1 la yXud % , Annexure-A fnukad % 27-05-2016 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF FRESH VENDOR REGISTRATION AS ON 27-05-2016 dze- la- S. No. vkbZVe dk uke Name of items vkosnd dk uke Name of applicant vkosnu fnukad Date of application orZeku fLFkfr Current status pkyu 'kfDr& vkbZVe Motive Power –BK items dze- la- S.No. vkbZVe dk uke Name of items vkosnd dk uke Name of applicant vkosnu fnukad Date of application orZeku fLFkfr Current status 1. Liner (LP) M/s Cooper, Satara. 21.11.09 Firm has sent 04 nos. for fitment at AMV/DSL shed for field trials. Trial period is two year and has been started in Aug.11. AMV/DSL shed has been advised on 02.08.13 to submit performance. Further as per current vendor guide line ver-12, Firm has been advised to submit details of legal documents and WCR/Jabalpur has been requested to place developmental order 10 nos. on 23.09.14. Reminder issued. Reply received on 12.05.15 on which shortcoming advised to firm on 07.07.15. Firm’s reply awaited. 2. CCB (with advance feature) M/s FTRTIL, Hosur. 12.01.11 DLW has been advised to place development order on 09.06.14. DLW has placed developmental order for 11 no. in June 14. Firm has offered for prototype inspection vide letter dated 28.01.16. 3. High friction brake block M/s HCL, Mumbai 27.06.13 Capacity & capability assessment has done. Inspection of brake blocks against development order done and IC issued on 26.03.15.Trial scheme has been issued on 30.04.15.Fitment/performance details sought from sheds vide letter dt. 29.07.15. Reminder issued dt. 30.12.15 & 18/19.05.16. 4. High friction brake block M/s ILPL, Mumbai 15.07.09 Firm has been advised to submit improved sample for testing at BDL/RDSO along with testing charges. Firm’s letter dt. 08/09/15 received and under scrutiny. 5. Air Compressor (Water cooled) M/s KPCL, Pune 07.11.12 Manufacturing 3 nos. of prototype air compressor has been cleared vide letter no. SD.Dev.GM.Compressordt. 21.01.13. Firm has informed on 24.03.15 that internal testing is carrying out & prototype will be offered till Feb 2016. Firm again informed that prototype will be offered in first week of July 2016. 6. Brake Interface Unit (BIU) M/s Lotus, Visakhapatnam 09.04.15 Development order for 10 Nos. BIU has been recommended to DMW/Patiala on 03.11.15. Functional testing is carried out from 18/11/15 to 21/11/15 & limitations observed in BIU Design are communicated to firm on 16/12/15. Type test results have also been sought from the firm. Firm reply received on 16.12.15 regarding type test. Some clarification is asked from firm on 15.01.16. Firm reply regarding type test was received on 25.01.16 & firm was advised on 27.01.16 to submit type test result accordingly. Firm has submitted the type test results. Clearance for BIU against WCR PO has been provided vide note, addressed to EC group, dt. 08/05/2016. 7. Brake Interface Unit (BIU) M/s Medha, Hyderabad 09.04.15 Functional Testing & Type Testing is completed in Aug 2015. Development order for 10 Nos. BIU has been recommended to DMW/Patiala on 11.09.15. 8. Auto Drain Valve M/s Midland Co., Kolkata 12.10.10 Fitment details have been received from DLW on 14.08.14. Zonal Railways has been advised to furnish performance on quarterly basis for one year field trial on 25/26.08.14. Reply from Zonal Railways awaited. One year field trial is now completing on 30.08.2015. Performance feedback has been received from DLS/GY only on 18.08.2015. All Zonal Railways has

Status of fresh registraion cases Annexure-A

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Status of fresh registraion cases Annexure-A

1

layXud % , Annexure-A

fnukad % 27-05-2016 dks os.Mj vkosnu dh fLFkfr

CURRENT STATUS OF FRESH VENDOR REGISTRATION AS ON 27-05-2016 dze- la-

S. No. vkbZVe dk uke

Name of items vkosnd dk uke

Name of applicant

vkosnu fnukad

Date of application

orZeku fLFkfr Current status

pkyu 'kfDr& बे्रक vkbZVe

Motive Power –BK itemsdze- la-

S.No. vkbZVe dk uke

Name of items vkosnd dk uke

Name of applicant

vkosnu fnukad

Date of application

orZeku fLFkfr Current status

1. Liner (LP) M/s Cooper, Satara.

21.11.09

Firm has sent 04 nos. for fitment at AMV/DSL shed for field trials. Trial period is two year and has been started in Aug.11. AMV/DSL shed has been advised on 02.08.13 to submit performance. Further as per current vendor guide line ver-12, Firm has been advised to submit details of legal documents and WCR/Jabalpur has been requested to place developmental order 10 nos. on 23.09.14. Reminder issued. Reply received on 12.05.15 on which shortcoming advised to firm on 07.07.15. Firm’s reply awaited.

2. CCB (with advance feature)

M/s FTRTIL, Hosur.

12.01.11 DLW has been advised to place development order on 09.06.14. DLW has placed developmental order for 11 no. in June 14. Firm has offered for prototype inspection vide letter dated 28.01.16.

3. High friction brake block

M/s HCL, Mumbai 27.06.13 Capacity & capability assessment has done. Inspection of brake blocks against development order done and IC issued on 26.03.15.Trial scheme has been issued on 30.04.15.Fitment/performance details sought from sheds vide letter dt. 29.07.15. Reminder issued dt. 30.12.15 & 18/19.05.16.

4. High friction brake block

M/s ILPL, Mumbai 15.07.09 Firm has been advised to submit improved sample for testing at BDL/RDSO along with testing charges. Firm’s letter dt. 08/09/15 received and under scrutiny.

5. Air Compressor (Water cooled)

M/s KPCL, Pune 07.11.12 Manufacturing 3 nos. of prototype air compressor has been cleared vide letter no. SD.Dev.GM.Compressordt. 21.01.13. Firm has informed on 24.03.15 that internal testing is carrying out & prototype will be offered till Feb 2016. Firm again informed that prototype will be offered in first week of July 2016.

6. Brake Interface Unit (BIU)

M/s Lotus, Visakhapatnam

09.04.15 Development order for 10 Nos. BIU has been recommended to DMW/Patiala on 03.11.15. Functional testing is carried out from 18/11/15 to 21/11/15 & limitations observed in BIU Design are communicated to firm on 16/12/15. Type test results have also been sought from the firm. Firm reply received on 16.12.15 regarding type test. Some clarification is asked from firm on 15.01.16. Firm reply regarding type test was received on 25.01.16 & firm was advised on 27.01.16 to submit type test result accordingly. Firm has submitted the type test results. Clearance for BIU against WCR PO has been provided vide note, addressed to EC group, dt. 08/05/2016.

7. Brake Interface Unit (BIU)

M/s Medha, Hyderabad

09.04.15 Functional Testing & Type Testing is completed in Aug 2015. Development order for 10 Nos. BIU has been recommended to DMW/Patiala on 11.09.15.

8. Auto Drain Valve M/s Midland Co., Kolkata

12.10.10 Fitment details have been received from DLW on 14.08.14. Zonal Railways has been advised to furnish performance on quarterly basis for one year field trial on 25/26.08.14. Reply from Zonal Railways awaited. One year field trial is now completing on 30.08.2015. Performance feedback has been received from DLS/GY only on 18.08.2015. All Zonal Railways has

Page 2: Status of fresh registraion cases Annexure-A

2

been advised to furnish performance on 11/15.12.15. It is also requested to DLS AMV & TKD to place dev. order for 10 Nos. (5 Nos. each by AMV & TKD) on 15.12.15.

9. Gauge complex with AFI

M/s Midland Co., Kolkata

12.07.11 Capability assessment done. QAP approved. Modified Prototype inspection has done on 11.02.15. Fitment & functional test on loco has done on 18.03.15. DLW has been advised to place Dev. Order on 30.04.15. On 08.02.16 WR also was advised to place dev P.O.

10. Air Flow Indicator for CCB on ALCO Loco

M/s Midland Co., Kolkata

10.02.15 Scrutiny done and shortcomings advised to firm on 18.02.15. C&CA done. Firm has been advised to submit revised QAP dated 7/29.10.15. Reminder issued on 08.02.16 & 03.05.16. Reminder also issued on 08.02.16 to Z. Rlys to submit field performance of items already supplied by firm to them.

11. Connecting Rod Big End Bearings Upper Half Lower Half

M/s Patel Brass Works Pvt. Ltd., Gujarat

23.09.11 Firm has been advised to manufacture 15 sets connecting rod big end bearing dated 28.01.13 for prototype inspection. Reminder issued on 23.09.14 for prototype inspection along with details of legal documents on 23.09.14. Reminder issued with confirmation of material on 12.02.15. Reply received on 08.04.15 & under scrutiny.

12. Auto Drain Valve M/s Prag Ploymers, Lucknow

11.02.15 Capacity assessment has been done on 31.12.15. Firm cleared for dev. order. DLW/DMW has been advised to place dev. Order on 05.04.16.

13. Feed Valve M/s Prag Ploymers, Lucknow

09.04.15 Capacity assessment has been done on 31.12.15. Firm cleared for dev. order. DLW/DMW has been advised to place dev. Order on 05.04.16.

14. Gauge complex with AFI

M/s Pricol, Coimbatore

12.06.14 Shortcomings advised to firm on 28.07.14 & 02.09.14. Reply received on 02.01.15 and shortcomings advised to firm on 19.01.15. Also issues were discussed with firm at RDSO on 28.01.15. Reply received on 13.05.2015 & 02.06.15. Shortcomings again advised to firm on 25.06.15. Again Shortcomings again advised to firm on 28.07.15/05.08.15. Reply received on 04.09.15. C&CA done on 24/25.12.15. DLW advised to place development order on 25.01.16

15. Valve- Emergency Brake for HHP Loco

M/s Recon, Howrah

09.04.15 Scrutiny done & shortcoming advised to firm on 03.06.2015. Firm reply received on 03.07.17. Factory License has been received on 10.09.15. Capacity assessment has been done on 07.01.16. Remarks of capacity assessment have been advised to firm on 12.02.16. Firm cleared for Development Order. DLW has been advised to place development order on 10/12.02.2016.

16. Modified Hand Brake Assembly

M/s ACME, Howrah

11.05.15 Scrutiny done & shortcoming advised to firm on 03.06.15. Firm reply received and shortcoming advised to firm on 13.07.15.Firm reply received on 07.08.15. Again shortcoming found and letter issued on 04.09.15. Firm reply received on 05.10.15. Capacity assessment has been done on 08.01.16. Remarks of capacity assessment have been advised to firm on 10/12.02.16. Firm cleared for Development Order. DLW/DMW has been advised to place development order on 10.02.2016

17. Modified Hand Brake Assembly

M/s J. P. Seat, Howrah

20.05.15 Scrutiny done & shortcoming advised to firm on 04.06.15. Reminder issued to firm on 04.09.2015. Reply received on 23.12.15. Shortcoming has been advised to firm on 27.01.16.

18. Modified Hand Brake Assembly

M/s Target, Patiala 27.05.15 Scrutiny done & shortcoming advised to firm on 04.06.15.Firm reply received on 07.08.15. Shortcoming advised to firm on 04.09.15. Firm reply received. Shortcoming advised to firm on 16.12.15.

19. Valve- Emergency Brake for HHP Loco

M/s Topgrip Instruments, Kolkata

07.05.15 Capacity assessment has been done on 16.07.2015. Firm cleared for Development Order. DLW has been advised to place development order on 03.09.15. Based on satisfactory prototype test, firm cleared for

Page 3: Status of fresh registraion cases Annexure-A

3

field trial. DLW has been advised to fit 10 nos. subject item on HPP loco dated 01.04.16.

20. Modified Hand Brake Assembly

M/s Topgrip Instruments, Kolkata

14.05.15 Capacity assessment has been done on 16.07.2015. Remarks of capacity assessment have been advised to firm on 12.08.2015.Firm reply received on 20.08.15 and found in order. Case is put up for approval of prototype inspection. Firm cleared for Development Order. DLW has been advised to place development order on 03.09.15.

21. J-1 Safety valve M/s Topgrip Instruments, Kolkata

17.05.15 Capacity assessment has been done on 16.07.2015. Remarks of capacity assessment have been advised to firm on 12.08.2015.Firm reply received on 20.08.15 and found in order. Case is put up for approval of prototype inspection. Firm cleared for Development Order. Based on DLW letter, E. Rly. has been advised to place development order on 19.02.16.

22. Brake System,Computer / Microprocessor Controlled ALCO and EMD Locomotives

M/s Wabtec Railway Electronics, USA

01.06.15 Scrutiny done & shortcomings advised to firm on 02.07.15. Reply of some points received on 18.08.15. Reply of remaining points dt. 13/10/15 is received on 01/12/15. Some clarification is asked from firm on 18.01.16. Firm is asked to deposit $1000 against fee for vendor registration application vide letter dt. 31.03.16.

23. Valve- Emergency Brake for HHP Locomotives

M/s Knorr Bremse India (P) Ltd

28.07.15 Comments on application form issued to firm on 02.09.15. Firm reply received on 13.01.16 and under scrutiny.

24. Lube Oil Pump (gear driven gear type)

M/s Santra & Co 28.07.15 Comments on application form issued to firm on 08/10.09.15. Firm’s reply received dt. 17.03.16 and under scrutiny.

25. Air Flow Measuring Valve and Air Flow Indicator

M/s Radish Technologies

29.07.15 Shortcoming has been advised on 20.08.15. Reply received on 29.10.2015. Again Shortcoming advised on 24.11.15. Reply received on 22.01.16. On 19.02.16, firm advised shortcomings and also discussed with firm on shortcomings in revised QAP. Reply received on 11.04.16 on which shortcomings advised on 28.04.16. Reply received on 13.05.16 and under scrutiny.

26. Air Flow Indicator for CCB on ALCO Locomotives

M/s Topgrip Indus Instruments Pvt. Ltd, Kolkata

02.09.15 Shortcoming has been advised on 30.09.15. Reply received on 11.01.16. Shortcomings advised on 08.02.16. Reminder issued on 03.05.16.

27. N-1 Reducing valve M/s Topgrip Instruments Company, Kolkata

04.09.15 Shortcoming has been advised to firm on 28/29.10.2015. Firm reply received on 12.12.15. Capacity assessment has been done on 04.02.15. Remarks of capacity assessment have been advised to firm on 31.03.16.

28. Valve feed, ALCo, EMD & Electric locomotives

M/s Topgrip Instruments Company, Kolkata

04.09.15 Shortcoming has been advised to firm on 28/29.10.2015. Firm reply received on 12.12.15 and firm cleared for dev. order. DLW/DMW has been advised to place dev. Order on 05.04.16.

29. D-1 Emergency brake valve

M/s Topgrip Instruments Company, Kolkata

07.10.15 Shortcoming has been advised to firm on 28/29.10.2015. Firm reply received on 12.12.15. Capacity assessment has been done on 04.02.15. Remarks of capacity assessment have been advised to firm on 31.03.16.

30. Auto Drain Valve M/s Associated Tools, Howrah

26.11.15 Shortcoming has been advised to firm on 16/29.12.2015. Firm reply received on 23.05.16 and under scrutiny.

31. Valve- Emergency Brake for HHP Locomotives

M/S Kaysons Electricals Pvt. Ltd., Varanasi

05.03.16 Shortcoming has been advised to firm on 20/24.05.16.

dze- la-

S. No. vkbZVe dk uke

Name of items vkosnd dk uke

Name of applicant

vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr& bZlh vkbZVe

Motive Power – EC items 1. 8 V, 450 Ah LM M/s Aegan 12.08.13 Application received on 19.08.13 and under scrutiny.

Page 4: Status of fresh registraion cases Annexure-A

4

Lead Acid Battery Batteries LtdNo26/1,27/3, Chudagondanahalli Village,Hosakote,Lakkur Hobli,Malur Taluk , Kolar District-563160

Case file sent to legal Cell on 17.09.13 for Scrutiny. File return from Legal cell on 09.01.2014. Firm send internal type test results on 28.01.14 in office case is scrutinized. Type testing completed and after approval letter issued for developmental order on 19.12.2014.

2.

Classification Light (LED based) for EMD locomotives

M/s Balin & Co 2A Ramkrishna Road, Sardapally, Barrackpore, PO Nonchandanpukur,Kolkata-22

13.03.12

After scrutiny, letter issued to firm on 23.03.12. Reply received on 2-06-12, e- mailed to firm on 14-06-2012 for submitting complete reply-awaited, letter issued for clarification on 6/9-07-12 and reply received on 20-07-12 through e-mail and firm is again asked clarification through e-mail on 30-07-12 for address mismatch. Reply received on 9-08-11 & letter issued for clarification on 6-09-12, reply received on 01-11-12 and letter issued again to firm on 28-12-12 for reply. Reply received on 5-02-13 .Capability and capacity assessment has been planned on 23-05-13 &24-05-13 After scrutiny, letter issued to firm on 23.03.12. Reply received on 2-06-12, e- mailed to firm on 14-06-2012 for submitting complete reply-awaited, mail received from firm on 26-06-12, letter issued for clarification on 6/9-07-12 and reply received on 20-07-12 through e-mail and firm is again asked clarification through e-mail on 30-07-12 for address mismatch. Reply received on 9-08-11 & letter issued for clarification on 6-09-12, reply received on 01-11-12 and letter issued again to firm on 28-12-12 for reply. Reply received on 5-02-13. Capability and capacity assessment has been carried out from 4 -7 July 13 and under process. Documents received on 12-08-13 and sent to Legal Cell for scrutiny on 27-08-13. File received from Legal cell with remarks on 28-10-13. Letter issued to firm on 08-11-13 for compliance the legal cell remarks and reply awaited. Reply received on 2-12-13 and again sent to Legal Cell for scrutiny on 11-12-13. File received from legal cell on 08.01.2014 and under further process. Letter sent to firm on 18.03.14 for manufacture the sample. Reply received through mail on 04.04.14 and letter issued to firm on 22.05.14 for submitted internal type test report. Letter issued to firm on 16.06.14 for submitted complete internal type test report. Reply received on 09.03.2015. Type test has been carried out from 18 to 22-04-15 & 26-04-15 at firm premises. Letter issued for remaining test from outside lab on 02-06-15. Reply received. Letter issued to firm on 26.11.15 for submitting the burn-in test report as per governing specification. Reply received. Letter issued to firm on 28.03.2016 for field trials.

3.

Sensor, Fuel Level M/s BAYHAM INDIA PVT LTD 14.02.13

Application received on 14.02.13 and Letter issued to firm on 15.03.13 Reply received from M/s Bayham through Mail on 01-04-13. Letter issued on 21-06-13 for submitting documents as per vendor guideline ver.7. Reply received on 08-08-13 and send for Legal cell /RDSO scrutiny on 27-08-13. File received from legal cell on 08.01.2014 and under further process. Letter sent to firm on 07.03.14 for submit the declaration for undertaking. Reply received on 24.03.14. Deficiencies advised to firm on 01.05.14. Reply received on17/18.06.14 and Letter issued to firm for deficiencies on 03-07-2014. Reminder letter issued to firm on 29/09/2014, reply awaited.

4. 8V, 500 Ah LM Lead Acid Battery

M/s Beacon battery enterprises/ hoppecke battery

14.07.11

Application scrutinised. Documents not found as per RDSO Spec. Joint meeting held with firm on 19.07.11 and advised to comply the same. Firm agreed to modify the design and document. Reply received on

Page 5: Status of fresh registraion cases Annexure-A

5

systems Beacon :172 Sector 23 Gurgaon 122017

18.10.2011. Letter issued for manufacture of Ni-Cd Battery Sample on 03.11.2011. Visit to firm on 23.11.11. Testing facility and samples not available. Firm has given the assurance by Feb 2012. Reply received and letter issued to firm on 06.07.12 for deficiencies. Reminder letter issued on 06.03.2013. Letter issued on 02-07-13 for submitting documents as per vendor guideline. Documents received on July 19, 2013 against reminder. Document paper not completed by Notary attested till date. Document papers submitted by firm and file sent to Legal cell on date 22.11.13. File return from Legal cell on 09.01.2014. One set of 8V, 500Ah lead acid battery for developmental P.O. meet to firm from DLW Varanasi and checked by RDSO at firm premises not found suitable samples and letter send to firm and DLW Varanasi dated 03.03.2014. Revised letter sent to firm on 08.04.14. Firm has submit the compliance doc. to RDSO on 07.08.14 and discussed with JD/DEMU for development of testing Lab and ready the modified sample. Firm has agreed to submit the internal test results on Sept. 2014.

5.

6V, 150Ah Ni-Cd Battery Storage Unit

M/s Beacon battery enterprises/ hoppecke battery systems Beacon :172 Sector 23 Gurgaon 122017

13.05.11

Application scrutinised. Documents not found as per RDSO Spec. Joint meeting held with firm on 19.07.11 and advised to comply the same. Firm agreed to modify the design and document. Reply received on 18.10.11. Letter issued for manufacture of Ni-Cd Battery Sample on 03.11.2011. Visit to firm on 23.11.11.Testing facility and samples not available. Firm has given the assurance by Feb 2012. Reply received and letter issued to firm on 06.07.12 for deficiencies. Reminder letter issued on 06.03.2013. Letter issued on 02-07-13 for submitting documents as per vendor guideline. Documents received on July 19, 2013 against reminder. Case file sent to legal cell on 17.09.2013 for scrutiny. File return from Legal cell on 09.01.2014. DLW developmental order given to firm for one loco set of 6v, 150Ah Ni-Cd battery and proto type test done at firm’s premises. Test results are not found satisfactory and letter sent to DLW Varanasi and firm on 03.03.2014. Revised letter sent to firm on 08.04.14. Firm has submit the compliance doc. to RDSO on 07.08.14 and discussed with JD/DEMU for development of testing Lab and ready the modified sample. Firm has agreed to submit the internal test results on Sept. 2014.

6.

General Purpose Relay

M/s Bhopal Electrical Insulation Pvt Ltd, Plot no 82-B, Sector-H, Industrial Area, Govindpura, Bhopal-23

18.10.10

Re Endurance test to be done & ETDC report awaited. Letters & Reminders have been sent to firm on 30.08.11, 24.10.11, 16.11.11, 13.12.11, 28.12.11 & 16.01.12. Re-endurance test started on 16.03.12. Mechanical and electrical endurance test completed on 19.04.12 and 01.5.12 respectively. The firm has to get vibration & shock test completed at some NABL accredited/Gov. Lab. for getting shock and vibration test conducted, letter sent to the firm on 21.06.12 and 04.07.12. 6th reminder sent to the firm on 22.02.13. The report of vibration & shock test submitted by the firm on 16.04.2013. The QAP as per new format is still awaited. Letter for compliance of QAP as Per RDSO format sent to firm on 31.05.13. QAP after complying all points of deficiencies is awaited. QAP dated 30.07.2013 in one copy received on 06.08.2013 and is under scrutiny. Letter of deficiencies sent to the firm on 23.08.2013. A reminder citing the early deficiencies sent to the firm on 31 Oct/01 Nov/2013. After overcoming the deficiencies, QAP dated 04.12.2013 received from the firm. An e-mail dated 09.12.2013 sent to the firm for submitting required documents

Page 6: Status of fresh registraion cases Annexure-A

6

before approval. An e-mail dated 13.12.2013 sent to the firm for submitting required documents before approval. The firm submitted some documents along with their letter dated 11.02.2014 but not all documents as advised to the firm as per latest guidelines, ver-8.0. Letter for balance documents sent to the firm on 26/27.03.2014. Some of the documents submitted on 28.04.2014 by the firm but there were errors in documents. On 09.05.2014 the firm submitted documents but there were error in some documents. The firm assured that they will submit those documents after correction by 19.05.2014. Documents from the firm have been received on 20.05.2014. The firm has submitted justification letter on 06.06.2014 for not submitting factory license and another letter for waiver from field trial. An inspection at firm’s premises has been planned for checking the men power and installed power capacity to verify the claimed “none requirement of factory license”. Verification report submitted on 18.06.14 regarding substitute of factory license. Letter for developmental order issued on 16.07.2014. A letter for status of developmental order sent to DMW/PTA on 02.11.2015. A letter for status of field trials has been sent to the firm on 11.03.2016.

7.

