Standard Costs: Direct Labor and
Materials
Chapter Twelve
12 - 3
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Outline of Chapter 12Standard Costs: Direct Labor and Materials
• Standard Costs
• Direct Labor and Materials Variances
• Incentive Effects of Direct Labor and Materials Variances
• Disposition of Standard Cost Variances
• The Costs of Standard Costs
12 - 4
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Connection to Other Chapters
Chapter 12 shows how standard costs and variances are used for decision control.
Chapter 4 discussed the decision control process.
Chapter 6 showed how budgets are used in decision control.
12 - 5
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Standard Cost
Definition: The expected cost that is reasonably required to achieve a given objective under specified conditions.
Used for Decision Management: • Standards can be better predictors of future costs than actual past
costs.• Can be used in product pricing, bidding, and outsourcing decisions.
Used for Decision Control:• Set performance expectations or benchmarks for the costs of products,
processes, or sub-components.• Variances from standards get attention of managers.
12 - 6
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Setting and Revising Standards
Setting standards depends on specialized knowledge.• Price standards from economic forecasts• Quantity standards from engineering studies
Choosing between tight and loose standards• Tight standards motivate higher performance (decision control).• Loose standards allow more discretion (decision management).
Standards are usually set once a year.• Frequent revision would reduce incentives to control costs.
12 - 7
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Target Costing
Target costing is a technique used for new product planning.
1. Market planners begin with selling price required to achieve a desired market share.
2. Selling price Desired profit = Total target cost
3. Assign portion of total target costs to marketing, engineering, and manufacturing departments.
4. Redesign product and techniques to achieve target.
12 - 8
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Purpose of Variances
Variances measure the difference between actual and standard costs.
• Favorable (F) variance, if actual < standard• Unfavorable variance, if actual > standard
Decision control• Variances alert managers to deviations from plan.• Performance rewards may be based on minimizing variances.
12 - 9
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Variance Computation
Symbols: T= Total; A = Actual; S = Standard; P = Price; Q = Quantity
Total Variance = Actual Cost minus Standard cost
TV = (AQ AP) - (SQ SP)
= (AQ AP) + [ - (SP AQ) + (SP AQ)] - (SQ SP)
= [(AQ AP) - (SP AQ)] + [(SP AQ) - (SQ SP)]
= [AQ (AP - SP)] + [(AQ - SQ) SP]
= PV + QV
Total Variance = Price Variance + Quantity Variance
See Self-Study problem.
12 - 10
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Direct Labor Variance
Symbols: a = Actual; s = Standard; H = Hours; W = Wage rate per hour
Total Flexible budget Totalactual based on standardcost actual input cost(Ha Wa) (Ha Ws) (Hs Ws) |_______________________| |______________________|
[Ha (Wa - Ws)] [(Ha - Hs) Ws]Wage variance Efficiency variance
|_________________________________________________| [(Ha Wa) (Hs Ws)]
Total labor variance
See Figure 12-1.
12 - 11
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Interpreting Direct Labor Variance
Large variances in either direction indicate performance is not as planned, due to either poor planning, poor management, or random fluctuation.
Unfavorable wage variance• Workers were not available at lower rates
Unfavorable wage variance with favorable efficiency variance• higher-paid workers performed work more efficiently
Favorable wage variance with unfavorable efficiency variance• lower-paid workers performed work less efficiently
12 - 12
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Direct Materials Variance - current use
In this case, no direct materials remain in ending inventories.
Total Flexible budget Totalactual based on standardcost actual use cost(Qa Pa) (Qa Ps) (Qs Ps) |_______________________| |____________________|
[Qa (Pa - Ps)] [(Qa - Qs) Ps] Price variance Quantity variance
|______________________________________________| [(Qa Pa) (Qs Ps)]
Total materials variance
See Figure 12-2.
12 - 13
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Direct Materials Variance - no current use
In this case, all purchased materials remain in ending inventories.
