STATE OF NEW YORK DEPARTMENT OF PUBLIC SERVICE CHANGE NOTICE October 29, 2021 TO: TAMMY MITCHELL DIRECTOR OFFICE OF ELECTRIC, GAS AND WATER FROM: ROBERT LEMIEUX, Utility Analyst Trainee 2 (Environmental) Environmental Certification & Compliance Section Office of Electric, Gas and Water SUBJECT: 11-T-0534 – EM&CP Change for Rochester Area Reliability Project (RARP) Station 80 Shunt Reactor RECOMMENDATION: Approval of Change Notice MC-10 as Requested *** *** *** In accordance with Ordering Clause 31 of the Order Adopting the Terms of a Joint Proposal and Granting Certificate of Environmental Compatibility and Public Need, with Conditions, issued and effective in this case on April 23, 2013, Rochester Gas and Electric Corporation (RG&E) has notified Staff of the Department of Public Service (DPS Staff) of one proposed minor change. Change Notice MC-10 - RG&E proposes the installation of a shunt reactor at its Station 80 Substation in the Town of Henrietta in Monroe County. The proposed installation will occur on the northern end of the 345 kilovolt (kV) Bus #1 inside the existing footprint of Station 80, and all work required for this installation will be completed within the station’s existing fence line. Subsequently,

STATE OF NEW YORK DEPARTMENT OF PUBLIC SERVICE

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

STATE OF NEW YORK

DEPARTMENT OF PUBLIC SERVICE

CHANGE NOTICE

October 29, 2021

TO: TAMMY MITCHELL

DIRECTOR

OFFICE OF ELECTRIC, GAS AND WATER

FROM: ROBERT LEMIEUX, Utility Analyst Trainee 2 (Environmental)

Environmental Certification & Compliance Section

Office of Electric, Gas and Water

SUBJECT: 11-T-0534 – EM&CP Change for Rochester Area

Reliability Project (RARP) Station 80 Shunt Reactor

RECOMMENDATION: Approval of Change Notice MC-10 as Requested

*** *** ***

In accordance with Ordering Clause 31 of the Order Adopting the

Terms of a Joint Proposal and Granting Certificate of Environmental

Compatibility and Public Need, with Conditions, issued and effective

in this case on April 23, 2013, Rochester Gas and Electric

Corporation (RG&E) has notified Staff of the Department of Public

Service (DPS Staff) of one proposed minor change.

Change Notice MC-10 - RG&E proposes the installation of a shunt

reactor at its Station 80 Substation in the Town of Henrietta in

Monroe County. The proposed installation will occur on the northern

end of the 345 kilovolt (kV) Bus #1 inside the existing footprint of

Station 80, and all work required for this installation will be

completed within the station’s existing fence line. Subsequently,

CASE 11-T-0534

- 2 -

due to no expansion of the existing station footprint and no

improvements required for access to the Station, there will be no

increase in temporary or permanent environmental impacts.

Additionally, all new equipment associated with the reactor’s

installation is compatible with existing components and will not

create any significant increase in noise or visual impact. This

installation is in support of NextEra’s Empire State Line, a project

in which Station 80 was one of multiple network facilities

identified as requiring upgrades.

Staff has reviewed this proposed change and believes it will

not result in any net increase of adverse environmental impact, nor

is it directly related to any issues contested during the

proceedings. DPS Staff recommends that this change be approved, and

RG&E be so notified.

