TECHNO-COMMERCIAL PROPOSAL FOR 450 KLD EFFLUENT TREATMENT PLANT
Following are the few salient features of our offer:
1. Our offer is for – Design, Detailed engineering, submission of detailed arch. General
arrangement drawings, Civil Construction, Supply of Electro mechanical Units &
Equipments, Erection and Commissioning.
2. Our technical proposal consists of Physical, Chemical and biological treatment process to
treat 450 KLD of effluent.
3. Proposed biological treatment is anaerobic followed by aerobic system i.e., UASB and ASP.
We proposed anaerobic system followed by BT and ASP to minimize Power consumption.
4. We considered standby arrangements for pumps, blower’s etc. to ensure continuous and
smooth plant operation.
5. For disinfection of treated Effluent we proposed Chlorination system.
6. At the time of detailed engineering, based on site conditions, location, technology and
other parameters there may be small changes/modifications in the process, sizes &
volumes of civil units, change of capacities or drives of electro mechanical equipments etc.
for the betterment of treatment process.
7. Following are the assumptions we have considered while preparing the offer and any
change may affect civil costing:
• Inlet to first unit is by gravity at NGL-0.00 or by pump
• Water, electricity, access road for heavy vehicle available to proposed ETP site.
• Soil Bearing Capacity is not less than 25 Tons/M2
• Soil type is not black cotton or loose. Water table is below 30 meters. No bailing of
water is required while excavation or no pile foundation required while construction.
• Soil type is not rocky or very hard and blasting not required.
• Suitable place is available for extra excavated soil for disposal near 50 meters lead.
2
TECHNICAL OFFER FOR
EFFLUENT TREATMENT PLANT
OF 450 KLD CAPACITY
3
SECTION -I
1.0. DESIGN DATA
I) FLOW : 450 m3/day.
II) SOURCE OF EFFLUENT : Effluent from Process & Washings
III) TREATMENT PLANT : 19 M3 / Hr.
CAPACITY
IV) RAW EFFLUENT CHARACTERISTICS :
Parameter
Unit
Value
pH - 4
TSS mg/lt. 10500
COD mg /lt. 33500
BOD mg /lt. 20350
TDS mg /lt. 27500
Oil & Grease mg /lt. 15
V) TREATED EFFLUENT CHARACTERISTICS :
Parameter
Unit
Value
pH -- 7.0 to 8.0
Suspended Solids mg/lt. < 30
COD mg /lt. < 250^
BOD 3 days at 27 0
C mg /lt. < 100
TDS mg /lt. < 2100^^
Oil & Grease mg /lt. < 10
^Inorganic TDS may interfere in the value of COD
^^If Inorganic TDS is < 2100 ppm in raw effluent.
VI) DESIGN OF ETP PROCESS
Proposed Effluent Treatment Plant will treat 450,000 liters per day waste water by
Physical, Chemical and Biological process.
Scheme for biological treatment is anaerobic treatment followed by aerobic treatment.
4
SECTION -II
2.0. CONCEPT OF UNIT OPERATIONS
I) CONCEPT FOR ETP
a. Good quality of treated water.
b. Under any circumstances stringent pollution control norms are met.
c. No threat for disposal.
d. To keep the environment clean & free from contamination.
e. In future, it is pre- requisite for ISO 14001 Certification / other appreciation’s.
f. Minimal electricity consumption, less chemical consumption with low
Operation & maintenance cost and less space.
g. Save the mother earth for future generations and fulfill social obligations.
II) PROCESS DESIGN
The process design involves Physical, Chemical and Biological processes.
PHYSICAL AND CHEMICAL PROCESS
Screening, Collection, Equalization, Neutralization, Clarification, Drying.
BIOLOGICAL PROCESS
Converting organic pollutant into harmless by-products with the help of Anaerobic and
Aerobic Microorganisms.
Flow sheet is enclosed for ready reference.
PROPOSED TREATMENT PROCESS SCHEME
Effluent coming from the factory shall be first screened through bar screen chamber.
