Operational SOP Doc. No. OPS.03.0710
Start Up the Evap System Version Number
Aug 23 2017 v1
Page 1 of 14
SAMPLE PROCEDURE ONLY – DO NOT USE FOR EQUIPMENT OPERATION
www.aps-online.net Applied Performance Strategies, Inc. (610) 987-4050
Purpose: To start the Evaporator System for normal operation.
Required PPE:
Safety Glasses
Hearing Protection
Steel Toed Shoes
Nitrile Gloves
Potential Hazards:
In the automatic mode the equipment may start without warning. Keep hands clear unless the unit is locked out in a safe condition.
Fall hazard exists on ladder and the raised platform. Use three-point contact when climbing up to or down from the platform.
The vessels, heat exchangers and piping for have hot surfaces which could cause burns. Avoid contact with these hot surfaces.
Reference Documents: None
Required Equipment & Materials:
• Startup process log sheet S-2536
• pH tester
Operational SOP Doc. No. OPS.03.0710
Start Up the Evap System Version Number
Aug 23 2017 v1
Page 1 of 14
SAMPLE PROCEDURE ONLY – DO NOT USE FOR EQUIPMENT OPERATION
www.aps-online.net Applied Performance Strategies, Inc. (610) 987-4050
Steps Key Points
Line up Cooling Tower Water Note: if the cooling tower is already in operation, proceed to the next section.
1. Turn CONTROL POWER Switch ON at the Main control panel.
2. Verify that Green CONTROL POWER light is lit.
3. Wait for HMIs to boot up.
4. Turn on Disconnect Switch for COOLING TOWER PUMP.
Operational SOP Doc. No. OPS.03.0710
Start Up the Evap System Version Number
Aug 23 2017 v1
Page 2 of 14
SAMPLE PROCEDURE ONLY – DO NOT USE FOR EQUIPMENT OPERATION
www.aps-online.net Applied Performance Strategies, Inc. (610) 987-4050
Steps Key Points
5. Turn on Disconnect Switch for COOLING TOWER FAN.
6. Press the START button on the CT Fan Controller to start the controller.
7. At the Concentrator HMI (Page 2) turn on the cooling tower water:
a. Turn on CONDENSER WATER PUMP.
b. Turn on COOLING TOWER PUMP.
c. Turn on COOLING TOWER (fan).
a.
b.
c.
Operational SOP Doc. No. OPS.03.0710
Start Up the Evap System Version Number
Aug 23 2017 v1
Page 3 of 14
SAMPLE PROCEDURE ONLY – DO NOT USE FOR EQUIPMENT OPERATION
www.aps-online.net Applied Performance Strategies, Inc. (610) 987-4050
Steps Key Points
Start the Seal Water System Note: if the seal water system is already in operation, proceed to the next section.