REVIEWED & APPROVED: ________________________

TAMMY MITCHELL

DIRECTOR

OFFICE OF ELECTRIC, GAS AND WATER

cc: Carol Howland, ([email protected])

Bob Lemieux, DPS ([email protected])

DPS Central File

Attachments

1

Internal Use

ENVIRONMENTAL MANAGEMENT & CONSTRUCTION PLAN

NOTICE OF CHANGE

PROJECT: Station 80 Shunt Reactor Installation NYSPSC Case No. 11-T-0534

Refer to Dwg #: 2 New Drawings 33203-200 Remove / Install Sheet Nos.: 1 of 1

Location: 474 Lehigh Station Road, Henrietta, Monroe County, NY

RG&E is proposing to install a shunt reactor at its Station 80 in the Town of Henrietta, Monroe County, NY. The shunt reactor is

needed to support NextEra’s Empire State Line Project (ESL Project). The foundations for the shunt reactor are expected to

begin in January 2022, with the overall construction start of March 2022. All work will be completed within the existing station

80 fence line.

Feature(s) Changed: RG&E is proposing the installation of a 345kV 100 MVAR shunt reactor on the northern end of 345kV

Bus #1 within the existing footprint of Station 80. Associated protection and control items will also be installed. This work

would include the installation of the following new major electrical and physical equipment:

• One (1) 100 MVAR Shunt Reactor

• One (1) Shunt reactor foundation with oil Containment

• One (1) three phase, surge arrester/bus support structure

• One (1) 362 kV, 40 kA, 3000 A Special Purpose IPO Circuit Breaker with Synchronous Switching Control

• One (1) 345 kV, Circuit Breaker Foundation

• One (1) 345 kV dead-end structure and foundation (with integrated switch truss)

• One (1) 362 kV 3000A, 63kA, 1300 kV BIL upright mounted double side-break switch

• Three (3) single phase CCVT structures and foundations

• CCVT junction box

• Grounding materials

• Conduit materials

• Control cabling

• Miscellaneous bus work

• Three new relay panels (#11, #9 and #28).

This work would also include the relocation of three existing 345 kV CCVT’s. In addition, the following electrical and physical

equipment will be removed:

• One (1) 345 kV lattice type dead-end structure and four (4) foundations.

• Five (5) 345 kV bus support pedestal structures and foundations.

• Three (3) CCVT lattice type structure and foundations.

• Minimal conduit removal.

• One (1) Disconnect Switch Stand and foundations. The structure is currently being used as a bus support for supporting

rigid bus over the existing 345kV Bus CCVTs.

Access to Station 80 for the installation / removal of the above components will be from the permanent existing access road

currently servicing Station 80, which requires no improvements. Since all construction activities will be within the existing

Station 80 fence line, there will be no material increase in any environmental impacts. The new components are consistent with

other equipment within the existing Station and will present no significant increase in visual or noise from existing conditions.

The Station is approximately ¼ mile from Lehigh Station Road. No environmental controls are deemed necessary at this time.

Rationale for Change: As part of Q#545A Empire State Line Project, multiple network facilities have been identified as requiring

upgrades, which includes Station 80.

2

Internal Use

Related Filings:

9/30/2011 – RG&E filed an Application for a Certificate of Environmental Compatibility and Public Need for the Rochester Area

Reliability Project (RARP) which included a new 345 KV line to RG&E’s existing Station 80.

4/23/2013 – A Certificate of Environmental Compatibility and Public Need was issued for the RARP.

10/11/2013 – RG&E filed EM&CP 1 which included Drawing C-004 showing the entire Station 80.

12/20/2013 – Order Issued approving EM&CP 1

5/7/2015 – RG&E filed an application to amend the RARP Certificate for construction of a 5th Bay at Station 80. Station 80

would be expanded to the south for the new bay.

7/21/2015 - Order approving amendment application & 5th Bay.

1/8/2021 – RG&E filed notice of RARP being placed in service. (Restoration activities still ongoing).

Sent To DPS Staff By: Carol Howland Date: 10/5/2021

DPS Staff Approval By: Date:

Refer to attached project drawings.

