UNCLASSIFIED

STATE OF THE GARRISON

COL Raymond P. Lacey

Fort Sill Garrison Commander

Vision: To transform and adapt Fort Sill through infrastructure and program

development to enable the installation to fulfill its strategic roles and missions.

As of 30 Dec 10

Page 2: State of the Garrison

UNCLASSIFIED

STATE OF THE GARRISON

AGENDA

• Transformation – 2007-2017

• Capital Investment Strategy

• Quality of Life Initiatives

• Other Significant Projects/Events

• Takeaways

Page 3: State of the Garrison

UNCLASSIFIED

FY2007-2010 - Complete FY2011-2013 - Present

ADA Campus $210M AFRC Campus $45.2M FY12 Construction Projects

31st ADA Campus $132M Cooper CDC $8.7M Vehicle Maint. Facility $52M

Grierson CDC $4.2M JFETS $28M Battle Cmd Trng Ctr $23M

TSC $8M Physical Fitness Ctr $25M

South MEGA DFAC

North MEGA DFAC$63M

Reception Bn Complex (Phase 1)

$37M

B6050 (TBUP) $42M Chapel $13.4M

UEPH Barracks $65M THAAD GIF $36M

Dental Clinic $10.8M Other Construction Projects

FA AIT Barracks (Phase 1) $61M ARRA Projects $59.5M

WTU Barracks $22M AAFES ( 3 projects) $15.3M

General Storage (CIF) $14.8M RCI – Picerne (432 homes

and 886 renovations)$154M

Youth Center $5M FY2014-2017 - Future

B5966 (TBUP) $42M NCO Academy $34M

× Artifact Storage – ADA $12.8M FA AIT Barracks (Phase 2) $87M

Reception Bn (Phase 2&3) $100M

Other Construction Projects

PAL (179 guest rooms) $TBD

TRANSFORMATION 2007-2017

= Construction complete

= Construction ongoing

= Funded - Construction not started

= Funding expected in FY11/12

× = Not Funded – Project is at risk

Page 4: State of the Garrison

UNCLASSIFIED

• Contract awarded to Harper Construction on 30 Dec 09

• 80,000 SF, state-of-the-art simulations training facility

• Virtual reality environmental trainers

• Digital distributed learning classrooms

• Video teleconferencing capability

• Supports both the TRADOC training base and FORSCOM units

$28M Project

Joint Fires and Effects Training Facility

Page 5: State of the Garrison

UNCLASSIFIED

TRAINING SUPPORT CENTER

• Contract awarded 25 Sep 09

• Warehouse facility

• Consolidates and centralizes training support products and services

• Scheduled to open July 2011

$8M Project

Page 6: State of the Garrison

MEGA-DINING FACILITY PROJECT

• Builds 2 2400-man DFACs

• Converts 3 starship DFACs

to classrooms

• 1st DFAC mission ready

3QFY11

$63M Project

Page 7: State of the Garrison

B6007

B6050

B5960

B5955

B5970

RLB

Recpt

Ctr4

1

3 5

6

2

B6007

B6050

B5955

B5960

B5970

RLBs

Mega-DFACs

Future Reception Bn Complex

6000 Area Development Plan

Training Barracks Upgrade Program

Page 8: State of the Garrison

• Upgrade 5 Starships

• Latrines and Laundry facilities

• Platoon bays and Admin space

TRAINING BARRACKS UPGRADE PROGRAM

(TBUP)

Total costs estimated at $200M

FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17

2 x Mega-DFAC/DFAC conversion

B6050

1 2

Recpt Center Phase I

B5955

B5960

B5970

B6007

AIT Barracks Phase I

AIT Barracks Phase II

First Starship – update as of Aug 2010

• B6050 awarded Sep 09, BOD 16 Jun 11, $41.4M

• Additional Mandatory Renovations - $1.69M - tie-in of

existing façade, asbestos abatement, beam shear

reinforcement (no impact to construction timeline)

