Upload
dotstats
View
222
Download
0
Embed Size (px)
Citation preview
8/9/2019 State Measures Synthesis - 2010
1/40
2010
DOT State Statshttp://members.mtkn.org/measures
Data and Measure Synthesis
8/9/2019 State Measures Synthesis - 2010
2/40
Note
This synthesis contains an index of facts that are tracked by State Departments of Transportation.
Direct citations are provided. Some State DOTs collect data for performance reasons, while
others do so to better communicate with the public. Information quality, then, varies according to
source.
Table of Contents
Alabama........................................................................................................................................... 1
Alaska .............................................................................................................................................. 1
Arkansas .......................................................................................................................................... 2Arizona ............................................................................................................................................. 2California.......................................................................................................................................... 3
Colorado .......................................................................................................................................... 3
Connecticut...................................................................................................................................... 5Delaware.......................................................................................................................................... 6
Florida.............................................................................................................................................. 7
Georgia ............................................................................................................................................ 8
Idaho................................................................................................................................................ 9
Indiana ........................................................................................................................................... 10
Iowa ............................................................................................................................................... 10
Illinois............................................................................................................................................. 12
Kansas........................................................................................................................................... 12
Louisiana ....................................................................................................................................... 13
Maine ............................................................................................................................................. 13
Maryland ........................................................................................................................................ 15
Massachusetts............................................................................................................................... 16
Michigan ........................................................................................................................................ 17
Minnesota ...................................................................................................................................... 18
Mississippi ..................................................................................................................................... 19
Missouri ......................................................................................................................................... 19
Montana......................................................................................................................................... 19
Nebraska ....................................................................................................................................... 22
Nevada .......................................................................................................................................... 23
New Hampshire ............................................................................................................................. 23
New Mexico ................................................................................................................................... 24
North Carolina................................................................................................................................ 25
8/9/2019 State Measures Synthesis - 2010
3/40
North Dakota.................................................................................................................................. 26
Ohio ............................................................................................................................................... 26
Oregon........................................................................................................................................... 27
Pennsylvania ................................................................................................................................. 28
Rhode Island.................................................................................................................................. 29South Carolina ............................................................................................................................... 29
South Dakota ................................................................................................................................. 30
Texas ............................................................................................................................................. 30
Utah ............................................................................................................................................... 31
Vermont ......................................................................................................................................... 32
Virginia........................................................................................................................................... 32
Wisconsin ...................................................................................................................................... 33
Washington State .......................................................................................................................... 34
West Virginia.................................................................................................................................. 36
Wyoming ........................................................................................................................................ 36
8/9/2019 State Measures Synthesis - 2010
4/40
P a g e | 1Alabama
Source:
Ninety-Eighth Annual Report, 2009
http://tinyurl.com/3xlflub
Public road mileage
Public lane mileageAnnual vehicle miles traveledAnnual vehicle miles traveled on the state systemRoad miles under maintenance by Division, type of surfaceTotal functionally obsolete bridgesTotal structurally deficient bridgesTotal contracts awardedTotal right of way parcels acquiredFunds expended on construction and maintenanceNumber of contracts and amount awardedTotal fiscal receiptsTotal fiscal expendituresTotal gallons of fuel taxed
Principal and interest paid on highway bondsTotal equipment purchasesTotal equipment salesTotal personnel separations and appointments
Source:
Planning and Performance Report, 2010
http://tinyurl.com/lsvsha
Miles of state highwayNumbers of bridge structuresAverage IRI for the state's roadway system in inches per milePercent of roadway miles with an IRI of 120 or greater in percent of milesAverage bridge condition for the state's bridge system, weighted average rating
Percent of bridges with a condition rating of 4.99 or worseLevel of funding for Surface Transportation Improvement and Preservation ProgramNumber of departmental employeesPercent of administration expenditures to total expendituresPercent of FTEs in administration to total FTEsNumber of publicly owned airportsPercent of aviation projects recommended for state matching fundsNumber of aviation FTEs
Alaska
Planning and Performance Reports, 2009
Source: Not available online
Fatality rate per 100 million miles traveledPercent of road lane miles that meet standardsSquare footage of structurally deficient bridge deck areaPercent of construction contract funding advertised by April 30thPercent of administrative and engineering costs to total project costsNumber of work-related injuries/injury rate per 100 employeesPercent of DOT and PF employees completing required safety trainingCustomer satisfaction (very satisfied and somewhat satisfied)
http://tinyurl.com/3xlflubhttp://tinyurl.com/3xlflubhttp://tinyurl.com/3xlflubhttp://tinyurl.com/lsvshahttp://tinyurl.com/lsvshahttp://tinyurl.com/lsvshahttp://tinyurl.com/lsvshahttp://tinyurl.com/3xlflub8/9/2019 State Measures Synthesis - 2010
5/40
P a g e | 2Percent change in number of airports that are closed seasonallyNumber of resource development road projects actively being designed or constructedGovernment sector customer satisfactionDollar value of deferred maintenance needs
Source:
Planning and Performance Reports, 2010
http://tinyurl.com/lsvsha
Miles of state highwayNumbers of bridge structuresAverage IRI for the state's roadway system in inches per milePercent of roadway miles with an IRI of 120 or greater in percent of milesAverage bridge condition for the state's bridge system, weighted average ratingPercent of bridges with a condition rating of 4.99 or worseLevel of funding for Surface Transportation Improvement and Preservation ProgramNumber of departmental employeesPercent of administration expenditures to total expendituresPercent of FTEs in administration to total FTEsNumber of publicly owned airports
Percent of aviation projects recommended for state matching fundsNumber of aviation FTEs
Arkansas
Source:
Annual Report, 2008
http://tinyurl.com/m2v24u
Department workforce by percent genderDepartment workface by percent minorityNumber of contracts awarded
Arizona
Source:
Comprehensive Annual Financial Report, 2009
http://tinyurl.com/29dqcbc
Condition level of roadsEstimated to actual expenditures by yearCondition level of bridgesPercentage of state bridges by decade builtChange in net assetsFund balances of governmental fundsExpenditures of federal awardsNet assets by component