33203-200 REM – Station 80 Site Plan; Removal

33203-200 SH 1 – Station 80 Site Plan; Install

1217

+

+

+

+

+

+

+

+

1061

1062

1063

1064

1217

101

N88°19'03"E

1141.05

F

O

U

N

D

R

E

B

A

R

R

G

&

E

C

A

P

I

N

S

I

D

E

1

"

P

I

P

E

D

O

W

N

B

O

X

W

IR

E

F

E

N

C

E

W

IT

H

P

O

S

T

100

N

we

s

100

N

8

8

°

1

9

'0

3

"

E

L

A

N

D

S

N

/F

L

IV

O

N

IA

A

V

O

N

L

A

K

E

V

IL

L

E

R

A

IL

R

O

A

D

T

A

X

M

A

P

P

A

R

C

E

L

N

O

. 1

7

4

.0

4

-

1

-

1

0

.1

109

N88°24'23"E

479.75

N88°25'47"W

462.44

N

2

2

°

2

0

'0

8

"

E

2

8

6

.

3

9

OV

ER

HE

AD

E

LE

CT

RIC

O

N

ST

EE

L B

AS

ES

ROCHESTER PANNELL 2

RP-2

NYPA CIRCUIT

SR1-39B

NYPA CIRCUIT

NR-1

RGE CIRCUIT

40

ROCHESTER PANNELL 1

RP-1

NO. 2, 280 MVA 3Ø

AUTOTRANSFORMER

NO. 3, 420 MVA 3Ø

AUTOTRANSFORMER

NO. 5, 420 MVA 3Ø

AUTOTRANSFORMER

Aø Bø Cø

EXISTING FENCE

EXISTING CABLE TRENCH

B14

B14

C14

C14

++++++++

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

++

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

1030

1050

1060

1170

1031

1131

1051

1052

1162

1053

1163

1185

1224

1054

1164

11741184

1025

1125

1055

1165

1175

1187

1056

1166

1186

1057

1167

1028

1058

1168

1188

1049

1059

1169

+

+

+

+

104105

108

110

N

2

2

°

2

0

'0

8

E

5

0

0

.

0

0

S88°19'03"W

1322.59

R

=

5

6

9

6

.

7

0

T

=

2

3

9

.

1

1

L

=

4

7

7

.

9

3

D

E

L

T

A

=

4

°

4

8

'2

5

"

S

2

0

°

2

2

'1

3

"

W2

3

.

5

1

F

O

U

N

D

P

I

P

E

W

O

O

D

C

O

R

N

E

R

P

O

S

T

4

'

T

A

L

L

B

O

X

W

I

R

E

F

E

N

C

E

GA

TE

B

O

X

W

I

R

E

F

E

N

C

E

A

L

O

N

G

L

I

N

E

F

E

N

C

E

F

A

D

E

S

O

U

T

R

R

S

P

I

K

E

4

'

T

A

L

L

B

O

X

F

E

N

C

E

R

A

I

L

R

O

A

D

T

R

A

C

K

S

E

L

E

V

:

5

4

6

.

8

5

N

:

1

1

1

4

3

0

1

.

2

6

E

:

1

3

9

2

3

0

7

.

3

1

OV

ER

HE

AD

E

LE

CT

RIC

ON

S

TE

EL B

AS

ES

R

A

I

L

R

O

A

D

T

R

A

C

K

S

A B C F M1 N PJ K MC1 E

A

6

7

B C F

85'

M1 N PJ

6

7

5 5

4 4

3

2

1

3

2

1

80'

80'

80'

65'

115kV CONTROL

BUILDING

345 kV CONTROL

BUILDING

80'

EXISTING

EXISTING

6" WATER

6" WATER

8""

WA

TE

R

8" W

AT

ER

HYDRANT HYDRANT

MH A

K MC1 E

8 8

345 kV CONTROL

BUILDING

EXISTING

75'

35' 44' 18' 95' 40' 113' 40' 95' 18' 35'

NO. 3, 420 MVA 3Ø

AUTOTRANSFORMER

44'