Over from screen chamber collected in Oil & Scum removal tank. Mechanically Oil &
Scum shall be scraped from Oil & Scum removal tank. By gravity effluent over flow is
collected in Collection cum Equalisation Tank. Floating mixer shall be provided at
equalisation tank for mixing of effluents. From this unit effluent is transferred to Buffer
tank by pump. At Buffer tank suitable chemical solutions are added to neutralise the
effluent. From buffer tank effluent is sent to UASB by pumping. At buffer tank floating
mixer shall be provided for mixing.
5
BIOLOGICAL TREATMENT
UASB SYSTEM
From buffer tank effluent shall be pumped to Up flow Anaerobic Sludge Blanket Digester
(UASB). Major part of organic load shall be removed here. The anaerobic organisms will
degrade the high concentrated organic matter present in the effluent. In this digester
bacterial granules will be formed which is used as a medium for attachment of
microorganisms, which will in turn convert the complex organic matter into simple
compounds like methane gas, CO2 & H2O. On top of the digester-Gas Liquid Solid
separation system shall be provided.
Gas separately collected in Gas Holder and send to Boiler as a fuel. Excess gas will be
flared with Gas flare system. Necessary safety devises and instrumentation shall be
provided for UASB reactor. The overflow from UASB is sent to the Bio- tower-I.
BIO- TOWERS
Bio tower-I, II have designed as a roughening tower for organic matter reduction from
the influent. Bio tower is constructed with civil columns and beam supports. Bio tower
is filled with PVC structured Bio fill media. The overflow effluent from the UASB, is fed
to the top of the bio tower-I by gravity. At bio tower-I recirculation pumps are
provided to recirculate the effluent from bottom sump to top of the tower to maintain
the surface overflow rate required for the media. The media attached micro-organisms
will degrade the organic matter as BOD in the effluent. One part of the effluent from
recycling feed line is collected at the top of the Bio tower-II. Recycling pumps are also
provided at BT-II for recirculation and also transfer effluent to next unit i.e., Aeration
Tank. Excess biomass on the Bio-tower plastic media is automatically removed due to
the recirculation flow.
ASP SYSTEM
Activated Sludge Process comprises of Aeration tank followed by Secondary Clarifier,
which are, proposed to meet the requirements. In aeration tank organic load as BOD will
be degraded with the help of cultivated microbial culture. Constant Mixed Liquor
Suspended Solids (MLSS) will be maintained in aeration tank in definite proportions by
recycling the bio sludge trapped by the secondary clarifier. At aeration tank air is
supplied from air blower to supply oxygen for the microorganisms.
6
Recycling of bio-sludge from secondary clarifier will be done by non-clog, centrifugal,
semi open type continuous duty & suitable capacity sludge re circulation pump. The
overflow from secondary clarifier is collected in chlorine contact tank.
CHLORINE CONTACT TANK
In chlorine contact tank chlorine dosing system is provided to disinfect the harmful
pathogens present in water. Disinfected water from this unit is transferred to Dual
media filter by pumping.
DUAL MEDIA FILTER
As pre-treatment unit Dual Media filter (DMF) is provided before Activated Carbon
Filter. The effluent is pumped to DMF to remove suspended particles, turbidity. DMF is
in MS-EP construction with top and bottom dished ends. Operation of the DMF is
Manual.
ACTIVATED CARBON FILTER
Activated carbon filter shall be provided for reduction of Odor, smell & removal of
chlorine. ACF will have activated carbon granules and water will be passed through this
media. Odor and color will be trapped in the media.
SLUDGE TREATMENT
Excess sludge from Secondary clarifier shall be collected on Sludge Drying Beds for
sludge dewatering manually. Dewatered and dried sludge cakes shall be used as good
manure or for secured land filling.
7
SECTION -III
3.0. UNITS & EQUIPMENTS
3.1. CIVIL UNITS
Sr.
No.
Particulars
Quantity
1. Bar Screen Chamber One No
2. Oil & scum Removal Tank One No.
3. Equalization Tank One No.
4. Buffer Tank One No.
5. UASB One No.
6. Bio Tower Two Nos.
7. Aeration Tank One No.
8. Secondary Clarifier One No.
9. Chlorine Contact Tank One No.
10. Sludge Drying Bed Six Nos.
11. Panel room One No.
12. Foundations for Mechanical units/equipments Lot
13. Railing, Ladders, Cable Trenches, Earth pits, Puddle pipes &
miscellaneous Jobs
Lot
3.2. MECHANICAL UNITS / EQUIPMENTS
Sr.