Highway user revenue fund collectionsHighway user revenue fund distributionsFuel tax ratesRatios of outstanding debt by typeNumber of vehicle registrations by yearVehicle registrations per year compared to fuel salesAppropriated full time equivalentsTotal public road mileage by highway class and governmental ownershipDaily vehicle miles traveled with population data
http://tinyurl.com/lsvshahttp://tinyurl.com/lsvshahttp://tinyurl.com/lsvshahttp://tinyurl.com/m2v24uhttp://tinyurl.com/m2v24uhttp://tinyurl.com/m2v24uhttp://tinyurl.com/29dqcbchttp://tinyurl.com/29dqcbchttp://tinyurl.com/29dqcbchttp://tinyurl.com/29dqcbchttp://tinyurl.com/m2v24uhttp://tinyurl.com/lsvsha8/9/2019 State Measures Synthesis - 2010
6/40
P a g e | 3California
Source:
Caltrans Performance Measures, 2010
http://tinyurl.com/2d25sxj
Fatalities per 100 million vehicle miles traveled (MVMT) on the California state highway system
Number of work-related fatalities in a calendar yearPercent of major incidents cleared in less than 90 minutesTotal ridership on the State-supported intercity railProject approval and environmental document (PA/ED) percent of projectsRight of way (R/W) certification percent of projectsReady to list (RTL) percent of projectsConstruction contract acceptance (CCA) percent of projectsCooperative agreements percent executed within 60 days of headquarters' approvalPercent difference between total low bids and total of all engineer's estimatesPercent of projects with low bid within 10% of engineers estimatePavement condition percent of distressed lane milesFederal subvention formula funds obligated for local projects (on/off state highway system)Percent of payments made to vendors and other government agencies within the time limits
Request for Authorization to Proceed packages submitted by local agencies that are reviewedand processed by Caltrans and are ready for submittal to Federal Highway Administration(FHWA) Percent processed within 30 days of receiving the complete and accurate request
Percent of external survey respondents who said Caltrans was doing a good or excellent job
Source:
California Transportation Quick Facts, 2008
http://tinyurl.com/2fs95fm
Total state highwaysTotal other public roadsTotal public roadsTotal number of bridgesTotal miles of Class I railroad trackage
Number of public use airportsTons of freight moved by railTons of freight moved by airShort tons moved by waterborne shipmentsNumber of cars registeredNumber of motorcycles registeredNumber of rail transit systemsAverage commute timePercent of commuters by modeTotal roadway travel in milesTotal annual rail and transit passengersNumber of air passengers enplaned and deplaned
Colorado
Source:
Annual Report, 2009
http://tinyurl.com/3a26cp6
Monthly estimated toll revenue vs. actualMonthly toll traffic volumesFiscal year actual revenueFiscal year actual appropriations
http://tinyurl.com/2d25sxjhttp://tinyurl.com/2d25sxjhttp://tinyurl.com/2d25sxjhttp://tinyurl.com/2fs95fmhttp://tinyurl.com/2fs95fmhttp://tinyurl.com/2fs95fmhttp://tinyurl.com/3a26cp6http://tinyurl.com/3a26cp6http://tinyurl.com/3a26cp6http://tinyurl.com/3a26cp6http://tinyurl.com/2fs95fmhttp://tinyurl.com/2d25sxj8/9/2019 State Measures Synthesis - 2010
7/40
P a g e | 4Fiscal year projected revenueFiscal year projected appropriationsTotal traffic fatalitiesTotal alcohol related traffic fatalitiesTotal percent alcohol related traffic fatalitiesTotal vehicle traffic fatalitiesTotal unbuckled traffic fatalitiesTotal motorcycle traffic fatalitiesTotal bicycle traffic fatalitiesTotal pedestrian traffic fatalitiesFatality rate per 100 million miles traveled
Source:
Annual Performance Report, 2009
http://tinyurl.com/372eyxf
Total cashes per 100 million vehicle miles traveledFatal crashes per 100 million vehicle miles traveledInjury crashes per 100 million vehicle miles traveledPercent of drivers and occupants using seatbelts
Alcohol-related fatal crashes as percent of all fatal crashesNumber of CDOT vehicle accidentsNumber of workers compensation claimsDollar amount of workers compensation claims (in millions)Striping, signs, signals and guardrail maintenancePercent bridge deck area in good and fair conditionPercent pavement in good and fair conditionOverall maintenance level of serviceRoadway surface maintenanceBridge maintenanceRoadside maintenanceEquipment, buildings and grounds maintenancePlanning and training maintenance workers
Roadside landscape maintenanceTunnel maintenanceMinutes of delay per traveler in congested state highway segmentsSnow and ice controlPercent of on-time performance for buses on the I-25 HOT lanesPercent of design projects meeting established schedulePercent of annual employee turnoverPercent of disadvantaged business enterprise (DBE) participation
Source:
Transportation Facts, 2010
http://tinyurl.com/29jvh2g
CDOT budget history in millions
State budget to transportation by percentFuel tax history by yearState motor fuel tax rates for Colorado and surrounding statesRelative value of motor fuel tax by yearRevenue (millions) vs. full-time equivalent (FTE) countState road condition history by percentCondition of state roads by functional classificationBridge conditions by functional classificationTotal bridges by functional classification
http://tinyurl.com/372eyxfhttp://tinyurl.com/372eyxfhttp://tinyurl.com/372eyxfhttp://tinyurl.com/29jvh2ghttp://tinyurl.com/29jvh2ghttp://tinyurl.com/29jvh2ghttp://tinyurl.com/29jvh2ghttp://tinyurl.com/372eyxf8/9/2019 State Measures Synthesis - 2010
8/40
P a g e | 5Cubic yards of road surface, concreteCubic yards of road surface, asphaltRoadway center line miles by regionDaily vehicles-miles traveled by regionDaily truck vehicle-miles by regionNumber of registered vehicles in ColoradoNumber of licensed drivers in ColoradoAverage annual percent change in VMTNumber of commercial airports
Connecticut
Source:
CTDOT Performance Measures 2010
http://tinyurl.com/35wu6af
Rate of annual highway fatalitiesPercent of seat belt usageNumber of motorcycle riders trainedPercent of roads with good ride quality
Number of bridge work items completedPercent of roadway bridges in good or better conditionMean distance between failures (rail)Mean distance between transit failures (buses)Average age of bus fleetPercent of airport pavement rated good or excellentNumber of rail passengersPercent of on-time rail performanceNumber of Bradley International Airport passengersRevenue generated from Bradley International Airport parkingCost savings from photo log usagePercent of statewide roadway network digitizedPercent of right of way purchases attained by agreement
Number of CT Transit passenger tripsAmount of recycled material used in projectsPercent of road network with traffic volumes greater than capacityAverage highway incident duration timeAverage highway incident response timePercent of funds expended for bicycle / pedestrian accessPercent of agreements executed in under 60 daysPercent of construction contracts awarded within 60 days of bid openingNumber of project closeoutsCT recovery: percent funds obligatedCT recovery: percent dollars expendedCT recovery: number of jobs created/sustainedCT recovery: percent of stimulus projects completed on time
Source:
Transportation Fast Facts, 2008
http://tinyurl.com/2evgq34
Average number of vehicles per householdTotal registered vehiclesAnnual miles of travel per vehicleAverage annual miles of travel per driverMiles of public roadsMiles of state roads
http://tinyurl.com/35wu6afhttp://tinyurl.com/35wu6afhttp://tinyurl.com/35wu6afhttp://tinyurl.com/2evgq34http://tinyurl.com/2evgq34http://tinyurl.com/2evgq34http://tinyurl.com/2evgq34http://tinyurl.com/35wu6af8/9/2019 State Measures Synthesis - 2010
9/40
P a g e | 6Miles of national highway system roadsMiles of interstate roadsDaily vehicle miles traveled in ConnecticutAverage daily tripsNumber of state and town bridges by functional classificationSpecial transportation fund revenues by sourceTotal number of rail assets by typeTotal number of bus assetsTotal number of commuter assesAnnual passenger trips by rail lineAnnual passenger trips by busNumber of passenger enplanementsNumber of passenger replacementsNumber of work zone crashes
Delaware
Source:
Transportation Performance Measures, 2010
http://tinyurl.com/3y7q9l7
Percent of Freedom of Information Act responses within 10-day standardDepartment bond ratingPercent pay as you go revenueDebt service coverage ratioNumber of participants attending public workshops and hearingsPercent of responses to inquiries within 10 working daysPercent of hiring process turnaround time from close of posting to offer equaling 45 daysPercent of the DOT staff attending at least one training sessionNumber of disadvantaged businesses employed on DelDOT contracts/agreementsPercent help desk calls resolved within 3 working daysPercent of critical applications availablePercent of preliminary traffic impact studies reviewed within 20 days
Percent subdivision plans reviewed within 60 days of receiptPercent properties needed for projects that are cleared by the plans, specifications, andestimates date
Percent equipment exceeding age and/or usage parametersPercent of time snowfall of 4 inches or greater removed within 24 hoursPercent of time wind and flooding cleanup within 48 hoursPercent of reduction of drainage work order backlogPercent CTF requests for estimates filled within 20 business daysPercent toll receipt collection and deposit accuracy ratePercent ETC market utilizationStatewide annual ridershipPercent on time fixed routePercent on time paratransitPercent of system-wide recovery ratio
Number of accidents per 100,000 milesPercent paratransit growthPercent of preventable accidents per monthNumber of worker's compensation claims per month leading to lost timePercent of projects advertised as scheduledPercent of construction projects completed on time as contractedPercent of construction projects completed with less than 10 percent overrunsPercent of bridges rated structurally sufficientNumber of curb ramps reconstructed per year to ADA standards
http://tinyurl.com/3y7q9l7http://tinyurl.com/3y7q9l7http://tinyurl.com/3y7q9l7http://tinyurl.com/3y7q9l78/9/2019 State Measures Synthesis - 2010
10/40
P a g e | 7Percent of environmental documents completed as scheduledPercent of utility documents completed as scheduledPercent of hot mix meeting acceptable quality standardsPercent of critical signal maintenance calls responded to and corrected in 24 hoursPercent of customers in administration office who wait less than 20 minutesNumber of days waiting time for CDL road testsNumber of days turnaround time in dealer sectionPercent annual audit rate for Tier I and II MF/SF licenseesPercent of retail stations inspected