Aø Bø

Aø Bø Cø

Aø Bø Cø

Aø Bø Cø

EXISTING FENCE

AC

CE

SS

R

OA

D

AC

CE

SS

R

OA

D

AC

CE

SS

R

OA

D

AC

CE

SS

R

OA

D

AC

CE

SS

R

OA

D

16'16'

34'-6" 20' 20' 22' 22'

16'16'

EXISTING DUCT BANK

20'

20'

37'-6"

37'-6"

37'-6"

10'

40'

40'

40'

40'

40'

40'

40'

40'

37'-6"

+

+

1185

WH

IT

E M

AR

KE

R P

OS

T

E

M

P

I

R

E

S

T

A

T

E

P

I

P

E

L

I

N

E

F

O

U

N

D

R

E

B

A

R

LANDS N/F

SYLVESTER & BETTY ANN DUHART

TAX MAP PARCEL NO. 174.04-1-12.111

50'

EASEMENT

50'

NEW ACCESS ROAD

16'

266'-3"

30'

35'

5

0

'-

4

"

75'

35'

319'

127'-6"

18' 8'12'

127'-11"

18'8' 12' 22' 22' 22' 22'

35'

99'

NEW FENCE

75'

319'

NO. 1, 420 MVA 3Ø

AUTOTRANSFORMER

Aø Bø CøAø Bø Cø

5-0B

5-0B

8"ø WATER

SEE CONSTRUCTION

NOTE 3

SEE CONSTRUCTION

NOTES 1 & 2

5-0C

NO.

DATE:

APP.

CK.

DR. SCALE: FILE:

REV.

BY APP.DATEREV. DESCRIPTION

PE Stamp

AN

SI D

C

AD

D D

raw

ing, D

O N

OT

R

EV

IS

E M

AN

UA

LLY

.

AVANGRID ENGINEERING

CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION

Property of AVANGRID, Inc.

RG&E

STATION: 80

SITEPLAN

SHEET 1 OF 1

33203-200 REM 5-0C

JEP/EPRODTB/EPRODTB/EPRO12/2005

NONE 33203-200 SH 1 REM.DWG

SEE DOCUMENT MANAGEMENT FOR PREVIOUS REVISIONS

3 01/06/2015 RW/UDI INSTALL SPARE TRANSFORMER PMS

4 09/05/2017 MLM/RUE GRTA. STA 80 - AS-BUILT JJT/RUE

Time: 10:35 A.M. Date: 10/5/2018

REFERENCE DRAWINGS:

33203-204 SH.2 345KV PLOT PLAN

33203-205 SH.12, 14 & 15 FOUNDATION PLAN 33203-3217 SH 2

33203-3217 SH 2 PLAN VIEW GENERATOR

THIS DRAWING HAS BEEN DRAWN BY, OR REPRODUCED

FROM, A DRAWING PREPARED BY AN ORGANIZATION

OTHER THAN SARGENT & LUNDY. SARGENT & LUNDY

IS NOT RESPONSIBLE FOR WORK BY OTHER ORGANIZATIONS.

55 EAST MONROE ST., CHICAGO, ILL.

PROJ. No.

PREPAREDREV DATE DESCRIPTION APPROVEDREVIEWED

5-0A 07/31/2020 ISSUED FOR 30% DESIGNSV

JGO KVP

5-0B 02/17/2021 ISSUED FOR 70% DESIGNSV

BLM

--

5-0C 06/11/2021 ISSUED FOR BIDSV

BLM

--

--

NOTES:

1. UNDER NEW YORK STATE EDUCATION LAW ARTICLE 145 (ENGINEERING),

SECTION 7209 (2), IT IS A VIOLATION OF THE LAW FOR ANY PERSON,

UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER,

TO ALTER THIS DOCUMENT.

2. DRAWINGS PREPARED UNDER - LICENSED PROFESSIONAL

ENGINEER IN THE STATE OF NEW YORK.

5-0B

CONSTRUCTION NOTES:

1. TEMPORARILY DISCONNECT STRAIN BUS AND THE CORRESPONDING

CONNECTIONS TO THE LOW BUS.