Sensor, Fuel Level

M/s Elixir Engineering, #6, SFHS Shopping Area, Nandini Lay out, Bangalore – 560 096

13.06.13

Letter issued on 21-06-13 for submitting documents as per vendor guideline ver.7, Reply received on 13-08-13 and under process. Letter issued to firm on 20-08-13 for compliance of Legal Cell Observation. Reply received and sent to legal Cell on 19-09-13 for Scrutiny. File received from legal cell on 08.01.2014 and under further process. Letter sent to firm on 07.03.14 for submit the declaration for undertaking. Reply received on 24.03.14. Deficiencies advised to firm on 01.05.14. Reply received on 27.05.14 and letter issued for clarification on 20-06-14. Reply received from firm through e-mail on 27.06.14. Letter for clarification issued on 01.08.2014. Reply received on 04/09/14 and capacity and capability assessment to be carried out.

8.

Master Controller of EMD locomotive (Dynamic Control Assembly)

M/s Inspros Engineers Pvt Ltd,126, Sector-A, Industrial Area, Mandeep, Bhopal- 462046

30.04.11

Load Life test is completed. The firm has submitted vibration test report issued from ERTL New Delhi on 09/02/12. Letter issued to DLW vide our letter SD. EMD. Master Controller (Inspros) on 02/03/12 for extension of P.O. issued to M/s Inspros. IC issued on 23.03.12. Prototype clearance for field trial has been issued to M/s lnspros Engineers Pvt. Ltd, Bhopal on 19-04-12. Letter to SBI and GY Shed sent for Performance feedback of the EMD Master Controller under field trial. Technical Audit with DLW conducted on 23rd and 24th May’13. Audit report prepared and issued to DLW and Firm for complying the issue raised in the report. Audit verification is still pending, however this office has reminded by letter on 08.11.2013. Letter issued to firm for providing the date of verification for audit on 05/03/2014. Reply received from firm. Date of verification finalised and letter issued to firm on 19/03/2014. Letter also issued to DLW for providing the fitment details on the locomotive on 19/03/14. Letter issued to DLW and M/s Inspros for re- scheduled the verification for audit as requested by the Firm on 03/04/14. M/s Inspros intimated to RDSO again and re- scheduled the date of verification for audit. Case is under process. Letter issued to M/s Inspros and DLW for verification for audit on 23/05/2014. Letter issued to firm on 18/07/2014 for clarification on failure of trial equipment. Letter issued to firm for QAP clarification on 21.10.2014. QAP clarification received and is under scrutiny. Firm is

Page 7: Status of fresh registraion cases Annexure-A

7

advised to submit the compliance the documents and failures of equipment under field trial as discussed in the MOM dated 03.07.2015. Reminder issued on 06.11.15 and reply awaited. Letter issued to firm on 11.01.2016 to compliance the issues and submit the report with joint note with shed. Letter issued to firm on 16.03.2016 for submit the compliance the documents.

9.

Conventional stick type Master controller BHEL model MC03802B

M/s Inspros Engineers Pvt Ltd,126, Sector-A, Industrial Area, Mandeep, Bhopal- 462046

03.01.12

After scrutiny, letter sent to firm vide our letter no. SD.ALCO MASTER CONTROLLER on 19/01/12 for submitting the QAP. The firm has submitted QAP on 09/02/12 and scrutinised. Intimated on Phone and e-mail also to M/s Inspros for offer the type test. Reply received on 21.06.12. BHEL type test programme sent to firm by e-mail on 18.07.12 and asked to submit the internal test result as per the BHEL test programme. The firm again advised by e-mail to offer for type test on 01/08/2012. Reminder issued to firm on 11/09/12.The capability assessment waived off. Prototype Type Test started. In-house test done at 6th and 7th feb` 2013 at the firm premises. Vibration test completed. Test report scrutinised. Letter issued to DMW/Patiala with a copy to firm for field trial on 14/08/2013 vide this office letter no. SD.DFM.ALCo MASTER CONTROLLER (Inspros) dt. 14.08.13. Reminder letter issued to DMW on 19/03/2014. Reply received from DMW/PTA of Status of field trial on loco. Letter issued to DMW/PTA on 29.01.15 for fitment details.

10.

Flasher light (LED based)

M/s Kaysons Electrical Pvt Ltd, SH 15/79, Shivpur Varanasi 221003

24.02.11

Reminder uploaded for reply on 05-05-2011, till date reply not uploaded by firm. Letter issued again on 02.09.11 for same. Reminder sent through e-mail on 15.11.11. Reply received through e-mail on 17.11.11. Wave soldering certificate received on 02.12.11. Verified at firm by RDSO representative on 17.03.2012, Firm was asked to send compliance with Vendor guidelines on 1-05-12, firm is advised on 08-06-2012 through email to send the QAP as per Latest Format., reminder letter dated 5-10-12 mailed and reply received on 01-11-12 and letter issued to firm for reply on 07-12-12 and QAP revived on 28-1-2013 and under process. Capacity Assessment and type test is carried out from 26-2-13 to 2-03-13. Corrected copy of QAP received on 05-04-13, Inspection call not received for remaining type test, letter issued for type test inspection call on 26-06-13. Further Type test has been carried out from 22 to 26-07-13 & 12-08-13 at firm premises Letter issued for remaining test from outside lab on 23-08-13. Results awaited. Reminder Letter issued to firm on 06.03.14. Incomplete result received on 14.08.14. Letter issued to firm on 05.09.14 for submit remaining test report. Test results of LED value in Candela is awaited from the firm. E- mail sent to firm on 11.04.16 for submit the complete vibration test report.

11.

Marker light (LED Type)

M/s Kay sons Electrical Pvt Ltd,SH 15/79, Shivpur Varanasi 221003

19.02.11

Reminder uploaded for reply on 05-05-2011, till date reply not uploaded by firm. Letter issued again on 02.09.11 for same. Reminder sent through e-mail on 15.11.11. Reply received through e-mail on 17.11.11. Wave soldering certificate received on 02.12.11. Verified at firm by RDSO representative on 17.03.2012, Firm was asked to send compliance with Vendor guidelines on 1-05-12, reply received on 19-05-12 after scrutiny, firm is advised on 08-06-12 through email to send the QAP as per Latest Format. Reminder letter dated 05-10-12 mailed and letter issued to firm for reply on 07-12-12 and QAP received on 28-1-2013 and under process. Capacity Assessment and type test is carried out from 26-2-13

Page 8: Status of fresh registraion cases Annexure-A

8

to 2-03-13. Corrected copy of QAP received on 05-04-13. Inspection call not received for remaining type test, letter issued for type Test inspection call on 26-06-13. Further Type test has been carried out from 22-07-13 to 26-07-13 & 12-08-13 and Letter issued for remaining test from outside lab on 23-08-13. Results awaited. Reminder Letter issued to firm on 06.03.14. Incomplete result received on 14.08.14 Letter issued to firm on 04.09.14 for submit remaining test report. Test results of LED value in Candela is awaited from the firm. E- mail sent to firm on 11.04.16 for submit the complete vibration test report.

12.

Intelligent Low Idling Equipment

M/s Laxven Systems,Plot No 188/A, Sector-III,Lane-1, IDA, Phase-II, Cherlapally Hyderabad- 500 051

18.04.12

Letter issued after scrutiny on 4-5-12. Reply received on 17-05-12. After scrutiny, firm is advised on 04-06-12 through email to send the QAP as per revised format. Reply received on 14.06.12 through email and hard copy received on 21.06.12. Prototype testing (In-house) has been carried out on 29.08.12 to 30.09.12 and ETDC /ERTL test completed. Loco validation test has been done on 01/10/2012 at KZJ. Firm has submitted the original copy of test reports. Letter issued to firm and Sr.DME(D)/KZJ on 04/12/2012 vide our letter no. SD.LOW IDLE (Laxven) dt. 04.12.12 reg. field trial clearance. Letter issued to MLY shed for field performance on 05.06.13. Reminder letter issued to MLY shed with a copy to and firm on 28/03/14. Reminder -II issued to Sr. DME/MLY on 21.10.2014 for performance. Reminder-III issued 29.01.15.

13.

Micro-Controller based governor for ALCO / DLW / DMW 16 & 6 Cylinder 251 Series Diesel / Electric Locomotives

M/s Laxven Systems,Plot No 188/a, Sector-III,Lane-1, IDA, Phase-II, Cherlapally Hyderabad- 500 051

18.04.12

Application received on 19.04.2012. Letter written to the firm date 02.05.2012 for details. Letter received from the firm vide letter no. LAX/RDSO/MCBG-048/12-13 date 15.05.12. Deficiencies advised to firm on 19.06.12 by email. Reply received on 04.07.12 by email and case is under process. Latest Digital Signature submitted and uploaded on RDSO website by firm on 31st July12.Further credentials have been sought from the vendor as per the vendor guideline on 7/8th Aug2012. Letter sent to firm on 8th Oct'2012 for compliance of infrastructure. Firm sent mail on 06.02.13 regarding the compliance of infrastructure. Check sheet has been prepared. Further, on 18th Feb'13, firm has been asked to submit Plant & Machinery list in non-judicial stamp of Rs. 100. And self-declaration form of allied sister concern. Firm has submitted self-declaration form of allied sister concern. Firm has submitted Plant & Machinery list in non-judicial stamp. MCBG test schedule under Scrutiny as per Rev 03. Testing at the firms premises planned in April 2013. Firm has been asked to send the OGA drg for MCBG. Capacity Assessment and functional testing of prototype conducted on 9th and 10th May 2013. Firm has to carry out further testing at the Govt. recognized lab. Letter issued on 13/08/2013. Firm has submitted ETDC test report and the same is under study. MCBG unit is planned to be tested on engine test bed at DMW. Letter issued on 08.10.13 to DMW for testing. Letter issued to CMM/PTA on 23.05.14 for developmental order for two no. MCBG and a letter issued to M/s Laxven System on 23.05.14 for conducting remaining test as per Rev. 03. Remaining test has been carried out at firm premises from 17.07.14 to 22.07.14 and letter sent to DMW/Patiala on 07.08.14 for conducting performance test. Performance test has been carried out at DMW on 13.10.14 to 16.10.14 and case is under process. Equipment has been fitted on loco no. 16716 at DMW, Patiala and performance is under monitoring. Second unit fitted on loco no. 16714 and letter issued to diesel

Page 9: Status of fresh registraion cases Annexure-A

9

shed MLY on 20.05.2015 for performance feedback. 14.

Marker light (LED Type)

M/s Malika International A-16, Sector-10, Noida-201301

25.04.12

Letter issued after scrutiny on 04-05-12 and reply received on 24-05-12, shortcoming advised to firm on 15-06-12 through email. Reply received on 21-06-12. Capability & Capacity assessment carried out on 24-07-12 & 25-07-12. Deficiency advised to the firm on 14.09.12.Reply received on 10-10-12 , Deficiency advised to the firm on 22-10-12 , reply received on 30-10-12 and Letter issued to firm for prototype development on 07-12-12. Internal test report received on 28.03.13 further queries called trough mail on 10-04-13 and reply received on 23-04-13 and under process, QAP compliance will be ascertained in June 13 however letter issued on 21-06-13 for submitting documents as per vendor guideline ver.7. Reply received on 28-06-13 but documents are not as per guideline and informed to firm through phone on 08-07-13. Reply received on 16-07-13 and processed for Legal cell scrutiny. Letter issued to firm on 23-08-13 for compliance of Legal cell observation. Reply received on 02.09.2013 and send to legal cell on 04-09-13 for scrutiny of documents, Scrutinized document received on 05-09-13. Capability & capacity assessment has been carried out 04-10-13 & 05-10-13. Firm is advised to comply the observation before type test on 31-10-13. Reply awaited. Reply received through mail on 13.01.2014 and 12.03.14. Letter issued to firm on 07.04.14 for suitable date for type testing call from firm side. Reply received through mail on 15.04.14 and type test is carried out from 13.05.14 to 17.05.14. Remaining type test is carried out on 04.06.14 to 05.06.14. Letter issued for remaining test from outside lab on 12-06-14. Results awaited.

15.

Flasher Light, LED type for ALCO Locomotives- Spec No. ELRS/Spec/LFL/0017 Rev. 01, Sep 04

M/s Malika International A-16, Sector-10, Noida-201301

18.01.13

Letter issued to Firm for further clarification on 8/11-02-13, Firm reply received on 25-02-13 and further reply of firm received on 08-03-13 As per revised vendor guideline documents sought vide letter dt. 21.06.13. Reply received on 28-06-13 but documents are not as per guideline and informed to firm through phone on 08-07-13. Reply received on 16-07-13 and processed for Legal cell scrutiny. Letter issued to firm on 23-08-13 for compliance of Legal cell observation. Reply received on 02.09.2013 and send to legal cell on 4-09-13.Scrutinized document received on 05-09-13. Capability & capacity assessment has been carried out on 04-10-13, 05-10-13. Firm is advised to comply the observation before type test on 31-10-13.Reply awaited. Reminder-I issued to firm on 21.03.14. Letter issued to firm on 11.03.2015 for submit current status of product.

16.

Micro Controller Based speed recorder-indicator

M/s Stesalit Ltd, Park Plaza (N) 71, Park Street, K O L K A T A – 700 016

12.09.07

Prototype approval is issued for field trials on 15.05.09 vide letter no.SD. DFM. M.1.3 (Stesalit). Letter issued to firm vide our letter even no. SD. DFM. M.1.3 (Stesalit) on 21/07/11 regarding status of field trial. Firm response received. Letter issued to DLW regarding to know the dispatch details of trial equipment. Reply from DLW received. As per the DLW letter, trial equipment is lying at the central dispatch at DLW and it is ready to dispatch. A request letter issued to DLW in this regard on 03/02/12. Firm has requested to include in Part-II Category. Reply issued to firm on 28.03.12 for completing the field trial in response to up gradation to part-II. A letter issued to DMW vides our letter of even no. SD. DFM. M.1.3 (Stesalit) on 18/07/2013 for providing the fitment details. Reminder letter issued to DMW on 31.01.2014. Reply from DMW/PTA is received on 20/03/2014. Letter issued to concerned diesel sheds for performance feedback on

Page 10: Status of fresh registraion cases Annexure-A

10

21/03/2014. Letter issued to concerned diesel sheds for performance feedback on 21/03/2014. Trial equipment failed. Letter issued to M/s Stesalit for repair/ Replacement of the failed equipment on 06.08.2014. Reminder issued to firm on 29.01.15.

17.

Flasher light LED type for ALCo locomotives

M/s Electronic Equipment Co. Pvt. Ltd, 544 Rabindrapally, brahmapur kolkata

15.04.13

Scrutiny of Online form & letter issued on 06 may 2013.Reply received through mail on 21-05-13 and letter issued to firm for sending documents as per Version 7 of the guideline on 21-06-13.Documents received from firm on 08-07-13 and sent to Legal cell for scrutiny on 11-07-13. After legal scrutiny letter issued to firm on 23-08-13 .Document submitted on 18-09-13 and send to Legal cell on 19-09-13 for scrutiny. After legal scrutiny, letter issued to firm on 30.09.13 to provide suitable date for the capacity assessment. Reply received through mail on 16.01.2014 related to clause wise compliance report of reliability specification and case is under process. Capacity assessment has been done in 26.02.14 to 27.02.14. Letter issued to firm on08.04.14 for manufacture samples.

18.

Battery-8V, 500Ah lead acid

M/s United Lead oxide Products Pvt. Ltd.

12.06.13

Application received on 18.06.13 and as per revised Vendor guideline fresh documents sought Vide letter dt. 21.06.13. Documents received as on 19 July 2013. Documents with Original Case file Sent to legal Cell for Scrutiny. Observation raised by legal Cell communicated to the firm vide letter dt 17.09.13 and firm has submitted the documents on 05.12.13. File sent to Legal cell for scrutiny on 05.12.20. File return from Legal cell on 09.01.14. Firm has informed for firm visit and Capacity/capability assessment done on 06.04.14, and development order letter send to DMW/DLW and inform to firm. Letter sent to firm again for prepare the sample for Prototype testing on 11.09.14. Prototype testing is under process. Developmental order issued from DLW 31.07.2015 for 70 no. quantity.

19.

Master Controller for EMD locomotive

M/s Saitronik Electric equipments Plot No. 2-10-168, EC Nagar, Post-Cherlapally, Hyderabad - 500 051

14/03/2014

Application received on 14.03.2014. As per vendor guideline documents scrutinised and letter issued for complying the deficiencies vide letter dt. 18.03.2014. Letter issued to firm on 03/04/2014 for complying the deficiencies mentioned vide our letter no. SD.EMD. MASTER CONTROLLER (Saitronik). Reply received, case is under process. Letter issued to firm on 02/05/2014 again for submission of list of M/c vide our letter no. SD.EMD. MASTER CONTROLLER (Saitronik). Documents received on 23/07/2014 and are under scrutiny. Deficiency advised to firm on 05.08.2014 SD.EMD. MASTER CONTROLLER (Saitronik). Case is under process in reference to firm`s Reply dated 06/08/2014. Letter issued to firm on 22.10.2014. Reminder issued to firm on 12.02.2016 for willingness to develop the HHP Master controller as per EOI. Letter issued to firm for clarification in change in address on 14/15.03.2016. Letter issued to on 28.03.2016 for fresh vendor registration. Letter sent to DLW on 09.05.2016 for placing developmental order on the firm.

20.

Control System, AC- AC Traction for 4500HP EMD Locomotives & its sub-assemblies

ABB India Ltd Survey No 88/3 & 4 Kasaba Hobli , Nelamangala Taluk , Bangalore 562 123

06-03-2014

Vendor registration form has been received & it is under scrutiny. Shortcomings were advised to the firm vide RDSO letter dated- 07.05.14. Reminder letter issued to the firm dt 11-07-14. Reply from M/s ABB has been received on 04-11-2014. Emailed has been sent to M/s ABB on 03-02-2015 regarding “Make in India” policy on foreign firms against DG note no-DG/Misc./2014, dated-20-10-2014. M/s ABB has submitted the Bill of material via email dated-05-02-2015. M/s ABB has submitted the list of indigenous

Page 11: Status of fresh registraion cases Annexure-A

11

components for AC-AC propulsion system for diesel locomotives on 27-02-2015. Shortcomings were advised to M/s ABB on 16-03-2015. Firm replied vide letter dated 26.05.2015 and is under scrutiny.

21. Control System, AC- AC Traction for 4500HP EMD Locomotives & its sub-assemblies

Crompton Greaves Limited Plot No: 9, New Industrial Area Phase-2, Mandideep - 462 046 (Madhya Pradesh)

06-02-2014

Vendor registration form has been received & it is under scrutiny. Shortcomings were advised to the firm vide RDSO letter dated- 07.05.14. Reminder letter issued to the firm dt 11-07-14. M/s CGL’s reply against RDSO letter dated-07.05.14 has been received on 26.12.14 and is under scrutiny. Furthermore, shortcomings based on firm’s reply, has been advised to the firm vide letter dated-28.10.15.

22.

General Purpose Relay

Narbada Electro Engineering, Shed No.46E, Industrial Area, Govindpura Bhopal.

17-04-2014

The form and attached documents were scrutinized and a letter citing deficiencies sent to the firm on 01.05.2014. QAP and undertakings/declarations received from the firm on 21.07.2014. Letter for deficiencies sent to the firm on 02.09.2014. QAP and undertakings/declarations received from the firm on 12.01.2015. Capacity assessment of the firm done from 11.05.2015 to 12.05.2015. Letter issued to firm on 09.06.2015 for sending internal test report and to inform RDSO for type test. The firm submitted type test scheme and internal test report of GP relay on 28.09.2015 and the same is under scrutiny. A letter along with approved type test scheme for advising type test date, sent to the firm on 13/14.10.2015. Reply received from firm on 02.11.15. Letter dated 08.01.16 received from the firm for type test after 25th January 2016. Type test is planned since 02.02.16. Type test is under progress. GP Relay has been sealed on 14.04.16 for endurance test.

23.

Classification Light (LED based) for EMD locomotives

M/S Universal Controls, Plot No:42, Electronic Complex Extn, Kusahiguda, Hyderabad-500062

15.04.2014

Form On- line received and after scrutiny of the form and attached documents, a letter issued to firm on 07.05.2014. Incomplete reply received on 19.05.14 and a letter issued to firm on 28.08.14 for submit complete reply with, Mandatory Declarations as per revised vendor guide line version 12.0. Reply received on 17.09.14. Letter issued to firm on 03.12.14 for capacity assessment. A Letter issued to firm on 12.01.2015 for manufacture samples of LED based Classification Light for proto type testing. Reply received on 24.02.2015. Letter Issued to firm on 16.11.2015 for Submission of Burn in Test report.

24.

Sensor, Fuel Level M/s Pricol Engineering Industries Limited

10.06.2014

Online application received on 10.06.2014 and letter issued to firm on15.07.2014 for submitting documents/clarifications. Reply received on 28.01.15. Shortcomings advised to firm on 13.02.15 by email. Reply received on 21/07/15. Letter sent to firm on 25.08.2015 for submitting shortcomings.

25.

Control system locomotives Microprocessor based for ALCO locomotives

Lotus Wireless Technologies India Pvt. Ltd.

27.06.2014

Online application received on 27.06.2014 and case is under process. Deficiencies advised to firm vide letter no. SD.Dev.MCS, dt: 08.08.14. Reply received on 11.09.14. Email sent to firm for obtaining balanced documents on 01.10.14, firm has submitted the same on 08.10.14. Email sent to firm for obtaining balanced documents on 14.10.14 and reply received on 22.10.14. Letter issued to firm on 02.12.14 for need few clarifications and reply awaited.

26.

Classification Light LED Type for EMD locomotives

Electricals Electronics Industrial Corporation, 108 Anandapally P.O. Jadavpur University Kolkata 700032

27.06.2014

Online application received on 27.06.2014 and case is under process. After scrutiny letter send to firm on 23.07.14. Reply received on 20.08.14. Mailed to firm on 29.08.14 for submit Mandatory Declarations as per revised vendor guide line version 12.0. Reply received on 01.09.14. Letter issued to firm on 14.10.14 for Capacity and Capability assessment. Firm visit on 13.11.14 to 14.11.14. A Letter issued to firm on 09.01.2015 for manufacture samples of LED based

Page 12: Status of fresh registraion cases Annexure-A

12

Classification Light for proto type testing. Reply received on 24.03.2015. Type test has been carried out from 22 to 27-04-15 at firm premises. Letter issued for remaining test from outside lab on 02-06-15. Reply received. Letter issued to firm on 11.09.2015 for field trials.

27.

Micro-Controller based governor for ALCO / DLW / DMW 16 & 6 Cylinder 251 Series Diesel / Electric Locomotives

Lotus Wireless Technologies India Pvt. Ltd.

17.07.14

Online application received on 17.07.2014. Deficiencies advised to firm vide letter no. SD.Dev.MCBG (Alco), dt: 08.08.14. Reply received on 11.09.14. Email sent to firm for obtaining balanced documents on 01.10.14, firm has submitted the same on 08.10.14 and case is under process. Email sent to firm for obtaining balanced documents on 14.10.14 and reply received on 22.10.14. Letter issued to firm on 02.12.14 for need few clarifications and reply awaited. Capability cum capacity assessment done on 11.05.15 & 12.05.15.

28.

Sensor, Fuel Level M/s Saitronik Electric Equipments

11/08/2014

Online application form received and case after scrutiny letter issued to firm on 24/10/2014 for submitting deficiencies/clarifications. Reply received from firm on 10/11/2014. After scrutiny of documents letter issued to firm on 20/11/2014 for submitting clarifications. Documents received from firm on 01/12/2014 and scrutiny is under process. Letter issued to firm on 27.01.15 for asking some clarification regarding compliance of specification. Reply received through e-Mail on 24-02-15 and under process.

29.

Control System, AC- AC Traction for 4500HP EMD Locomotives & its sub-assemblies

M/s Yongji Xinshisu Electric Equipment Co. Ltd., P.R. China

04.09.2014

Online application form dated-04.09.2014 was received and is under scrutiny. Shortcomings advised to firm on 29.12.14. Vide their letter dated-08-01-2015, Firm has submitted the intimation regarding joint venture between M/s Poineer Filmed Pvt Ltd. and Yongji Xinshisu Electric Comp ltd. Vide their letter dated-14-02-2015, Firm has asked some queries from RDSO regarding specification of AC-AC IGBT control traction system and same is under preparation by RDSO. However shortcomings against RDSO letter dated-29-12-2014 are still awaited from the firm. Reminder letter issued to firm on 15.09.2015 in connection with compliance of specification and shortcomings. Reply received on 25/10/2015 and case is under process.