Florida
Source:
Florida Performs, 2010
http://tinyurl.com/37aprss
Number of bridge inspectionsBridges contracted for repair or replacementPercentage of port containers inspectedNumber of lane miles added
Lane miles maintained on the state highway systemNumber of road miles under constructionNumber of toll transactionsPercent growth in delayRatio of transit ridership growth in population growthPercent of customers waiting 15 minutes or less for driver license servicePercent of driver license waiting 30 minutes or morePercent of road construction on timeAverage time to complete a road construction projectPercent of road construction projects within budget
Source:
Florida Transportation Indicators, 2010
http://tinyurl.com/2gx9ksl
Estimated populationPercent change in populationEstimated population by selected groupProjected future populationTotal registered vehiclesAnnual percent change in Florida registered vehiclesTotal licensed driversWeekly regular gasoline priceRegular gasoline price before taxesGasoline taxesMonthly gasoline salesRegular and total gasoline sales
Total Florida certified taxable gallonsVehicles miles traveled, monthly and annuallyVehicles miles traveled, percent changeAnnual VMT by functional classificationU.S. monthly VMTTotal transit boardings, monthly and annuallyAnnual Amtrak boardingsPercent change in Amtrak boardingsTotal commercial airline passengersTotal airline enplanements
http://tinyurl.com/37aprsshttp://tinyurl.com/37aprsshttp://tinyurl.com/37aprsshttp://tinyurl.com/2gx9kslhttp://tinyurl.com/2gx9kslhttp://tinyurl.com/2gx9kslhttp://tinyurl.com/2gx9kslhttp://tinyurl.com/37aprss8/9/2019 State Measures Synthesis - 2010
11/40
P a g e | 8Annual rail freight tonnageSeaport annual tonnageAnnual cargo at SIS airportsAnnual number of touristsAADT entering and leaving the state through common corridorsNumber of passengers at major portsCenterline mileage by functional classificationPercent change in centerline milesState highway lane milesLane miles by functional classificationStatewide daily person hours of delay on interstate systemPercent change in person hours of delay on interstate systemPercent of centerline miles congestedFatalities on public roadsFatalities by typeCrashes and resulting injuriesAlcohol related crashes and fatalitiesProducer price index for highway and street constructionValue of residential building permits issued in Florida
Source:
Performance and Production Review, 2009
http://tinyurl.com/ybjuh4w
The number of consultant contracts actually executed compared against the number plannedThe number of ROW projects certified compared to the number scheduled for certificationThe number of construction contracts actually executed compared against the number plannedThe number of local agency program consultant contracts actually executed compared against
the number plannedThe number of local agency program construction contracts actually executed compared against
the number plannedFor all construction contracts completed during the year, the percentage of those contracts that
were completed within 20 percent above the original contract time
For all construction contracts completed during the year, the percentage of those contracts thatwere completed at a cost within 10 percent above the original contract amountThe percentage of bridge structures on the state highway system having a condition rating of
either excellent or goodThe percentage of bridge structures on the state highway system with posted weight restrictionsThe percentage of lane miles on the state highway system having a pavement condition rating of
either excellent or goodAchieve a maintenance rating of at least 80 on the state highway systemThe number of lane miles of capacity improvement projects on the state highway system let
compared against the number plannedThe public transit ridership growth rate compared to the population growth rateOf the federal funds subject to forfeiture at the end of the federal fiscal year, the percent that was
committed by the departmentThe departments dollar amount of administrative costs as a percent of the total programAdopt a balanced work program and manage cash within the statutory requirementsThe annual dollar amount of MBE utilizationAverage amount of each toll transaction dedicated to covering operational costsThe revenue variance expressed as a percentage of indicated revenueThe number of SunPass transactions as a percentage of total transactions
Georgia
Annual Report, 2009
http://tinyurl.com/ybjuh4whttp://tinyurl.com/ybjuh4whttp://tinyurl.com/ybjuh4whttp://tinyurl.com/ybjuh4w8/9/2019 State Measures Synthesis - 2010
12/40
P a g e | 9Source:http://tinyurl.com/nzhtln
Rural area roadway milesUrban roadway milesTotal miles of public roadsTotal national highway system mileage
Total interstate mileageMiles of paved roads on the county and city systemsTotal available transportation revenue by sourceActive park and ride lotsPercent park and ride usageNumber of rural transit programsNumber of urban transit systemsNumber of rural vehicle transit milesNumber of rural passenger tripsNumber or urban vehicle milesNumber or urban passenger tripsMiles of class one railroad track mileageShort line track railroad mileageTotal railroad mileageTotal public and private airportsTotal public use airportsTotal private use airportsNumber of passengers at international airportsFiscal year expenditures by source
Idaho
Source:
Annual Accountability Report, 2009
http://tinyurl.com/2a7ujcg
Five-year fatality rate per 100 million vehicle miles traveled on the state highway system
Percent of pavement in good or fair conditionPercent of bridges in good structural conditionRatio of construction bids within budgetPercent of projects awarded in the year identified in the annual programTime elapsed between the date motor vehicle titles are requested by customers and the date the
titles are processed for mailingRatio of Internet transactions to the total transactions processed annually by the Division of Motor
Vehicles (DMV)
Source:
Facts and Figures, 2010
http://tinyurl.com/249f3gfLane miles by district
Centerline miles by districtFTE positions by departmentTotal budget by departmentTotal system lane milesTotal system centerline milesTotal bridgesTotal miles of rail linesTotal public airportsState fuel tax
http://tinyurl.com/nzhtlnhttp://tinyurl.com/nzhtlnhttp://tinyurl.com/nzhtlnhttp://tinyurl.com/2a7ujcghttp://tinyurl.com/2a7ujcghttp://tinyurl.com/2a7ujcghttp://tinyurl.com/249f3gfhttp://tinyurl.com/249f3gfhttp://tinyurl.com/249f3gfhttp://tinyurl.com/249f3gfhttp://tinyurl.com/2a7ujcghttp://tinyurl.com/nzhtln8/9/2019 State Measures Synthesis - 2010
13/40
P a g e | 10Total FTE positionsAnnual traffic fatalitiesCollision fatality rate per 100 million AVMTCollision injury rate per 100 million AVMTPercent seat belt use statewideTotal adopt-a-highway active groupsTotal scenic bywaysTotal rest areasNumber of unrestricted public-use airportsNumber of metropolitan planning agenciesNumber of rural transit providersRegistered motor vehicles and trailersMiles of railroadActive railroad crossingsRail shipments in tons
Indiana
Source:
Transportation Performance Metrics, 2009
http://tinyurl.com/koj2x6
General fund appropriations in dollarsNumber of FTE employeesState construction plan contracts awarded on time on quarterly scheduleState construction plan contracts awarded on budget on quarterly schedulePercentage of INDOT roads with an acceptable RQI (smoothness) rating
Iowa
Source:
Iowa Department of Transportation Performance Report, 2009
http://tinyurl.com/399e99k
Number of commercial vehicle safety inspectionsNumber of fraud investigations conductedNumber of motor carrier safety and hazardous materials (HM) regulation training sessions
providedNumber of new carrier reviews performedNumber of drivers placed on out-of-serviceNumber of commercial vehicles inspected transporting hazardous materialsNumber of fraudulent document detection training seminars providedPercent of life standard reviewed annuallyPercent completion of automated inventoryPercent completion of annual maintenance planPercent completion of capital and special projectsPercent of light fleet into service within time standard
Annual percentage of officers crash reports submitted electronicallyAnnual number of graduated drivers license/older driver classesPercent of IRP supplements filed electronicallyPercent of IFTA quarterly reports filed electronicallyPercent of oversized permit requests filed electronicallyPercent of customers satisfied with IT acquired workstations and laptopsPercent of time the site is available for access to IT resources during business hoursPercent of road use tax fund (RUTF) revenue to the PRF that is spent for DOT operationsPercent of IPPEs current as of June 30, 2008Percent of purchases deployed within 45 days of receipt
http://tinyurl.com/koj2x6http://tinyurl.com/koj2x6http://tinyurl.com/koj2x6http://tinyurl.com/399e99khttp://tinyurl.com/399e99khttp://tinyurl.com/399e99khttp://tinyurl.com/399e99khttp://tinyurl.com/koj2x68/9/2019 State Measures Synthesis - 2010
14/40
P a g e | 11Percent of approved mainframe and network system access (SA) documents completed withinthree work days from entry approvalPercent of time the network is availablePercent of cash flow resources borrowed from internal fundsPercent of classification requests (single position requests that do not require class studies or
class description changes) analyzed and a report of the classification analysis andrecommendation sent to appropriate division director within 45 calendar days of receipt of acomplete (all request requirements satisfactorily met) request
Percent of highway miles that meet or exceed a sufficiency rating of tolerable or aboveThe overall annual percent of all districts A and B highway miles returned to a reasonable, near
normal surface condition within 24 hours from the end of the winter stormThe overall annual percent of all districts C and D highway miles returned to a reasonable, nearnormal surface condition within three work days from the end of the winter stormRatio of annual program cost versus annual program cost estimateShoulder miles of new paved shoulders awarded for construction on the primary highway systemThe percent of total dollars paid to the total awarded amount for all contractsAverage pavement condition index (PCI) value for planning Class 1 (interstate)Average pavement condition index (PCI) value for planning Class 2 (commercial industrial
network)Percent of SI&A values for our bridge system that meets last years values