No.
Particulars
Quantity
1. Bar Screen One No.
2. Oil & scum Scraper Mechanism One No.
3. ET - Effluent Transfer Pump (1W+1Sb) Two Nos.
4. Floating Mixer Two Nos.
5. Chemical Dosing System Two Nos.
6. UASB Feed Pump (1W+1Sb) Two Nos.
7. GLS system One Lot.
8. UASB Feed Distribution Grid One Lot.
9. Bio-fill media Lot.
10. BT Distribution Grid One No.
11. BT Recycling Pump (2W+2Sb) Four Nos.
12. Air Blower (2W+1Sb) Three Nos.
8
13. Air Diffusers and Grid One Lot.
14. Secondary Clarifier Mechanism One No.
15. Bio-sludge Recycling Pump (1W+1Sb) Two Nos.
16. Chlorine Dosing System One No.
17. Filter Feed Pump ( 1W+1Sb) Two Nos.
18. Dual Media Filter One No.
19. Activated Carbon Filter One No.
3.3. PIPING & FITTINGS
Sr.No.
Particulars
Quantity
1. Interconnecting Piping between all proposed ETP
units within battery limits with all necessary Valves &
other fittings.
Lot
3.4. ELECTRICAL WORKS
Sr.No.
Particulars
Quantity
1 MCC Panel board One No.
2 Electrical cabling from panel to units of ETP Lot
3 ETP earthing Lot
3.5. INSTRUMENTATION & SAFETY DEVICES
Sr.No.
Particulars
Quantity
1. Pressure Gauges Lot
2. Liquid Flow Meter One No.
3. Flame Arrester Two Nos.
4. Moisture Trap Two Nos.
5. Pressure Relief Valve Two Nos.
6. Gas Flare Stack One No.
9
3.6. OPTIONAL UNITS/EQUIPMENTS
Sr.No.
Particulars
Quantity
1. Gas Holder One No.
2. Gas flow Meter One No.
3. Gas Blower (1W+1Sb) Two Nos.
10
SECTION -IV
4.0. TECHNICAL SPECIFICATIONS FOR UNITS & EQUIPMENTS
4.1. CIVIL UNITS / WORKS
1. BAR SCREEN CHAMBER
Type : Rectangular
MOC : RCC M30
Volume : 0.60 M3
Quantity : One No.
2. OIL & SCUM REMOVAL TANK
Type : Rectangular
MOC : RCC M30
Volume : 12 M3
Quantity : One No.
3. COLLECTION & EQUALISATION TANK
Type : Rectangular / Square
MOC : RCC M30
Volume : 150 M3
Quantity : One No.
4. BUFFER TANK
Type : Rectangular / Square
MOC : RCC M30
Volume : 36 M3
Quantity : One No.
5. UASB REACTOR
Type : Circular
MOC : RCC M30
Volume : 1510 M3
Quantity : One No.
6. BIO-TOWERS
Type : Rectangular / Square
MOC : RCC M30
Area : 36 M2
Quantity : Two Nos.
11
7. AERATION TANK
Type : Rectangular / Square
Volume : 810 M3
MOC : RCC M30
Quantity : One No
8. SECONDARY CLARIFIER
Type : Circular
MOC : RCC M30
Volume : 90 M3
Quantity : One No.
9. CHLORINE CONTACT TANK
Type : Rectangular
MOC : RCC M30
Volume : 45 M3
Quantity : One No.
10. SLUDGE DRYING BEDS
Type : Square
MOC : BBM
Area : 30 M2
Quantity : Six Nos
11. MCC PANEL ROOM
Type : Square / Rectangular
Area : 20 M2
MOC : BBM
Quantity : One No.
