P.O. Box 800 8631 Rush Street Rosemead, California 91770 (626) 302-9645 Fax (626) 302-6396

Gary A. Stern, Ph.D. Managing Director, State Regulatory Operations

August 14, 2019

ADVICE 4036-E-A (U 338-E)

PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

SUBJECT: Supplemental to Advice 4036-E, Southern California Edison Company’s Attestation of Compliance with the Safety Requirements Checklist

PURPOSE

In response to the Public Advocates Office at the California Public Utilities Commission (Cal Advocates) recommendation that Southern California Edison Company (SCE) submit this supplemental advice letter to provide additional information on how SCE’s Priority Review Projects (PRPs) meets the Safety Requirements Checklist, SCE hereby submits this supplemental information to its attestation of compliance with the Safety Requirements Checklist, in compliance with Decision (D.)18-01-024. This advice letter supplements in part and does not change the substance of the original Advice 4036-E. BACKGROUND

On January 11, 2018, the California Public Utilities Commission (Commission or CPUC) issued D.18-01-024 (Decision), which approved PRPs proposed by the utilities and ordered the sponsoring utility for each PRP to submit a Tier 1 Advice Letter containing an attestation signed by the project manager describing efforts to comply with the Safety Requirements Checklist within 18 months after the Decision’s effective date.

SCE submitted its attestation of compliance with the Safety Requirements Checklist (Advice 4036-E) on July 11, 2019, in compliance with D.18-01-024. On July 21, 2019, Cal Advocates protested SCE’s Advice 4036-E (the Protest). In the Protest, Cal Advocates recommends that the Commission require SCE to submit a supplemental AL because it asserts that SCE’s description of efforts to comply with the Safety Requirements Checklist is too vague.

ADVICE 4036-E-A (U 338-E) - 2 - August 14, 2019

DISCUSSION

SCE did not object to Cal Advocates’ recommendation and, as such, submits this supplemental Advice Letter that provides additional detail describing how each of SCE’s PRPs meet the Safety Requirement Checklist and noting when requirements are not applicable to particular PRPs.

Please see Attachment A for SCE’s attestation of compliance with the Safety Requirements Checklist. Additional details describing how each of SCE’s PRPs meet the Safety Requirement Checklist is provided in Appendix A of that document.

As discussed in SCE’s attestation, SCE has complied with all applicable Safety Requirement Checklist requirements for its PRPs approved in D.18-01-024.

TIER DESIGNATION

Pursuant to General Order (GO) 96-B, Energy Industry Rule 5.1, and D.18-01-024 this advice letter is submitted with a Tier 1 designation.

EFFECTIVE DATE

This advice filing will become effective July 11, 2019, the same date requested as Advice 4036-E.

PROTESTS

SCE asks that the Commission, pursuant to GO 96-B, General Rule 7.5.1, maintain the original protest and comment period designated in Advice 4036-E and not reopen the protest period. The modifications included in this supplemental advice letter do not make substantive changes that would affect the overall evaluation of the advice letter.

NOTICE

In accordance with General Rule 4 of GO 96-B, SCE is serving copies of this advice filing to the interested parties shown on the attached GO 96-B and A.17-01-020 et al service lists. Address change requests to the GO 96-B service list should be directed by electronic mail to [email protected] or at (626) 302-4039. For changes to all other service lists, please contact the Commission’s Process Office at (415) 703-2021 or by electronic mail at [email protected].

Further, in accordance with Public Utilities Code Section 491, notice to the public is hereby given by filing and keeping the advice filing at SCE’s corporate headquarters. To view other SCE advice letters filed with the Commission, log on to SCE’s web site at https://www.sce.com/wps/portal/home/regulatory/advice-letters.

ADVICE 4036-E-A (U 338-E) - 3 - August 14, 2019

For questions, please contact Lisa Mau at (626) 302-3684 or by electronic mail at [email protected]

Southern California Edison Company

/s/ Gary A. Stern, Ph.D. Gary A. Stern, Ph.D.

