7
Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT andard Submittal Cover Let

Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal

Embed Size (px)

Citation preview

Page 1: Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal

Standardizing Transportation Project Submittals to DNR

TeamJim Doperalski WDNRMike Halsted WDNRJanet Smith WisDOTTroy Stapelmann WisDOT

Standard Submittal Cover Letter

Page 2: Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal

Goal of Submittal Cover Letter

• Improve interagency communication

• Standardize submittal content

• Establish project review expectations

• Ensure project timelines are met

Page 3: Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal

Used for ALL DOT projects under Cooperative Agreement, including local roads, that need DNR review

When should this be used?

Page 4: Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal

Completed by : Anyone in need of DNR reviewIncluding:

1. REC/SWEC2. PDS 3. Planning4. Consultants5. Municipalities 6. (other)

Who should use this and who should submit it?

Submitted to DNR Liaison by:

1. REC (or assigns)2. Consultant Representing DOT3. Local Program4. Municipality (or assigns)

DNR acknowledges submittal via e-mail or phone

Page 5: Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal

DNR / DOT PROJECT REVIEW State of Wisconsin Department of Natural Resources (DNR) and Department of Transportation (WisDOT) DNR0002 7/2012

DNR Internet: http://dnr.wi.gov/ WisDOT Internet: http://www.dot.wisconsin.gov/

Dnr Liaison Dnr Region Dnr Address Dnr City, State Zip

Wisconsin Department of Transportation Division of Transportation Systems Development Region Address Region City, State, Zip

Inform WisDOT Regional Environmental Coordinator, if more than 45 days is needed.

Design Project ID

Project Highway

Review Request Date (m/d/yy)

Construction Project ID

Estimated Project Cost (range) to Construction Year

Project Name

Project Limits

County

Project On Tribal Land

Yes No Contact Name (first, mi, last)

Contact (Area Code) Phone Number

Section of Roadway Being Evaluated

Type of Review Requested

Initial Review Final Concurrence Scope Change

Other:

Document Type Environmental Assessment (EA) Environmental Report (ER) Programmatic Env Report (pER)

WisDOT Project Classification Bridge Rehabilitation Bridge Replacement Expansion Pavement Replacement Preventive Maintenance SHRM (state hwy rehab/maint) Recondition Reconstruction Resurface Safety

Other:

Work Involved Beam Guard Replacement Borrow and/or Waste Site Required Channel Change/Stream Relocation Clearing and Grubbing Culvert Replacement or Extensions Dredging Grading Fill Outside Toe of Slope Intersection Improvement Right of Way Acquisition Shoulder Work Storm Sewer

Other:

Storm Water Management (check all that apply) Trans 401 post construction requirements NPDES MS4/Urbanized Area TMDL Implementation Area

Page 6: Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal

DNR / DOT PROJECT REVIEW State of Wisconsin Department of Natural Resources (DNR) and Department of Transportation (WisDOT) DNR0002 7/2012

DNR Internet: http://dnr.wi.gov/ WisDOT Internet: http://www.dot.wisconsin.gov/

Dnr Liaison Dnr Region Dnr Address Dnr City, State Zip http://dnr.wi.gov/org/es/science/TransportationLiaisonStaff.pdf http://dnr.wi.gov/contact/ssbyregion.html

Wisconsin Department of Transportation Division of Transportation Systems Development Region Address Region City, State, Zip HTTP://WWW.DOT.STATE.WI.US/ABOUT/LOCATE/DTD.HTM

Inform WisDOT Regional Environmental Coordinator, if more than 45 days is needed.

Design Project ID

XXXX-XX-XX Project Highway

STH XX Review Request Date (m/d/yy)

MONTH DAY, YEAR Construction Project ID

XXXX-XX-XX

Estimated Project Cost (range)

XXX,XXX to X,XXX,XXX Construction Year

YEAR

Project Name

AS DESCRIBED IN FIIPS/CDR

Project Limits

FROM CTH X TO XXXX ROAD

County

COUNTY

Project On Tribal Land

Yes No Contact Name (first, mi, last)

JANE DOE

Contact (Area Code) Phone Number

XXX-XXX-XXXX

Section of Roadway Being Evaluated

Type of Review Requested

Initial Review (PREVIOUSLY CALLED INITIAL CONCURRENCE/COMMENTS) Final Concurrence Scope Change(ATTACH PREVIOUS DNR LETTER)

Other:

Document Type Environmental Assessment (EA) Environmental Report (ER) Programmatic Environmental Report (pER)

WisDOT Project Classification Bridge Rehabilitation Bridge Replacement Expansion Pavement Replacement Preventive Maintenance SHRM (state hwy rehab/maint) Recondition Reconstruction Resurface Safety

Other:

Work Involved Beam Guard Replacement Borrow and/or Waste Site Required Channel Change/Stream Relocation Clearing and Grubbing Culvert Replacement or Extensions Dredging Grading Fill Outside Toe of Slope Intersection Improvement Right of Way Acquisition Shoulder Work Storm Sewer

Other:

Storm Water Management (check all that apply) Trans 401 post construction requirements NPDES MS4/Urbanized Area TMDL Implementation Area

For more information and directions, please see the back of this form.

WisDOT Project Classification Bridge Rehabilitation: FDM 3-5-2 Bridge Replacement: FDM 3-5-2 Expansion: FDM 3-5-2 Pavement Replacement: FDM 3-5-2 Preventive Maintenance (PM): FDM 3-1-5 SHRM (State Hwy Rehab/Maint): Maint Manual 13.08 Recondition: FDM 3-5-2 Reconstruction: FDM 3-5-2 Resurface: FDM 3-5-2 Safety (HSIP): PMM 4-1-10

See WisDOT region storm water/erosion control engineer.

Page 7: Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal

Page 2 Project Description and Reason for Project: (Include copy of Concept Definition Report and preliminary plans indicating location and nature of work. List contingency construction year if applicable.)

This Wisconsin Department of Transportation, NW Region project involves routine maintenance for structure B-61-0054 (on State Highway 93 over the Trempealeau River), to be completed by a let construction contract (tied with state project 7130-01-70). [See attached project location map -Exhibit A.] The existing structure was constructed in 1977, on former County Highway A. It is not classified as structurally deficient or functionally obsolete. Routine maintenance of the structure is needed to correct problems that if left untreated will reduce the overall lifespan of the structure. The existing deck is smooth (little surface friction), with spalls and cracks. The concrete girder ends are cracked with rust staining. Both joints are leaking. Bearings are rust coated. The drainage inlets are low and present a traffic hazard.

The proposed project will address the maintenance concerns and provide a better driving surface, increasing safety for the traveling public. State Highway 93 is a long truck route, making it a critical link for the local and statewide economy. The project length is restricted to the structure and approaches (approximately 350 feet). The proposed work includes a concrete deck overlay, joint replacements, bearing replacements and girder repair (limited to girders at the abutments). [See record drawing -Exhibit B.] The approaches will be evaluated for concrete approach slabs. There will be no change to the waterway. Work under the structure is limited to at the abutments. There is no work proposed at any of the piers. The existing State Highway 93 cross-section will be maintained [see attached typical sections-Exhibit C]. Construction will either be staged under traffic or with traffic detoured onto County Road A and State Highway 95.

No impacts to wetlands are expected. There is no proposed fill, other than very minor blending of the shoulder material to match the minimally increased profile (approximately 1-inch) after the concrete deck overlay. Some minor roadway excavation at the abutments may be necessary to perform repairs. Best management practices will be required for protecting Trempealeau River for before, during & after construction. If wetlands are impacted it will be limited to temporary loss.