30. Governor/LCC Engine for DEMU

M/s MADHURA INTERNATIONAL, Pune

07.10.14 Online application received and case is under process.

31.

Distributed Power Control System for HHP Locomotives

Lotus Wireless Technologies India Pvt. Ltd.

22.01.15

Online application received on 22.01.15. Letter issued to Firm on 6/9.02.15. Capability cum capacity assessment done on 11.05.15&12.05.15.Letter sent to DLW for placing developmental order on the firm on 18.06.15. Inspection call received on 19.01.2016. Letter sent to firm on 21.01.2016 for submit documents. Documents received on 03.02.2016. Proto type testing carried out from 16.05.16 to 19.05.16 at firm’s premises.

32. Distributed Power Control System for Alco Locomotives

Lotus Wireless Technologies India Pvt. Ltd.

22.01.15

Online application received on 22.01.15. Letter issued to Firm on 6/9.02.15. Letter e-mailed to firm on 27-03-2015. Capability cum capacity assessment done on 11.05.15&12.05.15. Proto type testing carried out from 12.04.16 to 15.04.16 at firm’s premises.

33. Control system locomotive, Microprocessor based for ALCO locomotives

M/s Laxven Systems, Hyderabad

06.02.15 Online application received on 06.02.15 and case is under process. Letter issued to firm on 13-08-15 for submitting shortcomings.

34. Sensor, Fuel Level

M/s Top Grip Industries , Hyderabad

23.02.15 Online application received on 23.02.15 and letter issued to firm on 18/03/2015 for submitting Shortcomings. Documents have been scrutinized and

Page 13: Status of fresh registraion cases Annexure-A

13

letter issued to firm on 19/06/2014 for submitting shortcomings. Reply received on 28/08/2015 and case is under process.

35.

Loco Cab Video and Voice Recording System RDSO Spec. No. MP.0.0400.14, Rev-0

Matrix Security and Surveillance Pvt Ltd, 8-2-293/82/J/119-A, Journalist Colony, Phase II, Jubileehills, Hyderabad

16.04.15 Online application received on 16.04.15. Shortcoming of vendor registration form has been advised to firm on 06-07-2015. Reminder letter has been issued to firm on 07.10.2015. Reply received on 10/11/2015. Vide RDSO letter no SD-DEV.LCVR-DTDR, dated-11-12-2015, for Placement of developmental order for M/s Matrix has been given to DMW/Patiala for Alco locomotives. Letter has been sent to CME/DLW on 22-01-2016 regarding placement of development order to M/s Matrix for HHP locomotives.

36.

Distributed Power Control System for HHP Locomotives

MEDHA Servo Drives Pvt. Ltd., Hyderabad

15.04.15 Online application received on 15.04.15. Capability cum capacity assessment done on 08.05.15.Letter sent to DLW for placing developmental order on the firm on dated 18.06.15. Inspection call received on 05.02.2016. Inspection carried out from 16.02.2016 to 27.02.2016.

37.

Flasher light LED type for ALCo locomotives

M/s Surya Electronics, R.R Dist, Hyderabad, Pin:500055

16.04.15 Online application received on 16.04.15. After scrutiny of on line form letter issued to firm on 18.05.15 and reply awaited. Reminder letter issued to firm on 01.09.2015.Reply received on 09.09.2015. Letter issued to firm on 20.10.2015 for submit remaining documents. Reply received on 06.01.2016. Letter issued to firm on 29.01.16 for furnish the remaining ISO documents. Reply received and case is under process.

38.

Marker light LED Type for ALCo locomotives

M/s Surya Electronics, R.R Dist, Hyderabad, Pin:500055

16.04.15 Online application received on 16.04.15. After scrutiny of on line form letter issued to firm on 18.05.15 and reply awaited. Reminder letter issued to firm on 01.09.2015. Reply received on 09.09.2015.Letter issued to firm on 20.10.2015 for submit remaining documents. Reply received on 06.01.2016. Letter issued to firm on 29.01.16 for furnish the remaining ISO documents. Reply received and case is under process.

39.

Auxiliary Power Unit (APU) for HHP Locomotives

Daulat Ram Engineering Services (P) Ltd, 10/2, NH-12 Simrai, Post: Obedullahganj, Dist : Raisen-464993(M.P.)

29.04.15 Online application received on 29.04.15 and shortcomings advised to firm on 19.05.15 and reply awaited. RDSO official visited the firm for capability assessment on 15/07/15 but couldn’t be carried out on account of the firm.

40.

Control System, AC- AC Traction for 4500HP EMD Locomotives & its sub-assemblies

Daulat Ram Engineering Services (P) Ltd, 10/2, NH-12 Simrai, Post: Obedullahganj, Dist : Raisen-464993(M.P.)

29.04.15 Online application received on 29.04.15. Shortcomings were advised to M/s DRESPL on 19-06-2015. Reminder regarding shortcomings has been sent to firm on 12-02-2016.

41.

Head Light for EMD Locomotives

Jay Sree Supply Agency (Calcutta) Pvt. Ltd.118 GARFA MAIN ROAD KOLKATA – 700075

11.05.15 Online application received on 11.05.15. After scrutiny of on line form letter issued to firm on 01.06.15. Reply received on 16.06.15. After scrutiny of document letter issued to firm on 01.09.2015. Reply received on 22.9.15. Letter issued to firm on 26.11.15 for submitting the documents. Reply received on 01.01.2016. Letter issued to firm on 07.04.2016 for manufacturing the samples for type testing.

42. Auxiliary Power Unit (APU) for HHP Locomotives

IC Electricals Company (P) Limited, 156, 2nd Floor, DSIDC, Okhla Industrial

07/05/2015

Online application received on 29.05.15 vide Vendor Reference ID: QAM2015/5789. Letter issued to firm on 01/07/2015 for submitting shortcomings. Reminder letter issued on 16.07.2015.Capabiity cum capacity assessment carried out 21/07/15. Letter sent to DLW

Page 14: Status of fresh registraion cases Annexure-A

14

Area, Phase-I, New Delhi - 110 020

on 25/08/2015 for placing developmental order on the firm. Inspection call received on 04.02.2016. E-mail sent to firm on 11.02.206 for submitting details of sub components of APU. Reply received and case is under process. Clarification regarding alternator & Compressor are sought from the firm through e-mail on 29.04.16. Response of e-mail dated 29.03.16 regarding engine clarification are also awaited.

43. Control system locomotives Microprocessor based for ALCO locomotives

IC Electricals Company (P) Limited, 156, 2nd Floor, DSIDC, Okhla Industrial Area, Phase-I, New Delhi - 110 020

07/05/2015

Online application received on 29.05.15 vide Vendor Reference ID: QAM2015/5789. Letter issued to firm on 01/07/2015 for submitting shortcomings.

44. Auxiliary Power Unit (APU) for Alco Locomotives

Daulat Ram Engineering Services (P) Ltd, 10/2, NH-12 Simrai, Post: Obedullahganj, Dist : Raisen-464993 (M.P.)

01.06.15 Online application received on 01.06.15. Telephonically advised to firm for submitting the relevant documents. Documents received on 12/01/2016. Letter issued to firm on dated 22.03.2016 for submission of clarifications and short comings.

45. Converter, Traction control, IGBT-based for 4000HP EMD locomotives & its sub-assemblies

Daulat Ram Engineering Services (P) Ltd, 10/2, NH-12 Simrai, Post: Obedullahganj, Dist : Raisen-464993 (M.P.)

01.06.15 Online application received on 01.06.15 and case is under process

46. Control system locomotives Microprocessor based for ALCO locomotives

Daulat Ram Engineering Services (P) Ltd, 10/2, NH-12 Simrai, Post: Obedullahganj, Dist : Raisen-464993 (M.P.)

01.06.15 Online application received on 01.06.15. Letter issued to firm on 27/10/2015 for submitting documents.

47. Remote Monitoring and Management of Locomotive and Trains

M/s Laxven Systems, Hyderabad

12.06.15 Online application received on 12.06.15 and case is under process. Letter issued to firm on 30/06/2015 for submitting shortcomings. Firm submitted documents vide letter no. LAX/RDSO/REMMLOT-104/15-16 date:25-07-15. Letter issued to firm on 13-08-15 for submitting the remaining documents.

48. Loco Cab Video and Voice Recording System

M/s Laxven Systems, Hyderabad

12.06.15 Online application received on 12.06.15. Shortcomings of vendor registration form have been advised to firm on 16-07-2015. Reply is awaited. Reminder has been given to the firm on 16.10.2015. Vide RDSO letter no SD-DEV.LCVR-DTDR, dated-11-12-2015, for Placement of developmental order for M/s Laxven has been given to DMW/Patiala for Alco locomotives. Letter has been sent to CME/DLW on 22-01-2016 regarding placement of development order to M/s Laxven for HHP locomotives.

49. Head light assembly (Twin Beam) for ALCo locomotives.

MATSUSHI POWER TECHNOLOGIES, S-158 , GREATER KAILASH PART – II , NEW DELHI – 110048

01.06.15 Online application received on 01.06.15. After scrutiny of form & document letter issued to firm on 24.7.15. Reply received. After scrutiny mail to firm on 27.10.2015 for submit remaining documents. Reply received on 5.11.15. Again e- mail sent to firm on 02.12.2015 for submit remaining documents. Reply received and case is under process.

Page 15: Status of fresh registraion cases Annexure-A

15

50. Flasher light LED type for ALCo locomotives

MATSUSHI POWER TECHNOLOGIES, S-158 , GREATER KAILASH PART – II , NEW DELHI – 110048

01.06.15 Online application received on 01.06.15. After scrutiny of form & document letter issued to firm on 24.7.15. Reply received. After scrutiny mail to firm on 27.10.2015 for submit remaining documents. Reply received on 5.11.15. Again e- mail sent to firm on 02.12.2015 for submit remaining documents. Reply received and case is under process.

51. 500 W DC-DC converter for Twin-beam headlight. For ALCo locomotives.

MATSUSHI POWER TECHNOLOGIES, S-158 , GREATER KAILASH PART – II , NEW DELHI – 110048

01.06.15 Online application received on 01.06.15. After scrutiny of form & document letter issued to firm on 24.7.15. Reply received. After scrutiny mail to firm on 27.10.2015 for submit remaining documents. Reply received on 5.11.15. Again e- mail sent to firm on 02.12.2015 for submit remaining documents. Reply received and case is under process.

52. Marker light LED Type for ALCo locomotives

MATSUSHI POWER TECHNOLOGIES, S-158 , GREATER KAILASH PART – II , NEW DELHI – 110048

01.06.15 Online application received on 01.06.15. After scrutiny of form & document letter issued to firm on 24.7.15. Reply received. After scrutiny mail to firm on 27.10.2015 for submit remaining documents. Reply received on 5.11.15. Again e- mail sent to firm on 02.12.2015 for submit remaining documents. Reply received and case is under process.

53. Master Controller Improved stick type for ALCo locomotives

Inspros Engineers Pvt. Ltd., 126, Sector-A, Industrial Area, Mandeep, Bhopal- 46

08.07.15 Online application received on 08.07.15 and case is under process. Letter issued to firm on 07.08.2015 for submission of documents. Reply received on 17.11.15 and case is under scrutiny. Letter issued to firm on 15.02.2016 for compliance of issues. Letter issued to DMW on 29.04.16 for development order given to firm.

54. Auxiliary Power Unit (APU) for HHP Locomotives

Medha Servo Drives Pvt Ltd.

16.07.2015 Online application received on 16.07.15 and case is under process. Letter sent to DLW on 25/08/2015 for placing developmental order on the firm.

55. Auxiliary Power Unit (APU) for HHP Locomotives

EMD Locomotive Technologies noida Phase II, Extn, 201305, UP, India

03.08.2015 Online application received on 03.08.15 and case is under process. Letter sent to DLW on 25/08/2015 for placement of developmental order on the firm.

56. Auxiliary Power Unit (APU) for Alco Locomotives

IC Electricals Company (P) Limited, 156, 2nd Floor, DSIDC, Okhla Industrial Area, Phase-I, New Delhi - 110 020

30.07.2015 Online application received 30.07.15 and firm letter dated 17/08/2015, received on 25/08/2015. E-mail sent to firm on 09/10/2015 for submit the shortcoming. Letter sent to DMW on 08.01.16 for recommending developmental order on firm.

57. Governor/LCC Engine for DEMU

Sirveen Control Systems Pvt. Ltd., Plot No.A-7/1, Electronic Complex, Kushaiguda, HYDERABAD-500062.

30.07.15 Online application received 30.07.15 and case is under process.

58. Distributed Power Control System for HHP Locos.

GE India Industrial Pvt Ltd, Transportaion System Division AIFACS Building,1, Rafi Marg,NewDelhi-110001

12.08.2015 Clarification for work address sought from the firm on 13.08.2015 through e-mail and reminded through letter on 31.08.2015. Clarification received on 08/09/2015. Letter issued to firm on 15/09/2015 for submission of required fee. Clarification received by firm on 17/09/2015. Mail sent to firm on 30.01.15 for submit the revised fee.

59. Auxiliary Power Unit (APU) for Alco Locomotives

Hind Rectifiers Limited, Plot No. 110, E-16 Road, MIDC Satpur Nashik-422007

05.08.2015 Online application received on 05.08.2015. Letter issued to firm on 26/11/2015 for submitting shortcomings/clarifications.

Page 16: Status of fresh registraion cases Annexure-A

16

60. Auxiliary Power Unit (APU) for HHP Locomotives

Cooper Corporation Private Limited, Nariman House. M-60/1 Additional Midc Post Kodoli Satara Maharashtra 415004

04.09.2015 Online application received on 04.09.2015. Letter issued to firm on 26/11/2015 for submitting relevant documents. Documents received on 10.02.2016 and case is under process. QAP submitted by the firm on 08.03.2016 and case is under process.

61. Auxiliary Power Unit (APU) for HHP Locomotives

Kirloskar Oil Engine Ltd., Laxmanrao Kirloskar Road, Khadki, Pune -411 003

04.09.2015 Online application received on 04.09.2015. Letter issued to firm on 26/11/2015 for submitting relevant documents. Document received on 16.012.15. Documents scrutinized and shortcomings were informed through e-mail dated 26.02.2016. E-mail received and case is under process. Letter issued to firm on dated 22.03.2016 for submission of clarifications and short comings.

62. Auxiliary Power Unit (APU) for Alco Locomotives

Stone India Limited, 16, Taratalla Road, Kolkata, West Bengal, India. Pincode - 700088

04.09.2015 Online application received on 04.09. Letter issued to firm on 26/11/2015 for submitting relevant documents.

63. Marker light LED Type for ALCo locomotives

Electricals Electronics Industrial Corporation, 108 Anandapally P.O. Jadavpur University Kolkata 700032

18.09.2015 Online application received on 18.09.2015. Letter issued to firm on 26.11.15 for submitting the documents. Reply received on 18.12.15. Letter issued to firm on 18.1.2016 for manufacturing the samples and submits their internal test report.

64. Flasher light LED type for ALCo locomotives

Electricals Electronics Industrial Corporation, 108 Anandapally P.O. Jadavpur University Kolkata 700032

18.09.2015 Online application received on 18.09.2015. Letter issued to firm on 26.11.15 for submitting the documents. Reply received on 18.12.15. Letter issued to firm on 18.1.2016 for manufacturing the samples and submits their internal test report.

65. Control System, AC-AC Traction for 4500HP for EMD locomotives & its sub-assemblies

Bharat Heavy Electricals Limited, BHEL, Electronics Division, Mysore Road Bangalore 560026

23.09.2015 Online application received on 23.09.2015. Capability assessment of the firm conducted on 19.08.15 to 20.08.15. Letter No. SD. HHP. LCCS (BHEL) sent to DLW on 09/09/2015 for placement of developmental order on the firm. Shortcomings advised to firm on 16.11.2015.

66. Auxiliary Power Unit (APU) for ALCo Locomotives M/s Prag Polymers,

Lucknow-226011

15.09.2015 Online application received on 15.09.2015. Letter issued to firm on 13.11.2015 to furnish the shortcomings/clarifications. Reply received on 14.12.2015. Letter sent to DMW on 06.01.2016 for placing developmental order on the firm.

67. Auxiliary Power Unit (APU) for ALCo Locomotives

Cooper Corporation Private Limited, Satara Maharashtra 415004

08.09.2015 Online application received on 08.09.2015. Letter issued to firm on 26/11/2015 for submitting relevant documents. Document received on 21.12.15 and case is under process. Letter issued to firm on 08.02.2016 for submitting shortcomings. Documents received on 19.02.2016. Scrutiny of documents is under process. Letter issued to firm on dated 29.04.2016 for submission of compliance of shortcomings.

68. Loco Cab Video and Voice Recording System

Medha Servo Drives Pvt Ltd., P-4/5B,IDA Nacharam,Hydrabad-500076

03.12.2015 Online application received on 03.12.2015 and case is under scrutiny. Vide RDSO letter no SD-DEV.LCVR-DTDR, dated-11-12-2015, for Placement of developmental order for M/s Medha has been given to DMW/Patiala for Alco locomotives. Letter has been sent to CME/DLW on 22-01-2016 regarding placement of development order to M/s Medha for HHP

Page 17: Status of fresh registraion cases Annexure-A

17

locomotives. 69. Distributed Power

Control System for Alco Locos

BHARAT FORGE LTD, Mundhwa, Pune - 411036. Maharashtra, India.

17.12.2015 Online application received on 17.12.2015 and case is under process.

70. Distributed Power Control System for HHP Locos

BHARAT FORGE LTD, Mundhwa, Pune - 411036. Maharashtra, India.

17.12.2015 Online application received on 17.12.2015 and case is under process.

71. Auxiliary Power Unit for HHP Locomotives

BHARAT FORGE LTD, Mundhwa, Pune - 411036. Maharashtra, India.

17.12.2015 Online application received on 17.12.2015 and case is under process.

72. Control System, AC- AC Traction for 4500HP EMD Locomotives & its sub-assemblies

BHARAT FORGE LTD, Mundhwa, Pune - 411036. Maharashtra, India.

15.01.2016 Online application received on 15.01.2016 and case is under process. Short comings were advised to firm on 10-02-2016. Reply received on 18-02-2016 and documents are under scrutiny by RDSO.

73. Auxiliary Power Unit for HHP Locomotives

K K Iron Industries, SH 15/79-A Shivpur Varanasi UP

07.02.2016 Online application received on 07.02.2016. Documents received on 09/02/2016 and case is under process.

74. Auxiliary Power Unit (APU) for Alco Locomotives

Kirloskar Oil Engines Ltd, A-11/1, MIDC, Ambad, Nasik - Maharashtra – India- 422010

08.03.2016 Online application received on 08.03.2016 and case is under process.

75. Low Maintenance lead acid Batteries for Diesel Electric loco engine starting application (8 V, 500 Ah lead acid)

LEAD ACID BATTERY CO. (P) LTD, KOLKATA

28.03.2016 Online application received on 28.03.2016 and case is under process. Letter issued to firm on 13.05.2016 to furnish the shortcomings/clarifications.

76. Master Controller Improved stick type for ALCo locomotives

Lifting Machineries India Pvt. ltd., Gurgaon

28.03.2016 Online application received on 28.03.2016 and case is under process. Letter issued to firm on 13.05.2016 to furnish the shortcomings/clarifications.

77. Master Controller of EMD locomotive

Lifting Machineries India Pvt. ltd., Gurgaon

28.03.2016 Online application received on 28.03.2016 and case is under process. Letter issued to firm on 13.05.2016 to furnish the shortcomings/clarifications.

78. Auxiliary Power Unit (APU) for Alco Locomotives

Laxven Systems, Hyderabad

01.04.2016 Online application received on 01.04.2016 and case is under process.

79. Auxiliary Power Unit for HHP Locomotives

Laxven Systems, Hyderabad

01.04.2016 Online application received on 01.04.2016 and case is under process.

80. Fuel Level Sensor for Diesel Electric Locomotives

i-LAB Informatics Pvt. Ltd., GUJARAT

01.04.2016 Online application received on 01.04.2016 and case is under process.

81. Remote Monitoring and Management of Locomotive and Trains

Bharat Forge Ltd., Pune

04.04.2016 Online application received on 04.04.2016. Short comings were advised to firm on 10-02-2016.

82. Contactors, Electro pneumatic & Electromagnetic for ALCo locomotives

Kaysons Electricals Pvt. Ltd., Varanasi

07.04.2016 Online application received on 07.04.2016 and case is under process. Letter of shortcomings sent to the firm on 10.05.2016.

83. Loco Cab Video and Voice Recording System

Kaysons Electricals Pvt. Ltd., Varanasi

07.04.2016 Online application received on 07.04.2016. Documents received from firm on 12.04.2016. Letter issued to firm on 12.05.2016 for submitting shortcoming/clarifications.

84. Remote Monitoring Lotus Wireless 02.05.2016 Online application received on 02.05.2016 and case is

Page 18: Status of fresh registraion cases Annexure-A

18

and Management of Locomotive and Trains

Technologies India Pvt. Ltd, B7, EEIE Industrial Park ,B-Block, Autonagar, Vishakapatnam-530012

under process.

85. DC General Purpose Relay for Diesel-Electric locomotive (Alco)

Kaysons Electricals Pvt. Ltd., Varanasi

12.05.2016 Online application received on 12.05.2016 and case is under process. Letter of shortcomings sent to the firm on 20.05.2016.

86. Governor/LCC Engine for DEMU

Laxven Systems, Hyderabad

12.05.2016 Online application received on 12.05.2016 and case is under process.

87. Master Controller of EMD locomotive

Craftsman Automation Private Limited, Unit 3, 123/4 Sangothipalayam Road , Arasur Post, Coimbatore - 641 407, Tamil Nadu, India.

12.05.2016 Online application received on 12.05.2016 and case is under process.

88. Auxiliary Power Unit for HHP Locomotives

Siemens Ltd, Plot 6A, Sector 18, Maruti Industrial Area, HUDA Gurgaon 122015, India

25.05.2016 Online application received on 25.05.2016 and case is under process.

89. Remote Monitoring and Management of Locomotive and Trains

Siemens Ltd, Plot 6A, Sector 18, Maruti Industrial Area, HUDA Gurgaon 122015, India

25.05.2016 Online application received on 25.05.2016 and case is under process.

dze- la- S. No.

vkbZVe dk uke Name of items

os.Mj dk uke Name of Vendor

vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr& bZe vkbZVe

Motive Power – EM items S. No. Name of item Name of applicant Date of

application

Current status as on date: 27.05.2016.

A. Traction Motors Items --- 1. Arm Insulating for brush

holder M/s APEX AUTO,Adityapur, Jamshedpur.

10.05.16 Vendor form under scrutiny.

2. Carbon Blocks M/s Mersen India Pvt. Ltd., Bangalore

21.04.14 Type test of new carbon block grade LFC554 (I) carried out at firm’s premises from 14-7-14 to 16-7-14. On 08.05.15, cleared for placement of dev. order from DMW and zonal railways.

3. Carbon Blocks M/s Schunk Metal & Carbon (I) Pvt. Ltd., Bangalore

18.01.16 Shortcoming advised to the firm on 28-4-16.

4. Conductor copper Heat sealed kapton covered

M/s Cosmos Conductors Pvt. Ltd., Tumkur

02.01.13 On 06.05.13, assessment done by RDSO officer. Type test witnessed from 25.01.14 to 27.01.14. On 20.03.14, advised to offer for type test as a fresh due to non-compliance of cl. 5.1.2 of spec.

5. Conductor copper Heat sealed kapton covered

M/s Mahendra Industries, Bangalore

16.07.12 On 08.0513, assessment done by RDSO officer. Type test witnessed from 22.01.14 to 24.01.14. Cleared for dev. order on 23.05.14 to DMW/PTA.

Page 19: Status of fresh registraion cases Annexure-A

19

6. Conductor copper Heat sealed kapton covered

M/s Malwa Strips Pvt. Ltd., Dewas

05.10.10 On 07.07.11, firm cleared for placement of dev. order by DMW. On 07.02.14, reminder-I issued to CME/DMW for placement of dev. order.