2. RECONNECT EXISTING STRAIN BUS TO THE NEW DEAD END STRUCTURE AND

EXISTING LOW BUS.

3. THE CURRENT PLAN IS TO CUT BACK AND CAP OFF EXISTING WATER PIPE. THIS

PLAN IS CURRENTLY BEING DISCUSSED AND SUBJECT TO CHANGE.

4. ALL WORK DONE BY CONTRACTOR/INSTALLER PURSUANT TO THIS DRAWING

SHALL: (A) CONFORM TO THE GOVERNING CONTRACT DOCUMENTS; (B) BE

PERFORMED EXCLUSIVELY BY ITS TRAINED, COMPETENT PERSONNEL OR,

WHERE PERMITTED, THAT OF ITS SUBCONTRACTOR(S); AND (C) COMPLY WITH

ALL APPLICABLE SAFETY LAWS, REGULATIONS, PROGRAMS AND PRACTICES TO

ENSURE THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE, INCLUDING

THE CONTRACTOR'S/INSTALLER'S PERSONNEL (OR THAT OF ITS

SUBCONTRACTOR(S)) PERFORMING THE WORK.

5. UNDERGROUND OR EMBEDDED UTILITIES [MAY] EXIST WITHIN THE AREA OF AND

ADJACENT TO THE LIMITS OF THE LOCATION OR IDENTIFICATION OF SUCH

UTILITIES HAS NOT BEEN VERIFIED BY OWNER OR BY S&L.

CONTRACTOR/INSTALLER IS RESPONSIBLE FOR FIELD LOCATING AND

IDENTIFYING UNDERGROUND OR EMBEDDED UTILITIES AND ANY OTHER

UNDERGROUND OR EMBEDDED UTILITY DIMENSIONS.

6. REFERENCES USED HAVE BEEN IDENTIFIED ON

EXCAVATION/FOUNDATION/DEMOLITION DRAWINGS AND HAVE BEEN PROVIDED

TO ASSIST THE CONTRACTOR/INSTALLER IN THE FIELD LOCATING EXISTING

UTILITIES AND OTHER POTENTIAL UNDERGROUND OR EMBEDDED

INTERFERENCES. THESE REFERENCES ONLY SHOW THE APPROXIMATE

LOCATION OF POTENTIAL UNDERGROUND OR EMBEDDED UTILITIES AND MAY

NOT INDICATE OR REFLECT ALL EXISTING UNDERGROUND OR EMBEDDED

UTILITIES OR THEIR ACTUAL LOCATIONS.

7. REFERENCES IDENTIFIED SHALL NOT SUBSTITUTE FOR THE

CONTRACTOR'S/INSTALLER'S OBLIGATION TO FIELD LOCATE ANY

UNDERGROUND OR EMBEDDED UTILITIES OR INTERFERENCES THAT MAY

AFFECT THE WORK.

8. DUE CAUTION SHALL BE TAKEN DURING ANY

EXCAVATION/FOUNDATION/DEMOLITION WORK WITHIN THE AREA OF AND

ADJACENT TO THE LIMITS OF THE WORK DUE TO POSSIBLE INTERFERENCES

THAT MAY NOT BE REFLECTED ON THE REFERENCES IDENTIFIED.

DEMOLITION DRAWING

= FIELD TO DISCONNECT AND REMOVE EQUIPMENT

5-0C

AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
G
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
AVANGRIDVANGRIDGRIDRID
AutoCAD SHX Text
13666-066
AutoCAD SHX Text
REMOVAL

1217

+

+

+

+

+

+

+

+

1061

1062

1063

1064

1217

101

N88°19'03"E

1141.05

F

O

U

N

D

R

E

B

A

R

R

G

&

E

C

A

P

I

N

S

I

D

E

1

"

P

I

P

E

D

O

W

N

B

O

X

W

IR

E

F

E

N

C

E

W

IT

H

P

O

S

T

100

N

we

s

100

N

8

8

°

1

9

'0

3

"

E

L

A

N

D

S

N

/F

L

IV

O

N

IA

A

V

O

N

L

A

K

E

V

IL

L

E

R

A

IL

R

O

A

D

T

A

X

M

A

P

P

A

R

C

E

L

N

O

. 1

7

4

.0

4

-

1

-

1

0

.1

109

N88°24'23"E

479.75

N88°25'47"W

462.44

N

2

2

°

2

0

'0

8

"

E

2

8

6

.

