Status of ATF2 final focus prototype (emphasizing French involvement) Collaboration with China : Jie GAO, Sha BAI (IHEP, Beijing) Philip Bambade LAL- Orsay 1 st FJPPL workshop

Status of ATF2 final focus prototype ( emphasizing French involvement )

Embed Size (px)

DESCRIPTION

Status of ATF2 final focus prototype ( emphasizing French involvement ) Collaboration with China : Jie GAO, Sha BAI (IHEP, Beijing). Philip Bambade LAL-Orsay 1 st FJPPL workshop Marseille, 15-17 January 2008. LC needs nanometer-size beams. - PowerPoint PPT Presentation

Citation preview

Page 1: Status of ATF2 final focus prototype ( emphasizing French involvement )

Status of ATF2 final focus prototype(emphasizing French involvement)

Collaboration with China :

Jie GAO, Sha BAI (IHEP, Beijing)

Philip Bambade LAL-Orsay

1st FJPPL workshop Marseille, 15-17 January 2008

Page 2: Status of ATF2 final focus prototype ( emphasizing French involvement )

LC needs nanometer-size beams

Dyx

eb HfNnL 4~

2

• Linac repetition rate f << ring frequency need tiny IP size • Beam-beam mutual focusing beamstrahlung, disruption…

Dyn

E

CM

HE

PL,

electrical~

2 n /

set z y

main linacbunchcompressor

dampingring

source

pre-accelerator

collimation

final focus

IP

extraction& dump

KeV

few GeV

few GeVfew GeV

250-500 GeV

HD = disruption enhancementf = linac repetition rateNe = bunch populationnb = bunches per train = RMS bunch size = emittance = power transfer efficiency

1. RF technology (gradient, efficient power transfer)

2. Beam phase-space control & stability emittance focus

Page 3: Status of ATF2 final focus prototype ( emphasizing French involvement )

ATF2 final focus test @ KEK

Goal A : nanometer beam size - obtain y ~ 35 nm at focal point - reproduce reliably y and maintain in time

Goal B : trajectory stabilisation - 1-2 nm at focal point - intra-train feedback (ILC-like trains)

1. Expert training on real system2. Instrumentation for nano-beams3. Accelerator RD & operation by multi-partner collaboration

• 2008 end construction & installation • october 2008 first beams • 2009 commissioning

COST : ~ 3 + 1 M$ Asia, EU, US

Page 4: Status of ATF2 final focus prototype ( emphasizing French involvement )

ATF2 Construction ScheduleNot changed since December 2006

Page 5: Status of ATF2 final focus prototype ( emphasizing French involvement )

Assembly hall before constructionAssembly hall before construction

Assembly hall emptied for constructionAssembly hall emptied for construction

Construction of reinforced floorConstruction of reinforced floor Construction of shieldingConstruction of shieldingPhotos: Nobu Toge

ATF2 construction

Page 6: Status of ATF2 final focus prototype ( emphasizing French involvement )

LAPP: Mechanical support & stability of FD Characterisation & impact in beam operation A.Jérémie, G.Gaillard, N.Geffroy B.Bolzon continues as ANR post-doc

LLR: Background evaluation (algorithm, GEANT4) Instrumentation & experimentation for validation M. Verderi, H.Guler (ANR post-doc)

LAL: Beam tuning & control / slow feedback controller Commissioning & operation / optimization “Flight simulator” tool, instrumentation studies P.Bambade, J.Brossard, C.Rimbault Y.Rénier, M.Alabau (Valencia), S.Bai (IHEP) + ANR post-doc to be hired in 2008 (quasi done)

KEK direct partner + UK, SLAC, CERN, IHEP, Valencia

Page 7: Status of ATF2 final focus prototype ( emphasizing French involvement )

Present French support for ATF2ANR (2007-2010) : 400k€ project grant to fund 1) three 2-year post-docs at LAL,LAPP and LLR 2) equipment money for mechanical stabilisation work at LAPP