Number of new transportation research dollars securedPercent of non-committed right of way parcels returned to private, commercial, or public usesThe percent of programmed projects let for construction in the current fiscal yearAverage number of days taken to issue access permits (from receipt to date of issuance)Percent of rail miles capable of carrying heavy axle unit trainsPercent of airports that meet at least 75 percent of the facility and service objectives for their
functional rolesPercent of cities over 5,000 population with at least weekly scheduled transit access to health
facilities and groceriesPercent of airports that meet at least 75 percent of the facility and service objectives for their
functional rolePercent of Revitalize Iowas Sound Economy (RISE) projects that support jobs with wages thatmeet or exceed 110 percent of the average county wage rate
Large truck (semi-truck) vehicle miles of travelAutomobile vehicle miles of travelNumber of miles of trails for public useNumber of aviation cargo tons originated and terminated in IowaNumber of tons of rail freight originated and terminated in IowaNumber of tons of waterway freight originated and terminated in IowaNumber of enplanementsNumber of AMTRAK passengersNumber of transit passengers (ridership)Total transit revenue mileage
Source:
Results Iowa: Transportation, 2010
http://tinyurl.com/2g668k6
Shoulder miles of new paved shoulders awarded for construction on the primary highway systemNumber of acres of rural roadside area which have been disturbed by construction that are
seeded with native grasses and wildflowersRatio of wetlands replaced to wetland acres impacted by highway constructionPercent of all non-committed right-of-way parcels returned to private, commercial, or other public
usesPercent of highway miles that meet or exceed an acceptable sufficiency rating
http://tinyurl.com/2g668k6http://tinyurl.com/2g668k6http://tinyurl.com/2g668k6http://tinyurl.com/2g668k68/9/2019 State Measures Synthesis - 2010
15/40
P a g e | 12Illinois
Source:
A Tradition of Service Annual Report, 2009
http://tinyurl.com/24olqk9
Total airports
Total heliportsNumber of annual landing facility inspections by typeOccupant fatality rate to seat belt rateFront seat occupant restraint usage rate in IllinoisTotal library cost savingsSalt usage for lane mile plowedNumber of DBE certified firms by work category of serviceFederal and state DBE participation summaryTotal DBE awards by districtProjected transit and rail contracts to be administeredHow often IDOT can be trusted to do what is right on transportation issuesOverall IDOT public perception of performanceTotal licensed drivers
Number of passenger cars registeredTotal vehicle plate registrationsAnnual vehicle miles traveledAnnual gallons of fuel consumedTotal miles of highways and streetsTotal highway structures greater than 20 feetTotal railroad grade crossings
Kansas
Source:
Annual Report, 2010
http://tinyurl.com/34b3dl9
Estimated to annual construction costsTotal recovery act fundingRecovery act funding for state highwaysRecovery act funding for Kansas CityRecovery act funding for WichitaRecovery act funding for local governmentsRecovery act funding for transportation enhancementsRecovery act funding for urban transit providersRecovery act funding for rural transit providersSafety belt usage per yearFatality rate per 100 million peopleNumber of fatalitiesRoad miles in comprehensive transportation plan let to construction
Bridges in comprehensive transportation plan let to constructionPercentage within baseline of core comprehensive transportation plan budgetPercent of rural miles with sufficient shoulder widths for Class B Routes (average daily traffic of
5,100 vehicles)Percent rural miles with sufficient shoulder widths for Class C Routes (average daily traffic of3,800 vehicles)
Percent of urban highway miles congestedPercent of rural highway miles congestedTime required clear incidents in minutes
http://tinyurl.com/24olqk9http://tinyurl.com/24olqk9http://tinyurl.com/24olqk9http://tinyurl.com/34b3dl9http://tinyurl.com/34b3dl9http://tinyurl.com/34b3dl9http://tinyurl.com/34b3dl9http://tinyurl.com/24olqk98/9/2019 State Measures Synthesis - 2010
16/40
P a g e | 13Number of full time equivalent (FTEs)Annual percentage of vacancies in KDOTs positionsAnnual percentage of turnovers at KDOT - overall in highest conditionAnnual percentage of turnovers at KDOT - engineersPavement condition during CTP - percent of Interstate miles in highest conditionPavement condition during CTP - percent of Non-Interstate milesBridge condition during CTP - percent of bridges in good condition
Louisiana
Source:
Louisiana Performance Accountability System, 2011
http://tinyurl.com/39soy3y
Average number of vacant positionsTotal approved positionsVacancy rateTotal administration expendituresTotal construction expendituresTotal maintenance expenditures
Percent of administrative expenditures to construction/maintenance costsNumber of e-mail inquiries receivedNumber of e-mail inquiries responded to within three business daysPercentage of correspondence responded to within three business daysActual number of major customer service public outreach eventsNumber of events heldPlanned number of major customer service outreach eventsBridge operative cost per vehicleNumber of vehicles that crossed both waysTotal bridge overrating costPercentage of statewide significance miles in fair or higher conditionPercentage of interstate highway system miles in fair or higher conditionPercentage of national highway system miles in fair or higher condition
Percentage of regional highway system miles in fair or higher conditionBudget for TIMED bridge projectsBudget for TIMED road projectsExpenditures for TIMED bridge projectsExpenditures for TIMED road projectsOverall projects funds expended for TIMED bridge projectsOverall projects funds expended for TIMED road projectsNumber of rest area locations removed/improved in accordance with planThe percent of rest area locations removed/improved in accordance with planNumber of functionally obsolete structurally deficient bridgesPercent of Louisiana bridges that are classified as structurally deficient or functionally obsoleteTotal number of Louisiana bridgesNumber of projects delivered on timeNumber of projects delivered in annual program
Percentage of projects delivered on timeProject bid costsProject construction costsProject construction costs as a ration of bid costsNumber of annual engineering programsNumber of annual engineering programs that are outside 10 percent of the program budgetPercentage of annual engineering programs that are outside of 10 percent of the program budgetNumber of ownerships with clear titles acquiredNumber of ownerships with clear titles to be acquired
http://tinyurl.com/39soy3yhttp://tinyurl.com/39soy3yhttp://tinyurl.com/39soy3yhttp://tinyurl.com/39soy3y8/9/2019 State Measures Synthesis - 2010
17/40
P a g e | 14Percentage of ownerships with clear titles acquiredNumber of projects bidNumber of projects requiring rebidPercent of projects that required rebidNumber of addenda, postponements, and change orders recorded quarterlyNumber of projects processed quarterlyPercentage of ferry crossings not made during scheduled operating hoursTotal number of crossings not made due to operational downtime during a periodTotal number of scheduled crossings during a periodTotal ferry cost for previous periodTotal number of passengers for periodTotal operating costs per passengerPercentage of interstates that meet or exceed performance specificationsTotal miles of interstate roadwaysTotal miles of interstate roadways that pavement markings meet or exceed performancerequirementsPercentage of deficient non-interstate line miles re-stripedTotal non-interstate line miles that are deficientTotal non-interstate line miles that are re-stripedPercentage of new traffic signal installations / modifications completed and operational during the
fiscal year that was done within six months from the date the request was made to the dateoperationalTotal number of new/modified traffic signal requests during the fiscal yearTotal number of new/modified traffic signals completed and operational in less than six monthsduring the fiscal yearNumber of components of projects implementedPercentage of projects implemented for each fiscal yearTotal number of components of projects to be implementedAverage percent reduction in crash rates at all safety improvement project locationsPost-improvement crash rates for individual safety improvement project locationsPre-improvement crash rates for individual safety improvement project locationsNumber of elements implemented (i.e., completed or fully funded) in the current yearPercent of elements in the Louisiana Statewide Transportation Plan implemented (i.e., completed
or fully funded) in current yearTotal number of elements in the Louisiana Statewide Transportation SystemMiles of urban NHS that are in an un-congested conditionPercent of the urban NHS in un-congested conditionTotal miles of urban NHSMiles of urban IHS that are in an un-congested conditionNumber of fatalities current yearNumber of fatalities previous yearPercent reduction in annual fatality ratePercent pavement condition reported quarterlyPercentage of airports with Pavement Condition Index (PCI) above 70Total number of airportsTotal number of airports with PCI above 70
Number of additional participating parishes with matching shareNumber of participating parishes from previous yearTotal number of participating parishes - rural / urbanNumber of navigation projects completed in LouisianaNumber of navigation projects initiated in LouisianaReturn on state's investment (for each dollar of state investment)State's share of construction expendituresTotal construction expenditures (federal and state)Amount of funds for execution of the State Rail Infrastructure Improvement Program to besecured
8/9/2019 State Measures Synthesis - 2010
18/40
P a g e | 15Number of rail projects that are fundedRatio of number of rail projects initiated over the number of projects in rail programNumber of flood insurance policy holders with rate reductionPercentage of policyholders receiving insurance reduction
Maine
Maryland
Biennial Progress Report, 2009
Source: Not available online
Miles of the interstate system in good or better conditionMiles of principal and minor arterial highways that are not built to nationally accepted designstandardsMiles of highway major collectors that are not built to the departments state design standardsMiles reconstructed using state aid for minor collector highways in partnership with municipalitiesMiles of an even distribution of Remaining Service Life (RSL) for arterials and major collectorsNumber of bridges repaired or replaced creating an even distribution of Remaining Service Life(RSL)Biennial spending on transit