7. Glass tape, Silicon elastomer

M/s Bells Organic (P) Ltd., Kolkata

31.07.08 On 25.05.16, approved in Part-II category.

8. Glass tape, Silicon elastomer

M/s MICAPLY, Bhopal

28.04.14 On 07.05.16, capacity assessment carried out.

9. Glass tape, Silicon elastomer

M/s SnehamInternational Belgaum

04.02.15 Vendor form under scrutiny.

10. Holder Brush M/s Power Mica Insulators, Kolkata

03.12.12 On 04.02.13, capacity assessment carried out. From 28.05.13 to 29.05.13, type test carried out. Cleared for dev. order on 24.10.13 to DMW & on 17.12.13 to CMPE/NR.

11. Holder Brush (Constant Pressure type)

M/s Mersen India Pvt. Ltd., Bangalore

20.01.12 Firm has supplied only constant pressure brush holder for AG3101 and TM4907 after type test. i.e., 500Nos. of AG3101 to BHEL and 180 Nos. of AG3101 to NR/AMV & KJM sheds. Firm has not supplied any conventional brush holders.

12. Insulating material Kit, Class 200 (Glass Mica Tape)

M/s MICAPLY, Bhopal

05.06.13 On 22.10.13, assessment done by officer. From 26.12.13 to 28.12.13, type test conducted at firm’s premises. Cleared for dev. order on 07.05.14 to DMW/PTA. DMW P.O., dtd: 13.01.15, received.

13. Insulating material Kit, Class 200 (Glass Mica Tape)

M/s CGPPI Adhesive Products Limited, Goa

29.10.15 Vendor form under scrutiny.

14. Insulating material Kit, Class 200 (Including Inter Turn Ceramic Sheet)

M/s Ruby Mica Company Lld., Giridih, Jharkhand.

06.12.13 On 31.07.14 advised firm to offer proto type for testing. On 20.03.15, firm offered for type test.

15. Insulating material kit, Class 200 (Inter Turn Ceramic Sheet)

M/s MICAPLY, Bhopal

13.05.13 On 22.10.13, assessment done by officer. From 26.12.13 to 28.12.13, type test conducted at firm’s premises. Cleared for dev. order on 07.05.14 to DMW/PTA. DMW P.O., dtd: 17.01.15, received.

16. Insulating material kit, Class 200 (Kapton Mica Tape)

M/s MICAPLY, Bhopal

20.03.13 On 22.10.13, assessment done by officer. From 26.12.13 to 28.12.13, type test conducted at firm’s premises. Cleared for dev. order on 07.05.14 to DMW/PTA. On 16.09.14, P.O. placed by DMW/PTA.

17. Insulating material kit, Class 200 (Kapton Mica Tape)

M/s CGPPI Adhesive Products Limited, Goa

29.10.15 Vendor form under scrutiny.

18. Insulating material kit, Class 200 (Slot Liner Nomex Tape)

M/s MICAPLY, Bhopal

20.03.13 On 22.10.13, assessment done by officer. From 26.12.13 to 28.12.13, type test conducted at firm’s premises. Cleared for dev. order on 07.05.14 to DMW/PTA. DMW P.O., dtd: 13.01.15, received.

19. Insulating material kit, Class 200 (Slot Liner Nomex Tape)

M/s Ruby Mica Company Lld., Giridih, Jharkhand.

22.10.13 On 31.07.14 advised firm to offer proto type for testing. On 20.03.15, firm offered for type test.

20. Insulating material kit, Class 200 (Including Glass Mica Tape, Kapton Mica Tape, Slot Liner Nomex Tape & Inter Turn Ceramic Sheet)

M/s Hatim Dielectrics (P) Ltd., Kolkata

10.05.16 Vendor form under scrutiny.

21. Motor Armature, DC Traction for ALCo

M/s Daulat Ram Engg. Services (P) Ltd. Raisen

14.08.12 On 13.09.12, clearance given for fitment trial at DMW. On 16.04.13, cleared to supply balance quantity to DMW.

22. Motor Armature, DC Traction for ALCo

M/s Star ElectricCompany, Ludhiana

27.01.14 On 04.03.14, advised shortcoming.

23. Motor Commutating field coils assembly, DC Traction for ALCo

M/s Cosmic General Industries, Mumbai

13.06.13 On 22.02.14 & 19.03.15, RDSO officer visited for capability assessment. On 09.04.15, recommended for placement of dev. order from DMW.

24. Motor Complete, DC Traction for ALCo locomotives with followingsub-assembly:A.

M/s Daulat Ram Engg. Service (P) Ltd., Raisen.

13.04.12 On 29.04.13, type test completed and 02 nos. cleared for fitment & field trial at DLW.

Page 20: Status of fresh registraion cases Annexure-A

20

Armature, B.Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame (machined)

25. Motor Complete, DC Traction for ALCo locomotives with followingsub-assembly:A ArmatureB.Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame machined)

M/s Saini Electrical & Engineering Works, Navi Mumbai

08.05.12 Type test completed. On 20.07.12, advised for fitment at DMW for field trial. On 04.12.12, 04 TMs cleared for trial at DMW.

26. Motor Complete, DC Traction for ALCo locomotives with followingsub-assembly:A ArmatureB. Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame (machined)

M/s Rotomac Electricals Pvt. Ltd., Kolkata

06.06.13 On 05.09.13, assessment of Kolkata premises done by RDSO officer. On 23.09.13, assessment of Sahibabad premises done by RDSO officer. On 16.02.15, recommended for developmental order to DMW.

27. Motor Complete, DC Traction for ALCo with following sub-assembly:A Armature B. Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame (machined) (TM 4907)

M/s Integrated Electric Co. Pvt. Ltd., Bengaluru.

19.12.11 On 27.03.13 & 22.11.13 (again), advised shortcomings. On 04.05.13, assessment done by RDSO officer. Reminder sent on 15.04.2014 to respond to letter, dated 22.11.2013.

28. Motor Complete, DC Traction for ALCo with following sub-assembly:A Armature B. Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame(machined)-(TM 5002)

M/s Integrated Electric Co. Pvt. Ltd., Bangalore

27.04.10 On 02.03.12, recommended for developmental order to DMW. Letter sent to DMW/PTA on 22.11.13 for status of P.O.

29. Motor Main Field Coils assembly, DC Traction for ALCo

M/s Cosmic General Industries, Mumbai

19.07.13 On 22.02.14 & 19.03.15, RDSO officer visited for capability assessment. On 09.04.15, recommended for placement of dev. order from DMW.

30. Motor Main field coils assembly, DC Traction for ALCo

M/s Stesalit Ltd., Solan (H.P.)

27.04.12 On 22.02.13, provisional approval of drg. of main field coils given.

31. Motors Traction AC, for EMD locomotives

M/s BHEL, Bhopal 19.11.13 On 24.05.16, approved in Part-II category.

32. Motors Traction AC, for EMD locomotives

M/s Daulat RamEngg. Service (P)Ltd., Raisen.

21.12.10 On 18.01.11, recommended for developmental order. On 10.09.15, again recommended for developmental order to be placed by DLW.

33. Motors Traction AC, for EMD locomotives

M/s Saini Electrical & Engg. Works, Navi Mumbai

04.01.11 On 18.01.11, recommended for developmental order. Also advised shortcomings on 04.02.11. On 10.09.15, again recommended for developmental order to be placed by DLW.

34. Motors Traction AC, for EMD locomotives

M/s CSR ZHUZHOU Electric CO., LTD

04.07.13 On 17.12.13, design detail received. On 15.05.14, received revised QAP. On 16.06.2014, asked RA/Berlin for carrying out capacity & capability assessment of the firm. On 13-14 January 2015, assessment was done by RA Berlin. On 08.06.15, recommended for developmental order.

35. Motors Traction AC, for EMD locomotives

M/s Crompton Greaves Ltd., Mandideep, Bhopal

12.02.14 On 22.01.15, type test cleared. On 23.03.15, capacity assessment by an officer carried out.

36. Motors Traction AC, for EMD locomotives

M/s Saini Electrical and Engg. Works,

28.07.14 Vendor form under scrutiny.

Page 21: Status of fresh registraion cases Annexure-A

21

Ambernath (East), Dist. Thane.

37. 3-phase induction motors for 4500 hp, AC- AC WDG4 & WDP4B diesel electric locomotives

M/s S. E. P. Electrotyazmash Ukraine

05.05.15 On 06.11.15, advised shortcomings of documents received on 27.08.15.

38. 3-phase induction motors for 4500 hp, AC- AC WDG4 & WDP4B diesel electric locomotives

M/s Force MotionTechnology LLP,Navi Mumbai

19.05.16

Vendor form under scrutiny.

39. 3 Phase Squirrel Cage Induction Motor for 5500HP AC-AC WDG5 Locomotives

M/s Saini Electrical and Engineering Works, Ambernath [East], Dist. Thane

21.09.15 Vendor form under scrutiny.

40. 3 Phase Squirrel Cage Induction Motor for 5500HP AC-AC WDG5 Locomotives

M/s Siemens Ltd., New Delhi

16.11.15 Vendor form under scrutiny.

41. Tape, Kapton adhesive M/s MICAPLY, Bhopal

30.09.13 On 22.10.13, assessment done by officer. From 26.12.13 to 28.12.13, type test conducted at firm’s premises. Cleared for dev. order on 07.05.14 to DMW/PTA.

42. Tape, Resi-glass banding M/s Rotomac Electricals Pvt Ltd., Kolkata

03.12.12 On 02.05.13, assessment done by RDSO officer. On 19.08.13, advised DMW for placement of developmental order.

43. Tape, Kapton adhesive M/s SnehamInternational, Belgaum

09.02.15 Vendor form under scrutiny.

44. Tape, Resi-glass banding M/s Nashik Insulations Pvt. Ltd., Nashik

13.05.13 On 01/05.05.15, recommended for placement of dev. order from DMW.

45. Class 200 resin-preimpregnated semi-cured unidirectional Polyglass banding tapes Used on traction machines (TG/TM/AG) of diesel electric Locomotives and DEMUs

M/s MICAPLY, Bhopal

07.10.15 On 07.05.16, capacity assessment carried out.

B. Gears & Pinions Items ---- 1. Gears & pinion (Case

hardened) Traction for EMD locomotives

M/s Elecon Engineering Company Ltd., Anand Sojitra Road

14.08.12 On 14-15.12.12, capacity assessment carried out. On 22.01.13, recommended for dev. order to DLW for both items. Again on 03.07.13, 04.10.13 & 20.3.14, advised DLW for placement of dev. order. On 29/10/14 firm informed that DLW has placed 17 teeth pinions of EMD locos. 1. PO No. 061412060.14137565 dt. 23.09.2014 for 66 Nos. of Pinion 17 T G4. 2. PO No. 061412080.14137568, dt. 23.09.2014 for 25 Nos. of Pinion 17 T P4. On 23/10/2015, firm requested RDSO for prototype inspection of 77 & 90 teeth bull gears of EMD locos and submitted internal inspection report which are under scrutiny. On 10.11.15, advised shortcomings of 77teeth & 90 teeth bull gear documents which are not submitted by firm along with inspection call letter. On 16.11.15, firm submitted clarification and documents and called RDSO for prototype inspection. For prototype inspection of same planned to visit this firm on 30.11.2015. Prototype inspection of 77 teeth and 90 teeth bull gears of HHP (EMD) locos have been carried out by RDSO from 30.11.2015 to 4.12.2015. On 10.12.15, IC issued for both items. 77 teeth and 90 teeth bull gears pressing have been carried out at DLW, Varanasi from 9/2/2016 to 11/2/2016 and found that Pressing pressure of

Page 22: Status of fresh registraion cases Annexure-A

22

77 Teeth bull gears are within the specified limit. While one no. 90 teeth bull gear of WDG4 loco was rejected due to low pressing pressure. On 15.2.2016, RDSO informed the firm and CDE/DLW about failure of prototype inspection of 90 teeth bull gears. On 28.3.2016 firm informed that 90 teeth bull gears will be ready for prototype inspection on 2.4.2016. 0n 12.1.2016, firm submitted 17 teeth pinion’s incomplete internal inspection report and called RDSO for prototype inspection. On 17.2.2016, RDSO advised the firm to compile shortcoming and submit the same to RDSO. On 03.03.2016, firm submitted clarification on shortcoming which is under scrutiny. On 8.3.2016 shortcoming again informed to the firm as seen on submitted documents. On 28.3.16 firm submitted internal inspection reports of 17 teeth pinions of WDP4 & WDG4 locos and request to RDSO for prototype inspection of the same. RDSO is planning to visit this firm on 5.4.2016 for above. Prototype inspection of 6 nos. 17-teeth pinions for WDP4 & 6 nos 17-teeth pinions for WDG4 and 6 nos 90-teeth bull gears of HHP locos has been carried out from 5.4.2016 to 12.4.2016 and documents are under scrutiny.

2. Gears & pinion (Case hardened) Traction for EMD locomotives

M/s G. G. Automotive Gears Ltd., Dewas

19.02.11 On 26-27.03.12, capacity-cum-capability assessment done and on 02.05.12, cleared for dev. order for both items. IC issued on 21.7.2014 for 90 teeth bull gear of WDG4 locos. From 27.01.15 to 30.01.15, prototype inspection of 17 teeth pinions for WDG4 & WDP4 against DLW P.O. carried out and results are not acceptable. For performance of M/s GGAG make traction gears of HHP locos on 4.8.15 & 24.9.15 (Reminder-I) sent to concerned Rlys to send performance of M/s GGAG make traction gears of HHP locos. Till date we have received performance from AMV & NKJ sheds (total 8 nos gears). On 27.11.2015 letter send to CDE/DLW to send performance of firm make gears. Till date no reply got from DLW. Prototype inspection of 17 teeth pinions of WDG4 & WDP4 locos have been carried out from 24/8/2015 to 28//08/2015. On 07/09/2015, separate IC issued for both items and dispatch clearance given to the firm. On 20.2.2016 firm requested to register their firm name in RDSO vendor Directory as Part-II vendor. On 28.4.2016 firm submitted documents & under scrutiny. Officer visit is pending

3. Gears & pinion (Case hardened) Traction for EMD locomotives

M/s Kalyani Engineering Works, Ghazizbad

18.11.11 On 22.08.13 & 17.09.13, capacity-cum-capability assessment carried out. On 18.10.13, recommended for developmental order to DLW for both items. DLW placed P.O. for 30 nos. of 90 teeth bull gears. On 20.3.14, again advised DLW for placement of dev. order for pinions. On 24.03.14, DLW informed that they placed 68 nos. pinions (WDG4 & WDP4) dev. order.

4. Gears & pinion (Case hardened) Traction for EMD locomotives

M/s Research Dev & Mfg Corporation, Bangalore

13.09.11 On 15.03.12, advised DLW for dev. order for both items. On 24.10.14, approved as Part-II for traction gears. Firm got 6 Nos. 17 teeth pinions order from DLW. On 20.3.14, again advised DLW for placement of dev. order for pinions. Prototype inspection of 77 teeth bull gears & 17 teeth pinions of WDP4 locos against DLW P.O. carried out from 21-4-2015 to 26-04-2015. On 14.5.2015 and 20.5.15, letters sent to firm to dispatch, 6 nos, 17 teeth pinions & 4 nos, 77 teeth bull gears of

Page 23: Status of fresh registraion cases Annexure-A

23

WDP4 locos respectively to DLW for fitment. After successful fitness at DLW, IC will be issued. On 28.7.2015, firm is advised to dispatch 2 nos. 77 teeth bull gears to DLW for fitment. IC issued on 06.10.15 for 17 teeth & 77 teeth. On 22.12.2015 firm requested for prototype inspection of 17 teeth pinions used on WDG4 locos. Protototype inspection of same has been carried out from 04.1.2016 to 06.1.2016 and inspection documents under scrutiny. On 29.12.2015 firm upgraded as Part-I vendor for supply of traction gears of HHP (EMD) locos.

5. Gears & Pinions, Traction, Case hardened for DEMU

M/s Elecon Engineering Company Ltd., Anand Sojitra Road.

29.01.13 On 02.05.13, recommended for dev. order to CDE/Chennai for both items. Firm informed that they got 10 sets order from M/s CGL. On 11.11.14, firm informed through email that they will call RDSO for prototype inspection in Dec 2014 against CGL order. On 16.12.2015 firm submitted 91 teeth bull gears internal inspection report and called RDSO for prototype inspection of same. On 28.1.2016 & 15.2.2016 advised the M/s CGL / Bhopal to submit the P.O. of railways in behalf of which firm had given developmental order to the firm. Till date (03.03.2016) no reply got from the M/s CGL.

6. Gears & Pinions, Traction, Case hardened for DEMU

M/s Kalyani Engineering Works, Ghazizbad

18.11.11 On 22.08.13 & 17.9.13, capacity-cum-capability assessment carried out. On 18.10.13, recommended for developmental order to CDE/ICF, Chennai for both items.

7. Gears & pinions, Traction, Case hardened, for ALCo

M/s Elecon Engineering Company Ltd., Anand Sojitra Road.

28.01.13 On 02.05.13 and again on 04.10.13, recommended for dev. order for both items to DMW/PTA. On 16.10.13, firm got P.O. for 10 Nos. of 18 teeth pinions from CGL. On 13.11.14, firm informed through email that they have received 58 nos traction bull gears order from DMW Patiala against P.O.no. 01/15/1013/1/561539, dated 17.9.2014. On 11.11.14, firm informed through email that they will call RDSO for prototype inspection in Dec. 2014 against CGL order. On 17/9/2015, firm called RDSO for prototype inspection of ALCo. Prototype inspection of 65 teeth traction bull gears carried out from 13/10/2015 to 15/10/2015 and IC issued on 2/11/2015. On 12.12.2015 firm submitted 74 teeth bull gears internal inspection report and called RDSO for prototype inspection of the same. RDSO has carried out prototype inspection of 74 teeth bull gears from 22.1.2016 to 24.1.2016 and on 03.03.2016 IC issued

8. Gears & pinions, Traction, Case hardened, for ALCo

M/s Kalyani Engineering Works, Ghazizbad

18.11.11 On 22.08.13 & 17.9.13, capacity-cum-capability assessment carried out. On 18.10.13, recommended for dev. order to DMW for both items. On 13.11.13, DMW/PTA placed 18 teeth pinions dev. Order.

9. Gears & pinions, Traction, Case hardened, for ALCo

M/s Trina Quebec Gears Ltd., New Delhi

04.03.13 Pending due to not comply of shortcomings. On 22.11.13, advised firm to give latest status of shortcomings. Prototype inspection of 65 teeth & 74 teeth carried out against DMW P.O. from 18.02.14 to 21.02.14. On 05.03.14, IC issued. As per firm’s letter, dtd: 14.03.2015, shortcomings is still existing and it will be eliminated within next six months. On 29.4.15, firm informed that they are under process of procuring Heat treatment furnace from M/s TRIAD Engineers, Bangalore and assuming that it will be installed at the end of Dec.’15. On 30.09.15, cleared for developmental order for pinion only to be placed DMW. On

Page 24: Status of fresh registraion cases Annexure-A

24

30.9.15, firm requested for registration as Part II vendor for supply of traction gears. On 5.10.15, RDSO requested to DMW/PTA to send fitment details & performance of firm make 65 teeth & 74 teeth bull gears. Till date same is awaiting. On 27.11.2015, letter send to CPLE/DMW to send fitment details & performance of firm make gears but till date no reply got from DMW / PTA. On 07.03.2016, firm requested to change firm’s name from M/s Trina Quebec Gears Ltd to M/s Trina NRE Transportation Ltd. and submitted relevant document. On 9.5.2016, advised shortcoming.

10. Traction Gears, (Case hardened) for EMD

M/s Vulcan Industrial Engg Ct Ltd., Dist - Anand, Gujarat

07.02.14 pacity cum capability assessment by an officer is pending. On 18/24-03-2015, firm requested to grant status of approved firm.

11. Traction Gears, (Case hardened) for EMD

M/s Shanthi Gears Ltd., Coimbatore.

07.03.11 On 17.06.11, cleared for dev. order for item. Under process for manufacturing of traction gears. On 04.03.2015,QAP for manufacturing of traction bull gears of HHP locos has been approved .On 17.3.2015 firm called RDSO for 2nos bull gears prototype inspection against the requirement of minimum 6 nos bull gears. On 24/3/2015 RDSO advised the firm to submit P.O. copy, gears inspection & material testing report for prototype inspection to this office. On 26/5/15, firm submitted internal inspection report of 77 teeth bull gears of WDP4 locos through email & called RDSO for prototype inspection of same. RDSO is waiting for hard copy of same, and then date will be decided. On 16/6/2015 firm submitted hard copy of 77 teeth bull gears inspection documents which are under scrutiny. On 15/6/2015, firm advised to submit failure investigation report of 17teeth pinions which were failed at GY, VSKP & ET shed. On 1/9/2015, reminder –III issued, but till date no response got from the firm. Awaiting for failure investigation report. On 18.2.2016 Firm again submitted internal inspection report and called RDSO for prototype inspection of HHP gears, without submitting the 17 teeth pinions failure investigation report. On 26.2.2016 & 29.2.2016 firm advised to submit clarification on the above. On 10.3.2016, firm requested to RDSO for prototype inspection of 77 teeth and 90 teeth bull gears of HHP locos. RDSO is Planning to visit this firm on 25.5.2016 for the same.

12. Traction Gears, (Case hardened) for EMD

M/s Hilton Metal Forging Ltd., Tal- Wada, Dist- Palghar

14.12.15 Firm’s capacity cum capability assessment of the firm has been carried out from 19.1.2016 to 20.1.2016. Documents under scurrility

13. Traction Gears, (Case hardened) for ALCo locomotives

M/s Kateel Engg. Industry Pvt. Ltd., Bangalore

01.06.15 On 22.6.2015, shortcoming informed to the firm. On 16/7/2015, reminder-1 sent to firm to submit clarification on shortcoming. On 19/7/2015 firm has submitted documents related to gears of EMD loco. On 31-7-2015, reminder -2 sent to submit clarification on short coming. On 20.8.2015, reminder-3 issued. On 18/9/2015, reminder-4 issued to the firm to submit clarification on shortcomings. On 10.11.2015, reminder-5 issued & given 10 days time to submit the same otherwise case of registration will be closed. Till date (11-12-2015) no reply is received from the firm. Till date (26.2.2016) no reply received from firm.

14. Traction Pinions, (Case hardened) for EMD

M/s Vulcan Industrial Engg Ct Ltd., Dist - Anand,

07.02.14 Capacity cum capability assessment by an officer is pending. On 18/24-03-2015 firm requested to grant status of approved firm.

Page 25: Status of fresh registraion cases Annexure-A

25

Gujarat 15. Traction Pinions, (Case

hardened) for EMD M/s Trina Quebec Gears Ltd., New Delhi

26.09.09 From 12-3-2015 to 14-3-2015 Prototype inspection of 17 teeth pinions of WDG4 locos has been carried out by RDSO. On 17.3.2015, IC on 17 teeth pinions issued. Prototype inspection of 17 teeth pinions of WDP4 locos carried out from 29/10/2015 to 31/10/2015 & under scrutiny. On 10.11.2015 IC & dispatch letter issued. On 2/11/15, advised DLW to send fitment details and performance of firm make 17 teeth pinions of WDG4 locos. Till date same awaiting. On 27.11.2015 Reminder-1 send to CDE/DLW to send fitment details & performance of firm make pinions. On 07.3.2016, firm requested to change firm’s name from M/s Trina Quebec Gears Ltd., to M/s Trina NRE Transportation Ltd., Delhi. On 9.5.2016, advised shortcomings

C. Bearings & Susp. Tube Items --- 1. Bearing, Traction Motor-

TM Drive end & TM Non-drive end for EMD locos

M/s FAG (Germany / Italy)

29.05.13 Compliance of the shortcomings received on 23.06.14. Further, shortcomings noticed were again advised during visit of firm’s representative at RDSO on 27.01.15. Reminder issued on 19.05.2015. Compliance of shortcomings received on 30.06.15. Further, shortcomings noticed were advised during visit of firm’s representative at RDSO on 23.07.15. On 12.10.2015, advised to offer a prototype inspection & capability assessment of the firm at OEM works. Firm vide their letter email dated 02.11.2015 has agreed to bear the cost of above visit.

