10
Optional Auto Drain Valve Model TSG-AD Water Inlet " Compression Fitting ¾" Safety Relief Valve ¾" Steam Outlet Knockouts for Electrical Supply Line Knockout for Control Cable Install Upright and Level WARNING: Elderly persons, pregnant women, or those suffering from heart disease, high blood pressure, diabetes, or who are otherwise not in good health, do not use this device unless directed to do so by a physician. Also, do not use steambath while under the influence of alcohol. ! IMPORTANT: The warranty of this product is voided if it is used in a commercial application or for anything other than a residential steambath installation. Plumbing Installation Instructions Steambath Generator Models: TSG-7 and TSG-10 The Steamist “TSG” Generator comes factory assembled, carefully wired and tested. The Plumbing Installation must conform to local and national codes. All electrical power should be turned OFF when working with Steam Generator. 1. Pre-Installation a) Be sure that the proper size Steam Generator has been selected by using the sizing page in the “Full Line Brochure,” “Pricing Guide,” “The Generator Sizing Guide,” “Architectural Guidelines,” or in the Residential Systems/Steambath Product Information section of the Steamist website - www.steamist.com. CAUTION: An improperly sized Steam Generator may NOT produce the amount of steam necessary to reach selected temperature. IMPORTANT: Refer to page 4 for model required for cubic foot rating. b) The Steam Generator should be located as close as possible to the Steamroom/Shower or tub enclosure. Steam pipe should NOT exceed twenty-five feet in length. If the steam pipe exceeds ten feet, use an appropriate pipe insulation rated for a minimum of 212°F. Possible locations include Vanity, Closets, or Basement near bath area. The serial number plate should be visible and the Steam Generator should be accessible for service. Refer to Installation Suggestions on page 4. Do NOT install Generator outdoors, in a moist, humid area, or in an area where parts may freeze or corrode. Also, do NOT install near flammable materials such as paints, thinners, gasoline, etc. c) The steam line and safety valve reach a temperature of 212°F during operation and should be appropriately protected to prevent personal injury by accidental contact. 2. Plumbing Rough-in Plumbing rough-in is required for the water supply and steam line; this should be completed before the walls are closed. For operation, the “TSG” Steam Generator requires a " O.D. copper tubing to the fitting on the generator for water inlet and a ¾" copper or brass pipe for steam outlet. NOTE: Safety Valve should be connected to a minimum ¾" indirect waste or as required by local plumbing codes. In the unlikely event this valve should open, the discharge must be directed to prevent damage to the home. a) Water Inlet - A water line should be roughed in from existing ½” hot or cold water pipe. Using a ½" x " tee, cut and solder tee into the existing water line (see Figure 4 on page 3). Solder a piece of " copper tubing into tee. Rough-in for water supply is now complete. b) Steam Outlet - Rough in the steam line using a minimum of a ¾" copper or brass pipe; do NOT use black iron or galvanized pipe; it will rust and discolor the wall of the steambath. The steamhead location should be 18" above the shower floor or 6" above the rim of the bathtub, as far from the seating area as possible. CAUTION: No shutoff valve can be installed in the steam line. Do NOT create traps or valleys in this line which would trap condensation and block the flow of steam. The steam pipe should be pitched allowing condensation to run back toward the Steam Generator (preferred), or toward the steamhead. Figure 1 - Steam Generator C US ® 02/09 Pub. No. 203-A - 1 - ®

Steambath Generator Models: TSG-7 and TSG-10 · ... Do NOT use a “saddle valve” or piercing ... shower opening must be sealed. ⅜" Shutoff Valve ... Access Requirements Models:

Embed Size (px)

Citation preview

Page 1: Steambath Generator Models: TSG-7 and TSG-10 · ... Do NOT use a “saddle valve” or piercing ... shower opening must be sealed. ⅜" Shutoff Valve ... Access Requirements Models:

Optional AutoDrain Valve

Model TSG-AD

Water Inlet ⅜" Compression

Fitting

¾" Safety Relief Valve

¾" Steam Outlet

Knockouts for Electrical Supply Line

Knockout for Control Cable

Install Upright and Level

®

®

WARNING: Elderly persons, pregnant women, or those suffering from heart disease, high blood pressure, diabetes, or who are otherwise not in good health, do not use this device unless directed to do so by a physician. Also, do not use steambath while under the influence of alcohol. !

