Status of CJPL-II Zhi Zeng Tsinghua University 2015/10/23 Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015

Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Status of CJPL-II

Zhi Zeng Tsinghua University

2015/10/23

Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015

Page 2: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

ContentsI.  A brief CJPL introduction II.  CJPL-II Design and experiment

proposals III.  Radioactivity material control IV.  Progress of civil engineering V.  Ventilation system design VI.  Summary

Page 3: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

I. A BRIEF CJPL INTRODUCTION

Page 4: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

4 15/10/19

--

China JinPing Underground Laboratory(CJPL)

Traffic Tunnel

Yalongjiang River

Jinping Mountain

CJPL At the middle

2400m

Traffic Tunnel8 km

Page 5: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

CJPL position Sichuan Province

15/10/19 5

Sichuan

Page 6: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

The Yalong River Hydropower

15/10/19 6

Yalong River Hydropower Development Company (Yalong Hydro) started to develop the hydro-energy for the entire river since 1990s. Yalong River make a great bend around Jinping mountain. Two Hydroelectric power plants are constructed on the bend since 2005 by Yalong Hydro.

Kangding

Xichang Zhongdian

Panzhihua

Yalong River

Jinping Mount.

Page 7: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Jinping Hydroelectric Power Plants

15/10/19

Jinping-I Power Plant 3600MW (6×600MW)

15/10/19Natural Water Vertical drop 310m

Jinping-II Power Plant 4800MW (8×600MW)

4 hydraulic tunnels Φ13m×16.6km

Page 8: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

CJPL Site and Jinping-II Hydropower Station

  Seven high pressure tunnels: two auxiliary tunnels, one water drainage tunnel and four headrace tunnels   Background radiation of marble is less than 1/100 of nature radiation   Maximum overburden of 2525 m and principal stress of 70MPa by back analysis   Average length of 17.7km with two curves in the end, good for comic radiation shielding.

8

Page 9: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Profile of Jinping Tunnel

15/10/19 9

Elev

atio

n/m

Tunnel length/m

JP Tunnel JP Tunnel

Jinping Mountain

Elevation/m

Yalong River

East

Yalong River

west

Page 10: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Convenient communications and transportation

Page 11: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Logistic Condition of CJPL

Page 12: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Ground building

12

Page 13: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Meeting Rooms

several meeting rooms(20-50 persons) one large hall (260 persons)

Page 14: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Dec. 12,2010 Openning Ceremony

Page 15: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

CJPL-I – Dark Matter Experiment

Access TunnelPANDA-X

ElectronicsCDEX

12m15m

15m

Page 16: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

2100m Y2L Korea 2450m

Canfranc Spain

2700m Kamioka Japan 2800m

Boulby UK 3500m

INO India

3500m LNGS Italy

4400m Baksan Russia

4500m DUSEL USA

6000m SNO Canada

4800m Modane France ~7200m

CJPL China

Comparison of main ULs in the world

(Unit:M.W.E)

Tunnel

Mine

Page 17: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Auxiliary tunnel A

II I 1

2430m

1900m

2370m

Tunnel B and F, 7.5 8.0m

  Evolution of Surrounding Rock

Tunnel C, 3 3.2m

2-1

Headrace tunnel no.3, D=12.4m

Headrace tunnel no.2, D=13.0m

1800m

Distribution of failure approach index(FAI)

Risk zone

Distribution of local energy released rate (LERR)

Risk zone

Distribution of the maximum principal stress

Risk zone

Page 18: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

CJPL laboratory with low background radiation

Convenient traffic condition Large equipment can be transported into the lab by truck Staffs and visitor can get into the lab by car

The deepest lab by rock cover in the world Equal ~7000m water shielding Lowest background cosmic radiation <70 counts/m2.y

Lowest background radiation The best underground lab with best rock (marble) cover condition and lowest background radiation level Without any high-energy radiation isotopes in the background radiation, easy for shielding

Facilities Stable electric power and communication supply Good condition for Logistics services Professional engineering staff

18

Page 19: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

III. CJPL-II DESIGN AND EXPERIMENT PROPOSALS

Page 20: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Design of CJPL-II

20

CJPL-I CJPL II

Rock Work 4000 m3 131000m3

Electric Power 70 kVA 1000 kVAFresh Air 2400 m3/h 45000 m3/h

Traffic Tunnel B

Headrace Tunnels

2# Tunnel

1# Tunnel

Water drainage tunnel

Traffic Tunnel A

Page 21: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Design of CJPL-II

21

Connecting Tunnel

Link Tunnel

Emergency tunnel

4x Lab Halls 130 x 12 x 12 m3

Page 22: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Render Picture of Lab Hall

Page 23: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Render Picture of Tunnel

Page 24: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Point Contact Germanium Array Dark Matter Experiment in CJPL

•  CDEX has started CDEX-1 experiment, and the first physical results has been published, two

new results submitted to PRL and PRD.

•  CDEX-10 (PCGe+Lar AC ) is testing at ground laboratory and

plan to ship to CJPL in 2015.

•  CDEX-1T multi-purpose experiment: Related technologies

has been exploited including background understanding, detector fabrication, crystal

growth, electronics and so on.