2. Bearings, Traction Motor- TM Drive end & TM Non-drive end for EMD locomotives

M/s FARO-S.p.A,Calendasco (PC)Italy

19.06.14 Compliance of the shortcomings received on 30.01.15. On 07.04.15, advised to submit credentials. Compliance of the credentials received on 14.05.15. On 19.05.15 & 08.06.15, cleared for developmental order.

3. Bearings, Traction alternator (EMD Part No. 9549071) for EMD locomotives

M/s FAG BearingsIndia Limited,Vadodara

19.05.16 Vendor form under scrutiny.

4. Bearings for Traction motor, ALCo locomotives - (NU328 & NH 318 rivetless)

M/s FAG Bearings India Ltd., Vadodara

31.07.12 On 06.02.13, assessment carried out. On 06.08.14, advised DMW for placement of developmental order.

5. Bearings for Traction motor, ALCo locomotives - (NU328 & NH 318 rivetless)

M/s SKF Technologies (India) Pvt. Ltd., Ahmedabad.

30.09.13 Cleared for developmental order on 02.08.12.

6. Bearings for Traction motor, ALCo locomotives - (NU328 & NH 318 rivetless)

M/s Austin Engineering Company Ltd., Junagadh (Gujarat)

07.10.14 On 12.05.15, advised shortcomings of compliance received on 17.04.15. Again, on 31.07.15, shortcomings advised. Compliance of the shortcomings received on 12.10.2015. On 22.02.16 advised to submit details of compliance as per RDSO Doc. No. QO-F-7.1-8 Ver. 1.0. Details of compliance received on 04.04.16 & case under process.

7. Bearings, roller type of Traction motor for ALCo locomotives, (NH320 rivetless - Commutator end; NU330 rivetless - Pinion end & Alternator / Generator bearings)

M/s Austin Engineering Company Ltd., Junagadh (Gujarat)

07.10.14 On 12.05.15, advised shortcomings of compliance received on 17.04.15. Again, on 31.07.15, shortcomings advised. Compliance of the shortcomings received on 12.10.2015. On 22.02.16 advised to submit details of compliance as per RDSO Doc. No. QO-F-7.1-8 Ver. 1.0. Details of compliance received on 04.04.16 & case under process.

8. Bearings Traction Motor & Alternator for DEMU (Tr. Alternator - 6326MC4, NU 326

M/s PrecisionBearings Pvt. Ltd.,Ahmedabad

08.01.15 On 12.05.15, advised shortcomings of compliance received on 06.04.15. Again, on 31.07.15, shortcomings advised. On 07.09.15, advised shortcomings of compliance received on 20.08.15.

Page 26: Status of fresh registraion cases Annexure-A

26

EM/C4 (DE side), NH 324 EM/C4 (NDE side), TM Commutator end - NH320 ECMRD/C4 (rivetless), NUP 318 EM/C4 (riveted), NH 320)

Reminder -I issued on 18.01.16. Reply received vide firm’s letter dated-18.02.16. Reply received vide firm’s letter dated 18.02.16 & Case under process.

9. Bearings Traction Motor & Alternator for DEMU

M/s National Engg. Industries Ltd., Jaipur

05.09.13 Cleared for Dev. Order of bearing no. NH320 ECMRD/C4 (rivetless) for TM commutator end of 1400HP DEMU on 01.07.14.

10. Tr. Alternator - 6326MC4, NU 326 EM/C4 (DE side), NH 324 EM/C4 (NDE side),

M/s Austin Engineering Company Ltd., Junagadh (Gujarat)

07.10.14 On 12.05.15, advised shortcomings of compliance received on 06.04.15. Again, on 31.07.15, shortcomings advised. Compliance of the shortcomings received on 12.10.2015. On 22.02.16 advised to submit details of compliance as per RDSO Doc. No. QO-F-7.1-8 Ver. 1.0. Details of compliance received on 04.04.16 & case under process.

11. Tube Suspension: Housing bearing kit (consisting 11 items)

M/s P.D. Steels, Mohali.

17.12.12 On 18.10.13, assessment carried out. On 16.01.14, cleared for placement of developmental order by DLW.

12. 9Tube Suspension: Housing bearing kit (consisting 11 items)

M/s Sonak Engineering Pvt. Ltd. Navi Mumbai

23.09.11 On 18.09.12 & 02.02.13, assessment carried out. On 12.03.13 cleared for developmental order. Prototype inspection carried out at firms premises from 11.01.16 to 13.01.16 against DLW P.O. On 16.02.16, dispatch clearance given to DLW for fitment trial.

13. 4Tube Suspension: Housing bearing kit (consisting 11 items) for EMD locomotives

M/s Saurabh Metal Pvt. Ltd., Bhopal

03.06.09 From 02-05-14 to 03-05-14, prototype inspection carried out against DLW P.O. On 17.10.14 IC issued. 1 set of suspension tube has been successfully fitted at DLW on 19.09.2014.

14. Tube Suspension: Housing bearing kit (consisting 11 items) for EMD locomotives

M/s Anup Malleables Ltd., Dhanbad

08.01.15 On 20.01.15, advised shortcomings. Reminder -1 issued on 17/20.04.15. Reminder -II issued on 24.07.15. Reminder -III issued on 18.01.16. Firm informed & ensured that compliance of shortcomings will be submitted up to 1st week of june’16 vide firm’s letter dated 25.04.2016.

15. Tube Suspension: Housing bearing kit (consisting 11 items) for EMD locomotives

M/s Special Engineering Services Ltd., Kolkata

24.04.15 On 12/13.05.15, advised shortcomings. Compliance of shortcomings received on 05.06.15 & scrutinized. Case is under process. On 02.03.16, informed to carry out capability assessment from 09.3.16 to 10.3.16. Capability assessment was done. On 22.04.2016, cleared for placement of developmental order.

16. Tube Suspension: Housing bearing kit (consisting 4 items) for EMD locomotives

M/s P.D. Steels, Mohali

07.10.14 On 07.11.14, advised shortcomings of vendor form. Clarification of shortcomings received on 08.01.15. Cleared for developmental order vide letter no. SD. Aux. TMB.3.1 (P.D. Steels), dtd: 03/09.03.2015.

17. Tube Suspension: Housing bearing kit (consisting 4 items) for EMD locomotives

M/s Sonak Engineering Pvt. Ltd., Navi Mumbai

14.10.14 On 18.04.15, assessment carried out. On 01.05.15, firm cleared for placement of developmental order.

18. Tube Suspension: Housing bearing kit (consisting 4 items) for EMD locomotives

M/s Indore Nitriders, Indore

12.02.15 On 16.02.15, advised shortcomings of vendor form. Reminder-1 issued on 22.05.15. Reminder -II issued on 24.07.15. Compliance of the shortcomings received on 02.12.15. Under scrutiny. Again, advised shortcomings on 18.01.16.

19. Tubes & accessories, Suspension bearing (10 components) of ALCo

M/s Alert Engineering Enterprises, Bhopal

21.12.11 On 20.03.13 assessment again carried out. On 04.07.13, firm cleared for placement of developmental order by DMW.

20. Tubes & accessories, Suspension bearing (10 components) of ALCo

M/s P.D. Steels, Mohali.

17.12.12 On 18.10.13, assessment carried out. On 16.01.14, cleared for placement of developmental order by DLW. Prototype inspection carried out at firms premises from 24.03.15 to 26.03.15 against DMW P.O. Clearance letter issued on 08.06.15 to firm for material dispatched to DMW. Inspection

Page 27: Status of fresh registraion cases Annexure-A

27

Certificate issued on 13.10.2015 after successful fitment trial at DMW/PTA.

21. Tubes & accessories, Suspension bearing (10 components) of ALCo

M/s Simplex Engg. & Foundry works (P) Ltd., Bhilai,

12.03.07 Cleared for developmental order on 06.07.09.

22. 7Tubes & accessories, Suspension bearing (10 components) of ALCo

M/s Sonak Engineering Pvt. Ltd. Navi Mumbai

13.09.11 On 18.09.12 & 02.02.13, assessment carried out.On 12.03.13, cleared for developmental order. From05-05-14 to 07-05-14, prototype inspection carriedout against DMW P.O. and clearance letter issuedon 30.05.14 to firm for material dispatched to DLW.On 09.07.14, I.C issued. Fitment of 02 setssuspension tubes have been successfully fitted atDMW on 24.06.14 on KZJ based locomotive.Fitment details received from DMW & requested tosend performance feedbacks from Rlys on 13.08.15.

23. Tubes & accessories, Suspension bearing (10 components) For TM 4907 & TM 5002 of ALCo locomotives

M/s Excelsior Industries, Habibganj, Bhopal

09.02.15 On 16.02.15, advised shortcomings of vendor form. Reminder-1 issued on 22.05.15. Compliance of shortcomings received on 05.06.15. On 05.05.16 & 06.05.16, assessment carried out & under process.

D. Cables & Cleaning Solvent Items 1. Locomotive Insulated

Wire – Sizes AWG # 3 and Smaller

M/s Apar Industries Ltd. (Unit: Uniflex Cables), Mumbai

27.06.13 On 19.06.14, Internal test results received. From 17.03.15 to 18.03.15, capacity assessment by an officer carried out. On 23.10.15, revised internal test results received. Type test going on from 20.11.15.

2. Flame Retardant 200°CFluoroelastomer Insulated Main Lead &Brush Gear Cablesused in Traction Motorsof Diesel ElectricLocomotives

M/s Siechem Technologies Pvt. Ltd., Pondicherry

21.01.13 On 03.06.13, capability cum capacity assessment and type testing completed. On 19.08.13, advised for fitment trial at DMW on 2 TMs.

3. 2Flame Retardant 200°CFluoroelastomer Insulated Main Lead &Brush Gear Cablesused in Traction Motorsof Diesel ElectricLocomotives

M/s United cables Industries, Noida.

13.07.10 On 11.08.11, advised DMW for placement of developmental order & to conduct fitment trial. On 20.08.13, asked for legal documents. On 21.10.13, advised for fitment trial at DMW on 2 TMs.

4. Locomotive Power Cable – Sizes AWG # 1 and Larger

M/s Apar Industries Ltd. (Unit: Uniflex Cables), Mumbai

27.06.13 On 19.06.14, Internal test results received. From 17.03.15 to 18.03.15, capacity assessment by an officer carried out. On 23.10.15, revised internal test results received. Type test going on from 20.11.15.

5. Resins & Varnishes For Traction Machines Used Ondiesel Electric Locomotives

M/s Fine Finish Organics Pvt Ltd., Navi Mumbai

22.05.14 On 13.01.15, advised for properties of INSUFINE-5002. On 20.07.15, clarification on shortcomings received. On 16.10.15, received QAP & mandatory declarations and waiting for factory license.

6. Wires Lead for Brush Gear Connectors and main lead cables (outgoing) for TM

M/s Siechem Technologies Pvt. Ltd., Pondicherry

05.06.13 On 03.06.13, capability cum capacity assessment and type testing completed. On 19.08.13, advised for fitment trial at DMW on 2 TMs.

E. TM Blower & Duct Items --- 1. Bellows- (Moulded

rubber without fabric), TM for ALCo

M/s Waidhan Engg. & Industries Pvt. Ltd., Singrauli (MP)

07.12.09 On 09.12.11, advised to DMW & DLW for dev. order. On 30.04.12, advised DMW & all CMPEs for dev. order. On 27/04/15, DMW has been asked about fitment of type of bellows 'leather or rubber'. On 05/02/15, firm stated that no dev. order placed by DMW. DMW stated on 20/05/15 that only leatherbellows are used.

2. 2Bellows- (Moulded rubber without fabric), TM for ALCo locomotives

M/s Abelasto Products Pvt. Ltd., Kolkata.

19.10.09 On 24.08.11, advised to DMW & DLW for dev. order. On 27.12.11, advised to all CMPEs for dev. order. On 30.04.12 & 16.05.13, advised DMW for dev. order.

3. Blower of Traction M/s Precision 08.01.15 On 26.02.15, advised shortcomings. On 30.04.15,

Page 28: Status of fresh registraion cases Annexure-A

28

motor for EMD Equipments Co., Varanasi

reminder given. On 09/11/15, clarifications on shortcomings received. On 08/01/16, again advised shortcomings of received clarifications. On 29.04.16, clarifications on shortcomings received & under scrutiny.

4. #1 Traction Motor Blower ASM for EMD (WDG5) locomotives (EMD Pt No. 40176904/DLW Pt No. 17456496)

M/s Saini Electrical and Engineering Works, Ambernath [East], Dist. Thane

21.09.15 On 07/12/15, shortcomings advised. Clarifications on short comings received on 29/12/15 & under scrutiny.

5. #1 Traction Motor Blower ASM for EMD (WDG5) locomotives (EMD Pt No. 40176904/DLW Pt No. 17456496)

M/s Thyron Engineering Pvt. Ltd., Sativali Road, Vasai (East)

24.09.15 On 03/12/15, advised shortcomings. On 06/05/16, reminder given for reply of shortcomings.

6. #2 Traction Motor Blower ASM for EMD (WDG5) locomotives (EMD Pt. No. 40172737/DLW Pt. No. 17455571)

M/s Thyron Engineering Pvt. Ltd., Sativali Road, Vasai (East)

24.09.15 On 03/12/15, advised shortcomings. On 06/05/16, reminder given for reply of shortcomings.

7. #2 Traction Motor Blower ASM (EMD Pt. No. 40172737/DLW Pt. No. 17455571)

M/s Saini Electrical and Engineering Works, Ambernath [East], Dist. Thane

21.09.15 Clarifications on short comings received on 29/12/15 & under scrutiny.

8. Main Generator Motor Blower ASM for EMD (WDG5) locomotives (EMD Pt No. 40170067/DLW Pt. 18090047)

M/s Saini Electrical and Engineering Works, Ambernath [East], Dist. Thane

21.09.15 Clarifications on short comings received on 29/12/15 & under scrutiny.

9. Main Generator Motor Blower ASM (EMD Pt No. 40170067/DLW Pt. 18090047)

M/s Thyron Engineering Pvt. Ltd., Sativali Road, Vasai (East)

07.10.15 On 03/12/15, advised shortcomings. On 06/05/16, reminder given for reply of shortcomings.

F. Alternator & DB Items ---- 1. Alternator, Traction &

sub-assemblies for ALCo locomotives

M/s Saini Electrical and Engineering Works, Navi Mumbai

22.10.13 Capability assessment of the firm done on 16.07.14. On 18.09.14, recommended for dev. order. On 22-12-14, DMW placed Advance acceptance against tender no. 201515350 for 4 sets. Stage inspection of Alco TA witnessed on 01-08-2015 at firm premises. From 29.09.15 to 03.10.15, type test witnessed. On 08.12.15, dispatch clearance given for fitment at DMW.

2. Alternator-Rectifier Traction, for EMDlocomotives (foralternator)

M/s TD Power Systems Limited, Bangalore

27.06.13 Capability assessment of the firm done on 28.07.14. On 16.09.14, recommended for dev. order. DLW placed dev. PO no. 091310180.15117980 dte. 27.03.15 for 10 units.

3. Alternator-Rectifier Traction, for EMD locomotives (for alternator)

M/s Saini Electrical and Engineering Works, Navi Mumbai

03.09.13 Capability Assessment of the firm done on 16.07.14 & 16.04.15. On 05.05.15, recommended for placement of dev. order from DLW. DLW placed developmental PO no. 091510190.15118284 dated 21-1-15 for 10 units. Stage inspection carried out from 07.05.16 to 10.05.16.

4. Alternator-Rectifier Traction, for EMD locomotives (for alternator)

M/s Medha Traction Equipment Pvt. Ltd., Ghatkesar

14.11.13 Capability assessment of the firm done on 29.07.14. On 16.09.14, recommended for dev. order. Letter dt. 16-09-14 issued to RA Berlin for capacity assessment of firm’s JV partner, i. e. TSA /Austria. As per RA/Berlin letter dt. 27th Oct 2014, assessment of TSA/Austria done and things found to be satisfactory for TA development. On 10-03-15, advised to take the necessary action in connection with RDSO’s new vendor approval policy on Manufacturing in INDIA.

Page 29: Status of fresh registraion cases Annexure-A

29

5. Alternator-Rectifier Traction, for EMDlocomotives foralternator (for Alternator& Rectifier)

M/s Daulat Ram Engineering Services (P) Ltd., Raisen

20.08.13 Capability assessment of the firm done on 17-06-14. On 16.09.14, recommended for dev. order. DLW placed dev. PO no. 091310180.15117952 dte. 12.03.15 for 10 units.

6. Alternator-Rectifier Traction, for EMDlocomotives foralternator

M/s Crompton Greaves Ltd., Bhopal

24.04.15 On 05.05.15, advised shortcomings. On 15-06-15, firm has submitted QAP and other details fallen short. Performance of TAs supplied/repaired is under field trial observation.

7. Alternator-Rectifier Traction, for EMDlocomotives foralternator (for Alternator& Rectifier)

Ruttonsha International Rectifier Ltd. Dist. Panchmahals, Gujarat

31.03.16 Shortcomings advised to firm on 26-04-16.

8. Auxiliary machines & sub-assemblies for ALCo locomotives

M/s Daulat Ram Engg. Service (P) Ltd., Raisen.

09.10.12 On 11.01.13, prototype clearance granted. On 17.07.14, asked fitment details from DMW. On 15.05.15, fitment details received from DMW. On 19.05.15, performance asked from respective zonal rlys.

9. Auxiliary machines & sub-assemblies for ALCo locomotives

M/s Saini Electrical and Engg. Works, Ambernath (East), Dist. Thane

04.02.15 On 20.02.15, advised shortcomings of vendor form. On 09.03.15, compliance against shortcoming received.QAP, Drawings and list of M & P still awaited. From 29.09.15 to 03.10.15, type test witnessed. On 08.12.15, dispatch clearance given for fitment at DMW.

10. 5Dynamic Brake Hatch assembly (Complete assembly including grid, motor & fan) for EMD locomotives

M/s BLA Engg. Pvt. Ltd., Kolkata.

23.06.11

On 17.01.12, cleared for developmental order. Capability assessment done on 07.09.13. Type test carried out from 17.10.14 to 21.10.14. On 15.02.2016 prototype cleared.

11. Dynamic braking fan assembly for EMD locomotives

M/s Saini Electrical and Engineering Works, Navi Mumbai

06.06.13 Capability assessment done on 28.09.13. Recommended for Developmental order on 18.03.14. Prototype test of DB fan assembly carried out from 14.12.14 to 18.12.14. Advised shortcomings of test result on 07.04.2015. Application considered for DB fan assembly as DB Hatch assembly has been deleted from RDSO vendor directory.

12. Dynamic Braking Grid M/s Stesalit Telema Electricals Pvt. Ltd. Baddi, Distt. Solan

03.06.14 Shortcomings advised on 04.09.2014. On 21.04.15, advised shortcomings of reply received on 05.02.15. Shortcomings in submitted documents advised on 25.06.2015. Firm reply received vide their letter dated 14.07.15.

13. Dynamic Brake HatchAssembly for EMDLocomotives (Completeassembly including grid,motor & fan) for EMD

M/s Narmada Switch gear Pvt. Ltd., Bhopal

19.06.14 Shortcomings advised on 04.09.2014. Reminder for shortcoming issued on 31.08.2015. On 08.01.2016, once again reminder set to firm.

14. Dynamic braking fan assembly for EMD locomotives

M/s Saini Electrical and Engineering Works, Navi Mumbai

03.06.14 Firm’s application of DB Hatch assembly has been considered for DB Fan assembly.

15. Fan assembly, Cooling for EMD locomotives

M/s Kaptronics Pvt. Ltd., Bangalore

02.04.12 On 13.04.12, cleared for developmental order. On 27.08.12, advised to update manufacturing facilities. On 27.01.15, firm informed to offer for prototype testing in 4th week of Feb. 2015. On 09.05.15, firm informed to offer for prototype testing in 2nd week of June 2015. On 25.04.16, asked to submit the internal test report as per spec. & required facilities for testing.

16. 7Fan assembly, Cooling for EMD locomotives

M/s Saini Electrical & Engineering Works, Navi Mumbai

10.04.12 Capability assessment done on 28.09.13. On 08.05.14, developmental order recommended to DLW. On 15.10.14, dev. P.O. placed by DLW. From 09.12.14 to 13.12.14, type test done against dev. P.O. On 01.07.15, Lab test result/clarification received. On 09.07.15, dispatch clearance given to DLW for fitment on locomotives. On 13.11.15, advised rejection of prototype unit because RCF

Page 30: Status of fresh registraion cases Annexure-A

30

draws excess current during load box testing on locomotives. On 04.02.16, re–type test done & under scrutiny. On 17.02.16, advised shortcoming & call for meeting against type test. On 26.02.16, advised to carry out further modification of the motor & submit the internal test report. On 08.04.16, firm submitted the internal test report with 6 no. of blade instead of earlier 8 blades and under scrutiny.

17. 54", Cooling fan assembly for EMD Locomotives

M/s Daulat Ram Inductries, Bhopal

09.01.15 On 24-03-15, capability assessment carried out. On 15.04.15, recommended for developmental order by DLW.

18. 54", Cooling fan assembly for EMD Locomotives

M/s Force MotionTechnology LLP, NaviMumbai

19.05.16 Vendor form under scrutiny.

19. 54" Radiator cooling fan assembly for EMD (WDG5) Locomotives

M/s Daulat Ram engineering Services Pvt. Ltd., Raisen

24.09.15 On 03.11.15, advised shortcomings. On 21.03.16, QAP & Legal docs received and under scrutiny. Technical details, Drawing and internal test report still are awaited.

20. 54" Radiator cooling fan assembly for WDG5 Locomotives

M/s Saini Electrical and Engineering Works Ambernath [East], Dist.Thane

21.09.15 Vendor form under scrutiny.

21. 54" Radiator cooling fan assembly for WDG5 Locomotives

M/s CraftsmanAutomation PrivateLimited,Coimbatore

28.04.16 Vendor form under scrutiny.

22. Generator Auxiliary for EMD locomotives

M/s Standard Electrical Industries, Coimbatore

03.06.14 On 26-08-14, capability assessment carried out. On 16.09.14, recommended for developmental order by DLW. Firm has received developmental P.O no. 091470130.15117918 dt 18.02.15 by DLW. On 11.09.15, Internal test report received. From 10.10.15 to 14.10.15, type test witnessed. On 26.02.16, dispatch clearance given to DLW for fitment & testing on locomotives.

23. Generator Auxiliary for EMD locomotives

M/s BHEL Electrical Machines Ltd., Kasaragod

22.05.14 On 26-08-14, capability assessment carried out. On 13.11.14, cleared for dev. order against earlier DLW P.O. On 01.05.15, clarification asked regarding dev. status of item. On 16.10.15, received internal test report & QAP. On 28.10.15, advised shortcomings of internal test report & QAP. On 26.12.15, received clarification of internal test report & revised QAP & under scrutiny.

24. Generator Auxiliary for EMD locomotives

M/s Saini Electrical and Engineering Works, Navi Mumbai

13.12.13 On 07.11.14, recommended for developmental order by DLW. Firm has received developmental P.O no. 091470130.15117941 dt 03.03.15 by DLW. On 13.07.15, firm has submitted internal test report against Dev. P.O. On 01.08.15, type test done against Dev. P.O. On 13.08.15, dispatch clearance given to DLW for fitment & testing on locomotives. On 17.02.16, cleared type test & further supply.

25. Generator Auxillary for EMD locomotives

M/s Integrated Electric Co. Pvt. Ltd., Bangalore

26.07.12 On 04.05.13, capacity assessment carried out. On 24.02.15, recommended for placement of developmental order by DLW.

26. Generator Auxiliary for EMD locomotives

M/s Kaptronics Pvt. Ltd., Bangalore

11.08.15 On 21.08.15, shortcoming advised to firm. On 12.10.15, compliance received against shortcoming & under scrutiny. On 13.11.15, advised shortcoming against submitted compliance. On 15.02.16, clarification received & under scrutiny.

27. Generator Auxiliary for EMD locomotives

M/s Force Motion Technology LLP, DIGHA MIDC, Navi Mumbai

31.03.16 Vendor form under scrutiny.

28. Radial DB Hatch Assly. of WDG5 Loco

M/s Daulat Ram Industries, Bhopal

29.07.15 Shortcomings advised on 27.10.2015.

Page 31: Status of fresh registraion cases Annexure-A

31

29. Radial DB Hatch Assly. of WDG5 Loco

M/s Saini Electrical and Engineering Works, Ambernath [East], Dist. Thane

21.09.15 Vendor form under scrutiny.

30. Rectifier Bank Assembly for HHP Locomotives (EMD Part No 40027895, DLW Part No 18021554 or equivalent

M/s Hind Rectifiers Limited, Mumbai

17.12.15 Shortcomings advised to firm on 29-01-16. Firm submitted documents fallen short on 15-02-16 which are under scrutiny.