IMPORTANT: The warranty of this product is voided if it is used in a commercial application or for anything other than a residential steambath installation.

Plumbing Installation Instructions

Steambath Generator Models: TSG-7 and TSG-10

The Steamist “TSG” Generator comes factory assembled, carefully wired and tested.The Plumbing Installation must conform to local and national codes. All electrical power should be turned OFF when working with Steam Generator.

1. Pre-Installationa) Be sure that the proper size Steam Generator has been

selected by using the sizing page in the “Full Line Brochure,” “Pricing Guide,” “The Generator Sizing Guide,” “Architectural Guidelines,” or in the Residential Systems/Steambath Product Information section of the Steamist website - www.steamist.com.

CAUTION: An improperly sized Steam Generator may NOT produce the amount of steam necessary to reach selected temperature.

IMPORTANT: Refer to page 4 for model required for cubic foot rating.

b) The Steam Generator should be located as close as possible to the Steamroom/Shower or tub enclosure. Steam pipe should NOT exceed twenty-five feet in length. If the steam pipe exceeds ten feet, use an appropriate pipe insulation rated for a minimum of 212°F. Possible locations include Vanity, Closets, or Basement near bath area. The serial number plate should be visible and the Steam Generator should be accessible for service. Refer to Installation Suggestions on page 4. Do NOT install Generator outdoors, in a moist, humid area, or in an area where parts may freeze or corrode. Also, do NOT install near flammable materials such as paints, thinners, gasoline, etc.

c) The steam line and safety valve reach a temperature of 212°F during operation and should be appropriately protected to prevent personal injury by accidental contact.

2. Plumbing Rough-in Plumbing rough-in is required for the water supply and

steam line; this should be completed before the walls are closed. For operation, the “TSG” Steam Generator requires a ⅜" O.D. copper tubing to the fitting on the generator for water inlet and a ¾" copper or brass pipe for steam outlet.

NOTE: Safety Valve should be connected to a minimum ¾" indirect waste or as required by local plumbing codes. In the unlikely event this valve should open, the discharge must be directed to prevent damage to the home.

a) Water Inlet - A water line should be roughed in from existing ½” hot or cold water pipe. Using a ½" x ⅜" tee, cut and solder tee into the existing water line (see Figure 4 on page 3). Solder a piece of ⅜" copper tubing into tee. Rough-in for water supply is now complete.

b) Steam Outlet - Rough in the steam line using a minimum of a ¾" copper or brass pipe; do NOT use black iron or galvanized pipe; it will rust and discolor the wall of the steambath. The steamhead location should be 18" above the shower floor or 6" above the rim of the bathtub, as far from the seating area as possible.

CAUTION: No shutoff valve can be installed in the steam line. Do NOT create traps or valleys in this line which would trap condensation and block the flow of steam. The steam pipe should be pitched allowing condensation to run back toward the Steam Generator (preferred), or toward the steamhead.

Figure 1 - Steam Generator

C US ®

02/09 Pub. No. 203-A- 1 -

®

®

®

Page 2: Steambath Generator Models: TSG-7 and TSG-10 · ... Do NOT use a “saddle valve” or piercing ... shower opening must be sealed. ⅜" Shutoff Valve ... Access Requirements Models:

Steam Generator

Water Level Probe

Hot or Cold Incoming Water

Supply

Shutoff Valve

Union (Required)

Free-Flowing Steam Line

Pressure Safety ValveConnect to Indirect Waste

or As Required by Local Codes.

