T-521
T-528
T-529
T-522
T-523
T-524
T-525
T-526
T-527
E-521
E-522
E-523
P-521
E-527
E-528
E-529
E-526
E-525
E-524
E-521Removal Reboiler
Duty: 218 kJ/hr
E-5221st Recovery Reboiler
Duty: 247 kJ/hr
E-5232nd Recovery Reboiler
Duty: 105 kJ/hr
E-524Flue Gas HeaterDuty: 525 kJ/hr
E-5251st Synthesis Heater
Duty: 45 kJ/hr
E-5262nd Synthesis Heater
Duty: 227 kJ/hr
E-5273rd Synthesis Heater
Duty: 58 kJ/hr
E-5284th Synthesis Heater
Duty: 44 kJ/hr
E-5295th Synthesis Heater
Duty: 171 kJ/hr
T-5211st Pre-Cryo Comp Turbine
Work: 15853 kW
T-5222nd Pre-Cryo Comp Turbine
Work: 5132 kW
T-5234th Syn Comp Turbine
Work: 60 kW
T-524Recovery Pump Turbine
Work: 25 kW
T-5251st Syn Comp Turbine
Work: 9.21 kW
T-5262nd Syn Comp Turbine
Work: 9.47 kW
T-5273rd Syn Comp Turbine
Work: 10 kW
T-528Removal Pump Turbine
Work: 1673 kW
T-529Steam System Pump Turbine
Work: 1257 kW
P-521Steam System Pump
Work: 1257 kW
S-5201T: 482 C
P: 95 ATM
S-5202T: 374 C
P: 41 ATM
S-5204T: 152 C
P: 3.7 ATM
S-5203T: 374 C
P: 41 ATM
S-5205T: 152 C
P: 95 ATM
S-5206T: 10 C
P: 1 ATM
To Section 1
AMMONIA PROCESSING PLANT
STEAM SYSTEM
PROCESS FLOW DIAGRAM
SECTION 5 - UTILITIES
APPROVED BY: CRYSTAL LIN, PM
PLANT LOCATION – REPUBLIC OF TATARSTAN, RUSSIA
MY CHEMICAL ROMANCE SOLUTIONS INC.
LOS ANGELES, CALIFORNIA
SCALE PROJECT NUMBER DRAWING NUMBER REV
NONE 01-2012 108A-PANG-108B 6