G. DEMU items --- 1. Alternator Traction & its

sub-assemblies for DEMU

M/s Daulat Ram Engg. Service (P) Ltd., Raisen

12.06.14 Shortcomings of QAP again advised to firm on 12-11-14.

2. Machines Auxiliary & its sub-assemblies for DEMU

M/s BHEL Electrical Machines Ltd., Kasaragod

14.11.13 Advised shortcomings on 19.12.13 & 27.03.14.

3. Motor Armature, DC Traction for DEMU

M/s Saini Electrical and Engg. Works, Mumbai

13.06.13 On 24.06.13, advised shortcomings. On 26-07-14, clarifications submitted by the firm and under scrutiny.

4. Motor Complete, DC Traction for DEMU with following sub-assembly:A. Armature, B. Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame - machined

M/s Saini Electrical and Engg. Works, Mumbai

13.05.13 Cleared for developmental order of 1400 hp DEMU on 23.09.14.

5. Motor Magnet frame (machined), DC Traction for DEMU

M/s Saini Electrical and Engg. Works, Mumbai

13.06.13 On 24.06.13, advised shortcomings. On 26-07-14, clarifications of shortcomings received and under scrutiny.

6. Motor Main field coils assembly, DC Traction for DEMU

M/s Saini Electrical and Engg. Works, Mumbai

13.06.13 On 24.06.13, advised shortcomings. On 26-07-14, clarifications of shortcomings received and under scrutiny.

7. Three Phase AC-AC Transmission System & Associated Control Equipment for 1600 H`P Diesel Electric Multiple Unit

M/s Crompton Greaves Ltd.,

01.06.15 Vendor form under scrutiny.

8. Three Phase AC-AC Transmission System & Associated Control Equipment for 1600 HP Diesel Electric Multiple Unit

M/s Bharat Force Ltd., Pune`

17.12.15 Vendor form under scrutiny.

9. Three Phase AC-AC Transmission System & Associated Control Equipment for 1600 HP Diesel Electric Multiple Unit

M/s Medha Servo Drives Pvt Ltd., Hydrabad

01.03.16 Vendor form under scrutiny.

H. Starter Motor Items --- 1. Motor Starter for

EMD locomotives M/s Illinois Auto Eletric Company, Illinois

10.10.11 Capacity assessment & testing report submitted by RITES on 12.12.13. On 17/18.02.14, cleared for dev. order.

2. Motor Starter for EMD locomotives

M/s Lucas TVS Limited, PADI

05.10.11 On 28.03.12, cleared for developmental order.

3. Motor Starter for EMD locomotives

M/s REIL Electrical India Ltd., Pondicherry

10.09.12 On 12.12.12, capacity assessment carried out. On 12.02.13, cleared for dev. order. On 01.01.14, prototype clearance against DLW P.O. given. Firm submitted revised QAP on 04.08.2014 & found in order. Firm has supplied 18 nos starter motors against DLW dev P.O. for 18 nos. All the 18 motors

Page 32: Status of fresh registraion cases Annexure-A

32

fitted on locomotives and dispatched to different sheds. Performance of these motors has been asked vide RDSO’s letter dated-01.12.15. On 24.05.16, firm has been asked corrective action taken to prevent failures.

4. Motor Starter for EMD locomotives

M/s Daulat RamEngineering Services(P) Ltd., Raisen

15.10.14 On 17.11.14, advised short comings. Papers submitted by firm and scrutinized the same advised to firm for short comings on 11/12/2014. Reply received from firm on 24.02.15 and letter issued to firm for clarification on dated 03.03.15. Further, advised shortcomings on 09.04.15. Reply received on 09.06.15 and its shortcomings advised on 10.06.15. Advised shortcomings of QAP on 23.06.15. Revised QAP received on 17.08.15. Further, advised shortcomings on 01.10.15. On 07.01.16, advised shortcomings. Reply received vide firm’s letter dated-26.02.16 and is under scrutiny.

5. 64 Volt, DC Cranking Motor (Locomotive application)

M/s Star AutoElectricals, Patna

12.04.16 On 10.05.16, advised shortcomings.

6. E-Locker/ Dustbin Motor Blower Assly for EMD (WDG5) Locomotives

M/s Saini Electrical and Engineering Works, Ambernath [East], Dist. Thane

21.09.15 On 24.11.15, advised shortcomings of vendor form. Reply on shortcomings received on 30.12.15 & under scrutiny.

7. E-Locker/ Dustbin Motor Blower Assly for EMD (WDG5) Locomotives

M/s Thyron Engineering Pvt. Ltd., Sativali Road, Vasai

07.10.15 On 24.11.15, advised shortcomings of vendor form. Reminder issued to the firm on 22.04.16.

dze- la-

S. No. vkbZVe dk uke

Name of items os.Mj dk uke

Name Of Vendor

vkosnu fnukad

Date of applicati

on

orZeku fLFkfr

Current status

pkyu 'kfDr& batu vkbZVe

Motive Power – Engine items EMD Items

1. Cylinder Head (VD SN 113)

M/s Ghatge Patil Industries Ltd., Kolhapur

19.03.16 Deficiencies advised to firm on 08.04.2016. Reminder sent to firm on 20.05.16. Reply awaited.

2. Carrier Piston Pin (VD SN 109)

M/s Bharat Forge Ltd., Pune

17.12.15 Deficiencies advised to firm on 04.02.2016. Reminder sent to firm on 06.05.2016. Reply awaited.

3. Steel – Crankshafts - 20 Cylinder (VD SN 111 D)

M/s Bharat Forge Ltd., Pune

17.12.15 Deficiencies advised to firm on 18.01.2016. Reminder issued to firm on 18.02.2016, 15.03.2016 & 18.04.2016,17.05.2016. Reply awaited.

4. Main Bearings (VD SN 108)

M/s Zollern BHW Gleitlager GmbH & Co., Germany

05.09.13 Letter sent to firm on 31.07.15. Reply received from firm on 15.09.15, 27.10.15, 06.01.2016 & 20.01.2016 Under process.

5. Main Bearings (VD SN 108)

M/s Hi-Bond Bearings Pvt. Ltd., Rajkot

19.12.14 Firm has not submitted some documents required for processing the case. Reply received on 28.08.2015 & 18.11.2015, 27.11.2015 & 08.02.2016. Deficiencies advised on 14.08.2015, 10.12.2015 & 08.03.16. Reply awaited.

6. Main Bearings (VD SN 108)

M/s KSPG, Pune 06.04.15 Firm has not submitted some documents required for processing the case. Balance deficiencies advised on 27.11.2015. Reminder sent to firm on 11.03.2016. Reply awaited.

7. Carrier Piston Pin (VD SN 109)

M/s High Precision Industry, Tamilnadu-641021

19.06.15 Firm has not submitted some documents required for processing the case. Balance deficiencies advised on 10.07.2015 & reminder sent to firm on 28.08.2015 & 04.11.2015 & 04.03.2016. Reply received on 08.04.16. Further deficiency advised on 05.05.2016. Reply awaited.

Page 33: Status of fresh registraion cases Annexure-A

33

8. Cylinder Head (VD SN 113)

M/s Dakshin Foundry Pvt Ltd, Karnataka

08.09.14 Firm has not submitted some documents required for processing the case. Reply received on 19.02.2016. Balance deficiencies advised on 06.10.2015, 22.12.15 & 25.02.16, 22.04.2016. Reply received on 15.03.16 & 12.05.16. Capacity assessment has been done on 11.05.16 & 12.05.16. Case is under process.

9. Cylinder Head (VD SN 113)

M/s Ashok Iron Work’s Pvt. Ltd. Karnataka

05.06.13 Firm has not submitted some documents required for processing the case. Reply received on 08.02.2016. Balance deficiencies advised on 04.11.2015, 22.12.15 & 25.02.16. Reply awaited.

10. Cylinder Head (VD SN 113)

M/s H.K. Engine Component LLc , USA.

17.05.13 Firm has not submitted some documents required for processing the case. Balance deficiencies advised on 31.07.2015 & 27.11.2015. Reply received on 15.10.2015 & 18.12.2015. Letter sent to RA Berlin for capacity & capability assessment on 22.01.2016.

11. Cylinder Head (VD SN 113)

M/s Shakthi Tech Mfg India Pvt Ltd, Coimbatore.

12.10.15

DLW has been advised on 26.02.16 to place developmental order on the firm.

12. Carrier Piston Pin (VD SN 109)

M/s Shakthi Tech Mfg India Pvt Ltd, Coimbatore.

09.12.15 DLW has been advised on 26.02.16 to place developmental order on the firm.

13. Piston and Piston- Casting (VD SN 115)

M/s Shakthi Tech Mfg India Pvt Ltd, Coimbatore.

09.12.15 DLW has been advised on 26.02.16 to place developmental order on the firm.

14. Carrier Piston Pin (VD SN 109)

M/s Craftsman Automation Pvt ltd, Coimbatore.

04.09.15 DLW has been advised on 26.02.16 to place developmental order on the firm.

15. Piston and Piston- Casting (VD SN 112)

M/s Craftsman Automation Pvt ltd, Coimbatore

23.09.15 DLW has been advised on 08.02.16 to place developmental order on the firm.

16. Cylinder Head (VD SN 113)

M/s Craftsman Automation Pvt ltd, Coimbatore.

23.04.15 DLW has been advised on 08.02.16 to place developmental order on the firm.

17. Carrier Piston Pin (VD SN 107)

CSR Changzhou Diesel Engine Components Co.,Ltd China

07.02.14 DLW has been advised on 04.08.2015 to place developmental order on the firm.

18. Cylinder Head (VD SN 111)

M/s Lohia Starlinger Ltd. Kanpur

30.01.13 DLW & DMW have been advised on 29.07.2013 to place developmental order on the firm.

19. Cylinder Head (VD SN 111)

M/s GE India Industrial Pvt. Ltd., Gurgaon 122009, Haryana

25.07.13 DLW has been advised on 15.05.15 to place developmental order on the firm.

20. Cylinder Head (VD SN 111)

M/s River Engineering Pvt. Ltd.

05.08.14 DLW has been advised on 19.11.2015 to place developmental order on the firm.

21. Piston and Piston- Casting (VD SN `115)

M/s GETS, New Delhi.

29.02.12 DLW has been advised on 15.05.15 to place developmental order on the firm.

22. Piston and Piston- Casting (VD SN 115)

M/s Federal Mogul Goetz (India) Ltd., Gurgaon

07.08.12 DLW have been advised on 22.06.2015 to place developmental order on the firm.

23. Piston and Piston- Casting (VD SN 115)

M/s CSR Changzhou Diesel Engine Components Co., Ltd., China

14.11.13 DLW has been advised on 04.08.2015 to place developmental order on the firm.

24. Piston and Piston- Casting (VD SN 115)

M/s River Engineering Pvt. Ltd.

05.08.14 DLW has been advised on 15.05.15 to place developmental order on the firm.

25. Carrier Piston Pin (VD SN 109)

M/s Rajshi Technologies India Pvt. Ltd. Rae Bareli

29.04.13 Prototype sample inspection done and sample rejected due to dimensional variations. The firm has to offer again for prototype inspection.

26. Piston Ring Set (VD SN 117)

M/s CSR Qishuyan Institute Co. Ltd. China

03.12.13 Prototype sample inspection is being planned.

Page 34: Status of fresh registraion cases Annexure-A

34

27. Piston Ring Set (VD SN 117)

M/s IGI, Rajkot 23.05.11 Prototype sample inspection done and sample rejected. Fresh inspection is being planned.

28. Carrier Piston Pin (VD SN 109)

M/s Jinan Shenggno Machinery Co. Ltd., China

22.12.10 Performance monitoring underway.

29. Piston and Piston- Casting (VD SN 115)

M/s Cooper Corporation Pvt. Ltd, Satara

22.02.12 Performance monitoring underway.

30. Bearing - Con Rod (VD SN 107)

M/s PBW Pvt. Ltd., Rajkot

21.09.11 i) Part – II status given for con rod bearing lower only on 20.04.2015. ii) Firm is yet to offer prototype upper con rod bearings.

Alco Items 31. Cylinder Head

Casting (251 Plus) (VD SN 112)

M/s Craftsman Automation Pvt ltd, Coimbatore.

21.04.16 Deficiencies advised to firm on 19.05.2016. Reply awaited

32. Piston Ring Set (Plasma Plated) (VD SN 119)

M/s IGI, Rajkot 17.03.16 Deficiencies advised to firm on 25.04.2016. Reply received. Under scrutiny.

33. Diesel Engine Crankshafts of Forged Steel -12 Cylinder (VD SN 111 A)

M/s Bharat Forge Ltd., Pune

17.12.15 Deficiencies advised to firm on 18.01.2016. Reply awaited. Reminder issued to firm on 18.02.2016 , 15.03.2016,18.04.2016 & 17.05.16 . Reply awaited.

34. Connecting Rod Bearings (VD SN 104)

M/s Hi-Bond Bearings Pvt. Ltd., Rajkot

19.12.14 Firm has not submitted some documents required for processing the case. Reply received on 18.11.2015 & 27.11.2015. Balance deficiency advised to firm on 14.08.2015 & 10-12-2015. Reminder sent to firm on 11.03.2016. Reply awaited.

35. Main Bearing Shell (Inter & Centre) (VD SN 105)

M/s Benara Automotives Pvt. Ltd., Agra-282007

10.06.14 Firm has not submitted some documents required for processing the case. Deficiencies are being advised.

36. Main Bearing Shell (Inter & Centre) (VD SN 105)

M/s Hi-Bond Bearings Pvt. Ltd., Rajkot

19.12.14 Firm has not submitted some documents required for processing the case. Reply received on 18.11.2015 & 27.11.2015. Balance deficiency advised to firm on 14.08.2015 & 10-12-2015. Reminder sent to firm on 11.03.2016. Reply awaited.

37. Main Bearing Shell (Inter & Centre) (VD SN 105)

M/s Esteedee Autocom Engineers Pvt. Ltd., Thane

16.04.15 Firm has not submitted some documents required for processing the case. Balance deficiencies advised on 06.10.2015 & 16.12.2015. Reply received on 05.11.2015 & 24.02.2016. Under scrutiny.

38. Main Bearing, Thrust (VD SN 106)

M/s Hi-Bond Bearings Pvt. Ltd., Rajkot

19.12.14 Firm has not submitted some documents required for processing the case. Reply received on 18.11.2015 & 27.11.2015. Balance deficiency advised to firm on 14.08.2015 & 10-12-2015. Reminder sent to firm on 11.03.2016. Reply awaited.

39. Main Bearing, Thrust (VD SN 106)

M/s Esteedee Autocom Engineers Pvt. Ltd., Thane

17.04.15 Firm has not submitted some documents required for processing the case. Balance deficiencies advised on 06.10.2015 & 16.12.2015. Reply received on 05.11.2015 & 24.02.2016. Under scrutiny.

40. Cylinder Head Casting (251 Plus) (VD SN 112)

M/s Ashok Iron Works, Belgaum

11.02.11 Firm has not submitted some documents required for processing the case. Reply received on 08.02.2016. Balance deficiencies advised on 04.11.2015, 22.12.15 & 25.02.2016. Reply awaited.

41. Cylinder Head Casting (251 Plus) (VD SN 112)

M/s Dakshin Foundry Pvt Ltd, Karnataka

05.08.14 Firm has not submitted some documents required for processing the case. Reply received on 19.02.2016. Balance deficiencies advised on 06.10.2015 & 22.12.15, 25.02.2016, 22.04.2016. Reply received on 15.03.16 & 12.05.16. Capacity assessment has been done on 11.05.16 & 12.05.16 Case is under process.

42. Liner Sleeve (Cylinder Liner Kit (3 RV) (VD SN 114.3)

M/s Eastern Equipment Enterprises, Kolkata

23.02.15 Firm has not submitted some documents required for processing the case. Balance deficiencies advised on 08.05.2015. Reminder sent on 03.07.15 & 21.08.2015. Reply received on 16.12.2015. Further balance deficiencies advised on 15.01.2016. Reply

Page 35: Status of fresh registraion cases Annexure-A

35

received on 19.02.2016. Further balance deficiencies advised on 05.04.2016. Reply awaited.

43. Piston Ring Set (3 RV) (VD SN 118)

M/s CSR Qishuyan Institute Co. Ltd. China

27.01.14 Capacity assessment is being planned.

44. Connecting Rod Bearings (VD SN 104)

M/s Benara Automotives Pvt. Ltd., Agra-282007

30.05.13 DMW & DLW have been advised on 20.06.2014 to place developmental order on firm.

45. Cylinder Head Casting (251 Plus) (VD SN 110)

M/s Lohia Corp Ltd., Kanpur

17.05.13 DLW & DMW have been advised on 29.07.2013 to place developmental order on the firm.

46. Cylinder Liner Kit (3 RV) (VD SN 114)

M/s Perfect Engg., Pune

14.01.11 DLW & DMW have been advised on 08.03.2013 to place dev. Order on the firm.

47. Cylinder Liner Kit (3 RV) (VD SN 114)

M/s Pefco Foundry, A division of Kores (India) Ltd. Pune

06.09.12 Performance monitoring underway.

48. Diesel Engine Crankshafts Of Forged Steel -16 Cylinder (VD SN 111 B)

M/s Bharat Forge Ltd., Pune

16.02.12 Performance monitoring underway.

dze- la-

S. No.

vkbZVe dk uke

Name of items os.Mj dk uke

Name of Vendor

vkosnu fnukad

Date of applicati

on

orZeku fLFkfr

Current status

pkyu 'kfDr & batu flLVe vkbZVe

Motive Power – Engine System items 1 Mechanical Unit

Injector Assembly for EMD locomotives

M/s Bosch limited, Bengaluru.

01.09.11

As per DLW PO No.100915190.10116635 dated 01.10.10,M/s Bosh Ltd. Bangalore supplied 192 no’s MUI’s to DLW. ALL MUI’s have been fitted on loco no. 12829/GOC/SR, 40161/R/SECR, 12256/GY /SCR, 12885/GOC /SR,70018/PTRU/ECR, 70324/ PA/SR,12975/R/SECR,12976/R/SECR,12973/JHS/NCR,12974/JHS/NCR,12977/R/SECR,70325/PA/CR. Further, M/s Bosch has supplied 18 no’s MUI’s against warranty replacement to DLW, out of 18 no’s, 14 no’s has been fitted on loco 70354/ABR/NWR & 2 no’s fitted on loco no. 70108/WR/SBI. After completing one year field service, letter sent to GY, JHS, R, GOC, KYN, PTRU on dated 08.05.15 regarding field performance. Reply received GY & KYN. Remaining awaited. Letter sent to firm on 08.07.15 regarding failure of MUI at KYN Shed, reply awaited. Reply to GOC,JHS,R regarding performance feedback on date 21.07.15.Performance received from Shed. A letter to Dy CDE/DLW/BSB & copy to M/s Bosch on dt. 17.11.2015 regarding failure investigation of MUI’s of GOC, R& KYN. Reply received on 29.01.2016 &02.03.2016 is being examined.

2 Mechanically Bonded Radiator Assly. For EMD Locomotives

M/s Fine Automotive & Industrial Radiator Pvt. Ltd., Pondicherry

16.07.12 Firm applied as fresh vendor registration for manufacturing and supply of Radiator assembly for EMD locomotives vide application no.QAM2012/2763 dated16.07.12. Document completed after Capability assessment done on letter sent to DLW/BSB on 10.10.2013 for developmental order on the firm. First inspection carried out in May 14 against firm’s inspection date 23.04.2014. Deficiencies advised in

Page 36: Status of fresh registraion cases Annexure-A

36

MOM. Further inspection carried out on 26.08.14 after removal of deficiencies testing was started. Testing is going on in one set of radiator. Hatch cycle test has been completed. Thermal cycle test is going on and may take one month more. Final visit carried out on firm premises 6 &7th October 2015 of further course of action. Radiator all concerned tests completed and for clearance I.C. issued on 09.11.2015 for prototype one set of radiator. I.C. reissued on 29.12.2015. One set fitted on WDG4D locomotive based at Diesel Loco shed Gonda. Remaining fitment of 07 sets of radiator on HHP locos are awaited for field performance.

3 Mechanical Unit Injector Assembly for EMD locomotives

M/s Haynes Corporation, USA

06.06.12

Deficiencies like QAP, Digital Signature Certificate, Balance sheet, Factory License & Proof of address etc. Letters sent on 19.03.2013 to RITES and on 18.03.2013 to M/s Haynes regarding capacity cum capability assessment. M/s RITES has informed that M/s Haynes have not submitted complete details and have also not confirmed acceptance to pay RITES charges. Letter dt. 11.6.13 sent to firm to submit complete details and remit RITES’ charges. Letter sent to firm on date 05.01.2015 regarding deficiencies according to latest vendor guideline ver.12.0. Letter sent to firm on date 29.04.15 regarding to remove the anomalies and submit the required document as per guideline for vendor approval. Reminder sent to firm on dated 21.05.15. Letter sent to firm on dt. 17/20.07.15 regarding submission of document as per latest vendor guideline ver.13.0. Reminder letter no.SDWDM2.3.6(Haynes) sent on dt. 28.09.15. Reply awaited.

4 Mechanically Bonded Radiator Assly. For EMD Loco

M/s Dolphin Manufacturing Ltd.

L.L.C, U.A.E

15.07.13 Firm applied as fresh vendor registration for manufacturing and supply of Radiator assembly for EMD locomotives. Firm completed documents as per the prevailing fresh vendor registration guideline No MP MP-G-7.1-1, version 12.0. Further letter was written to M/s Dolphin regarding for sending to document as per latest “Make in India concept” dated 19.01.2015 [ref: DG RDSO letter no.-DG/Misc/2014 dated 20.10.2014]. Firm intimate this office letter vide their letter dated 22.01.2015, that they agreed to submit their proposal according the latest RDSO’s policy. Letter to firm on dated 30.09.15 to submit the documents as per RDSO latest vendor guideline. Document Received &under scrutiny. Further deficiency advised on 23.12.15, Document partially received on 29.12.15. Letter sent to firm on15.02.16 regarding compliance of STR. Reply partially received. Letter sent to firm on 14.03.16 regarding compliance of STR. Compliance of STR received, documents under scrutiny. Firm has been advised to submit the STR compliance of radiator for HHP locomotives on 12.05.2016.

5 Plate type lube Oil cooler for Alco locomotive.

M/s Adhiam Thermal system & Solutions Pvt. Ltd. Chennai Bangalore Highway, Thirupathy Estate,

27.01.14

Deficiencies advised to firm on 06.02.2014. Firm reply received on 17.10.2014.Still not complying the requirements hence Letter sent to firm on dt. 07.11.14. Firm representative visited RDSO on 20.11.14 along with RDSO letter date 07.11.14. Firm

Page 37: Status of fresh registraion cases Annexure-A

37

Kanchipuram-631502

assured to submit the pending documents at the earliest. Letter sent to firm on dt. 27.11.2014 for submission of pending documents. Letter sent to firm on date 06.01.2015. Reply received. Letter sent to firm on date 23.01.2015 regarding preparedness for conducting visit of firms premises and capability assessment. Visited firm on dated 16 &17.06.2015. Tour report submitted. Deficiency again advised on dt to firm on 01.07.15. Letter sent to CME/DMW/PTA & copy to firm ie M/s Adhiam regarding developmental order on dt. 13.10.2015.

6. Plate type lube Oil cooler for Alco locomotive.

M/s Lord Vishwakarma Heat Exchangers Pvt. Ltd. Laksar Road, Kankhal Haridwar -249408

31.10.14 Deficiencies advised to firm on dt. 25.11.2014. Reply received on date 09.01.2015. and under scrutiny. Letter sent to firm on dt.05.01.2015 regarding vendor registration fee. Clarification. Letter sent to firm on dt. 12.3.2015 regarding deficiencies. Letter sent to firm on 10.07.15 regarding submission of product drawing . Letter to Firm on dt. 16.11.2015 regarding preparedness for conducting visit of firm premises & capability cum capacity assessment. Letter received from firm on 06.01.2016 & 06.04.2016. Offer for STR verification & capability assessment, is under process with JD/BK.