GAS:lm:jm Enclosures

ADVICE LETTER S U M M A R YENERGY UTILITY

Company name/CPUC Utility No.:

Utility type:Phone #:

EXPLANATION OF UTILITY TYPE

ELC GAS

PLC HEAT

MUST BE COMPLETED BY UTILITY (Attach additional pages as needed)

Advice Letter (AL) #:

WATERE-mail: E-mail Disposition Notice to:

Contact Person:

ELC = ElectricPLC = Pipeline

GAS = GasHEAT = Heat WATER = Water

(Date Submitted / Received Stamp by CPUC)

Subject of AL:

Tier Designation:

Keywords (choose from CPUC listing):AL Type: Monthly Quarterly Annual One-Time Other:If AL submitted in compliance with a Commission order, indicate relevant Decision/Resolution #:

Does AL replace a withdrawn or rejected AL? If so, identify the prior AL:

Summarize differences between the AL and the prior withdrawn or rejected AL:

Confidential treatment requested? Yes NoIf yes, specification of confidential information:Confidential information will be made available to appropriate parties who execute a nondisclosure agreement. Name and contact information to request nondisclosure agreement/access to confidential information:

Resolution required? Yes No

Requested effective date: No. of tariff sheets:

Estimated system annual revenue effect (%):

Estimated system average rate effect (%):

When rates are affected by AL, include attachment in AL showing average rate effects on customer classes (residential, small commercial, large C/I, agricultural, lighting).

Tariff schedules affected:

Service affected and changes proposed1:

Pending advice letters that revise the same tariff sheets:

1Discuss in AL if more space is needed.

CPUC, Energy DivisionAttention: Tariff Unit505 Van Ness AvenueSan Francisco, CA 94102 Email: [email protected]

Protests and all other correspondence regarding this AL are due no later than 20 days after the date of this submittal, unless otherwise authorized by the Commission, and shall be sent to:

Name:Title:Utility Name:Address:City:State:Telephone (xxx) xxx-xxxx:Facsimile (xxx) xxx-xxxx:Email:

Name:Title:Utility Name:Address:City:State:Telephone (xxx) xxx-xxxx: Facsimile (xxx) xxx-xxxx:Email:

Zip:

Zip:

ENERGY Advice Letter Keywords

Affiliate Direct Access Preliminary StatementAgreements Disconnect Service ProcurementAgriculture ECAC / Energy Cost Adjustment Qualifying FacilityAvoided Cost EOR / Enhanced Oil Recovery RebatesBalancing Account Energy Charge RefundsBaseline Energy Efficiency ReliabilityBilingual Establish Service Re-MAT/Bio-MATBillings Expand Service Area Revenue AllocationBioenergy Forms Rule 21Brokerage Fees Franchise Fee / User Tax RulesCARE G.O. 131-D Section 851CPUC Reimbursement Fee GRC / General Rate Case Self GenerationCapacity Hazardous Waste Service Area MapCogeneration Increase Rates Service OutageCompliance Interruptible Service SolarConditions of Service Interutility Transportation Standby ServiceConnection LIEE / Low-Income Energy Efficiency StorageConservation LIRA / Low-Income Ratepayer Assistance Street LightsConsolidate Tariffs Late Payment Charge SurchargesContracts Line Extensions TariffsCore Memorandum Account TaxesCredit Metered Energy Efficiency Text ChangesCurtailable Service Metering TransformerCustomer Charge Mobile Home Parks Transition CostCustomer Owned Generation Name Change Transmission LinesDecrease Rates Non-Core Transportation ElectrificationDemand Charge Non-firm Service Contracts Transportation RatesDemand Side Fund Nuclear UndergroundingDemand Side Management Oil Pipelines Voltage DiscountDemand Side Response PBR / Performance Based Ratemaking Wind PowerDeposits Portfolio Withdrawal of ServiceDepreciation Power Lines

Attachment A