Biennial spending on passenger railBiennial spending of aviationBiennial spending on freight railBiennial spending on portsBiennial spending on bikes and pedestrian improvements
Source:
Annual Attainment Report on Transportation System Performance, 2010
http://tinyurl.com/39jhrwl
Transportation emissions reduction measures by typeTransportation-related emissions by region
Transportation-related greenhouse gas emissionsPercent of BWI Marshall customers rating the airport "good" or "excellent" on key servicesBWI Marshall crime rateNumber of repeat discrepancies in the annual FAA inspectionRate of airfield ramp incidents and accidents per 1,000 operationsAirline cost per enplaned passengerNon-airline revenue per enplaned passengerNumber of nonstop airline markets servedAverage truck turn-around time at Seagirt Marine terminalMPA compliance with the Maritime Transportation Security ActDredge material capacity remaining for harbor and bay maintenance dredgingRevenue versus operating expenseAcres of wetlands or wildlife habitat created, restored, or improved since 2000
International cruises using the Port of BaltimorePort of Baltimore foreign cargo and MPA general cargo tonnageTransit customer satisfaction ratingPercent of transit service provided on timesCustomer perceptions of safety on the MTA systemPreventable accidents per 100,000 vehicle milesOperating cost per passenger tripOperating cost per revenue vehicle mileTransit transportation emissions reduction measures by typeTransit travel demand management
http://tinyurl.com/39jhrwlhttp://tinyurl.com/39jhrwlhttp://tinyurl.com/39jhrwlhttp://tinyurl.com/39jhrwl8/9/2019 State Measures Synthesis - 2010
19/40
P a g e | 16Annual transit vehicle revenue miles of service providedAverage weekday transit ridershipOverall customer satisfaction of E-Z Pass customersPercent of toll transactions collected electronicallyBranch office customer visit time versus customer satisfaction rating for MVAPercent of homeland security real ID act benchmarks achievedAlternative service delivery transactions as percent of total transactionsCost per transactionCompliance rate and number of vehicles tested for vehicle emissions inspection program versus
customer wait timePercent of information system availability compared to total number of records maintainedMaryland driver satisfaction ratingPercentage of the Maryland SHA network in overall preferred maintenance conditionNumber and rate of bicycle and pedestrian fatalities and injuries on all Maryland roadsUser cost savings for the traveling public due to incident managementAcres of wetlands restored and miles of streams restoredTotal fuel usage of the light fleetPercentage of state owned roadway centerline miles within a bicycle level of comfort BLOC grade
"D" or better and mileage of SHA owned highways with marked bike lanesPercentage of state owned roadway centerline miles within urban areas that have sidewalks that
meet with ADA complianceAnnual number and rate of traffic fatalities and personal injuries on all roads in MarylandNumber of bridges and percent that are structurally deficientPercent of roadway miles with acceptable ride conditionPercent of freeway lane-miles and arterial lane-miles with average annual volumes at or above
congested levels
Massachusetts
Source:
MassDOT Aeronautics Scorecard, 2009
http://tinyurl.com/y8g2j3s
Goal: to spend at least 95% of Division of Aeronautics capital bond spending cap in fiscal year2010Goal: to register 2,500 airworthy aircraft by December 31, 2009Goal: to inspect all 37 public-use airports annually by December 31, 2009Goal: to collect $400,000 in revenue for the registration of airworthy aircraft by June 30, 2010
Source:
MassDOT Highway Scorecard, 2009
http://tinyurl.com/26fny98
Construction spending FY2003-presentAdvertising FY2004-presentAverage time of consultant procurement - 40 contract averageAdherence to time and budget schedules by period
Percentage of projects on timeCauses of internal construction project extensionsCauses of external construction project extensionsTotal structurally deficient bridgesNumber of deficient bridges added vs. deficient removed: August 2007 to presentBridge health index in percentNational in-state highway system by pavement serviceability indexPavement condition trends since 2003 by pavement serviceability indexPavement condition trends since 2003 by IRI indexTotal number of toll transactions by year
http://tinyurl.com/y8g2j3shttp://tinyurl.com/y8g2j3shttp://tinyurl.com/y8g2j3shttp://tinyurl.com/26fny98http://tinyurl.com/26fny98http://tinyurl.com/26fny98http://tinyurl.com/26fny98http://tinyurl.com/y8g2j3s8/9/2019 State Measures Synthesis - 2010
20/40
P a g e | 17Percent of electronic toll collections by year
Source:
MassDOT MBTA Scorecard, 2010
http://tinyurl.com/27aqbqe
Average daily vehicle availability, by bus line
Mean miles between failures, by bus lineSpeed restrictions: travel time impact, in minutes, by bus linePercent of scheduled service operated, by bus lineOn-time performance, by bus lineCommuter rail on-time performanceAverage bus daily vehicle availabilityPercent of bus scheduled service operatedBus trips operated and dropped by routeAverage weekday ridership in millionsRidership percentage change compared to the same month of the previous yearRidership breakdown by service typeNumber of bus accidents per 1,000 vehicle miles traveled by lineNumber of complaints by mode
Michigan
Source:
Performance Measures Report, 2009
http://tinyurl.com/yljekwy
Percent of all freeway bridges in good or fair conditionPercent of non-freeway bridges on the trunkline system in good or fair conditionNumber of trunkline structurally deficient bridgesPercent of trunkline pavements with an SSC rating of fair or betterPercent of trunkline pavements with an IRI of fair or betterPercent of trunkline high-railroad crossings in fair or better conditionPercent of Tier 1 airport runways in good condition
Number of daily train milesPercent of Michigan population within 100 miles of intercity bus serviceNumber of counties receiving financial assistance from MDOT for operating public transportationPercent of carpool lot pavements in good or fair conditionNumber of fatalities and serious injuries on all highways per yearNumber of fatalities and serious injuries on state trunklines per yearNumber of fatalities and serious injuries on local roadways per yearStatewide average time of return for safety projectsPercent of safety-funded projects on the state trunkline system that address one or more of the
focus areas of the statewide highway planPercent of employees who are educated about workplace hazardsNumber of intercity motor coaches that pass the annual inspection without requiring a re-
inspection
Total number of public road agencies set up with interoperability talk group channels with MDOTPercentage of program dollars spent on protective effortsPercent of route miles along corridors of national/international significance operating at an
acceptable level of serviceComposite airport facility evaluation scoreComposite airport access evaluation scoreGrowth in MichiVan ridership and number of vans in servicePercent of passenger terminals served by two or more modes of transportationPercentage of freeway closures
http://tinyurl.com/27aqbqehttp://tinyurl.com/27aqbqehttp://tinyurl.com/27aqbqehttp://tinyurl.com/yljekwyhttp://tinyurl.com/yljekwyhttp://tinyurl.com/yljekwyhttp://tinyurl.com/yljekwyhttp://tinyurl.com/27aqbqe8/9/2019 State Measures Synthesis - 2010
21/40
P a g e | 18Minnesota
Source:
Accountability Minnesota, 2010
http://tinyurl.com/2d2k4h6
Annual Minneapolis transit ridership in millions
Peak hour transit capacity in millionsMinnesota traffic fatalities on all state and local roadsPercentage of state highway bridges in good condition by principal arterials square footagePercentage good and poor pavement ridge quality by state principal arterial highwaysFrequency of achieving bare lanes (snow) within targeted number of hoursPercentage of greater Minnesota interregional corridor system performing within 2 mph of target
speed or fasterPercentage of Twin Cities urban freeway miles congestedGreater Minnesota bus service hoursPercentage of MnDOT projects put out for bid in the year planned
Source:
Annual Transportation Performance Report, 2009
http://tinyurl.com/366e2zp
Minnesota traffic fatalities all state and local roadsSerious injuries all state and local roadsAverage annual fatalities by typeThe percentage of state highway bridges in good or satisfactory condition, by principal arterialssquare footageThe percentage of state highway bridges in fair or poor condition, by principal arterials square
footagePercentage good pavement ride quality state principal and minor arterialsPercentage poor pavement ride quality state principal and minor arterialsPavement preservation spending in millionsFrequency of achieving bare lane within targeted number of hoursSnow and ice expenditures in millions
Percent of bridge safety inspections completed on timeBridge inspection expenditures in millionsBridge repair and maintenance expenditures in millionsCustomer satisfaction with state highway maintenanceMn/DOT road maintenance customer satisfaction ratings by areaNumber of destinations served by nonstop flights from MinnesotaTons of freight shipped on Minnesota waterwaysTotal port expenditures in millionsPercent of greater Minnesota IRC miles performing within 2 mph of average speed target or
fasterPercent of airport pavements in good or poor conditionState and federal grants to publically owned airports in millionsPercentage of Twin Cities urban freeway miles congested
Clearance time for urban freeway incidents, in minutesIncident response time comparison by responder typeAnnual express transit ridership in millionsGreater Minnesota bus service in millionsGreater Minnesota transit operating spending in millionsMinnesota rail service improvement program spendingTransportation fuel consumption in Minnesota in billions of gallonsMn/DOT gasoline and ethanol use in millions of gallonsMn/DOT light duty vehicle purchases
http://tinyurl.com/2d2k4h6http://tinyurl.com/2d2k4h6http://tinyurl.com/2d2k4h6http://tinyurl.com/366e2zphttp://tinyurl.com/366e2zphttp://tinyurl.com/366e2zphttp://tinyurl.com/366e2zphttp://tinyurl.com/2d2k4h68/9/2019 State Measures Synthesis - 2010
22/40
P a g e | 19Percentage of Mn/DOT projects put out for bid (let for construction) in the year scheduledMn/DOT construction program in millions
Mississippi
Source:
Annual Report, 2009
Missouri
http://tinyurl.com/2e6k2z2
Construction contracts awarded in dollarsMiles of highway resurfacedLane miles of highway sealedMiles of unpaved shoulder re-shapedMiles of pavement striping appliedTotal tractor trailers weighedTotal oversize permits weighedTotal motorized assetsTotal new DBE businesses certifiedTotal DBE firms recertifiedTotal fiscal receipts
