STATE OF THE GARRISON
COL Raymond P. Lacey
Fort Sill Garrison Commander
Vision: To transform and adapt Fort Sill through infrastructure and program
development to enable the installation to fulfill its strategic roles and missions.
As of 30 Dec 10
UNCLASSIFIED
STATE OF THE GARRISON
AGENDA
• Transformation – 2007-2017
• Capital Investment Strategy
• Quality of Life Initiatives
• Other Significant Projects/Events
• Takeaways
UNCLASSIFIED
FY2007-2010 - Complete FY2011-2013 - Present
ADA Campus $210M AFRC Campus $45.2M FY12 Construction Projects
31st ADA Campus $132M Cooper CDC $8.7M Vehicle Maint. Facility $52M
Grierson CDC $4.2M JFETS $28M Battle Cmd Trng Ctr $23M
TSC $8M Physical Fitness Ctr $25M
South MEGA DFAC
North MEGA DFAC$63M
Reception Bn Complex (Phase 1)
$37M
B6050 (TBUP) $42M Chapel $13.4M
UEPH Barracks $65M THAAD GIF $36M
Dental Clinic $10.8M Other Construction Projects
FA AIT Barracks (Phase 1) $61M ARRA Projects $59.5M
WTU Barracks $22M AAFES ( 3 projects) $15.3M
General Storage (CIF) $14.8M RCI – Picerne (432 homes
and 886 renovations)$154M
Youth Center $5M FY2014-2017 - Future
B5966 (TBUP) $42M NCO Academy $34M
× Artifact Storage – ADA $12.8M FA AIT Barracks (Phase 2) $87M
Reception Bn (Phase 2&3) $100M
Other Construction Projects
PAL (179 guest rooms) $TBD
TRANSFORMATION 2007-2017
= Construction complete
= Construction ongoing
= Funded - Construction not started
= Funding expected in FY11/12
× = Not Funded – Project is at risk
UNCLASSIFIED
• Contract awarded to Harper Construction on 30 Dec 09
• 80,000 SF, state-of-the-art simulations training facility
• Virtual reality environmental trainers
• Digital distributed learning classrooms
• Video teleconferencing capability
• Supports both the TRADOC training base and FORSCOM units
$28M Project
Joint Fires and Effects Training Facility
UNCLASSIFIED
TRAINING SUPPORT CENTER
• Contract awarded 25 Sep 09
• Warehouse facility
• Consolidates and centralizes training support products and services
• Scheduled to open July 2011
$8M Project
MEGA-DINING FACILITY PROJECT
• Builds 2 2400-man DFACs
• Converts 3 starship DFACs
to classrooms
• 1st DFAC mission ready
3QFY11
$63M Project
B6007
B6050
B5960
B5955
B5970
RLB
Recpt
Ctr4
1
3 5
6
2
B6007
B6050
B5955
B5960
B5970
RLBs
Mega-DFACs
Future Reception Bn Complex
6000 Area Development Plan
Training Barracks Upgrade Program
• Upgrade 5 Starships
• Latrines and Laundry facilities
• Platoon bays and Admin space
TRAINING BARRACKS UPGRADE PROGRAM
(TBUP)
Total costs estimated at $200M
FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17
2 x Mega-DFAC/DFAC conversion
B6050
1 2
Recpt Center Phase I
B5955
B5960
B5970
B6007
AIT Barracks Phase I
AIT Barracks Phase II
First Starship – update as of Aug 2010
• B6050 awarded Sep 09, BOD 16 Jun 11, $41.4M
• Additional Mandatory Renovations - $1.69M - tie-in of
existing façade, asbestos abatement, beam shear
reinforcement (no impact to construction timeline)
Unaccompanied Enlisted Personnel Housing
$65M Project
• 7 new buildings
• 630 new rooms
• Ready for occupation
March 2012
Dental Clinic
$10.8M Project
• Contract awarded 26 Jul 10
• Provides 22 treatment rooms
• Support 6th and 31st ADA Bdes
MAJOR REPAIR AND RENOVATION
HPAAF Lighting$1.9M
Goldner Gym Upgrade$100K
