T-521 T-528 T-529 T-522 T-523 T-524 T-525 T-526 T-527 E-521 E-522 E-523 P-521 E-527 E-528 E-529 E-526 E-525 E-524 E-521 Removal Reboiler Duty: 218 kJ/hr E-522 1 st Recovery Reboiler Duty: 247 kJ/hr E-523 2 nd Recovery Reboiler Duty: 105 kJ/hr E-524 Flue Gas Heater Duty: 525 kJ/hr E-525 1 st Synthesis Heater Duty: 45 kJ/hr E-526 2 nd Synthesis Heater Duty: 227 kJ/hr E-527 3 rd Synthesis Heater Duty: 58 kJ/hr E-528 4 th Synthesis Heater Duty: 44 kJ/hr E-529 5 th Synthesis Heater Duty: 171 kJ/hr T-521 1 st Pre-Cryo Comp Turbine Work: 15853 kW T-522 2 nd Pre-Cryo Comp Turbine Work: 5132 kW T-523 4 th Syn Comp Turbine Work: 60 kW T-524 Recovery Pump Turbine Work: 25 kW T-525 1 st Syn Comp Turbine Work: 9.21 kW T-526 2 nd Syn Comp Turbine Work: 9.47 kW T-527 3 rd Syn Comp Turbine Work: 10 kW T-528 Removal Pump Turbine Work: 1673 kW T-529 Steam System Pump Turbine Work: 1257 kW P-521 Steam System Pump Work: 1257 kW S-5201 T: 482 C P: 95 ATM S-5202 T: 374 C P: 41 ATM S-5204 T: 152 C P: 3.7 ATM S-5203 T: 374 C P: 41 ATM S-5205 T: 152 C P: 95 ATM S-5206 T: 10 C P: 1 ATM To Section 1 AMMONIA PROCESSING PLANT STEAM SYSTEM PROCESS FLOW DIAGRAM SECTION 5 - UTILITIES APPROVED BY: CRYSTAL LIN, PM PLANT LOCATION – REPUBLIC OF TATARSTAN, RUSSIA MY CHEMICAL ROMANCE SOLUTIONS INC. LOS ANGELES, CALIFORNIA SCALE PROJECT NUMBER DRAWING NUMBER REV NONE 01-2012 108A-PANG-108B 6 DATE 06-09-2012 CLIENT – HP CHEMICAL SHEET 3 OF 3

steam system PFD

Embed Size (px)

DESCRIPTION

 

Citation preview

T-521

T-528

T-529

T-522

T-523

T-524

T-525

T-526

T-527

E-521

E-522

E-523

P-521

E-527

E-528

E-529

E-526

E-525

E-524

E-521Removal Reboiler

Duty: 218 kJ/hr

E-5221st Recovery Reboiler

Duty: 247 kJ/hr

E-5232nd Recovery Reboiler

Duty: 105 kJ/hr

E-524Flue Gas HeaterDuty: 525 kJ/hr

E-5251st Synthesis Heater

Duty: 45 kJ/hr

E-5262nd Synthesis Heater

Duty: 227 kJ/hr

E-5273rd Synthesis Heater

Duty: 58 kJ/hr

E-5284th Synthesis Heater

Duty: 44 kJ/hr

E-5295th Synthesis Heater

Duty: 171 kJ/hr

T-5211st Pre-Cryo Comp Turbine

Work: 15853 kW

T-5222nd Pre-Cryo Comp Turbine

Work: 5132 kW

T-5234th Syn Comp Turbine

Work: 60 kW

T-524Recovery Pump Turbine

Work: 25 kW

T-5251st Syn Comp Turbine

Work: 9.21 kW

T-5262nd Syn Comp Turbine

Work: 9.47 kW

T-5273rd Syn Comp Turbine

Work: 10 kW

T-528Removal Pump Turbine

Work: 1673 kW

T-529Steam System Pump Turbine

Work: 1257 kW

P-521Steam System Pump

Work: 1257 kW

S-5201T: 482 C

P: 95 ATM

S-5202T: 374 C

P: 41 ATM

S-5204T: 152 C

P: 3.7 ATM

S-5203T: 374 C

P: 41 ATM

S-5205T: 152 C

P: 95 ATM

S-5206T: 10 C

P: 1 ATM

To Section 1

AMMONIA PROCESSING PLANT

STEAM SYSTEM

PROCESS FLOW DIAGRAM

SECTION 5 - UTILITIES

APPROVED BY: CRYSTAL LIN, PM

PLANT LOCATION – REPUBLIC OF TATARSTAN, RUSSIA

MY CHEMICAL ROMANCE SOLUTIONS INC.

LOS ANGELES, CALIFORNIA

SCALE PROJECT NUMBER DRAWING NUMBER REV

NONE 01-2012 108A-PANG-108B 6

DATE 06-09-2012 CLIENT – HP CHEMICAL SHEET 3 OF 3