12. FOUNDATIONS FOR ELECTROMECHANICAL UNITS
Type : Rectangular/Square/Circular
Quantity : Lot
13. PUDDLE PIPES, LADDERS, RAILING, MANHOLES, EARTH PITS, PIPING SUPPORTS &
CABLE TRENCHES ETC.
MOC : Ladders-MS, Railing-MS/GI, Puddle Pipes –
MS/uPVC
Painting : As required
Quantity : Lot
12
4.2. MECHANICAL UNITS
1. BAR SCREEN
Type : Manual
MOC : SS304
Size : Suitable to Civil Unit
Quantity : One No.
Application : Screening of floatable solids
Location : Screen Chamber
2. OIL & SCUM REMOVAL MECHANISM
Type : Semi Automatic & Scraping type
Rated Power : 0.5 HP
Quantity : One No.
Motorized trolley with four wheels anti friction bearing, travel to & fro on MS rails.
Having electrical limit switches on either side. Neoprene rubber skimmer plate.
Control panel consist of air break reversing contractors, timer etc. Push button cable,
flexible cable, drive consist of gear/ motor.
3. ET - EFFLUENT TRANSFER PUMP
Type : Centrifugal, Self priming
MOC : SS Internals with CI body
Capacity : 19 M3/Hr
Head : 10 Meters
Drive : 3.0 HP
Quantity : 2Nos (1 W + 1 S )
Application : For Effluent transfer to Buffer Tank
Location : At Equalization Tank
4. FLOATING MIXER
Type of mixer : Slow speed
Drive : 5 HP & 2 HP
MOC : SS
Quantity : Two Nos.
Application : For mixing
Location : At Equalization Tank &Buffer Tank
5. CHEMICAL DOSING SYSTEM
Type of tank : Cylindrical Vertical
MOC of tank : HDPE
Tank Capacity : 200 Liters
13
Pump capacity : 0 to 30 LPH
MOC of pump internals : PP/SS
Quantity : Two Nos.
Application : For Neutralization
Location : Near Buffer Tank
6. UASB FEED PUMP
Type : Centrifugal, Self priming
MOC : SS Internals with CI body
Capacity : 19 M3/Hr
Head : 12 Meters
Drive : 3.0 HP
Quantity : 2Nos (1 W + 1 S )
Application : Effluent Feed to UASB
Location : At UASB Reactor
7. GLS SYSTEM
Application : Gas Liquid, Solids separation
Location : UASB Reactor top
MOC : MS-FRP/MS-PU coating
Quantity : One Lot
8. UASB FEED DISTRIBUTION GRID
Type : Perforated, Piping distribution for effluent
MOC : uPVC
Quantity : One Lot
9. BIO FILLS
Location : Medium for Bacterial attachment due to
contact time of bacteria & effluent increases.
MOC : PVC
Specific Surface Area : 93 M2 / M
3
Void Ratio ( M2 / M
3 ) More than 97 %
Thickness 0.6 mm & 0.3 mm
Standard Dimensions 1200x 600 x 600 mm
Max. width of support 100 / 50 mm
Dry weight 20 kg / m3
Quantity Lot
10. BIO-TOWERS DISTRIBUTION GRID
Type : Perforated, Piping distribution for effluent
MOC : uPVC
14
Quantity : One Lot
11. BIO TOWERS RECYCLING PUMP
Type : Self priming , Centrifugal, non-clog, Semi-open
impeller
Capacity : 54 M3/Hr X 10 M Head
Drive : 5.0 HP (each) motor, 3 phase, 2900 rpm,
TEFC class ‘F’ insulation with IPP 55
protection, weather proof.
MOC : CI
Accessories : Fabricated MS base-plate, coupling guard ,
foundation bolts etc.
Quantity : Four Nos ( 2 W + 2 Sb)
12. AIR BLOWERS
Type : Twin lobe, Roots
Media Handled : Air
Air Flow : 450 M3/hr.
Delivery Pressure : 0.45 kg/cm2
Duty : Continuous
Cooling : Air Cooled
Motor HP : 15
Accessories : All accessories as per requirement
Quantity : Three Nos.(2W+1Sb)
Application : Providing air
Location : Near Aeration Tank
13. AIR DIFFUSERS & GRID
Type : Fine membrane type air diffuser
MOC : EPDM
Size : 67mm OD x 2000 mm length
Air flow-Max. : 16 M3/Hr.