7. Mechanically Bonded Radiator Assly. For EMD Locomotives.

M/s Saswad heat transfer & engineering Co. Pvt. Ltd. Pune – 412301

16.06.15

Deficiency has been advised to firm vide letter dated 03.07.15. Reply received on 23.07.15. Under scrutiny. After scrutiny a letter has been sent to dated 29.07.15.Reply received from firm on 13.08.15.Further deficiency has been advised to firm on date 19.08.15..Reply received from firm on 09.10.15,under scrutiny. Meeting with firm representative regarding submission of the document as per vendor guideline. Reply received & under scrutiny. Further deficiency advised on 21.12.15. Letter sent to firm on 12.02.16 regarding compliance of STR. Reply partially received. Letter sent to firm on 14.03.16 regarding compliance of STR. Compliance received. Capability and capacity assessment and STR verification has been planned. Capability and capacity assessment and STR verification has been done on 28.04.16 to 29.04.16. Letter has been advised to firm to submit the supporting documents to RDSO on compliance of STR few points dt. 11.05.2016.

8. Turbocharger 3100, 3300 and 3600 h.p. for ALCo locomotives

Bharat Forge Ltd. Pune Cantonement, Mundhwa, Pune 411036

23.11.15 Document received. After scrutiny Deficiency has been advised to firm vide letter dated 11.12.15.

9. Plate type lube Oil cooler for Alco locomotives

Lloyd Electric & Engineering Ltd. (Formerly Perfect radiator &Oil cooler), Tauru, Mewat , Haryana-122106

18.01.16 Letter send to firm regarding deficiencies on 03.02.2016. No reply received till date. Reminder given to firm on 29.04.16.

10 Radiator Assembly For WDG5 Diesel Locomotive

M/s GEA Ecoflex India Pvt Ltd., Plot No. A-31/32, MIDC, Phase IV, Village-Nighoje, Chakan, Tal Khed, Distt. Pune-410501

29.03.2016

Letter to firm on 22.04.2016 for submission of hard copy of the documents to RDSO. Documents received on 09.05.2016 and under scrutiny.

Page 38: Status of fresh registraion cases Annexure-A

38

11 Mechanically Bonded Radiator Assly. For EMD Locomotives

M/s GEA Ecoflex India Pvt Ltd., Plot No. A-31/32, MIDC,Phase IV, Village-Nighoje, Chakan, Tal Khed, Distt. Pune-410501

13.04.2016

Letter to firm on 22.04.2016 for submission of hard copy of the documents to RDSO. Documents received on 09.05.2016 and under scrutiny.

dze- la-

S. No. vkbZVe dk uke

Name of items os.Mj dk uke

Name Of Vendor

vkosnu fnukad

Date of applicati

on

orZeku fLFkfr

Current status

Motive Power – Filter group items

1. Filter Housing, Secondary Engine Air Filters, for ALCo & EMD Locomotives

M/s G.B. Equipments System Ltd., Dehradun (India)

13.05.13. Deficiencies advised to firm on 07/06/13. Firm Reply received on 26-06-2013. Deficiencies advised to firm on 09.07.13. Reply received on 22.7.2013. File has been sent to legal cell for legal clearance on 02.8.13. File returned from legal cell on 21.10.2013 with remarks. Deficiencies advised to firm on 07/11/13. Reply received from firm on 18.11.13. Further deficiency advised to firm on 04.12.2013. Reply received from firm on 31.12.2013. Deficiencies advised to firm on 10.01.2014. Reply received from firm on 25.02.2014. Deficiencies still exist in firm’s reply. Firm advised vide letter-dated 14.03.14. Deficiencies advised to firm on 26.03.2014. Reply received on 02.06.14. Deficiencies advised to firm on 24/06/14. Reply awaited. Reply recd from firm on dated 12.08.14. Deficiencies still exists. Firm replied on 12.08.2014. Firm’s reply received on 10.09.2014. Visit of the firm planned in the 2nd week of Oct,2014. Capability assessment done from 09.10.14 to 10.10.14. The case is being processed for next stage. Advice letter for placement of developmental order issued to CDE/DLW & CME/DMW on 26.11.2014.

2. Spin-on Fuel Filter for EMD Locomotives

M/s Pioneer Fil Med(P) Ltd., Gurgaon

05.06.13 Deficiencies advised to firm on 03-07-2013. Reminder sent to firm on 31.01.2014. Firm has sent the related documents, on 11.02.14. Deficiencies advised to firm on 07.03.2014.Reply received from firm on dt.10.03.2014. Deficiencies advised to firm on 03-04-2014. Reply received on 08.05.2014. RDSO officer visited the firm on 09&10.05.14 for capacity assessment. Vide MOM dated 10.05.2014, the firm will submit copy of modified QAP. Copy of modified QAP has been recd. Type test has been planned to be conducted at firm’s premises from 11.08.14. RDSO team is at firm’s premises to conduct type test. Type testing has been completed on 13.08.14. Field trial is being planned. Letter for developmental order vide this office letter No.SD.Fil.Pioneer dt.01.09.14 has been issued to CMPE/D/NR. Reminder letter sent to CMPE/D/NR on 07.09.2015 for developmental order. Further communication is awaited.

3. Filter Element, Fibre Glass, ECC for EMD Locomotives

M/s Pioneer Fil Med(P) Ltd., Gurgaon

06.06.13 Deficiencies advised to firm on 03-07-2013. Reminder sent to firm on 31.01.2014. Reply received from firm on dt.10.03.2014. Deficiencies advised to firm on 03-04-2014. Reply received on 08.05.2014. Deficiencies advised to firm on 23.05.2014. Reply received on 03.06.14. Deficiencies advised to firm on 06-06-2014. Reply dated 25.6.14 received from the

Page 39: Status of fresh registraion cases Annexure-A

39

firm. Letter dated 29.08.2014 sent to firm. Letter sent to firm on 29.04.15.Reminder regarding submission of documents sent to firm on 29.07.2015. Firm vide letter dated 17.08.15 has informed that they are in process of developing the filter and needs 06 months more time. Further communication from the firm is awaited.

4. Filter, Compressor oil spin on, for EMD locomotives

M/s Pioneer Fil Med(P) Ltd., Gurgaon

06.06.13 Deficiencies advised to firm on 03-07-2013. Reminder sent to firm on 31.01.2014. Reply received from firm on dt.10.03.2014. Deficiencies advised to firm on 03.04.2014. Reply received on 08.05.2014. Deficiencies advised to firm on 23.05.2014. Reply received on 03.06.14. Deficiencies advised to firm on 06-06-2014. Reply dated 25.6.14 received from the firm. Letter dated 29.08.2014 sent to firm. Letter sent to firm on 30.04.15. Reminder regarding submission of documents sent to firm on 30.07.2015. Firm vide letter dated 17.08.15 has informed that they are in process of developing the filter and needs 06 months more time. Further communication from the firm is awaited.

5. 10”x30” Long Life Lube Oil and Fuel Oil Filter Elements (Two Piece) for EMD Locomotives

M/s Pioneer Fil Med(P) Ltd., Gurgaon

20.08.13 Deficiencies advised to firm on 06.09.13. Reply received from firm on 12.09.13 and file sent to legal cell on 13.09.13. Capacity assessments done on 21.09.13 and firm have been advised vide letters 26.09.13 & 11.10.13 for manufacturing of samples & prototype test. Firm, vide letter no. nil dated 26.11.2013 has requested for conducting type test at their premises without fixing actual date. Firm has been advised vide letter dt. 30.12.2013 for fixing date for manufacturing of samples at their firm premises and prototype test at M&C Lab/RDSO. Legal document received on 10.01.14 without any remarks, Letter recd from the firm to conduct type testing at firm’s premises received on 21.05.2014 RDSO official had gone to firm premises to manufacturing of sample on 18.06.2014. The samples have been sealed thereat. The samples are to be carried to RDSO by the firm for testing at M&C lab. Samples brought to RDSO by firm’s representative. RDSO team has been deputed to visit firm’s premises from 11.08.2014 to witness remaining tests. Filter paper testing except rig test etc has been done on 14.08.14. Rig testing is being rescheduled. Firm has been informed telephonically on 29.08.2014. Type tests including rig test at M&C Dte./RDSO have been completed. SCR vide RDSO letter dated 13.11.14 has been advised to place developmental purchase order on the firm for procuring the subject filters. Inspection against developmental PO of SCR has been done at firm’s premises and IC issued. Field performance report of subject filter is asked from Sr. DME(DSL) Gooty on 15.01.16. Performance received on 22.02.16.

6. Low Mean Pore size Primary & Secondary Fuel Oil Filter Elements for Diesel Electric Locomotives

M/s Pioneer Fil Med(P) Ltd., Gurgaon

24.10.13 Deficiencies like statutory compliance, QAP, factory license, power of attorney for authorized signatory etc. Deficiencies advised to firm on 07.11.13. Reply received on 13.01.14. Again deficiencies advised to firm on 22.01.14. Reply received from firm on dt.10.03.2014. Deficiencies advised to firm on 03-04-2014. Reply awaited. Staff visiting the firm from 11.04.2014 for testing of fuel filters. Type test conducted from 11.04.2014 to 13.04.2014. Reply received on 08.05.2014. RDSO officer visited the firm on 09&10.05.14 for capacity assessment. Vide MOM dated 10.05.2014; the firm will submit copy of modified QAP. Copy of modified QAP has been recd. Deficiencies advised to firm on 23.05.2014. Reply

Page 40: Status of fresh registraion cases Annexure-A

40

received on 03.06.14. Deficiencies advised to firm on 06-06-2014. Reply received from the firm. The case is under examination from the view point of testing charges, field trials etc. Letter for field trial has been issued on 10.07.14. Firm has got developmental P.O. from SCR. RDSO representative deputed on 18.09.2014 – 19.09.2014 for inspection of fuel filter elements against developmental P.O. at firm’s premises. Inspection of fuel filter elements against developmental P.O. of SCR has been completed at firm’s premises & I.C. dated 26.09.2014 has been issued. Letter sent to Sr.DME (Dsl), Guntakal & Kazipet on 26.12.2014 requesting them to advise fitment details of filters put on field trial. Fitment details of filters on 6 nos. locomotives of GTL shed received on 02.02.2015. Performance asked from Sr.DME (Dsl), Guntakal & Kazipet on 07.05.2015. Performance received from Kazipet & Guntakal shed on 22.06.15 & 07.07.15 respectively. Deficiencies advised to firm on 23.07.15. Reply received on 29.07.15. Performance report asked from DSL/Guntakal on 14.08.15 and reminder 23.09.15 & 16.11.15. Letter sent to Sr. DME (Dsl)/ Kazipet to send signed copy of performance report. Deficiency advised to firm on 14.08.2015. Reply received on 23.11. 2015. Letter dt 05.02.16 sent to CMPEs(Dsl)/NR & SWR for retrial.

7. Filter Air dryer & MR for Alco & EMD locomotives.

M/s Trident Pneumatics Pvt. Ltd., Coimbatore.

29.01.14

Deficiencies advised to firm on 07.02.2014. Letter sent to firm on 07.01.2015. Reply received on 25.03.2015. Deficiencies advised to firm on 31.03.2015. Firm’s reply received on 03.07.2015. Scrutiny done and deficiencies advised to firm on 13.08.2015. Reply awaited.

8. Filter housing, Secondary Engine Air Filter for ALCo and EMD locomotives

M/s Prag Polymers, B-1, Talkatora, Industrial Estate, Lucknow-226011

27.06.14 Deficiencies advised to firm on 15.07.2014. Letter sent to firm on 07.01.2015. Firm’s reply received on 10.02.2015. Deficiencies advised to firm on 20.02.2015. Reminder for deficiencies advised to firm on 11.09.2015. Reply received on 12.02.2016.

9. Long Life Lubricating Oil Filter Element for Locomotive Diesel Engines

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

14.07.14 Deficiencies advised to firm on 30.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014. Reply received on 02.03.2015. Deficiencies advised to firm on 27.03.2015. Firm’s reply received on 08.05.2015 & 22.06.2015. Deficiencies advised to firm on 17.08.2015. Reply received on 08.10.2015. Deficiencies advised to firm on 01.12.2015. Reply received on 22.02.16.

10. Soak Back Lube oil Filter for EMD Locomotives

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

14.07.14 Deficiencies advised to firm on 30.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014. Reply received on 02.03.2015. Deficiencies advised to firm on 27.03.2015. Reply received on 03.12.2015. Deficiencies advised to firm on 31.12.2015. Reply received on 29.02.16.

11. Low Mean Pore size Primary & Secondary Fuel Oil Filter Elements for Diesel Electric Locomotives

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

14.07.14 Deficiencies advised to firm on 28.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014 Reply received on 02.03.2015. Deficiencies advised to firm on 27.03.2015. Reply awaited.

12. Filter Elements, Suction strainer, for EMD locomotives

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

17.07.14 Deficiencies advised to firm on 28.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014. Reply received on 02.03.2015. Deficiencies advised to firm on 27.03.2015. Reply awaited.

13. Spin –on Fuel Filter for EMD locomotives

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

17.07.14 Deficiencies advised to firm on 31.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014. Reply received on 02.03.2015. Deficiencies advised to firm on 27.03.2015. Reply

Page 41: Status of fresh registraion cases Annexure-A

41

received on 04.04.2016. Deficiencies advised to firm on 03.05.2016. Reply awaited.

14. Spin-on turbocharger Lube Oil Filter for EMD Locomotives

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

17.07.14 Deficiencies advised to firm on 31.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014. Reply received on 02.03.2015. Deficiencies advised to firm on 27.03.2015. Reply awaited.

15. Low Mean Pore size Primary & Secondary Fuel Oil Filter Elements for Diesel Electric Locomotives

M/s G S Products, Dehradun

07.10.14 Deficiencies advised to firm on 29.10.2014. Original receipt of NEFT/RTGS payment and documents regarding category of vendors asked from firm vide letter dt. 05.01.2015. Reply received on 13.01.2015. Deficiencies advised to firm on 23.01.2015. Reply received on 25.03.2015. Capability assessment carried out on 02.09.15. Deficiencies advised to firm on 19.10.2015. Reply received on 02.11.15.

16. Disposable car body filters with built – in louvers and casing

M/s G S Products, Dehradun

04.02.15 Deficiencies advised to firm on 18.02.2015. Reply received on 17.03.2015. Capability assessment carried out on 02.09.15 and report is being prepared.

17. Low Mean Pore size Primary & Secondary Fuel Oil Filter Elements for Diesel Electric Locomotives

M/s G.B. Equipments System Ltd., Dehradun (India)

24.02.15 Deficiencies advised to firm on 17.03.2015. Reply received on 15.05.15. Deficiencies advised to firm on 29.06.2015. Reply received on 20.07.15. Capability assessment carried out on 01.09.15. Deficiencies advised to firm on 16.10.15 & 20.10.15. Reply received on 26.11.2015 & 09.02.2016. Deficiencies advised to firm on 11.04.2016. Reply received on 02.05.2016. Under scrutiny.

18. Long Life Lubricating Oil Filter Element for Locomotive Diesel Engines

M/s Pioneer Fil Med(P) Ltd., Gurgaon

16.04.15

Deficiencies advised to firm on 07.05.2015. Reminder letter for deficiencies sent to firm on 27.11.2015. Reply awaited.

19. Disposable car body filters with built – in louvers and casing

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

16.04.15 Deficiencies advised to firm on 14.05.2015. Reply received on 07.07.15. Deficiencies advised to firm on 17.09.2015. Reminder for deficiencies sent to firm on 29.01.2016. Reply received on 06.04.2016. Under scrutiny.

20. Disposable car body filters with built – in louvers and casing.

M/s Spectrum Filtration Pvt. Ltd., Howrah

11.05.15 Deficiencies advised to firm on 26.06.2015. Reply received on 07.09.15. Deficiencies advised to firm on 18.09.2015. Reply received on 06.11.2015. Deficiencies advised to firm on 01.12.2015. Reply received on 15.12.2015. Deficiencies advised to firm on 25.02.16. Capability assessment carried out on 09.&10.03.16 and report is being prepared.

21. Filter elements pre-cleaner for WDG5 locomotives.

M/s Pioneer Fil Med (P) Ltd., Gurgaon

06.08.15 Deficiencies advised to firm on 18.09.2015. Reply received on 16.10.15. Deficiencies advised to firm on 06.11.2015. Reply received on 29.12.2015. Deficiencies advised on 01.03.16. Reply awaited.

22. Disposable car body filters with built – in louvers and casing

M/s Pioneer Fil Med (P) Ltd., Gurgaon

08.10.15 Deficiencies advised to firm on 04.11.2015. Reply received on 29.12.2015. Field trial performance asked from Sr. DME /DSL/ TKD on 08.01.2016. Reply awaited.

dze-la-

S. No.

vkbZVe dk uke

Name of items os.Mj dk uke

Name of applicant vkosnu fnukad

Date of applicati

on

orZekufLFkfr

Current status

pkyu 'kfDr& ,y-Mh] vkbZVe

Motive Power – LD items 1. Coupler Assembly, H

type Tight lock for ALCo / Electric HHP locomotives.

M/s Escorts Limited/ New Delhi

19.09.11 Documents scrutinized and Shortcomings communicated several times vide letters No. SD.TTH.COUPLER dated 18.10.2011and 02.01.2012. Firm’s replies received vide letter nos.

Page 42: Status of fresh registraion cases Annexure-A

42

EL/RDSO/MP/RR/11-12/186dated 16.12.2011and 20.03.2012. Received documents again scrutinized and complied. Capacity assessment completed on dated 19.08.2012. Firm communicated for prototype inspection vide letter no. SD.TTH.COUPLER dated 08.02.2013. Prototype clearance, DM and IC issued on dated 03.07.2013. Fitment of Prototype completed at DLW and fitment details of two couplers received from DLWvide letter No.DLW.M.65.153 dated 22.10.13 Firms advised vide letter No. SD .TTH COUPLER dated 17.12.13 for submission of legal documents.

2. Draft gear with Yoke assembly for EMD locomotives ( part no. 8439090&8420236)

M/s Frontier Alloy steels Ltd , Kanpur

09.02.11 EMD part no. 8439090: Firm approved as Part I l source for EMD part no. 8439090 in vendor directory on dated 31.10.2013. EMD part no. 8420236: Documents scrutinized and complied on dated 29.08.2012. Capacity assessment completed on dated 03.10.2012. Firm advised for prototype testing on dated 29.10.2012. Prototype clearance, DM and IC issued on dated 07.08.13. Firm advised vide letter No. SD.DEV.PAC/MAC-CBC dated 17.12.13 for submission of legal documents.

3. Spring Pads Assembly, Side Buffer, Long life

M/s Prag Industries Lucknow

04.08.12 Documents scrutinized and Shortcomings communicated to Firm on dated 20.09.2012. Firm complied the shortcomings vide letter no. PI/REGN/2012-13 dated 13.10.2012. Capacity assessment completed on dated 07.01.2013. Firm communicated for prototype inspection vide letter no. SD.INS.RBS/PRAG dated 08.01. Firm advised vide letter No. SD.INS.RBS/PRAG dated 17.12.13 for submission of legal documents. Prototype inspection stages successfully completed and firm advised for developmental order. dated 31.03.2014

4. Coupler E-type for EMD locomotives

M/s Raneka Industries Ltd/ Pithampur

29.09.12 Documents scrutinized and Shortcomings and advice communicated several times to Firm vide letter No.SD.DEV.PAC/MAC-CBC (Pt)dated27.11.2012,25.02.2013,&08.04.2013. Firm’s reply received videletternos. RIL/KJ/MK/12-13 dated 07.01.2013, 12.01.2013, 26.02.2013, 15.03.2013, 15.10.2013. Firm complied after overcoming shortcomings and commissioning of ‘No bake’ moulding system as advised. Capacity assessment has been completed and Prototype inspection has been done andDevelopment order recommended vide this office letter noSD.PAC/MAC-CBC dated 07.08.2014

5. Coupler Assembly, H type Tight lock for ALCo / Electric HHP locomotives.

M/s Sanrok Enterprises/Faridabad

14.06.11 Documents scrutinized and Shortcomings communicated to Firm on dated 20.07.2011. Received documents again scrutinized and complied. Capacity assessment completed on dated 10.04.2012. Developmental order placed vide letter No.SD.TTH.COUPLERdated 19.07.2012. Prototype clearance and DM and IC issued on dated 11.10.13 Firms advised on dated 17.12.13 for submission of legal documents.

6. Draft Gear Soft with Yoke Assembly.

M/s Sanrok Enterprises/Faridabad

07.06.11 Document scrutinized and shortcomings communicated to firm. After overcoming shortcomings Capacity assessment completed on dated 14.11.2011. Advised for prototype testing on dated 16.11.2011. Prototype clearance, DM and IC issued on dated 31.12.2012. Fitment of Prototype completed at DMW/PTA. Firmadvised vide letter no. SD.TTH.COUPLER dated 17.12.13 for submission of legal documents.

Page 43: Status of fresh registraion cases Annexure-A

43

7. Draft gear with Yoke assembly for EMD locomotives ( part no. 8420236 & 8439090)

M/s Prag Industries Lucknow

15.12.12 Documents scrutinized and complied. Capacity assessment completed on dated 09.01.2013. Firm advised for prototype inspection vide letter no. SD.DEV.PAC/MAC-CBC dated 10.01.2013. Static, fatigue, compression set, tensile, ash content, ozone tests of rubber completed. Samples for tup hammer test have been shield. Firm advised vide letter No. SD.DEV.PAC/MAC-CBC dated 17.12.13 for submission of legal documents.

8. Spring Pads Assembly, Side Buffer, Long life

M/s Aryan Exporters Pvt Ltd

05.09.13 Legal documents scrutinized and shortcomings communicated to firm. Firm’s reply received vide letter no. AE/2013-14/RDSO/1/BS ASSY/987 dated 28.10.2013 and found complied. Capacity assessment has been completed. Developmental order has been recommended vide this office letter no. SD.DFM.A.10.1 dated 22.09.14

9. Draft Gear Soft with Yoke Assembly.

M/s Prag Industries Lucknow

17.10.13 Documentsscrutinized and complied. Capacity and capability assessment completed on dated 01.11.2013 and advised to prepare prototype sample vide letter no. SD.TTH.COUPLER dated 20.11.2013.

10. Coupler E-type for EMD locomotives

M/s Hindustan Engineering & Industries Ltd.

29.08.14 Application under scrutiny.Deficiency has been advised vide this office letter no. SD.DEV.PAC/MAC-CBC, dated 13.11.2014 to Firm.

11. High capacity ,long life side buffer assembly

N.K. Iron Industires, Agra.

01.01.15 Deficiency has been advised vide this office letter no. SD.DFM.A.10.1, dated 10.04.2015

12. Coupler E-type for EMD locomotives

Atul Engineering Udyog

15.01.15 Application under scrutiny.

dze- la-

S. No. vkbZVe dk uke

Name of items vkosnd dk uke

Name of applicant vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr& Ogh-Mh-th] vkbZVe

Motive Power – VDG items 1. Centre Pivot Liners

for locomotives M/s Engineered Polymers(I) Pvt. Ltd., Banglore

15.10.10 Capacity assessment done on 25.03.2015. Cleared for developmental order on 17.04.2015.

2. Vertical and Lateral hydraulic dampers

M/s Gabriel India Ltd., Distt.- Pune

29.10.10 Firm has been cleared for developmental order on 26.04.2012. Firm has completed supply of 05 loco sets of vertical damper in July 2014. Performance received on 18.05.2016. Case under review.

3. Vertical and Lateral hydraulic dampers

M/s GB Equipment Systems Ltd., Dehradun

23.01. 15 Application scrutinised, shortcomings communicated to firm on 05.02.2015. Reminder sent on 24.06.2015. Reply received on 15.7.15, shortcoming communicated on 12.10.15. Reply received through e-mail on 27.10.15. A letter send to firm on 03.11.15 for non-compliance of shortcoming. Reply received on 21.12.2015. Shortcomings communicated to firm on 13.01.2016 with closure notice. Reply received on 08.02.2016, through which firm has intimated that they will submit MoU with reputed manufacturer soon.

