62022.31023.00025 Biaya Pengangkutan dan PasangPanjang 1.5 M Lebar 20 Cm O/Patok 162.150167.325172.500Patok Tanah26 Operator Jam 12.22012.61013.00027 Pembantu Operator Jam 11.28011.64012.000Sumber : Dinas Pekerjaan Umum (Hrt)135Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014Bahan Bangunan dan Upah KerjaZONA 1 ZONA 2 ZONA 31 2 3 4 5NO URAIANBARANG SPESIFIKASI SATUANPAGU DANA20 Pekerjaan Pemboran Tanah1 Assisten Driller O - H 71.02273.28875.5552 Driver /Operator O - H 219.984227.004234.0253 Helper /Pitter lokal O - H 114.856118.522122.1884 PenangungJawab pemopaan Uji O - H 125.288129.286133.2855 Tool Pusher O - H 74.31976.69179.0636 Watchman/ Penjaga Malam O - H 66.42768.54770.668Keterangan:NO ZONA 1 ZONA 1 (Tidak Terpencil) Kec. Ma Sabak Barat, Kuala Jambi, Geragai, Dendang, Ma. Sabak Timur2 ZONA 2 (Terpencil)3 ZONA 3 (Sangat Terpencil)Dibuat oleh,FIRMAWATI, S.TNIP. 19840922201101 2 011Sekretaris Dinas Pekerjaan UmumMengetahui oleh,Drs. ALI FAHRUDDIN, NIP. 19761113199511 1 011WILAYAH (DESA)Kel. Mendahara Ilir-Sinar Kalimantan (Kec. Mendahara), Lagan Ulu (Kec. Geragai), Kuala Lagan- Manunggal Makmur (Kuala Jambi),Kuala Dendang-Jati Mulyo-Catur Rahayu-Kota Kandis (Kec. Dendang), Lambur-Kota Harapan - Siau Dalam-Simbur Naik-Kuala Simbur-Kota Raja-Alang-alang (Kec. Ma. Sabak Timur), Sei. Tering-Bunga Tanjung (Kec. Nipah Panjang), Rantau Jaya-Marga Mulyo-Tri Mulyo-Pematang Mayan-Sungai Dusun-Rantau Rasau II-Harapan Makmur-Bangun Karya (Kec Rantau Rasau), Desa Mencolok (Kec. Mendahara Ulu).Lagan Tengah (kec. Geragai), Koto Kandis (Kec. Dendang),Sei Ular (Kec. Ma. Sabak Timur), Pemusiran-Teluk Kijing-Sungai Raya-Simpang Jelita-Simpang Datuk-Sungai Jeruk (Kec. Nipah Panjang), Sungai Beras-Sinar Wajo (Kec. Mendahara Ulu), Sei Tawar-Mendahara Tengah-Merbau-Bakti Idaman-Pangkal Duri-Pangkal Duri Ilir (Kec. Mendahara), Lagan Ilir (Kec. geragai), Labuhan Pering-Sungai Benu-Desa Baku Tuo-Sei. Jambat-Air Hitam Laut (Kec. Sadu)Muara Sabak, 3 September 2014Sumber : Dinas Pekerjaan Umum (Hrt)136