CDEX-1T plan

Page 25: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Liquid Argon Dark Matter Experiment in CJPL-II

Construction of Detector in CJPL-II

  Outer sector (14x14x14m3 ): Water Cerenkov detector

  Middle sector in SS tank (9x9x9m3 ): Liquid scintillator detector for neutron veto

  Inner sector (6x6x6m3): Two phase TPC with Underground Ar

Page 26: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Liquid Xeon Darkmatter Experiment-PANDAX in CJPL-II

PANDAX Develop a: •  high-energy resolution

(0.5-3%FWHM) •  low-background(10-3 c

/keV kg yr) •  large size(3~4 m3) •  high-pressure(10-15bar)

Xe136 gas TPC

Page 27: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Jinping Neutrino ExperimentTwo modules 1k-ton water based scintillator detectors 1)  Best neutrino lab in the

world 2)  24m in diameter, 35m in

high 3)  Physics motivation

•  Solar neutrinos •  Supernova neutrinos •  Geo-neutrinos •  Atmospheric &

accelerator neutrinos

Inner vessel R = 7 m Fiducial mass = 1 kton

Page 28: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

JINPING Underground Nuclear Astrophysics JUNA Experiment

JUNA experiment aims at direct measurement of (α,γ), (α,n) reactions in hydrostatic helium burning and (p, γ), (p, α) reactions in hydrostatic hydrogen burning, and will provide key input of nuclear physics for understanding evolution of stars and origin of elements.

JUNA Accelerator concept design

Page 29: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

III. RADIOACTIVITY MATERIAL CONTROL

Page 30: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

CJPL-II Radioactivity Background Control

some coal ash from electric power plant and some nano-additive were as concrete building material during the tunnel construction.

Need to control the raw material of concrete!

Radionuclide Coal Ash Rock 238U 123.92±37.18 12.45±3.11 232Th 118.6±23.79 0.41±0.03 40K 356.73±71.35 9.84±2.46

Comparison of radionuclides concentration(Bq/kg)

Page 31: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

CJPL-II Radioactivity Background Control The components of concrete: water, cement and aggregate. The mass ratio in 1 m3

concrete would be 1:2:12( at this moment).

Blue: 20cm rock. Red/Green: concrete 20cm

rock/concrete thickness: 20cm

simulation model

gamma spectrum of simulation results

when the concentration of 238U in the cement less than 3.0 times than that in the rock, the gamma background would be increase less than 50%.

Page 32: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

CJPL-II Radioactivity Background Control GeTHU, low background gamma spectrometers in CJPL-I, designed for material screening for dark mater experiment. All the raw material used during construction of CJPL-II should be investigated by GeTHU.

CJPL-I low background facility GeTHU-I GeTHU-II

Page 33: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

raw material of cement

silica limestone iron ore stonetitanium gypsum

CaSO4·2H2O

iron ash

raw coal from Xinjiang

Gamma spectrum of raw material by GeTHU

Page 34: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

customized Moderate heat cement

customized Moderate heat cement

gamma spectrum of different cement by GeTHU --green ordinary cement (20150210)(~4 times) --blue moderate heat cement(<3times) --red rock sample(base line) --purple: ordinary cement (20150208)(3-4time)

Page 35: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

building material screening

2014.11

CJPL 2014.11

10

1

2014 11 2015 7 110 200GeTHU 00

Page 36: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

building material screening

steel sampling in the field

Page 37: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

building material screening

nano-addative material sampling and gamma spectrum by GeTHU(red: rock sample baseline; green: nano-addative)

nano-addative material sampling and gamma spectrum by GeTHU. The upper is 10 times to rock sample and can’t used in CJPL-II construction

Page 38: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

IV. PROGRESS OF CIVIL ENGINEERING

Page 39: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

CJPL-II Construction status

1#Lab Hall 100%

2#Lab Hall ~85%

3#Lab Hall 100%

4#Lab Hall ~90%

CJPL-II excavation completion(until Oct.15) lining of connecting tunnel

~60% 1#

2#

3#

4# 100 %

All excavation of Halls will be completed in the end of 2015 in the plan.

Page 40: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Start excavation on Nov. 01, 2014

Page 41: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

excavation on Apr.29,2015

1# Lab Hall 2# Connecting tunnel

3# Lab Hall 4# Lab Hall

Page 42: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

connection tunnel on Oct.15,2015

1# connection tunnel lining construction completion ~60%

3# connection tunnel lining construction completion 100%

Page 43: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Experiment Hall on Oct.15,2015

2#Lab Hall 3#Lab Hall

4#Lab Hall

Page 44: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Rock burst and collapse during Construction

rock burst after digging Dealing with the collapse

Page 45: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Rock burst risk prediction by microseism monitoring

Page 46: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

CDEX&PANDAX enlarge excavation projects

PANDAX

CDEX

Page 47: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

V. VENTILATION SYSTEM

Page 48: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

General Plan

normally: -- 24000 m3/h maximum: --45000 m3/h

Pipes:3×Φ800mm×9km

Air intake

Early efficiency purge tank

Air blower

Engine room

Medium efficiency purge tank

surge bin

surge bin

Fresh Air to Halls Air cleanliness ISO class 6

Engine room

Page 49: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Status of the drainage tunnel

water in the tunnel, 1~2m depth rock debris piled along tunnel

Page 50: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Render Picture :pipes along the wall

Page 51: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Render Picture :pipes on the top

Page 52: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Schedule of ventilation system

2015/09/01: design of ventilation system complete;

2015/12/31: construction plan determinated;

2016/06/30: system construction complete.

Page 53: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

VI. Summary•  CJPL-II has 4 130×12×12 m3 lab halls, and

its volume would be 131000m3. •  Radioactivity material screening during

CJPL-II construction; •  CJPL-II are constructing currently, and civil

engine would be finished in the end of 2015; •  CJPL-II would be ready in the end of 2016,in

our plan.

Page 54: Status of CJPL-II · Final Symposium of the Sino-German GDT Cooperation, Ringberg, 2015 Contents I. ... silica limestone titanium gypsum iron ore stone CaSO 4·2H 2O iron ash raw

Thanks !