AIL France - Japan : travel & equipment transport 1) 20k€ for LAL-LAPP-LLR in 2007, 25€ requested in 2008

AIL France - China : support for ATF2 including to KEK 1) 3k€ for LAL in 2007, 6k€ requested in 2008

AIL funds within IN2P3 institutional funds…

IN2P3 “institutional” and other (at LAL) : 1) permanent & temporary staff (e.g. 1 contract@LAL) 2) additional travel & equipment (30k€ @ LAL in 2007) 3) Eiffel ministerial 1-year PhD grant for S. Bai @ LAL 4) Orsay university 3-year PhD grant for Y.Rénier @ LAL

Page 8: Status of ATF2 final focus prototype ( emphasizing French involvement )

ATF2 at LAPP-Annecy• Design, simulation and construction of FD support: honeycomb block; adapt movers to block; attach support to ATF2 floor • Need compatibility with IP instrumentation supports• Vibration measurements at Annecy with all supports and magnets• Estimation of relative motion at ATF2 using transfer function from LAPP and ground motion measurements from ATF• Installation and characterisation at KEK in June 2008, monitor in operation • Open up to beam dynamics

Empty Charged

ATF floor

Estimation of relative motion at ATF2: 6nm(just about the specs)

Block transfer function

A. Jérémie (LAPP)

Page 9: Status of ATF2 final focus prototype ( emphasizing French involvement )

Y. Renier (LAL)

Thanks to A. Seryi & measurements from KEK

•f

Page 10: Status of ATF2 final focus prototype ( emphasizing French involvement )

Design beam-based feedback at IP

Y. Renier (LAL)•f

Page 11: Status of ATF2 final focus prototype ( emphasizing French involvement )

ATF2 Background : what can we learn ?

Background Photons inside 1mBackground Photons inside 10cm

Generated 100% flat HALO E=0.1% Gaussian – From 0.1% 1% electron in Halo– Signal : 2-4 103 Compton signal

photons Use Collimator to eliminate the

background photons

On going studies: Trying to describe the background normalization Better describe the HALO (Shape, population, energy distribution)

Include (design) collimator to eliminate background Further steps:

Background from the dump

Photons and charged particles Neutrons Special techniques “event biasing methods”

Photons spectrum from theBeam Position measurement device (Shintake monitor)

H. Guler (LLR)

Page 12: Status of ATF2 final focus prototype ( emphasizing French involvement )

H. Guler (LLR)

Page 13: Status of ATF2 final focus prototype ( emphasizing French involvement )

ATF EXT emittance investigation task force

Must make sure this won’t limit ATF2 !

Page 14: Status of ATF2 final focus prototype ( emphasizing French involvement )

First results with controlled bump in QM7

Learning control room work will continue more systematically in 2008

M. Alabau (IFIC - LAL) J. Brossard (LAL)

Page 15: Status of ATF2 final focus prototype ( emphasizing French involvement )

Investigate emittance reconstruction methods:1. Multiple wire scanners 2 minimisation (constraints ?)

2. Combine normal + skew quad scans reliable xy coupling ?

Dedicated schemes for flat beams (error analysis…) Develop practical tools for efficient control room work

C. Rimbault (LAL)

Page 16: Status of ATF2 final focus prototype ( emphasizing French involvement )

1. Increasing y gradual approach with looser tolerances2. Reducing y enhanced performance

3. Idem at displaced IP locations hosting other instruments4. Prepare magnet knobs for orthogonal waist scanning

S. Bai (IHEP / LAL)

minimum

nominal

Page 17: Status of ATF2 final focus prototype ( emphasizing French involvement )

S. Bai (IHEP / LAL)

Page 18: Status of ATF2 final focus prototype ( emphasizing French involvement )

- Significant impact on ATF2 commissioning and beam experimentation, characterisation of IP stability, understanding and control of beam-induced backgrounds, instrumentation presence at KEK…

- Research within international collaborative environment for accelerator R&D, as HEP experiments

Big labs

Univ. group

Univ. group

• project “tasks”• practical learn by doing

• academic endeavour• publish or perish…

• research bids / contracts

Training impact : future leaders (ILC, other…)

Present aims of French ATF2 involvement(2008 – 2010)

Page 19: Status of ATF2 final focus prototype ( emphasizing French involvement )

Concluding remarks

• 2-3 exciting years ahead of us !