Recognize material purchase price variance at time of purchase rather than waiting until materials are used.
Qb = Actual quantity bought
Total Flexible budgetactual based oncost actual purchased(Qb Pa) (Qb Ps) |_______________________|
[Qb (Pa - Ps)] Price variance
See Figure 12-3.
12 - 14
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Direct Materials Variance - current and future use
Total actual Flexible budget basedcost on actual purchased(Qb Pa) (Qb Ps) |___________________________|
[Qb (Pa - Ps)] Price variance
Flexible budget based Total standardon actual use cost
(Qa Ps) (Qs Ps) |__________________________|
[(Qa - Qs) Ps] Quantity variance
Price variance recognized at time materials purchased.Quantity variance recognized at time materials are used.
12 - 15
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Timely Reporting of Materials Price Variance is Important!
• Managers can act quickly to mitigate or capitalize on price changes.
• For example, if a raw materials price rises, managers might want to use less of the more expensive material and more of the relatively less expensive material, if such a substitution is possible.
• And/or management might want to raise the selling price for the final products.
12 - 16
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Risk Reduction and Standard Costs
• Risk reduction is a service individuals are willing to buy from financial markets.
• Standard costs remove price and efficiency fluctuation from performance measures of downstream users.
• Downstream users bear less risk because they know the standard costs they will be charged in the future.
12 - 17
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Incentive Effects: Build Inventories
Rewarding purchasing managers for favorable direct materials price variances creates an incentive for them to buy large quantities when price discounts are offered for high-volume purchases.
Penalizing production managers for unfavorable labor efficiency variances encourages keeping labor busy producing more.
Mitigation of inventory building incentive• Charge purchasing department for cost of holding inventory.• Just-in-time (JIT) purchasing and production policies
12 - 18
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Incentive Effects: Externalities
Purchasing externalities on production• Purchase cheaper substandard materials.• Purchase price variance is favorable.• Unusable material results in unfavorable material quantity variance.
Production externalities on purchasing• Short lead times on requisitions lead to higher purchase prices.• Requesting special orders for materials leads to higher prices.
See self-study problem, part b.
12 - 19
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Incentive Effects: Discourage Cooperation
Evaluating performance evaluation on individual's variances• Emphasizes individual instead of team efforts• Reluctance to help others look good
Solution:• Base reward system on both individual and departmental
(team) variances.• Too much weight on teamwork can lead to shirking (free-rider
problem).
12 - 20
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Incentive Effects: Mutual Monitoring
Mutual monitoring• Method where managers or employees at the same level monitor
each other’s performance• Noninsulating allocations encourage mutual monitoring (see
Chapter 7)
Example when performance evaluation of both purchasing and production manager depends on both material price and quantity variances.
• Purchasing manager wants to help production manager become more efficient in material usage.
• Production manager wants to schedule requisitions to help purchasing manager buy materials at better prices.
12 - 21
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Incentive Effects: Satisficing
Satisficing behavior: Managers have incentives to achieve standard but go no further.
Firm value would increase if managers attempted• continuous improvement beyond standard• innovate to meet competitive threats
12 - 22
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Disposition of Standard Cost Variances
Alternatives for disposing (writing off) standard cost variances are similar to the alternatives for disposing of over/underabsorbed overhead (Chapter 9).
1. Writing all variances off to cost of goods sold (expense)
2. Allocating between costs of goods sold (expense) and work-in process and finished good inventory
3. Recalculating the cost of each job
The above alternatives are listed in order of increasing complexity.
12 - 23
McGraw-Hill/IrwinAccounting for Decision Making and Control, 5/e
© 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Cost of Maintaining Standard Cost System
Standard cost systems require• Detailed standards for each labor and material input• Updating for technological and price changes• Time to investigate and explain variances
Standard cost systems are less likely to be used when• Direct labor cost is a small portion of total cost• Rapid change in production processes or new product
introductions would require frequent revisions of standards