Quantity : Lot
Application : Transferring the Oxygen to water in fine
bubbles.
Grid MOC : uPVC
Location : At Aeration Tank
14. SECONDARY CLARIFIER MECHANISM
Application : To scrap the settled sludge at the bottom of
clarifier & to collect sludge in center chamber.
Location : At Secondary Clarifier.
15
Size : Suitable to civil unit.
Access Bridge : The full span structural bridge with 1000 mm
width at center & 5 mm thick chequered plate
up to full length, with hand railing.
Motor : 0.5 H.P
Drive : Centre drive
Gear Box & Motor : Elicon /Crompton /Siemens
Scraping : MS – epoxy painted the center pipe having
two scraper arms with neoprene rubber
squeegees. The floor is scraped twice in
revaluation to collect sludge at the center.
Turn buckles to be provided with central shaft
for adjustment of scrapper slope.
Feed well
: MS-epoxy painted feed well, supported from
the bridge, with baffle plate.
Painting : All wetted parts will have one coat of epoxy
primer & two coats of epoxy paints. Above
water parts will have two coats of synthetic
enamel paint.
Quantity : One no.
15. BIO SLUDGE RECYCLING PUMP
Type : Self priming , Centrifugal, non-clog, Semi-open
impeller
Capacity : 19 M3/Hr X 10 M Head
Drive : 3.0 HP (each) motor, 3 phase, 2900 rpm,
TEFC class ‘F’ insulation with IPP 55
protection, weather proof.
MOC : CI
Accessories : Fabricated MS base-plate, coupling guard ,
foundation bolts etc.
Quantity : Two Nos ( 1 W + 1 Sb)
16. CHLORINE DOSING SYSTEM
Type of tank : Cylindrical, Vertical
MOC of tank : HDPE
Tank Capacity : 200 Liters
Quantity : One No.
Pump capacity : 0 to 10 LPH
MOC of pump : PP/SS
Quantity : One No.
Application : For Disinfection
Location : Near Chlorine Contact Tank
16
17. FILTER FEED PUMP
Type : Monoblock, Centrifugal
MOC : CI
Capacity : 22.5 M3/Hr
Head : 30 Meters
Drive : 5.0 HP
Quantity : 2 Nos (1 W + 1 S )
Application : Feed to Dual Media Filter
Location : Chlorine Contact Tank
18. DUAL MEDIA FILTER
Type : Vertical ,Cylindrical
MOC : MSEP
Feed Flow : 22.5 M3/Hr.
Size : Suitable
Media : Sand, Pebbles, Gravel, Anthracite
Quantity : One No.
Application : Removal of SS
Location : After Chlorine Contact Tank
19. ACTIVATED CARBON FILTER
Type : Vertical ,Cylindrical
MOC : MSEP
Feed Flow : 22.5 M3/Hr.
Size : Suitable
Media : Carbon
Quantity : One No.
Application : Removal of odor/color
Location : After DMF
4.3. PIPING & FITTNGS
1. INTER CONNECTING PIPING & FITTINGS
MOC : MS-C class – Pressure Lines / Above Water
Lines
uPVC-10Kg Pressure for Gravity Lines / Air Lines
/ Below Water Lines.
Painting : External protection for MS piping
Size : As required
Fittings : As required
Valves : Diaphragm/Butterfly
Quantity : Lot
17
4.4. ELECTRICAL WORKS
1. MCC PANEL
Type : Compartmental
MOC : 14 swg / 16 swg CRCA sheet
Painting : Painting and surface coating as required.
Size : As per design
Mounting : Floor mounting, cable entry at bottom/top with
back access
Incomer with : Ammeter, Volt meter, Digital type energy
meter
Quantity : One No.