Total fiscal disbursementsPercentage of expenditures by program
Source:
Tracker: Measures of Departmental Performance, 2010
http://tinyurl.com/28pw7yv
Average travel times on selected freeway sectionsAverage rate of travel on selected signalized routesAverage time to clear traffic incidentNumber of closures on major routesPercent of work zones meeting expectations for traffic flow
Time to meet winter storm event performance objectives on major and minor highwaysPercent of major highways in good conditionPercent of minor highways in good conditionPercent of vehicle miles traveled on major highways in good conditionPercent of bridges on major highways in good conditionPercent of bridges on minor highways in good conditionNumber of deficient bridges on the state system (major and minor highways)Percent of major bridges in good conditionNumber of fatalities and disabling injuriesNumber of impaired driver-related fatalities and disabling injuriesPercent of safety belt/passenger vehicle restraint useNumber of bicycle and pedestrian fatalities and disabling injuriesNumber of motorcycle fatalities and disabling injuries
Number of commercial motor vehicle crashes resulting in fatalities and injuriesNumber of fatalities and injuries in work zonesNumber of highway-rail crossing fatalities and collisionsNumber of nighttime crashesPercent of signs that meet customers expectationsPercent of stripes that meet customers expectationsPercent of overall customer satisfactionPercent of customers who contacted MoDOT that felt they were responded to quickly and
courteously with an understandable responsePercent of documented customer requests responded to within 24 hours
http://tinyurl.com/2e6k2z2http://tinyurl.com/2e6k2z2http://tinyurl.com/28pw7yvhttp://tinyurl.com/28pw7yvhttp://tinyurl.com/28pw7yvhttp://tinyurl.com/28pw7yvhttp://tinyurl.com/2e6k2z28/9/2019 State Measures Synthesis - 2010
23/40
P a g e | 20Average completion time on requests requiring follow upAverage completion time on constituent issues from federal and state elected officialsPercent of partner satisfactionPercent of earmarked dollars that represent MoDOTs high priority highway projectsNumber of dollars generated through cost-sharing and other partnering agreementsMoDOT national ranking in revenue per mileEconomic return from transportation investmentImpacts of job creation for selected industriesPercent of public support by transportation funding sourceNumber of jobs and businesses in freight industryNumber of external awards receivedNumber of innovative reports publishedNumber of new product evaluations completed and approved for useNumber of innovative technologies implemented during constructionNumber of innovative solutions implemented for maintenance operationsNumber of innovative revisions and dollars savedPercent of programmed project cost as compared to final project costPercent of projects completed within programmed amountPercent of projects completed on timePercent of change for finalized contracts
Average number of days it takes to go from local sponsor project programming to projectobligation
Percent of LPA projects completed within programmed amountPercent of LPA projects completed on timePercent of change for LPA finalized contractsCumulative savings due to cost containment since state fiscal year 2005Percent of completed project costs compared to the project estimate in the Environmental
DocumentPercent of customers who believe completed projects are the right transportation solutionsPercent of projects completed without environmental violationTons of carbon emissions from drivers on Missouri roadsMetric tons of CO2 generated from MoDOT activitiesNumber of tons of recycled material
Environmental improvement plan on maintenance facilitiesNumber of gallons of fuel consumedCost and usage of utilities for facilitiesCustomer satisfaction with non-motorized facilitiesADA transition plan progressPercent of minorities and females employedSeparation rates for minorities and femalesPromotion rates for minorities and femalesTrainees active, enrolled and graduated in the OJT programPercent of DBE participationNumber of non-construction solicitations sent to minority/women/disadvantaged business
enterprises and number of contracts awardedFreight tonnage by mode
Interstate motor carrier mileagePercent of satisfied motor carriersMissouri and Mississippi River waterborne freight tonnageNumber of airline passengersNumber of business-capable airportsBicycle and pedestrian activityNumber of transit passengersAverage number of days per week rural transit service is availableNumber of intercity bus stopsNumber of rail passengers
8/9/2019 State Measures Synthesis - 2010
24/40
P a g e | 21Number of passengers and vehicles transported by ferryboatState funding for multimodal programsPercent of customers satisfied with transportation optionsNumber of customers who participate in transportation-related meetingsPercent of customers who are satisfied with feedback they receive from MoDOT after offering
commentsMoDOT takes into consideration customers needs and views in transportation decision-makingPercent of positive feedback responses received from planning partners regarding involvement in
transportation decision-makingPercent of customers satisfied with rest areas convenience, cleanliness and safetyNumber of users of rest areasNumber of truck customers that utilize rest areasNumber of miles in Adopt-A-Highway programNumber of users of commuter parking lotsNumber of full-time equivalenciesSalaried employment levelsRate of employee turnoverLevel of job satisfactionNumber of lost workdaysRate and total of OSHA recordable incidents
Number of claims and amount paid for general liabilityFleet statusPercent of vendor invoices paid on timeDistribution of expendituresAccuracy of state and federal revenue projectionsNumber of excess properties conveyed and gross revenue generated from excess properties soldAverage cost per acre mowed and treatedAverage cost per square yard of chip sealDollars invested in information technology resourcesPercent of customers who view MoDOT as Missouris transportation expertNumber of engagements between Missouris congressional members, statewide elected officials
and legislatorsNumber of transportation-related legislative issues
Number of positive news reportsNumber of proactive communication efforts initiated specifically to advocate for key transportation
issuesNumber of public appearancesPercent of customers who feel MoDOT provides timely, accurate and understandable informationNumber of contacts initiated by MoDOT to mediaPercent of MoDOT information that meets the medias expectationsPercent of positive newspaper editorialsNumber of overall visitors to MoDOTs websiteNumber of customers engaged through social mediaRecovery Act projects and dollars awarded to dateRecovery Act funds obligated and expended to date by categoryRecovery Act project dollars awarded versus budget
Recovery Act direct jobs supportedPercent of Recovery Act ,multimodal project dollars obligated to date
Montana
Source:
Transportation Facts, 2008
http://tinyurl.com/lwmr6r
Centerline road mileage, by location
http://tinyurl.com/lwmr6rhttp://tinyurl.com/lwmr6rhttp://tinyurl.com/lwmr6rhttp://tinyurl.com/lwmr6r8/9/2019 State Measures Synthesis - 2010
25/40
P a g e | 22Statewide annual vehicles miles of travel (VMT), on systemStatewide annual vehicles miles of travel (VMT), off systemPercent passenger car traffic by systemPercent commercial truck traffic by systemNumber of fatal and alcohol/drug involved crashesFatality rate (fatalities per 100 million miles traveled)Injury rate (injuries per 100 million miles traveled)Crash rate (crashes per 100 million miles traveled)Percent of seatbelt usageTotal revenue in millions of dollarsGross motor fuel tax receiptsFuel consumptionMillions raised by cent per gallon fuel taxMotor fuel consumption on Montanas highwaysEstimated construction cost per million in millions of dollarsHighway vs. consumer price index construction expenditure impacts of inflationState highway physical conditionYearly rehabilitation in lane milesMaintenance responsibility by systemNumber of deficient bridges on and off the state highway system
Bridges on state highway system by functional classificationPercent of state highway bridges in need of repair or replacementPercent of non-state highway bridges in need of repair or replacementPercent enplanements of commercial and essential air service by locationPercent rail freight by type of good shipped
Nebraska
Performance Programming Process, 2009
Source: Not available
Ride index, a measure of quality (smoothness) as perceived by the highway user
Number of functionally obsolete, structurally deficient, and substandard bridges as measured by
the National Bridge Inventory Condition Assessment
Number of correctable crash sites funded for improvementCongestion index on the highway system, a measure of travel delay
Source:
Performance Measures: A Performance Based Transportation Agency, 2009
http://tinyurl.com/32kac5c
Traffic fatalities per 100 million vehicle miles traveled (VMT)Motor vehicle crashes on Nebraska roadways per million annual vehicle miles traveled (AMVT)The percent of on system crashes in construction work zonesThe average number of minutes per closure on Interstate 80
Percent of miles with surface condition rated good or very goodPercent of miles with ride quality rated good or very goodPercentage of structurally sound and functionally adequate bridgesRailroad grade crossing closures and crashesExternal customer/partner satisfaction by typePercentage of projects in the 1-year program delivered to lettingPercent of projects awardedAccuracy of project estimates contained in the 1-year programPercentage of construction projects completed within days allowedPercentage of construction projects finalized within 60 days
http://tinyurl.com/32kac5chttp://tinyurl.com/32kac5chttp://tinyurl.com/32kac5chttp://tinyurl.com/32kac5c8/9/2019 State Measures Synthesis - 2010
26/40
P a g e | 23Percentage of projects in the 5-year program delivered to lettingAccuracy of state highway user revenue projectionsCash balanceNo loss of wetland acresWetland mitigation bank acres for future needsEnvironmental impact statementsEnvironmental assessmentsNDOR motor vehicle damage frequency rateNumber of lost workdays due to job-related injuriesEmployee satisfaction
Nevada
Source:
Facts and Figures, 2009
http://tinyurl.com/yjsqauz
Total system mileage maintained by NDOT, centerlineCenterline miles by conditionMiles of improved road by county