Street LightingSheridan Rd ($515K),
Mow-Way Rd & Fort Sill Blvd
3-Mile Track Repair$660K
Snow Hall Renovation $12.6M
Knox Hall Renovation
$6.6M
Pxtra-Roof$350K
31st ADA Bde PT Path$497K
Buffalo Soldier AcresAccess Rd
$750K
Sidewalks/Bike Path$1.5M
Utilities ModernizationMultiple Bldgs
$10.7M
Water Line Improvements$15M
DEMOLITION PLAN
AAFES Construction
ApprovedFY10
• New Sheridan Road Shoppette--
$6.1M
• New Dual Food Facility--$5.1M
FY11
• Current Sheridan Road Shoppette
Expands--$4.8M
ProposedOut Years
• Expand the PX – Proposed for 2012
BOD Project
• Estimated Cost: $36M
• Proposed BoD Submittal: 2012
• Estimated Start: June 2013
• Estimated Complete: August 2015
• Expand the Fort Sill Blvd Shoppette
• Tentatively Proposed BoD for 2015
• Replace the Quarry Hill Troop Store
• BoD year to be identified
13 of
New! Sheridan Rd. Shoppette
Scope: construct 7,266 sq/ft shoppette
4.0 module with Subway, 1,100 sq/ft car wash
and 6 MPDs
Cost: $6.1M
Schedule: (95% Design)
Mar 2011 Start Construction
Nov 2011 Construction Complete
Dec 2011 Grand Opening
Sheridan
Road
14 of
New! Dual Food Facility
Scope: construct 4,933 sq/ft dual food
facility, Burger King and Church’s Chicken
with separate drive-thrus
Cost: $5.1M
Schedule: (95% Design)
Sep 2010 Contract Award
Dec 2010 Construction Start
Oct 2011 Construction Complete
Nov 2011 Grand Opening
Demo existing BK after grand opening
Existing
Burger King
15 of
Expand Current Sheridan Rd. Shoppette
Scope: expand shoppette to 3.0 module 10,906 sq/ft
(existing 5,021 sq/ft), add 3 MPDs and a pizza food concept
Cost: $4.8M
Schedule: (95% Design)
Dec 2011 Start Construction*
Jun 2012 Construction Complete
Nov 2012 Grand Opening
*after new shoppette opens
Mow Way Rd
16 of
Residential Communities Initiative (RCI)
Housing Population – 18% On Post and 82% Off Post
Facts
• Housing partner selected, Sep 07–
PICERNE MILITARY HOUSING
• Picerne assumed responsibility for
housing - 01 Nov 08 (Partnership Signing
Ceremony was Aug 08 for 50 years)
• Current inventory - 1,411 homes
• Demolish 115 homes
• Building 432 new homes
• Net gain of 317 homes
• End state – 1728
• ~$154M for construction and
development activities for the Initial
Development Period, 2010 – 2016
Other Facts
• Neighborhood Centers to be built
• General Officer Quarters - 3
Planned Housing Renovations
• Historic Renovations – 332 homes
• Medium Renovations – 554 homes
886 homes impacted by renovations
E6-E872 homes
E6-E874 homes
E6-E860 homes
E6-E856 homes
E6-E870 homes
O1-O3/W1-W370 homes
04-05/W4-W5 and E930 homes (19 FGO/ 11 E9)
Buffalo Soldier Acres - 432 NEW Homes
Ground broken 18 Nov 10
UNCLASSIFIED
QUALITY OF LIFE INITIATIVES
• Force Protection
• Installation Accessibility for ADA Compliance
• Automated Installation Entry (AIE)Program IE
Apache Gate
Key Gate – East (work begins 3 Jan 11)
• Scott Gate (Fort Sill Blvd)
• Bentley Gate (Sheridan Road)
• Key Gate – West
• FY11 Spend Plan Execution
UNCLASSIFIED
OTHER SIGNIFICANT PROJECTS/EVENTS
• DOL transition to AMC
• Fort Sill Master Plan
• AFRC – Occupants move in 1 Feb 11
• RCF Reutilization
UNCLASSIFIED
TAKE AWAYS
• Transformation – now thru 2017
• BRAC is nearly complete
• Significant positive economic impact to SW Oklahoma
• Ensuring balance and equity for competing missions