Standard Scaffold Details

Embed Size (px)

DESCRIPTION

Present standard scaffold details and designs.

Citation preview

Page 1: Standard Scaffold Details

_________________________________________________________

Standard Scaffold Details _________________________________________________________

OCTOBER 2010

ENGR SREEJIT RAGHU MEng (Hons) DIC ACGI MIStructE CEng MIEM IntPE (UK)

Page 2: Standard Scaffold Details

Standard Scaffold Details

2

Table of Contents 1. Scaffold Dimensions Summary......................................................................... 3 2. General Details .............................................................................................. 6 3. Independent Scaffold Details ........................................................................... 7 4. Putlog Scaffold Details .................................................................................... 8 5. Tying In Details.............................................................................................. 9 6. Roof Scaffold Edge Protection ........................................................................ 11

Page 3: Standard Scaffold Details

Standard Scaffold Details

3

1. Scaffold Dimensions Summary

Page 4: Standard Scaffold Details

Standard Scaffold Details

4

Member Section

Scaffold tubes 48.3 x 4.0 steel grade 235MPa and used scaffold tubes (FOS = 2.0)

Timber boards 225.0 x 38.0 timber C16

(max span 1.500m; min overhang 50mm; max overhang 152mm;)

Scaffold Not Sheeted or Sheeted With Pervious Sheeting 0% Impermeability (Debris Netting)

Activity Very light duty, inspection,

painting, stone cleaning, access;

General purpose, brickwork,

window fixing, rendering,

plastering;

Ledger span 2.800m 1.800m

Standard unbraced

height 2.200m 2.200m

Transom span 1.000m

(4 timber boards widths)

1.000m

(4 timber boards widths)

Ledger cross bracing

intervals Once every 2 standards Once every 2 standards

Tie vertical intervals Once every 2 lifts Once every 2 lifts

Tie horizontal intervals Once every ledger cross bracing

intervals

Once every ledger cross bracing

intervals

Façade bracing Once every elevation face

(on outer face only)

Once every elevation face

(on outer face only)

Timber board span Half of ledger span (1 putlog) Half of ledger span (1 putlog)

Number of lifts of

working platforms 26 lifts 20 lifts

For clarity, not all members

of each type shown.

Standard Unbraced Height

Ledger Span

Transom Span

Putlog

Ledger Cross Bracing Intervals

Tie

Vertical Intervals

Façade Bracing

Wind speed 21m/s with site in town >= 100km to sea.

Steel Base Plate

over Timber Sole

Plate 225.0 x 38.0

Single standard assumed.

Page 5: Standard Scaffold Details

Standard Scaffold Details

5

Scaffold Sheeted With Impervious Sheeting 100% Impermeability (Monarflex) Option 1

Activity Very light duty, inspection,

painting, stone cleaning, access;

General purpose, brickwork,

window fixing, rendering,

plastering;

Ledger span 1.500m 1.300m

Standard unbraced

height 2.200m 2.200m

Transom span 1.000m

(4 timber boards widths)

1.000m

(4 timber boards widths)

Ledger cross bracing

intervals Once every 2 standards Once every 2 standards

Tie vertical intervals Once every 2 lifts Once every 2 lifts

Tie horizontal intervals Once every ledger cross bracing

intervals

Once every ledger cross bracing

intervals

Façade bracing Once every elevation face

(on outer face only)

Once every elevation face

(on outer face only)

Timber board span Half of ledger span (1 putlog) Half of ledger span (1 putlog)

Number of lifts of

working platforms 6 lifts 6 lifts

Scaffold Sheeted With Impervious Sheeting 100% Impermeability (Monarflex) Option 2

Activity Very light duty, inspection,

painting, stone cleaning, access;

General purpose, brickwork,

window fixing, rendering,

plastering;

Ledger span 2.400m 1.800m

Standard unbraced

height 2.200m 2.200m

Transom span 1.000m

(4 timber boards widths)

1.000m

(4 timber boards widths)

Ledger cross bracing

intervals Once every standard Once every standard

Tie vertical intervals Once every 2 lifts Once every 2 lifts

Tie horizontal intervals Once every ledger cross bracing

intervals

Once every ledger cross bracing

intervals

Façade bracing Once every elevation face

(on outer face only)

Once every elevation face

(on outer face only)

Timber board span Half of ledger span (1 putlog) Half of ledger span (1 putlog)

Number of lifts of

working platforms 6 lifts 6 lifts

Page 6: Standard Scaffold Details

Standard Scaffold Details

6

2. General Details

Page 7: Standard Scaffold Details

Standard Scaffold Details

7

3. Independent Scaffold Details

Page 8: Standard Scaffold Details

Standard Scaffold Details

8

4. Putlog Scaffold Details

Page 9: Standard Scaffold Details

Standard Scaffold Details

9

5. Tying In Details

Page 10: Standard Scaffold Details

Standard Scaffold Details

10

Page 11: Standard Scaffold Details

Standard Scaffold Details

11

6. Roof Scaffold Edge Protection

Page 12: Standard Scaffold Details

Standard Scaffold Details

12

Page 13: Standard Scaffold Details

Standard Scaffold Details

13