Vehicle miles of travel by countyTruck miles of travelNumber of state-maintained bridges needing renovation by deficiencyState highway revenue funds in millionsState gasoline tax revenueState motor vehicle fund taxes, licenses, and fees revenueState motor vehicle taxes to highway fund derived from the motor vehicle fundHighway fund federal-aid revenue for highways by phaseHighway fund expenditures and disbursementsDepartment of transportation expenditures by activityDepartment of transportation expenditures by appropriationHighway fatality ratesHighway fatalities
Statewide pedestrian and bicycle fatalitiesSeatbelt use for fatalities where seatbelts were a factorNumber of employees by functionPercent of highway miles congestedHighway miles congestedTransit ridership by countyTransit ridership by small-urban and rural transportationMiles of track by railroadFreeway service patrol statistics by incident type
Source:
Performance and Major Projects, 2010http://tinyurl.com/yhzyhew
The rate of work place injuries and illnesses per 100 employeesThe rate of medical claims per 100 employees for work place injuries and illnesses requiring
medical attentionPercentage of employees trained in accordance with prescribed training plans and State statuterequirementsPercentage rating obtained from employees satisfaction surveysPercentage of Agreements executed within 45 days from when division submits agreement to the
date when it is fully executed
http://tinyurl.com/yjsqauzhttp://tinyurl.com/yjsqauzhttp://tinyurl.com/yjsqauzhttp://tinyurl.com/yhzyhewhttp://tinyurl.com/yhzyhewhttp://tinyurl.com/yhzyhewhttp://tinyurl.com/yhzyhewhttp://tinyurl.com/yjsqauz8/9/2019 State Measures Synthesis - 2010
27/40
P a g e | 24Percent congestion at level of service D for 85% of state urban roadwaysPercent congestion at level of service D for 85% of state rural roadwaysPercentage of projects within established range of cost estimate and schedule to completionPercentage of state maintained pavements needing annual preservation in order to maintain the
pavement International Roughness Index (IRI) rating of good or fair conditionPercentage of fleet requiring replacementPercentage of fleet in compliance with condition criteriaPercentage of building facilities that comply with regulatory building and safety codesPercent of emergency plans that have been completedNumber of fatalities on Nevadas streets and highwaysPercentage of projects completed within the range of established estimate and schedule after the
environmental processPercentage of Department owned bridges which are eligible for federal funding and are
categorized as structurally deficient or functionally obsoletePercentage of permits issued or rejected within 45 days of receipt
New Hampshire
Source:
Annual Financial, 2009http://tinyurl.com/32f4klv
Number of bridge inspections completedNumber of survey requests completed by Design DivisionNumber of utility relocationsNumber of right-of-way property acquisitionsNumber of new well installationsNumber of oversize permits issuedNumber of driveway permits issuedNumber of gallons of fuel usedNumber of vehicles passing though the toll turnpike systemNumber of registrations for aircraft processedHighway funds revenue (in millions)Highway funds expense (in millions)All funds revenue (in millions)All funds expense (in millions)Number of wetlands permits applications processed
New Mexico
Source:
Good to Great, 2010http://tinyurl.com/22v8wrq
Percent of airport runways in good conditionAnnual number of riders on park and rideNew Mexico Rail-Runner Express total ridership
Ride quality index (RQI) for new constructionPercent of programmed projects let to bid according to scheduleTotal traffic fatalitiesAlcohol-involved traffic fatalitiesUnbelted traffic fatalitiesCrashes in safety corridorsNumber of statewide pavement miles preservedPercent of interstate lane miles in NM rated goodPercent of non-interstate lane miles in NM rated goodRest area satisfaction
http://tinyurl.com/32f4klvhttp://tinyurl.com/32f4klvhttp://tinyurl.com/32f4klvhttp://tinyurl.com/22v8wrqhttp://tinyurl.com/22v8wrqhttp://tinyurl.com/22v8wrqhttp://tinyurl.com/22v8wrqhttp://tinyurl.com/32f4klv8/9/2019 State Measures Synthesis - 2010
28/40
P a g e | 25Rest area satisfaction in tonsNMDOT vacancy ratePercentage of prior year audit findings resolvedLost days of workEmployee injuries
North Carolina
Source:
NCDOT Annual Performance Report, 2009http://tinyurl.com/2antxmk
Rate of fatalities per 100 million vehicle milesRate of crashes per 100 million vehicle milesRate of injuries per 100 million vehicle milesPercent of statewide safety belt usageNumber of centrally issued driver licensesPercent of strategic highway corridor miles that have little or no recurring congestionPercent of scheduled ferry runs completedAverage time to clear a major accident
Percent reduction in expected growth of vehicle miles traveledPercent increase in the number of intercity rail passengersPercent of interstate route pavement lane miles in good conditionPercent of primary route lane pavement miles in good conditionPercent of secondary route lane pavement miles in good conditionPercent of bridges in good conditionWeighted score of all highway features and elements, excluding pavement and bridges, in
good/excellent conditionPercent of projects advertised for bid and awarded to theContractor for construction on schedulePercent of projects that completed right of way plans on schedulePercent of highway construction projects completed on schedulePercent of highway construction projects completed on budgetAverage environmental inspection score for construction and maintenance projects statewidePercent of administration costs compared to overall budgetPercent of federal receipts to eligible authority to billPercent of planned expenses to actual receiptsPercent of offsite DMV services compared to onsite servicesAverage customers wait time at DMV officesEmployee safety indexTotal average time to hire staffPercent of employees surveyed that feel the department is a great place to workPercent of active NCDOT leadership positions that met or exceeded performance expectations
Source:
NCDOT Dashboard, 2010http://tinyurl.com/239vofc
Total crashes by yearTotal fatalities by yearTotal injuries by yearTotal vehicle miles traveled by yearCrash rate by yearFatality rate by yearInjury rate by yearHighway incident clearance time in minutesFerry service reliability in percent
http://tinyurl.com/2antxmkhttp://tinyurl.com/2antxmkhttp://tinyurl.com/2antxmkhttp://tinyurl.com/239vofchttp://tinyurl.com/239vofchttp://tinyurl.com/239vofchttp://tinyurl.com/239vofchttp://tinyurl.com/2antxmk8/9/2019 State Measures Synthesis - 2010
29/40
P a g e | 26Percent change in rail service ridershipPercent reduction in vehicle miles traveledPercent of highways with reoccurring congestionBridge health indexPavement condition indexRoadside feature conditionEmployee emotional commitmentEmployee discretionary effortEmployee rational commitmentEmployee intent to stay
North Dakota
Source:
Biennial Report, 2009http://tinyurl.com/2bmx6vo
Number of bridges state bridgesNumber of overload permits issuedNumber of vehicles registered
Safety belt usage percentPercentage of crashed recorded electronicallyTotal certified DBE businesses
Source:
Performance Measures Report Card, 2008http://tinyurl.com/lzgtd6
Percent STIP estimate vs. bid, statePercent STIP estimate vs. bid, local governmentPercent bid as scheduledPercent of customers satisfied/very satisfied with DOTs programsPercent customer overall satisfactionLevel of employee satisfaction
Days lost per million hours workedTotal highway fatalitiesTotal highway injuriesVehicle miles traveled (VMT), interstateVehicle miles traveled (VMT), interregionalRide quality deficient state/roadway miles, interstateRide quality deficient state/roadway miles, interregionalDistress deficient state/roadway miles, interstateDistress deficient state/roadway miles, interregional
Ohio
Source:
Results Ohio, 2009
http://tinyurl.com/2bw6x76
Total number of crash fatalitiesTotal number of crash injuriesTotal number of crashes
Organizational Performance Index Listing, 2009Source: not available online
http://tinyurl.com/2bmx6vohttp://tinyurl.com/2bmx6vohttp://tinyurl.com/2bmx6vohttp://tinyurl.com/lzgtd6http://tinyurl.com/lzgtd6http://tinyurl.com/lzgtd6http://tinyurl.com/2bw6x76http://tinyurl.com/2bw6x76http://tinyurl.com/2bw6x76http://tinyurl.com/2bw6x76http://tinyurl.com/lzgtd6http://tinyurl.com/2bmx6vo8/9/2019 State Measures Synthesis - 2010
30/40
P a g e | 27Percent of projects completed by revised completion datePercent of projects finalized in less than 6 monthsRating projects not finalized within 6 monthsC-95 contractor performance (quality)C-95 contractor performance (timeliness)EEO , contract compliance reviewsEEO , onsite project monitoringEquipment , cost per mile , cars and vansEquipment , cost per mile , dump trucksEquipment , cost per mile , loadersEquipment , cost per mile , pickupsEquipment, downtime per work order (DPWO) days, dump trucksEquipment, downtime per work order (DPWO) days, loadersEquipment, downtime per work order (DWPO) days, cars and vansEquipment, downtime per work order (DWPO) days, pickupsFacilities, building condition assessments, county garagesFacilities, building condition assessments, headquartersFacilities, building condition assessments, outpostsFacilities, building condition assessments, rest areasFacilities, building condition assessments, water treatment facilities
Availability of I.T. network to usersAvailability of Servers to UsersDrainage obstruction per lane mile, general systemDrainage obstruction per lane mile, general systemLitter per lane mile, general systemLitter Per lane mile, priority SystemPavement deficiency per lane mile, general systemPavement deficiency per lane mile, priority systemPavement drop off per lane mile, general systemPavement drop off per lane mile, priority systemPavement marking per lane mile, general systemPavement marking per lane mile, priority systemSign per lane Mile, general system
Sign per lane Mile, priority systemVeg. obstruction per lane mile, general systemVeg. obstruction per lane mile, priority systemPlan package delivered on time (local-let)Plan package delivered on time (ODOT-let)Plan package quality (ODOT-let)Performance evaluations on timeBridge condition, percent deck area with floor condition of 1 or 2Bridge condition, percent deck area with general appraisal >=5Bridge condition, percent deck area with wearing surface of 1 or 2Bridge condition, percent deck area with Paint condition of >=5Pavement conditions, general system percent LM w/ PCR >=55Pavement conditions, priority system percent LM W/PCR >=65
Pavement conditions, urban system percent LM w/ PCR >= 55Safety, safety annual work plan and quarterly updatesSafety, studies with countermeasure and action plan
Oregon
Source:
Annual Performance Progress Report, 2009http://tinyurl.com/29qoneu
http://tinyurl.com/29qoneuhttp://tinyurl.com/29qoneuhttp://tinyurl.com/29qoneuhttp://tinyurl.com/29qoneu8/9/2019 State Measures Synthesis - 2010
31/40
P a g e | 28Traffic fatalities: traffic fatalities per 100 million vehicles miles traveled (VMT)Traffic injuries: traffic injuries per 100 million vehicles miles traveled (VMT)Safe drivers: percent of drivers who drove safely by avoiding traffic violations and accidents
during the prior three yearsImpaired driving: percent of fatal traffic accidents that involved alcoholUse of safety belts: percent of all vehicle occupants using safety beltsLarge truck at-fault crashes: number of large truck at-fault crashes per million vehicle miles
traveled (VMT)Rail crossing incidents: number of highway-railroad at-grade incidentsDerailment incidents: number of train derailments caused by human error, track, or equipmentTravelers feel safe: percent of public satisfied with transportation safetySpecial transit rides: average number of special transit rides per each elderly and disabled
Oregonian annuallyTravel delay: hours of travel delay per capita per year in urban areasPassenger rail ridership: number of state-supported rail service passengersAlternatives to one-person commuting: percent of Oregonians who commute to work during peak
hours by means other than single occupancy vehiclesTraffic volume: vehicle miles traveled (VMT) per capita in Oregon metropolitan areas for local
non-commercial tripsPavement Condition: Percent of pavement lane miles rated fair or better out of total lane miles
in state highway systemBridge condition: percent of state highway bridges that are not deficientFish passage at state culverts: number of high priority ODOT culverts remaining to be retrofitted
or replaced to improve fish passageIntercity passenger service: percent of Oregon communities of 2,500 or more with intercity bus or
rail passenger serviceBike lanes and sidewalks: percent of urban state highway miles with bike lanes and pedestrian
facilities in fair or better conditionJobs from construction spending: number of jobs sustained as a result of annual construction
expendituresTimeliness of projects going to construction phase: percent of projects going to construction
phase within 90 days of target dateConstruction project completion timeliness: percent of projects with the construction phase
completed within 90 days of original contract completion dateConstruction projects on budget: percent of projects completed on or under projected
preliminary engineering, right-of-way and construction costsCertified businesses: percent of ODOT contract dollars awarded to disadvantaged, minority,
women, and emerging small businessesPercent of customers rating their satisfaction with the agency's customer service as "good" or
"excellent": overall customer service, timeliness, accuracy, helpfulness, expertise andavailability of information
DMV customer services: field office wait time (in minutes)DMV customer services: phone wait time (in seconds)DMV customer services: title wait time (in days)Economic revitalization team customer satisfaction
Pennsylvania
Source:
Annual Report, 2008http://tinyurl.com/24r3n6v
Bridge construction bridge lettings, in millionsNumber of bridges improved / preservedNumber of structurally deficient bridgesTotal number of statewide fatalities by year
http://tinyurl.com/24r3n6vhttp://tinyurl.com/24r3n6vhttp://tinyurl.com/24r3n6vhttp://tinyurl.com/24r3n6v8/9/2019 State Measures Synthesis - 2010
32/40
P a g e | 29
Source:
Governors Performance Report, 2009http://tinyurl.com/dcbcb7
Number of freight railroadsRail tons originatedRail tons terminated
Annual public transit trips per capitaNumber of state-maintained miles of roadwaysNumber of state-maintained bridgesPercent structurally deficient bridgesConstruction costs for state bridges reconstructed / repairedPercentage of roads with poor IRIMiles of state maintained highways improvedNumber of Pennsylvania highway fatalitiesNumber of expressway service patrol assistsTraffic growth in Pennsylvania by percentTotal Amtrak Keystone ridership
Rhode Island
Source:
Performance Indicators by Department, 2009http://tinyurl.com/yag3q9r
Number of vehicle crash fatalities per 100 million vehicle miles traveledVehicle crash injuries per 100 million vehicle miles traveledLinear feet of state sidewalk retrofitted to conform to Americans with Disabilities Act regulationsPercentage of state roadways and sidewalks swept annuallyPercentage of state roadway miles whose pavement is rated as good or excellentNumber of Rhode Island bridges listed as structurally deficient
South Carolina
Source:Annual Accountability Report, 2010
http://tinyurl.com/ltpa8u
Appropriation budget by spendingNumber of employees receiving customer service trainingTotal number of grievances filed, heard internally, and perused to the state levelNumber of miles maintainedNumber of motorists assisted by yearRight of way condemnation rate in percentPercent of work requests completed in 60 days or lessNumber of work zone fatalities by yearTop probable causes of fatalities by typeFatalities by route category
Top fatality countiesFatalities by restraint usageTop types of crash eventsStatewide annual transit passenger boardingsMaintenance customer survey ratingsLandowner opinion of quality of serviceNumber of vehicles purchased by typeNumber of vehicles purchased vs. remainingAnnual statewide transit operating expenses
http://tinyurl.com/dcbcb7http://tinyurl.com/dcbcb7http://tinyurl.com/dcbcb7http://tinyurl.com/yag3q9rhttp://tinyurl.com/yag3q9rhttp://tinyurl.com/yag3q9rhttp://tinyurl.com/ltpa8uhttp://tinyurl.com/ltpa8uhttp://tinyurl.com/ltpa8uhttp://tinyurl.com/ltpa8uhttp://tinyurl.com/yag3q9rhttp://tinyurl.com/dcbcb78/9/2019 State Measures Synthesis - 2010
33/40
P a g e | 30SCDOT assets in millionsTotal fuel usage and costClaims and lawsuits receivedTurnover rate in percentTotal number of employees
Source:Engineering Dashboard, 2010
http://tinyurl.com/rxcr2p
Bridge status by condition classificationSystem service life in lane mile years lost vs. years addedAverage pavement remaining service life by route typeTotal traffic signal installations rebuilt and new by quarterTop seven maintenance activities by quarter in spendingNumber of days to complete work requests by quarterTotal dollars awarded in construction costs by quarterConstruction payouts by quarterQuality management team project performance reviews by DistrictPermit approval time in days compared to total
Number of projects let compared to delayedRight of way condemnation rateNumber of surplus property transactionsConstruction project schedule by month
South Dakota
Source:
DOT Fact Book, 2009http://tinyurl.com/ybmt9xk
Number of highway fatalitiesNumber of alcohol related highway fatalitiesFatal traffic crashes by road system type
Number of SDDOT full-time employeesPercentage of state budget going towards transportationBreakout of SDDOT budgeted funds for fiscal yearState motor fuel excise taxes per gallon for South Dakota and neighboring statesState motor fuel tax total revenues in millions of dollarsState motor vehicle 3 percent excise tax total revenues in millions of dollarsState highway fund total revenues in millions of dollarsFederal motor fuel tax revenues in billions of dollarsTotal miles of road in South DakotaAnnual vehicle miles traveled in South Dakota, state system and local roadsState highway system vehicle miles traveled (VMT) in billions of milesSouth Dakota highway surface condition indexPavement types on the South Dakota state highway system by type in percent
Highway construction costs per mile, reconstruction
Texas
Source:
TxDOT Tracker, 2010http://tinyurl.com/2fvslkb
Percent of construction projects on-timePercent of construction projects on-budget
http://tinyurl.com/rxcr2phttp://tinyurl.com/rxcr2phttp://tinyurl.com/rxcr2phttp://tinyurl.com/ybmt9xkhttp://tinyurl.com/ybmt9xkhttp://tinyurl.com/ybmt9xkhttp://tinyurl.com/2fvslkbhttp://tinyurl.com/2fvslkbhttp://tinyurl.com/2fvslkbhttp://tinyurl.com/2fvslkbhttp://tinyurl.com/ybmt9xkhttp://tinyurl.com/rxcr2p8/9/2019 State Measures Synthesis - 2010
34/40
P a g e | 31Percent of design projects on-timePercent of design projects on-budgetRight of way expenses to appropriationsPercent of right of way parcels acquired by negotiationNumber of fatalities per 100 million VMTPercent of two lane roads with shouldersPercent of railroad crossings with signalizationTexas traffic assessment program condition scoreAgency actual expenditures to total appropriationsTotal projected revenues to actual revenuesPercent of all contract funds awarded to HUBsPercent change in non-metro transit tripsDollar volume of actual letting to annual letting capDollar volume of highway projects delayed in the fiscal yearPercent of pavement in good or better conditionPercent of bridges in good or better conditionNumber of actual lane miles surfaced compared to plannedOverall maintenance condition score for the state highway systemTxDOT fleet gas emissionsVehicle miles traveled
Large urban area total travel delayLarge urban area travel delay per commuterLarge urban area total congestion costAssessment of extra travel time in 5 largest urban areasSmall urban total travel delaySmall urban travel delay per commuterSmall urban area total congestion costAssessment of extra travel time in 25 smaller urban areasActual vs. forecast revenue for the central Texas turnpike system
Utah
Source:
Strategic Direction and Performance Measures, 2009http://tinyurl.com/nmvu3q
Percent of increase in vehicle miles traveled (VMT)Percent of increase in state highway lane miles (new)Composite construction cost index (in millions) by yearMonthly payment value to contractors (in millions)Percent of pavement system by years until reconstructionPercent of statewide pavement condition miles in fair or better conditionNumber of bridges built per decadeNumber of bridges by conditionPercent accident clearance time, 1 hour to 2 hoursPercent accident clearance time, less than 30 minutesPercent accident clearance time, 30 minutes to an hourPercent accident clearance time, more than 2 hoursNumber of fatalities
Source:
Utah Performance Elevated, 2010http://tinyurl.com/2634mp2
Percent of miles of road in fair or better conditionPercent of pavement system service life remaining
http://tinyurl.com/nmvu3qhttp://tinyurl.com/nmvu3qhttp://tinyurl.com/nmvu3qhttp://tinyurl.com/2634mp2http://tinyurl.com/2634mp2http://tinyurl.com/2634mp2http://tinyurl.com/2634mp2http://tinyurl.com/nmvu3q8/9/2019 State Measures Synthesis - 2010
35/40
P a g e | 32Grade for snow and ice controlAccident clearance timeTotal number of fatalities by yearAverage freeway commute speeds from downtown Salt Lake City