8. At the Stripper HMI (Page 2) turn on the WATER SEAL PUMP.
9. Verify water seal return flow to tank.
10. Inspect stripper system pumps for seal water leaks.
Flow should be visible here
Operational SOP Doc. No. OPS.03.0710
Start Up the Evap System Version Number
Aug 23 2017 v1
Page 4 of 14
SAMPLE PROCEDURE ONLY – DO NOT USE FOR EQUIPMENT OPERATION
www.aps-online.net Applied Performance Strategies, Inc. (610) 987-4050
Steps Key Points
Start Up the Evap System
11. Remove and inspect filter screen.
12. Clean screen if any debris or foreign material is found.
13. Open Recovery Water Valve.
Operational SOP Doc. No. OPS.03.0710
Start Up the Evap System Version Number
Aug 23 2017 v1
Page 5 of 14
SAMPLE PROCEDURE ONLY – DO NOT USE FOR EQUIPMENT OPERATION
www.aps-online.net Applied Performance Strategies, Inc. (610) 987-4050
Steps Key Points
14. At the Stripper HMI (Page 1) Start the FEED PUMP.
15. Wait 10 seconds before proceeding.
16. Start the 1ST EFFECT EXTRACT PUMP.
17. Start the 2nd EFFECT EXTRACT PUMP.
Operational SOP Doc. No. OPS.03.0710
Start Up the Evap System Version Number
Aug 23 2017 v1
Page 6 of 14
SAMPLE PROCEDURE ONLY – DO NOT USE FOR EQUIPMENT OPERATION
www.aps-online.net Applied Performance Strategies, Inc. (610) 987-4050
Steps Key Points
18. Verify that the vacuum break valve is closed.
19. At the Stripper HMI (Page 2) Start the VACUUM PUMP.
20. Start the ESSENCE VACUUM PUMP.
Operational SOP Doc. No. OPS.03.0710
Start Up the Evap System Version Number
Aug 23 2017 v1
Page 7 of 14
SAMPLE PROCEDURE ONLY – DO NOT USE FOR EQUIPMENT OPERATION
www.aps-online.net Applied Performance Strategies, Inc. (610) 987-4050
Steps Key Points
21. Verify that system is building vacuum. Gauge should read at least 10 inHg. Before continuing to the next step.
22. Start the HOT WATER PUMP at the Evap System HMI.
23. Verify that injection water supply valve is open.
24. Visually inspect heat exchanger for leaks.
Operational SOP Doc. No. OPS.03.0710
Start Up the Evap System Version Number
Aug 23 2017 v1
Page 8 of 14
SAMPLE PROCEDURE ONLY – DO NOT USE FOR EQUIPMENT OPERATION
www.aps-online.net Applied Performance Strategies, Inc. (610) 987-4050
Steps Key Points
25. Set injection spray water valve to 45-degree position as shown.
26. Open spray heater water supply valve.
27. Prime the fluid column to ensure there is a level visible in the sight glass.
Sight Glass
Operational SOP Doc. No. OPS.03.0710
Start Up the Evap System Version Number
Aug 23 2017 v1
Page 9 of 14
SAMPLE PROCEDURE ONLY – DO NOT USE FOR EQUIPMENT OPERATION
www.aps-online.net Applied Performance Strategies, Inc. (610) 987-4050
Steps Key Points
28. At the Stripper HMI (Page 1) Start the condensate and extract pumps:
a. 1ST EFFECT COND PUMP
b. 2ND EFFECT COND PUMP
c. SPRAY HEATER EXTRACT PUMP
d. CONDENSOR EXTRACT PUMP
e. ESSENCE COND PUMP
29. Open steam supply valve to hot set.
a. b. c. d. e.
Operational SOP Doc. No. OPS.03.0710
Start Up the Evap System Version Number
Aug 23 2017 v1
Page 10 of 14
SAMPLE PROCEDURE ONLY – DO NOT USE FOR EQUIPMENT OPERATION
www.aps-online.net Applied Performance Strategies, Inc. (610) 987-4050
Steps Key Points
30. Open condensate valve to drain water from the system
31. Close valve when only steam is present.
32. Open steam supply valve (Chain Operated).
Operational SOP Doc. No. OPS.03.0710
Start Up the Evap System Version Number
Aug 23 2017 v1
Page 11 of 14
SAMPLE PROCEDURE ONLY – DO NOT USE FOR EQUIPMENT OPERATION
www.aps-online.net Applied Performance Strategies, Inc. (610) 987-4050
Steps Key Points
33. Open condensate valve to drain water from the system
34. Close valve when only steam is present.
35. Adjust STRIPPER STEAM SUPPLY PRESSURE setpoint to 20 PSI:
Touch to bring up
keypad for entry.
Operational SOP Doc. No. OPS.03.0710
Start Up the Evap System Version Number
Aug 23 2017 v1
Page 12 of 14
SAMPLE PROCEDURE ONLY – DO NOT USE FOR EQUIPMENT OPERATION
www.aps-online.net Applied Performance Strategies, Inc. (610) 987-4050
Steps Key Points
36. Turn STEAM VALVE on.
37. Open the manual inlet valve to balance tank.
38. Adjust flow rate and 1st stage vacuum to as needed to achieve desired brix.
Operational SOP Doc. No. OPS.03.0710
Start Up the Evap System Version Number
Aug 23 2017 v1
Page 13 of 14
SAMPLE PROCEDURE ONLY – DO NOT USE FOR EQUIPMENT OPERATION
www.aps-online.net Applied Performance Strategies, Inc. (610) 987-4050
History of Revisions
Revision Number
Revision Date
Revised By Reason for Revision