2. ELECTRICAL CABLING
Type : Armored
MOC : Copper/Al
Size : As per design-suitable capacity
Quantity : One lot
3. EARTHING
Type : Wire/flat
MOC : GI wire/Flat,CU Plate
Quantity : One Lot
4.5. INSTRUMENTATION & SAFETY DEVICES
1. PRESSURE GAUGE
Location : Delivery side of pump
Application : Measure pressure of liquid
Make : Wika / H-Guru
Type : Dial /Bourdan
Dial Size : Suitable
Range : 0 to 4 kg / cm2
Quantity : Lot
2. LIQUID FLOW METER
Type : Electromagnetic
Application : To measure the flow
18
Flow range : 0 to 20 M3/Hr
Qty. : One No.
3. FLAME ARRESTOR
Quantity : Two Nos.
Application : To arrest flames
Location : Gas pipeline
Size : Suitable as per design
MOC : MS/SS
4. MOISTURE TRAP
Quantity : Two Nos.
Application : To trap the moisture
Location : Gas pipeline
MOC : MS epoxy
Size : Suitable as per design
Drain valve : To be provided
Process medium : Biogas
5. PRESSURE RELIEF VALVE
Quantity : Two Nos
Application : To relieve pressure
Location : Top of the Digester
Size : Suitable
MOC : CI
6. GAS FLARE STACK
Quantity : One No.
Application : To flare the biogas
Location : At one corner of ETP plant
MOC : MS-EP Basin with MS – C and SS pipe as flare
Size : Suitable as per design
Ignition System : Manual
19
4.6. OPTIONAL UNITS/ EQUIPMENTS
1. GAS HOLDER
Quantity : One No.
Size : Suitable
Application : To store the gas
Location : Near Digester
MOC : MS & RCC
2. GAS FLOW METER
Quantity : One No.
Flow : 200 M3/Hr.
Location : Feed to Boiler
3. GAS BLOWERS
Quantity : Two Nos. (1W+1Sb)
Medium Handled : Biogas
Gas Flow : 200 M3/hr.
Duty : Continuous
20
SECTION -V
5.0. ELECTRICAL LOAD LIST
SR.NO. UNIT / EQUIPMENT QTY. WORKING LOAD
HP
STAND BY LOAD
HP
1. Oil & Scum Mechanism One No. 0.5
2. ET - Effluent Transfer Pump Two Nos. 3.0 3.0
3. Floating Mixer-ET One No. 5.0
4. Floating Mixer-BT One No. 2.0
5. Chemical Dosing System Two Nos. 1.0
6. UASB Feed Pump Two Nos. 3.0 3.0
7. BT Recycling Pump Four Nos. 10.0 10.0
8. Air Blower Three Nos. 30 15
9. SC Mechanism One No. 0.5
10. Bio-sludge Recycling Pump Two Nos. 3.0 3.0
11. Chlorine Dosing System One No. 0.5
12. Filter Feed Pump Two Nos. 5.0 5.0
Total Working Load HP 63.5 HP ( 47.63 KW)
21
SECTION -VI
6.0 PERFORMANCE ON THE BASIS OF BOD
6.1. RAW EFFLUENT CHARACTERISTICS
PARAMETER UNIT VALUE
BOD Mg/lt. 20500
6.2. TREATED EFFLUENT CHARACTERISTICS
PARAMETER UNIT VALUE
BOD Mg/lt. < 100
6.3. STAGE WISE REDUCTION OF BOD
S. No. Treatment System BOD
% Reduction Mg/Lt.
Outlet
1 Raw Effluent -- 20500
a UASB Treatment
85 3075
b Aerobic Treatment
BT System
70 923
c Aerobic Treatment
ASP System
95 47
d Tertiary system - <30
22
SECTION -VII
7.0. LIST OF STANDARD MAKES
UNIT/ EQUIPMENT
MAKES
Fabricated items SAI
Air Diffusers Rehau ,Germany / SSI-USA/Nipon
Air Blower Everest /Kay/KPT/Usha
Motors Crompton/Siemens/Kirloskar
Effluent Pumps Johnson /Kirloskar
Dosing System SR Metering / E-Dose/Positive Metering
Piping uPVC- Supreme/Finolex/MS-Zindal/TATA
Biofills Cool deck / MM Aqua/ Equivalent
Panel Components Siemens / L & T/Schneider/Equivalent
Cables Fine cab/Polycab
Pressure Gauges H Guru/Waree
Level Switches Techtrol/Fisher
Flow meter Forbes Marshall /E & H
Valves Intervalve/ Omkar/BDK/Equivalent
23
SECTION -VIII
8.0. SCHEDULE OF EXCLUSIONS
• Plant/Area Lighting.