3

9

OV

ER

HE

AD

E

LE

CT

RIC

O

N

ST

EE

L B

AS

ES

ROCHESTER PANNELL 2

RP-2

NYPA CIRCUIT

SR1-39B

NYPA CIRCUIT

NR-1

RGE CIRCUIT

40

ROCHESTER PANNELL 1

RP-1

NO. 2, 280 MVA 3Ø

AUTOTRANSFORMER

NO. 3, 420 MVA 3Ø

AUTOTRANSFORMER

NO. 5, 420 MVA 3Ø

AUTOTRANSFORMER

Aø Bø Cø

EXISTING FENCE

EXISTING CABLE TRENCH

B14

B14

C14

C14

++++++++

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

++

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

1030

1050

1060

1170

1031

1131

1051

1052

1162

1053

1163

1185

1224

1054

1164

11741184

1025

1125

1055

1165

1175

1187

1056

1166

1186

1057

1167

1028

1058

1168

1188

1049

1059

1169

+

+

+

+

104105

108

110

N

2

2

°

2

0

'0

8

E

5

0

0

.

0

0

S88°19'03"W

1322.59

R

=

5

6

9

6

.

7

0

T

=

2

3

9

.

1

1

L

=

4

7

7

.

9

3

D

E

L

T

A

=

4

°

4

8

'2

5

"

S

2

0

°

2

2

'1

3

"

W2

3

.

5

1

F

O

U

N

D

P

I

P

E

W

O

O

D

C

O

R

N

E

R

P

O

S

T

4

'

T

A

L

L

B

O

X

W

I

R

E

F

E

N

C

E

GA

TE

B

O

X

W

I

R

E

F

E

N

C

E

A

L

O

N

G

L

I

N

E

F

E

N

C

E

F

A

D

E

S

O

U

T

R

R

S

P

I

K

E

4

'

T

A

L

L

B

O

X

F

E

N

C

E

R

A

I

L

R

O

A

D

T

R

A

C

K

S

E

L

E

V

:

5

4

6

.

8

5

N

:

1

1

1

4

3

0

1

.

2

6

E

:

1

3

9

2

3

0

7

.

3

1

OV

ER

HE

AD

E

LE

CT

RIC

ON

S

TE

EL B

AS

ES

R

A

I

L

R

O

A

D

T

R

A

C

K

S

A B C F M1 N PJ K MC1 E

A

6

7

B C F

85'

M1 N PJ

6

7

5 5

4 4

3

2

1

3

2

1

80'

80'

80'

65'

115kV CONTROL

BUILDING

345 kV CONTROL

BUILDING

80'

EXISTING

EXISTING

6" WATER

6" WATER

8""

WA

TE

R

8" W

AT

ER

HYDRANT HYDRANT

MH A

K MC1 E

8 8

345 kV CONTROL

BUILDING

EXISTING

75'

35' 44' 18' 95' 40' 113' 40' 95' 18' 35'

NO. 3, 420 MVA 3Ø

AUTOTRANSFORMER

44'

Aø Bø

Aø Bø Cø

Aø Bø Cø

Aø Bø Cø

EXISTING FENCE

AC

CE

SS

R

OA

D

AC

CE

SS

R

OA

D

AC

CE

SS

R

OA

D

AC

CE

SS

R

OA

D

AC

CE

SS

R

OA

D

16'16'