IMPORTANT: Install steamhead 18" above the shower floor or 6" above the rim of the

bathtub.

Optional Auto Drain ValveConnect to Indirect Waste

or As Required by Local Codes.

®

Water Solenoid Valve

Plumbing Installation Instructions

3. Steam Generator InstallationThe Steam Generator should be mounted in a location convenient for hook-up and service by the plumber and electrician.CAUTION: The Steam Generator is designed to be used ONLY in an upright and level position; to do otherwise would damage the unit and void the warranty.

a) The Steam Generator can be mounted to a wall or set on the floor. However, the unit must be secured. To secure the unit to a vertical wall, loosen the two screws holding the electrical access cover, remove cover (see Figure 1). Located inside the cabinet near the top left and right corners are mounting holes. Place top cover back and secure.

b) Connect the ⅜" water supply, described in Section 2, to the Steam Generator by first soldering a ⅜" valve into the previously installed water line. The valve must be kept in an open position during normal operation. In areas where high water pressure may be a problem, a water hammer arrestor or a pressure regulator should be installed. Complete water supply by connecting ⅜" copper tubing from the valve to the water inlet compres-sion fitting. Refer to Figure 2.

IMPORTANT: Do NOT use a “saddle valve” or piercing type valve for water connection.

c) Connect the steam line from rough-in location described in Section 2 to the ¾" nipple on the Steam Generator using a union.

d) In the shower, place the center of the escutcheon onto the steam pipe and screw the steamhead into place. Care must be taken not to scratch the steamhead or escutcheon with wrench. After the plumbing connections are complete the electrician may finish wiring the unit.

Figure 2 - Plumbing Diagram

Installation Instructions Models: TSG-7 and TSG-10

02/09 Pub. No. 203-A- 2 -

Apply a small amount of silicone to prevent

movement.

Apply a small amount of silicone to prevent

movement.

IMPORTANT:Install top first

MUST be vertical

After inserting the top, snap in the bottom.

Cover Plate

Aromatherapy Reservoir

Back Plate

O-Ring MUST seal to inside of the Back Plate.

Center Hub

¾" NPT(Brass Pipe)

Must use sealant tape.

Apply silicone around the back edge of the

Back Plate to seal and prevent movement.

⅜" Hex KeyHole

Apply silicone around the steam

pipe to form a water-tight seal.

½"

Figure 3 - Steamhead Installation Figure 3a - Center Hub Installation

3199 Series Steamhead Installation Instructions

1. Make sure the ¾" nipple protrudes beyond the tile approximately ½". (See Figure 3)2. Wrap the nipple with pipe sealant tape.3. Put a bead of silicone around the outer edge of the Back Plate (see Figure 3) and center the Back Plate over the pipe in an upright position. While holding it in place, screw the Center Hub onto the nipple, using a ⅜" hex key to tighten.4. The Center Hub MUST be aligned with the four walls in the vertical and horizontal position (See Figure 3a). Make sure the steamhead O-ring is fully seated into the Back Plate.

If the nipple is sticking out too far the O-ring will not make a proper seal and the nipple must be adjusted.5. Apply a small amount of silicone at the back center point of the Cover Plate.This will aid in preventing movement of this plate. (See Figure 3a)6. Place the Cover Plate over the Center Hub. This is accomplished by first hooking the top and then snapping the bottom into place.7. Adjust the Back Plate and Cover Plate to line up squarely, and clean excess silicone with rubbing alcohol.

®

Page 3: Steambath Generator Models: TSG-7 and TSG-10 · ... Do NOT use a “saddle valve” or piercing ... shower opening must be sealed. ⅜" Shutoff Valve ... Access Requirements Models:

The Plumbing Instructions must be given to the homeowner for future use.

Slope ceiling 2" per foot

A ⅜" air gap is recommended below the door and the door should incorporate a splashguard. The top and sides of the

shower opening must be sealed.