• Unloading of the equipments at your factory and transportation to the ETP Site/ Area.
• All consumable oil, grease, chemicals for testing and commissioning.
• Charging of electric panel. Wiring, lighting and other fixtures in panel room./sheds
• All apparatus, chemicals, materials and other necessary equipment required for
laboratory for analysis.
• Arrangements to bring the influent up to the battery limits of the treatment plant as
well as the treated effluent from the treatment plant to the final discharge.
• Water, electricity and other utilities at one centre point of ETP for Erection, Fabrication,
Testing and Commissioning.
• Water pipeline arrangement for dosing systems
• Skilled or unskilled Manpower, Tools & tackles, Operators, Chemicals, Oil & grease,
Nutrients and bacterial culture (cow dung) etc. required at the time of testing &
commissioning.
• Approach Roads, Internal Roads, Green belt development, Plant lighting, Security cabin,
Boundary walls, Fencing, Gate and other infrastructure facilities inside and outside the
ETP area
• Unloading, Safe Storage for our equipments
• Instrument air /Compressed air
• All utilities / consumables like chemicals, spares, steam, power, water as required to ETP
as per process requirement to be arranged to battery limit of the units/equipments
24
• All civil related works, tanks, foundations, cable trenches, piping support pedestals,
earth pits, earthing, Structural Design & drgs etc.(If civil construction work excluded
from our scope)
• Any change in flow & characteristics of effluent.
• Any supply which is not specifically mentioned as part of our offer.
25
SECTION - IX
9.0 TERMINATION POINTS
• Inlet to First Unit Bar Screen Chamber
• Outlet from Last Unit-ACF
• Sludge from Sludge Drying Beds
• Power supply & charging our supplied ETP panel
26
SECTION -X
10.0. PROJECT SCHEDULE -BAR CHART
Specific Confirmation on project execution schedule.
Time period provided to execute the proposed ETP is 150 days. This ETP project involves
different types of engineering activities with civil, mechanical and electrical works etc.
PROJECT EXECUTION PLAN
WORK OF ETP
TIME PERIOD
Site survey ,design drawings, approval etc. 30 Days
Civil Works
90 Days
Mechanical units/ equipments Delivery at
site
Erection of ETP
30 Days
Total –ETP Ready to commission
150 Days
27
SECTION -XI
11.0. PRICE, TERMS & CONDITIONS
PRICE : Price for Design, Detailed Engineering, Construction, Supply,
Erection, Testing & Commissioning of 450KLD Effluent Treatment
Plant as per the scope and specifications mentioned in our offer
on turnkey basis shall be:
- Civil Works : Rs.1,33,75,000/-
- Electro-mechanical Supplies : Rs. 1,36,85,000/-
- Service Jobs : Rs. 7,50,000/-
P&F : @ 2%
FREIGHT : Extra to be paid by client at actual
TAXES : VAT and Service tax extra as applicable at the time of billing.
INSURANCE : 0.5%
PAYMENT : 30 % as advance along with Purchase Order
10 % against drawings approval
55 % and applicable taxes against profarma invoice on prorata
basis for Electro-mechanical equipments and against RA bills for
Civil works- as per submitted billing schedule.
5% after commissioning of ETP or 60 days from the last date of
major supply at site.
DELIVERY : The delivery period will be 150 days time from the date of
receipt of Purchase Order along with advance and clear site to
start work.
VALIDITYOF : 30 days.
OFFER
WARRANTY : Mechanical:
28
12 Months from the date of testing or 15 months from the date of
last major supply at site whichever is earlier for any
manufacturing defects. Defect will be rectified. Not applicable for
normal wear and tear.
Process:
12 Months from the date of process commissioning
ERECTION & :
COMMISSIONING Suitable lodging, boarding and local conveyance to our engineers
to be provided for two persons.