4. TPU spring pad (Happy Pad) for locomotives

M/s Micro Engineers, Plot No.104, Udyog Kendra Extn. 1, Near Habibpur Village, Greater Noida

26.12.12 Cleared for developmental order for 10 loco sets on 28.07.2014. DMW/PTA has placed P.O. for 261 Nos. Firm has submitted inspection call vide letter dated 29.06.2015. Inspection done on 24.08.15. A letter sends to DMW on 05.11.15 to send fitment details of 216 nos. of TPU Spring pads. Fitment detail received from DMW on 08.12.2015

5. TPU spring pad (Happy Pad) for locomotives

M/s Drip Elastotek, 58, Netaji Subhas Road, Calcutta Pijrapole Society, Goushala, Liluah,

13.10.15 Application scrutinised, shortcomings communicated to firm on 26.11.15. Reply received on 16.03.2016, under scrutiny.

Page 44: Status of fresh registraion cases Annexure-A

44

Howrah - 711 204 6. Motor Nose Link

Bushing for EMD Locomotives

M/s Prag Industries (I) Pvt. Ltd., E-7 Talkatora Industrial Estate, Lucknow

05.06.13 Prototype inspection carried out on dated 19.08.2014. I.C. issued on 21.08.14. As per DLW letter, fitment of 05 loco set completed in Jan 15, under field trial of one year. Performance feedback asked vide letter dated 09.02.16.

7. Motor Nose Link Bushing for EMD Locomotives

B.D. Bansal Steel Industries, Chembur, Mumbai

29.04. 15 Application scrutinised, shortcomings communicated to firm on 22.05.2015. Reply received on 22.06.15 & 10.07.15, shortcoming communicated to firm on 07.10.2015. Reply received on 12.10.15. Shortcoming again observed communicated to firm vide letter dated 05.02.16.

8. Motor Nose Link Bushing for EMD Locomotives

M/s Frontier Alloy Steels Ltd., Jamni Wala Road, Jamboo Khala, Tehsil Paonta Sahib,Distt. Sirmaur

13.10.15 Application scrutinised, shortcomings communicated to firm on 02.12.15. Reply received on 11.02.2016. Shortcomings again observed, communicated to firm on 10.03.2016. Reply received on 23.05.2016, under scrutiny.

9. Motor Nose Link Bushing for EMD Locomotives

M/s Viscon Rubber Industries, Factory - Gat No. 844/3, Near Tata DLT, Waki (Bk.), Chakan, Tal.- Khed, Dist- Pune

27.11.15 Application scrutinised, shortcoming communicated to firm on 01.02.16.

10. Bushing Traction Rod for EMD Locomotives.

M/s Manisha Rubeer Enterprises. Mumbai

26.11.10 Inspection completed on 18.11.15. Despatch memo issued. Material under fitment at DLW.

11. Bushing Traction Rod for EMD Locomotives.

M/s Mandeep Industries, Amausi Industrial Area, Nadarganj, Lucknow

19.08.14 Capability assessment done on 05.12.2014. Firm has offered prototype on 15.04.15. DD (VDG) & ARO/M & C dte have carried out prototype inspection. Material failed during testing, intimated to firm vide letter dated 14.10.15. Letter sent to firm on 05.02.2016 to re-offer prototype sample within 30 days failing which your application may be closed. Firm has requested for some more time (60 days) vide letter dated 11.03.2016.

12. Bushing Traction Rod for EMD Locomotives.

B.D. Bansal Steel Industries, Chembur, Mumbai

29.04. 15 Application scrutinised, shortcomings communicated to firm on 22.05.2015. Reply received on 22.06.15 & 10.07.15, shortcoming communicated to firm on 07.10.2015. Reply received on 12.10.15. Shortcoming again observed communicated to firm vide letter dated 05.02.16.

13. Bushing Traction Rod for EMD Locomotives.

M/s Frontier Alloy Steels Ltd., Jamni Wala Road, Jamboo Khala, Tehsil Paonta Sahib, Distt.- Sirmaur

13.10.15 Application scrutinised, shortcomings communicated to firm on 02.12.15. Reply received on 11.02.2016, Shortcomings again observed, communicated to firm on 10.03.2016. Reply received on 23.05.2016, under scrutiny.

14. Spring Single coil for EMD locomotives

M/s B. P. Springs, Howrah

13.05.11 Prototype inspection completed on 03.05.2014, against DLW P.O. (05 loco sets of WDP4 & WDG4 springs). Fitment details was asked from DLW vide letter dated 31.07.2014. Partial fitment detail received from DLW on 21.07.15. Letter again sent to DLW on 23.09.15 for sending complete fitment detail. Fitment detail for the rest Qty. asked from DLW & performance asked from Zonal railway vide letter dated 01.03.2016.

15. Spring – Single Coil for EMD locomotives

M/s Shandong Zhiheng Vibration Damping Tech. Co. Ltd., P.R. China

14.03.14 Firm has been cleared for developmental order in Mar 15. A letter was sent to DLW & DMW on 05.11.2015 regarding status of developmental order. Prototype inspection to be carried out by RDSO officer.

16. Rubber Spring Assembly for WDG4

M/s Aryan Exporter Pvt. Ltd., Lucknow

18.05.12 Comments communicated to firm on 15.06.2012, 27.09.12 & 21.11.12. Letter sent to firm on dated

Page 45: Status of fresh registraion cases Annexure-A

45

locomotive 18/22.07.2014 for case closure notice. Reply of the firm received on 22.08.2014, vide which firm intimated to do Ozone & low temp. test from outside agency. It was already intimated to firm vide letter dated 21.11.2012 for installation of Ozone & low temp. test machine in-house. Vide letter dated 29.06.15, firm has intimated that they have installed Ozone test machine in house. Firm has been intimated to give his readiness for capability assessment.

17. Rubber Spring Assembly for WDG4 locomotive

M/s Frontier Alloy Steels Ltd., Jamni Wala Road, Jamboo Khala, Tehsil Paonta Sahib,Distt. Sirmaur

13.10.15 Application & QAP has been scrutinised, shortcomings communicated to firm on 08.02.2016. Reply received on10.03.2016, under scrutiny.

18. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Simplex Castings Limited, Bhilai

28.10.09 Cleared for prototype on 10.09.12. Verification of manufacturing facilities available with the firm has been done on 19.10.12 as per the new STR. Prototype inspection upto 5th stage completed. 6th stage to be done.

19. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Nava Nirman Fabrication Pvt.Ltd., Hooghly

01.02.10 Capability assessment done on 26.07.2011, Shortcomings of assessment communicated to firm on 05.08.2011. Firm has been again advised on 10.04.12 to comply with the deficiencies pointed out during capacity assessment. Vide letter dated 10.06.2014, firm has intimated that Plano-miller will be ready as per STR upto 25.08.2014. A letter sent to firm on 05.11.15 to send para wise compliance of the STR. Letter sent to firm to submit compliance of STR upto 04.12.2015. STR compliance received on 09.12.15, clarifications asked vide letter dated18.02.2016. Reply received on 07.03.2016. Firm has asked some time to comply with the STR.

20. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Trident Auto Components Pvt. Ltd, Kanpur

31.07.10 Prototype inspection done. One bogie fitted in loco no.13391 at Diesel shed AMV on 21.09.2010. Firm has been cleared for developmental order of 02 loco bogies vide letter dated 31.07.2013. Firm has got developmental order for 10 Nos. of Fab-II bogies vide P.O. no. 041350120.14161435 dated 14.01.2014. QAP approved on 21.04.2014. Letter sent to M&C dte. for first stage inspection on 02.05.2014. 2nd stage inspection done on 13.09.2014. Firm has submitted inspection call for next stage on 17.04.15. Further, firm has got P.O. of WDM3D loco bogie in July 2014 and submitted inspection call on 16.07.2014, intimated to M & C dte. on 21.07.2014. M & C report received 22.04.15. During M & C inspection testing facilities were not found in the firm premises. Shortcomings communicated to firm on 29.05.15 and advised to comply with the shortcomings & offer prototype afresh. WPSS and WPQR submitted by the firm sent to M & C dte.on 29.09.15. Shortcomings of WPSS, WPQR communicated to firm on 29.12.2015. STR compliance asked vide letter dated 28.01.2016. Reply still awaited.

Page 46: Status of fresh registraion cases Annexure-A

46

21. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Ashika Commercial Pvt. Ltd. Kishangarh

17.08.10 Prototype Inspection completed & I.C. issued on 17.01.12. Bogies supplied by the firm are under field trial of one year. During STR verification of the firm by RDSO official on 09.04.2013, shortcomings were observed, communicated to firm on 22.04.2013. Reply of the firm received on 03.05.13. Letter sent on 13.05.2013 to firm to complete the deficiencies. Note send to ED/QA on 07.08.2014 to arrange for further inspection of WAG7 bogie frames. Letter sent to firm to submit compliance of STR upto 25.12.2015. As no reply received from firm, case under review.

22. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Beekay Engineering Corporation, Bhilai

24.02.11 Cleared for developmental order on 29.12.11. Bogies have been fitted in loco no. WDP4D-336 (Road No.-40243) and despatched to ED/SR on 10.08.2015, under field trial of one year. STR compliance asked vide letter dated 28.01.2016.

23. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Simplex Engg & Foundry Works Pvt. Ltd. Additional unit: 11, Industrial estate, Bhilai

07.11.12 Application scrutinized, Shortcomings communicated to firm on 07.12.2012, 09.05.2013, 06.08.2013. Firm’s reply received on 20.02.2013, 14.05.2013, 17.08.2013. Clarification on few points of the reply asked from firm vide letter dated 08.10.2013. Reply received on 04.12.2013. Firm’s premises have been verified for their infrastructural facilities on 10.12.2013.

24. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s ISGEC Heavy Engg. Ltd. Radaur Road, Yamunanagar Haryana

15.1.13 Capacity assessment done on 12.03.2014. Firm has been cleared for dev order on 27.08.2014 for non HHP locomotive bogie frames. Vide letter dated 14.12.2015, it has been advised to firm to submit STR compliance along with status of developmental order.

25. Fabricated Bogie Frame & Bolster Assembly for locomotive

Texmaco UGL Rail Pvt. Ltd., Belgharia, Kolkata-700 056, West Bengal, India

03.11.13 Application scrutinized, shortcomings communicated to the firm on 26.12.2013. Reminder sent on 22.09.2014. Reply received on 07.10.14, shortcomings communicated to firm on 31.10.2014. Reply received on 12.01.15, shortcomings communicated to firm on 23.02.2015. Reply received on 17.04.2015. Vide letter dated 04.01.2016, it has been advised to firm to submit STR compliance along with QAP. Only STR compliance received through e-mail on 09.01.16. Firm wants to utilise some facilities of his other unit, so clarification asked vide letter dated 16.03.2016.

26. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Hindustan Engg. & Industries Ltd. Kolkata

13.03.14 Application scrutinised. Shortcomings communicated to firm on 21.04.2014. Firm’s legal documents received on 24.04.2014, Shortcomings communicated to firm on 14.05.2014. Firm’s reply received on 26.08.2015. STR compliance asked vide letter dated 11.01.2016.

27. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Jupiter Wagons LTD., Kolkata

07.10.14 Application scrutinised, shortcomings communicated to firm on 08.12.2014. Firm’s reply received on 13.05.2015. Vide letter dated 07.01.2016, it has been advised to firm to submit STR compliance along with compliance of other shortcomings before 07.02.2016, failing which the registration application may be closed. Only STR compliance received through e-mail on 05.02.2016. Capability assessment done on 18 & 19.05.2016.

28. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Kay Bouvet Engineering Ltd., Satara, (Maharshtra)

07.10.14 Application scrutinised, shortcomings communicated to firm on 29.12.2014. Firm’s reply received on 16.02.2015, shortcomings again observed, communicated to firm on 09.04.2015. Firm’s reply received on 16.09.2015. Vide letter dated 08.01.2016, it has been advised to firm to submit STR compliance along with compliance of other shortcomings before 07.02.2016, for further processing of the case. Reply received on 09.02.2016, shortcomings communicated to firm on

Page 47: Status of fresh registraion cases Annexure-A

47

15.03.16. 29. Fabricated Bogie

Frame & Bolster Assembly for locomotive

M/s Chandra Udyog, NH-6, Salap (Math Bagan), Domjur, Howrah – 711409

15.07.15 Application & QAP has been scrutinised, shortcomings communicated to firm on 18.02.2016.

30. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Fedders Loyd Corportaion Ltd., PSL Engineering Pvt Limited District – Mandla, (Near Jabalpur) M.P

13.10.15 Application & QAP has been scrutinised, shortcomings communicated to firm on 18.02.2016.

31. Fabricated Bogie Frame & Bolster Assembly for locomotive

Rana Udyog Pvt.Ltd., VILL - SULATI, P.O. KANDUA, N.H. -6, P.S. SANKRAIL, DIST HOWRAH - 711302

12.02.16 Under scrutiny

32. Bogie Frame Assembly for WDG5 locomotive

Frontier Alloy Steels Ltd. KM 25/5 & 6, Kalpi Road, Rania,Kanpur Dehat

01.09.15 Application & QAP has been scrutinised. Case under review.

33. Fabricated Bogie Frame & Bolster assembly for locomotives

Shape Engine Co.Ltd., C-2, Bahadrabad Industrial Area , Haridwar, Uttarakhand

29.04.16 Under scrutiny

34. Truck frame assembly for EMD locomotives

M/s UP Steels, Nara, Meerut Road Distt. Muzaffarnagar U.P.

16.07.12 Capacity assessment has been done on 26.09.2013. Shortcomings of assessment communicated to firm on 08.10.2013. Prototype inspection upto stage-II (IV) has been done. STR compliance asked from firm vide letter dated 16.07.15. Firm has submitted inspection call of Stage-II (V), vide letter dated 05.10.2015. Para wise STR compliance asked from firm vide letter dated 23.10.15, reply received on 18.11.15. Clarification regarding machining facility & QAP asked vide letter dated 20.01.16. Reply received on 22.02.16. Observations communicated to firm on 03.03.2016.

35. Truck frame assembly for EMD locomotives

M/s Titagarh Wagons Limited1, Abdul Quddus Road, West Bengal

19.06.14 Application scrutinised. Shortcomings communicated to firm on 23.07.2014. Reply of the firm received on 21.08.2014. QAP sent to M & C dte. on 17.09.2014, for scrutiny. Firm has already casted 05 pieces of castings against DLW P.O. and offered for inspection. M & C inspection plan received on 02.12.2014. Note sent to M & C dte. on 07.01.2015, for inspection. As per M & C dte. report dated 30.01.15, 02 castings do not conforms the specification out of 04 offered castings. Accepted castings (S.No.2 & 5) inspection done on 11.03.2015. Firm has submitted inspection call for next stage, but there were shortcomings in STR compliance & QAP, communicated to firm on 24.06.2015. Reply received on 04.11.2015. Capacity & capability assessment done on 16 & 17.02.16. Assessment shortcomings communicated to firm on 02.03.2016. Reply received on 10.03.2016. Some clarification asked vide letter dated 28.03.2016. After reviewing case, M & C dte has been intimated for inspection of 2nd stage. Inspection report awaited from M & C dte.

Page 48: Status of fresh registraion cases Annexure-A

48

36. Primary vertical damper for EMD locomotives

M/s India Auto Industries Pvt.Ltd. Janakpuri, New Delhi

24.01.12 Capacity assessment has been done on 21.03.2013. Shortcomings of assessment communicated to firm on 09.04.2013. Vide letter dated 03.02.2015, clarification regarding design capability, past experience with M & P asked from firm. Firm submitted compliance on 14.02.2015. Inspection plan for type testing has been finalised. Vide letter dated 13.10.15, firm has been asked to offer prototype sample. Firm has intimated vide letter dated 12.11.2015 that prototype sample will be ready upto 25.11.2015. Prototype inspection done partially from 28 to 30.04.2016.

37. Primary vertical damper for EMD locomotives

M/s Suomen Vaimennin Oy- Finland C/o River Engg. Pvt Ltd,

04.04.13 Firm has been cleared for developmental order on 30.08.2013, intimated to CDE/DLW. DLW has intimated that dev order has been placed to firm for 180 Nos. of Primary dampers.

38. Primary vertical damper for HHP locomotives

M/s Escort Limited (Railway Equipment Division), Plot No -115 ,Sector -24, Faridabad

09.07.14 Application shortcoming communicated to firm vide letter dated 31.07.2014. Reply of the firm received on 27.08.2014 and found in order. Capacity assessment done on 09.01.2015. Shortcomings communicated on 22.05.15. Reply received on 05.06.15, Vide letter dated 13.10.15, firm has been asked to offer prototype sample. Firm has offered prototype on 05.12.2015. Prototype inspection completed on 16.05.2016.

39. Primary vertical damper for HHP locomotives

M/s Jagtar Singh & Sons Hydraulics Pvt. Ltd., Najafgarh, New Delhi

07.10.14 Application scrutinised, shortcomings communicated to firm on 31.10.2014. Reply received on 28.01.15, shortcomings communicated to firm on 13.04.15. Reply received on 12.05.15. Shortcomings communicated on 02.06.2015. Reply received on 13.07.15, shortcomings communicated to firm on 12.10.15. Revised QAP received on 10.03.2016.

40. Secondary Yaw Damper for EMD locomotives

Suomen Vaimennin Oy- Finland C/o River Engg. Pvt Ltd,

24.06.11 A clearance letter sent to CDE/DLW on 14.01.2013 for developmental order of 05 loco sets subject to condition that initial 02 nos. of prototype dampers pass during testing. DLW has intimated that dev order has been placed to firm for 56 Nos. of Secondary dampers.

41. Secondary Yaw Damper for EMD locomotives

M/s India Auto Industries Pvt.Ltd. Janakpuri, New Delhi

24.01.12 Capacity assessment has been done on 21.03.2013. Shortcomings of assessment communicated to firm on 09.04.2013. Vide letter dated 03.02.2015, clarification regarding design capability, past experience with M & P asked from firm. Firm submitted compliance on 14.02.2015. Inspection plan for type testing has been finalised. Vide letter dated 13.10.15, firm has been asked to offer prototype sample. Firm has intimated vide letter dated 12.11.2015 that prototype sample will be ready upto 25.11.2015. Prototype inspection done partially from 28 to 30.04.2016.

42. Secondary Yaw Damper for HHP locomotives

M/s Escort Limited (Railway Equipment Division), Plot No. -115 , Sector -24 Faridabad

09.07.14 Application shortcoming communicated to firm vide letter dated 31.07.2014. Reply of the firm received on 27.08.2014 and found in order. Capacity assessment done on 09.01.2015. Shortcomings communicated on 22.05.15. Reply received on 05.06.15, Vide letter dated 13.10.15, firm has been asked to offer prototype sample. Firm has offered prototype on 05.12.2015. Prototype inspection completed on 16.05.2016.

43. Bearing adapter with journal bearing assembly (Without bushing traction rod) for EMD locomotives.

M/s FAG Bearings India Ltd., Maneja, Vadodara- 390 013

20.04.12 Application scrutinized, first comments communicated to firm on 28.05.2012. Capability assessment done on 20 & 21.11.2014. It has been advised to firm on 15.04.15, to offer for prototype inspection. Firm has offered prototype on 28.10.2015. Drawing and QAP submitted by the firm has been approved on 09.11.15. Prototype inspection completed on 07.01.2016. Material under

Page 49: Status of fresh registraion cases Annexure-A

49

field trial of one year. 44. Rubber Spring

assembly –A & B for WDP4

M/s Prag Industries (I) Pvt. Ltd., E-7 Talkatora Industrial Estate, Lucknow

08.05.12 Letter sent to CMPE/SWR & CMPE/NFR for consideration of developmental order of 10 loco sets on 24.08.2012. Reminder sent to CMPE/SWR & CMPE/NFR on 24.06.13, for dev. Order. Status of dev order asked from CMPE/NWR & CMPE/ECoR on 04.11.2015.

45. Half cylinder wear for EMD locomotives

M/s A-One Enterprises Pvt. Ltd, Gurgaon.

24.07.12 Firm has been recommended for development order of 05 loco set on dated 28.04.2014. Firm has got developmental order from DLW and offered for prototype inspection on 11.05.15. Inspection completed from 08.08.15. Fitment detail asked from DLW on 30.10.2015 of 51 nos. of half cylinder wear.

46. Half cylinder wear for EMD locomotives

M/s Shree Meenakshi Polymer, site-II, Loni Road, Mohan Nager,Ghaziabad

13.04.15 Shortcomings communicated to firm on 08.05.2015. Reply received on 27.05.15. Shortcomings again observed, communicated to firm on 02.06.2015. Reply received on 26.08.2015. Shortcomings again observed, communicated to firm on 14.10.15. Reply received on 30.11.15 & 08.01.2016. Shortcoming again observed, communicated to firm vide letter dated 15.02.16. Reply received on 20.02.16, found in order. Capability assessment to be done by RDSO officer.

47. Vertical and Lateral Hydraulic Dampers (WDM3D)

M/s India Auto Industries Pvt.Ltd. Janakpuri, New Delhi

03.12.12 Capacity assessment has been done on 21.03.2013. Shortcomings of assessment communicated to firm on 09.04.2013. Vide letter dated 03.02.2015, clarification regarding design capability, past experience with M & P asked from firm. Firm submitted compliance on 14.02.2015. Inspection plan for type testing has been finalised. Vide letter dated 13.10.15, firm has been asked to offer prototype sample. Firm has intimated vide letter dated 12.11.2015 that prototype sample will be ready upto 25.11.2015. Prototype inspection done partially from 28 to 30.04.2016.

48. Vertical and Lateral Hydraulic Dampers (WDM3D)

M/s Knorr Bremse India Pvt Ltd., Palwal, Haryana

07.08.13 Firm has been recommended for development order of 05 loco sets on dated 15.05.2014. Inspection done on 01.08.2015. IC issued on 28.08.2015. Material under fitment at DLW and DMW.

49. Bushing Rubber for EMD locomotives

B.D. Bansal Steel Industries, Chembur, Mumbai

29.04. 15 Application scrutinised, shortcomings communicated to firm on 22.05.2015. Reply received on 22.06.15 & 10.07.15, shortcoming communicated to firm on 07.10.2015. Reply received on 12.10.15. Shortcoming again observed communicated to firm vide letter dated 05.02.16.

50. Bushing Rubber for EMD locomotives

M/s Frontier Alloy Steels Ltd., Jamni Wala Road, Jamboo Khala, Tehsil Paonta Sahib,Distt. Sirmaur

13.10.15 Application scrutinised, shortcomings communicated to firm on 02.12.15. Reply received on 11.02.2016, Shortcomings again observed, communicated to firm on 10.03.2016. Reply received on 23.05.2016, under scrutiny.

51. Centre Pivot Block assembly

M/s Quadrant EPP Surlon India Ltd., 54/11 Site IV,Industrial Area, Sahibabad, Distt.-Ghaziabad

10.02.15 Application scrutinised, shortcomings communicated to firm on 04.03.2015. Reply received on 13.07.15. Capability assessment done by DD/VDG on 30.09.2015. Performance asked from Zonal Railways vide letter dated 04.12.15. Reminder sent on 09.02.2016. Performance received. Case under review.

52. Centre Pivot Block assembly

M/s Shree Meenakshi Polymer, site-II, Loni Road, Mohan Nager, Ghaziabad

13.04.15 Application scrutinised, shortcomings to be communicated to firm.08.05.2015. Reply received on 27.05.15. Shortcomings again observed, communicated to firm on 02.06.2015 and 16.09.2015. Reply received on 06.11.15 & 08.01.2016. Shortcoming again observed, communicated to firm vide letter dated 15.02.16. Reply received on 20.02.16, found in order.

Page 50: Status of fresh registraion cases Annexure-A

50

Capability assessment to be done by RDSO officer.

53. Centre Pivot Block assembly

M/s A-One Enterprises Pvt. Ltd, Gurgaon.

05.05.15 Shortcomings to be communicated to firm on 07.09.2015. Reply received on 29.10.15, shortcomings communicated on 23.11.2015. Reply received on 29.12.2015. Shortcoming again observed, communicated to firm vide letter dated 08.01.16. Reply received on 19.01.16, under review.

54. Kit for TBU for WDG5 locomotives (DLW Part No. 17456216, VTS No. 00363)

Ametsis Ingenieríay Asesoría Técnica SL, C/ Ciudad de Frías 16, 28021, Madrid, Spain