Page 9: State of the Garrison

Unaccompanied Enlisted Personnel Housing

$65M Project

• 7 new buildings

• 630 new rooms

• Ready for occupation

March 2012

Page 10: State of the Garrison

Dental Clinic

$10.8M Project

• Contract awarded 26 Jul 10

• Provides 22 treatment rooms

• Support 6th and 31st ADA Bdes

Page 11: State of the Garrison

MAJOR REPAIR AND RENOVATION

HPAAF Lighting$1.9M

Goldner Gym Upgrade$100K

Street LightingSheridan Rd ($515K),

Mow-Way Rd & Fort Sill Blvd

3-Mile Track Repair$660K

Snow Hall Renovation $12.6M

Knox Hall Renovation

$6.6M

Pxtra-Roof$350K

31st ADA Bde PT Path$497K

Buffalo Soldier AcresAccess Rd

$750K

Sidewalks/Bike Path$1.5M

Utilities ModernizationMultiple Bldgs

$10.7M

Water Line Improvements$15M

Page 12: State of the Garrison

DEMOLITION PLAN

Page 13: State of the Garrison

AAFES Construction

ApprovedFY10

• New Sheridan Road Shoppette--

$6.1M

• New Dual Food Facility--$5.1M

FY11

• Current Sheridan Road Shoppette

Expands--$4.8M

ProposedOut Years

• Expand the PX – Proposed for 2012

BOD Project

• Estimated Cost: $36M

• Proposed BoD Submittal: 2012

• Estimated Start: June 2013

• Estimated Complete: August 2015

• Expand the Fort Sill Blvd Shoppette

• Tentatively Proposed BoD for 2015

• Replace the Quarry Hill Troop Store

• BoD year to be identified

13 of

Page 14: State of the Garrison

New! Sheridan Rd. Shoppette

Scope: construct 7,266 sq/ft shoppette

4.0 module with Subway, 1,100 sq/ft car wash

and 6 MPDs

Cost: $6.1M

Schedule: (95% Design)

Mar 2011 Start Construction

Nov 2011 Construction Complete

Dec 2011 Grand Opening

Sheridan

Road

14 of

Page 15: State of the Garrison

New! Dual Food Facility

Scope: construct 4,933 sq/ft dual food

facility, Burger King and Church’s Chicken

with separate drive-thrus

Cost: $5.1M

Schedule: (95% Design)

Sep 2010 Contract Award

Dec 2010 Construction Start

Oct 2011 Construction Complete

Nov 2011 Grand Opening

Demo existing BK after grand opening

Existing

Burger King

15 of

Page 16: State of the Garrison

Expand Current Sheridan Rd. Shoppette

Scope: expand shoppette to 3.0 module 10,906 sq/ft

(existing 5,021 sq/ft), add 3 MPDs and a pizza food concept

Cost: $4.8M

Schedule: (95% Design)

Dec 2011 Start Construction*

Jun 2012 Construction Complete

Nov 2012 Grand Opening

*after new shoppette opens

Mow Way Rd

16 of

Page 17: State of the Garrison

Residential Communities Initiative (RCI)

Housing Population – 18% On Post and 82% Off Post

Facts

• Housing partner selected, Sep 07–

PICERNE MILITARY HOUSING

• Picerne assumed responsibility for

housing - 01 Nov 08 (Partnership Signing

Ceremony was Aug 08 for 50 years)

• Current inventory - 1,411 homes

• Demolish 115 homes

• Building 432 new homes

• Net gain of 317 homes

• End state – 1728

• ~$154M for construction and

development activities for the Initial

Development Period, 2010 – 2016

Other Facts

• Neighborhood Centers to be built

• General Officer Quarters - 3

Planned Housing Renovations

• Historic Renovations – 332 homes

• Medium Renovations – 554 homes

886 homes impacted by renovations

Page 18: State of the Garrison

E6-E872 homes

E6-E874 homes

E6-E860 homes

E6-E856 homes

E6-E870 homes

O1-O3/W1-W370 homes

04-05/W4-W5 and E930 homes (19 FGO/ 11 E9)

Buffalo Soldier Acres - 432 NEW Homes

Ground broken 18 Nov 10

Page 19: State of the Garrison

UNCLASSIFIED

QUALITY OF LIFE INITIATIVES

• Force Protection

• Installation Accessibility for ADA Compliance

• Automated Installation Entry (AIE)Program IE

Apache Gate

Key Gate – East (work begins 3 Jan 11)

• Scott Gate (Fort Sill Blvd)

• Bentley Gate (Sheridan Road)

• Key Gate – West

• FY11 Spend Plan Execution

Page 20: State of the Garrison

UNCLASSIFIED

OTHER SIGNIFICANT PROJECTS/EVENTS

• DOL transition to AMC

• Fort Sill Master Plan

• AFRC – Occupants move in 1 Feb 11

• RCF Reutilization

Page 21: State of the Garrison

UNCLASSIFIED

TAKE AWAYS

• Transformation – now thru 2017

• BRAC is nearly complete

• Significant positive economic impact to SW Oklahoma

• Ensuring balance and equity for competing missions