FORCE MAJEURE : As applicable
EXTRA WORK : Any work not included as a part of our offer or scope shall be
deemed extra. Such works can be done by SEEPL with extra cost
with mutual agreement & understanding.
GENERAL : Any condition not specifically included could be discussed
and mutually agreed upon.
GENERAL TERMS AND CONDITIONS:
DELAY IN COMPLETION:
If the completion work is delayed beyond the contractual value date for reasons under your
control as listed out hereunder but not limited to them, we shall be entitled to suitable
readjustment in the period of completion by mutual consent and the contract will stand
amended to that extent.
a) Delay in approval of drawings/ specifications beyond a period of 7 days
from the date of submission by us.
b) Delay in inspection beyond the appointed date or delay in approval of
test certificates, whenever required, beyond a period of 7 days from the
date of submission by us.
c) Delay in release of dispatch clearance or hold up of work due to your
specific instructions or lack of instruction.
d) Delay in release of advance or progress payments due to us beyond 7
days from the date of bill submission.
e) Delay in arranging manpower, power, effluent, analysis, and water etc as
and when required.
f) Delay attributable to force Majeure conditions, more particularly detailed
under appropriate clause hereunder.
29
ERECTION &COMMISSIONING:
It will be the responsibility of the purchaser to make all the arrangements and provide all
facilities and materials for carrying out erection and pre-commissioning test, before the date of
readiness for such tests as intimated by us. In the event of delay on the part of purchaser in
making these arrangements including operators, water, power, effluent, analysis as per design
basis and consequent delay in erection or commissioning of equipment/ system, the purchaser
will release all such payment, which could have been due to us on erection/commissioning of
equipment/system. Any delay from client for arranging required facilities/materials more than
four weeks from the last major equipment supplied to site, client ahs to release all dues
against erection and commissioning to us.
OPERATING PERSONNEL
The purchaser will ensure that his operating personnel is made available before pre
commissioning to enable them witness all commissioning test and satisfy themselves about all
guarantee parameters.
ORDER CANCELLATION
The purchaser cannot cancel the purchase order without taking written consent from the
Supplier/contractor. For any reason order is cancelled by purchaser advance will be forfeited
and if there is any losses arises due to procurement or work progress at site suitable
compensation to be done by Purchaser.
PAYMENTS
The purchaser will ensure that payments released as per purchase order. Any delay is payments
against submitted bills or work progress Purchaser has to pay @18% interest on unsettled bill
amount on daily calculation basis.
DELAY
For any reason attributed to the Purchaser project delays more than three months from the
date of completion as per the purchase order, mainly due to delay in civil works or delay in
giving clearance for supplies or location finalization etc. Purchaser should amend and
compensate @ 1% increment on Total Price of the Purchase Order for every one month delay
to compensate the price escalations and overheads .
ACCEPTANCE OF THE TREATMENT PLANT
In case the plant is not commissioned after the supply within a period of 30 days due to the
non-availability of Effluent or any other reason. Whatsoever, the plant will be deemed as
successfully commissioned.
30
WAREHOUSING CHARGES
Should dispatches be delayed on our purchaser’s instructions or any other reason attributable
to purchaser, warehousing expenses shall be payable by the purchaser @ 2% of the
consignment value per month of part thereof.
EXCESS MATERIAL
Since we shall be sending to site a number of items in spare for smooth and uninterrupted
construction, erection and commissioning, such items which remain unused, will be our
property and will be removed by us as and when required.
PRICE BASIS & ESCALATIONS
Our commercial offer is based on present (the date of offer) market rate pricing for Steel,
Cement, Sand, Metal, Labor rates, Piping and electricals, Diesel etc. For any reason major
fluctuations or changes on any particular or total items change of price may impact the project.
Our price will be firm for the committed delivery period however any change due to the delay
of the project attributed to you to be compensating suitably with mutual understanding.
Any changes/amendments related to all taxes, duties and statutory requirements etc. area
applicable at actual at the time of billing.
Our technical offer and commercial offer with all terms, conditions etc should be part of the
Purchase order.