34'-6" 20' 20' 22' 22'

16'16'

EXISTING DUCT BANK

20'

20'

37'-6"

37'-6"

37'-6"

10'

40'

40'

40'

40'

40'

40'

37'-6"

+

+

1185

WH

IT

E M

AR

KE

R P

OS

T

E

M

P

I

R

E

S

T

A

T

E

P

I

P

E

L

I

N

E

F

O

U

N

D

R

E

B

A

R

LANDS N/F

SYLVESTER & BETTY ANN DUHART

TAX MAP PARCEL NO. 174.04-1-12.111

50'

EASEMENT

50'

NEW ACCESS ROAD

16'

266'-3"

30'

19'

5

0

'-

4

"

75'

35'

319'

127'-6"

18' 8'12'

127'-11"

18'8' 12'

22'

22' 22' 22'

35'

99'

NEW FENCE

75'

319'

NO. 1, 420 MVA 3Ø

AUTOTRANSFORMER

Aø Bø CøAø Bø Cø

30'-0"

5

0

'-

0

"

28'-0"

16'-0"

10'

DEADEND

345KV

5-0B 22'-0"

7'

HYA

MYA

TYA

LYA

SYA

HOLD

Aø Bø Cø

8"ø WATER

SEE CONSTRUCTION

NOTE 3

SEE CONSTRUCTION

NOTES 1 & 2

8"ø WATER

SEE CONSTRUCTION

NOTE 3

5-0C

5-0C

NO.

DATE:

APP.

CK.

DR. SCALE: FILE:

REV.

BY APP.DATEREV. DESCRIPTION

PE Stamp

AN

SI D

C

AD

D D

raw

ing, D

O N

OT

R

EV

IS

E M

AN

UA

LLY

.

AVANGRID ENGINEERING

CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION

Property of AVANGRID, Inc.

RG&E

STATION: 80

SITEPLAN

SHEET 1 OF 1

33203-200 5-0C

JEP/EPRODTB/EPRODTB/EPRO12/2005

NONE 33203-200 SH 1.DWG

SEE DOCUMENT MANAGEMENT FOR PREVIOUS REVISIONS

3 01/06/2015 RW/UDI INSTALL SPARE TRANSFORMER PMS

4 09/05/2017 MLM/RUE GRTA. STA 80 - AS-BUILT JJT/RUE

Time: 10:35 A.M. Date: 10/5/2018

REFERENCE DRAWINGS:

33203-204 SH.2 345KV PLOT PLAN

33203-205 SH.12, 14 & 15 FOUNDATION PLAN 33203-3217 SH 2

33203-3217 SH 2 PLAN VIEW GENERATOR

NOTES:

1. UNDER NEW YORK STATE EDUCATION LAW ARTICLE 145 (ENGINEERING),

SECTION 7209 (2), IT IS A VIOLATION OF THE LAW FOR ANY PERSON,

UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER,

TO ALTER THIS DOCUMENT.

2. DRAWINGS PREPARED UNDER - LICENSED PROFESSIONAL

ENGINEER IN THE STATE OF NEW YORK.

5-0B

HOLD NOTES:

1. HOLD PENDING VENDOR DRAWINGS.

LEGEND:

- DENOTES BILL OF MATERIAL (BOM) CALL OUTS, SEE DWG. 11159-306 SH2

XXX

CONSTRUCTION NOTES:

1. TEMPORARILY DISCONNECT STRAIN BUS AND THE CORRESPONDING

CONNECTIONS TO THE LOW BUS.

2. RECONNECT EXISTING STRAIN BUS TO THE NEW DEAD END STRUCTURE AND

EXISTING LOW BUS.

3. THE CURRENT PLAN IS TO CUT BACK AND CAP OFF EXISTING WATER PIPE. THIS

PLAN IS CURRENTLY BEING DISCUSSED AND SUBJECT TO CHANGE.