• Scope for more and closer collaboration with China : IHEP, other ?

• interesting three-way collaboration: - UE team (France, UK, Spain…) - Japan + China - and our American colleagues and friends…

Page 20: Status of ATF2 final focus prototype ( emphasizing French involvement )

Additional slides

Page 21: Status of ATF2 final focus prototype ( emphasizing French involvement )

Main present French ILC activities• Linac technology: SC cavities (processing & control), cryogenics, RF couplers• Injectors, sources (Compton based e+)• MDI & BDS ATF2 (experimentation)• Detector R&D: EM calorimetry (CALICE), Silicon sensors (vertexing & tracking), TPC• Physics studies, phenomenology• Communication & outreach• International project framework and governance

Established R&D programs contribute to global ILC projectEmphasis on feasibility demonstration and risk reduction

XFEL & DESY

?

Page 22: Status of ATF2 final focus prototype ( emphasizing French involvement )

Delays from recent ILC cuts ?

1) magnets, power supplies, beam position monitors, magnet movers, misc.

95% completed, KEK will help finalise : minor hardware, travel…

2) damping ring beam position monitor upgrade

(needed for further DR emittance reduction)

unclear at present…

3) Commissioning & optimisation, “flight simulator”

More remote work & through link up with partner teams…

4) Beam instrumentation, feedback, commissioning & tuning

expect slower continuation under “generic LC R&D” (EUCARD)

SLAC

UK

ATF2 startup should be on time Partners (we ?!) may be asked to do more…

Page 23: Status of ATF2 final focus prototype ( emphasizing French involvement )

Wasn’t FFTB sufficient ?

1. Not operated as dedicated facility small beam sizes shown but little reproducibility

and systematic study

2. Long-term stabilisation issues not addressed

3. Final Focus not based on new principle of local chromaticity correction

(1993-1994)

Page 24: Status of ATF2 final focus prototype ( emphasizing French involvement )

ATF2 area2008 Jan Feb Mar Apr May Jun

Concrete Shield Blocks

Beam dump

Utility (AC lines) 100/200V 400V

Utility (Cooling water)

Utility (Air)

DC cables Trays Cabling

HAPS

Hut for PS/Electronics

Hut for LW

Vacuum

Radiation Safety system documentation submission to Gov.

Network

Shintake Monitor

Magnets Install Alignment

EXT-ATF2 area2008 Jun Jul Aug Sep Oct

Laser Wire Move laser Install chambers/transports?

Bending dipoles

Tables/Magnets move modify install

Beam line Survey

DC cables Trays Cabling

EXT Kickers move PS/cables Install

Vacuum modify Install

Control system

Radiation Safety system Rad. ctrl. area KEK inspectionGov. inspection

Shintake Monitor commissioning to Laser hut

FD ?

nano BPM move

Monalisa ?

Page 25: Status of ATF2 final focus prototype ( emphasizing French involvement )

Optical telescope to minimize * IP

FD

Dx

sextupoles

dipole

0 0 0

0 1/ 0 0

0 0 0

0 0 0 1/

m

m

m

m

R

L*

local chromaticity correction with pairs of sextupole doublets optical bandpass

Focus in one plane,defocus in another:

x’ = x’ + G xy’ = y’– G y

Second orderfocusing

x’ = x’ + S (x2-y2)y’ = y’ – S 2xy

Just bends thetrajectory

L ~ 300ml* ~ 5m

+dp/p dp/p

Page 26: Status of ATF2 final focus prototype ( emphasizing French involvement )
Page 27: Status of ATF2 final focus prototype ( emphasizing French involvement )

Fast ns rise-time kicker tests for train (de-)compression and production of ILC-like train

T. Naito (KEK)