4. ALL WORK DONE BY CONTRACTOR/INSTALLER PURSUANT TO THIS DRAWING

SHALL: (A) CONFORM TO THE GOVERNING CONTRACT DOCUMENTS; (B) BE

PERFORMED EXCLUSIVELY BY ITS TRAINED, COMPETENT PERSONNEL OR,

WHERE PERMITTED, THAT OF ITS SUBCONTRACTOR(S); AND (C) COMPLY WITH

ALL APPLICABLE SAFETY LAWS, REGULATIONS, PROGRAMS AND PRACTICES TO

ENSURE THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE, INCLUDING

THE CONTRACTOR'S/INSTALLER'S PERSONNEL (OR THAT OF ITS

SUBCONTRACTOR(S)) PERFORMING THE WORK.

5. UNDERGROUND OR EMBEDDED UTILITIES [MAY] EXIST WITHIN THE AREA OF AND

ADJACENT TO THE LIMITS OF THE LOCATION OR IDENTIFICATION OF SUCH

UTILITIES HAS NOT BEEN VERIFIED BY OWNER OR BY S&L.

CONTRACTOR/INSTALLER IS RESPONSIBLE FOR FIELD LOCATING AND

IDENTIFYING UNDERGROUND OR EMBEDDED UTILITIES AND ANY OTHER

UNDERGROUND OR EMBEDDED UTILITY DIMENSIONS.

6. REFERENCES USED HAVE BEEN IDENTIFIED ON

EXCAVATION/FOUNDATION/DEMOLITION DRAWINGS AND HAVE BEEN PROVIDED

TO ASSIST THE CONTRACTOR/INSTALLER IN THE FIELD LOCATING EXISTING

UTILITIES AND OTHER POTENTIAL UNDERGROUND OR EMBEDDED

INTERFERENCES. THESE REFERENCES ONLY SHOW THE APPROXIMATE

LOCATION OF POTENTIAL UNDERGROUND OR EMBEDDED UTILITIES AND MAY

NOT INDICATE OR REFLECT ALL EXISTING UNDERGROUND OR EMBEDDED

UTILITIES OR THEIR ACTUAL LOCATIONS.

7. REFERENCES IDENTIFIED SHALL NOT SUBSTITUTE FOR THE

CONTRACTOR'S/INSTALLER'S OBLIGATION TO FIELD LOCATE ANY

UNDERGROUND OR EMBEDDED UTILITIES OR INTERFERENCES THAT MAY

AFFECT THE WORK.

8. DUE CAUTION SHALL BE TAKEN DURING ANY

EXCAVATION/FOUNDATION/DEMOLITION WORK WITHIN THE AREA OF AND

ADJACENT TO THE LIMITS OF THE WORK DUE TO POSSIBLE INTERFERENCES

THAT MAY NOT BE REFLECTED ON THE REFERENCES IDENTIFIED.

THIS DRAWING HAS BEEN DRAWN BY, OR REPRODUCED

FROM, A DRAWING PREPARED BY AN ORGANIZATION

OTHER THAN SARGENT & LUNDY. SARGENT & LUNDY

IS NOT RESPONSIBLE FOR WORK BY OTHER ORGANIZATIONS.

55 EAST MONROE ST., CHICAGO, ILL.

PROJ. No.

PREPAREDREV DATE DESCRIPTION APPROVEDREVIEWED

5-0A 07/31/2020 ISSUED FOR 30% DESIGNSV

JGO KVP

5-0B 02/17/2021 ISSUED FOR 70% DESIGNSV

BLM

--

5-0C 06/11/2021 ISSUED FOR BIDSV

BLM

--

--

5-0C

AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
G
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
H1
AutoCAD SHX Text
H3
AutoCAD SHX Text
H2
AutoCAD SHX Text
H0
AutoCAD SHX Text
AVANGRIDVANGRIDGRIDRID
AutoCAD SHX Text
INSTALL
AutoCAD SHX Text
13666-066