⅜" Shutoff ValveKeep in open

position during normal operation.

Steamhead InstallationSteamhead should be mounted 18" above the finished floor or 6" above the rim of the tub as

far from the bather as possible.

½" x ½" x ⅜" Tee. Using existing Hot or Cold water supply.

Union Required

Safety ValveConnect ¾" pipe to an

indirect waste or as required by local codes.

WARNING: If installing the Steamist Unit in conjunction with an acrylic modular tub/shower unit, please consult the “manufacturer of the module” for location of the steamhead.

Steam Outlet Pipe - Use a minimum of a ¾" Copper or Brass pipe.CAUTION: Do NOT install a shutoff valve on the steam outlet pipe. Do NOT create traps or valleys in this line which would prevent the flow of steam.The steam outlet pipe should be pitched toward the Steam Generator (preferred), allowing condensation to run back into the Steam Generator or toward the steamhead. If the steam pipe exceeds ten feet, use an appropriate pipe insulation rated for a minimum of 212°F.

^

^

MENU

^̂^̂

1 2

®

The TSC Control MUST be installed inside (Required).

Plumbing Installation Instructions

Figure 4 - Typical Installation Models: TSG-7 and TSG-10

02/09 Pub. No. 203-A- 3 -

®

Page 4: Steambath Generator Models: TSG-7 and TSG-10 · ... Do NOT use a “saddle valve” or piercing ... shower opening must be sealed. ⅜" Shutoff Valve ... Access Requirements Models:

®

Plumbing Installation Instructions

Access Requirements Models: TSG-7 and TSG-10

02/09 Pub. No. 203-A- 4 -

CAUTION: Do NOT install the steam generator in an attic location.

Alternate Basement Location(Insulated and Dry)

SteamGeneratorin Vanity

AlternateCloset

Location

Use 35" withOptional Auto Drain

35"

28"

20"

18"

^

^

MENU

^̂^̂

1 2

®

Select a location for mounting the Steam Generator that is accessible for installation and service. The access requirement indicates the minimum space for convenient access to Steam Generator.CAUTION: All models must be installed INDOORS, in a DRY, NON-FREEZING location away from flammable materials such as: Gasoline, Paints, Thinners, Etc.IMPORTANT: Steam Generator must be installed upright and level.

Figure 5

Installation Suggestions

ModelNo.

*Max. Cu. Ft.For Area Up To KW Volt Phase Amps

Wire Size 90ºCCopper AWG

LineFuse

*Refer to the Steamist Sizing Guide for actual Cu. Ft. capacity.

TSG-7 220 7.5 240208

11

3136

88

4050

Specification Chart

TSG-10 375 10 240208

11

4248

66

6060

®East Coast Office: 25 E. Union Ave., East Rutherford, NJ 07073 • Tel: 800-577-6478 • Fax: 201-933-0746

West Coast Office: 315 W. Pondera St., Suite F, Lancaster, CA 93534 • Tel: 800-355-6478 • Fax: 661-940-1617

Page 5: Steambath Generator Models: TSG-7 and TSG-10 · ... Do NOT use a “saddle valve” or piercing ... shower opening must be sealed. ⅜" Shutoff Valve ... Access Requirements Models:

Optional AutoDrain Valve

Model TSG-AD

Water Inlet⅜" Compression

Fitting

¾" Safety Relief Valve

¾" SteamOutlet

Knockouts forElectrical Supply Line

Knockout forControl Cable

01/09 Pub. No. 204-A- 1 -

Install Uprightand Level

®

C US®

WARNING: Elderly persons, pregnant women, or those suffering from heart disease, high blood pressure, diabetes, or who are otherwise not in good health, do not use this device unless directed to do so by a physician. Also, do not use steambath while under the influence of alcohol.!

IMPORTANT: The warranty of this product is voided if it is used in a commercial application or for anything other than a residential steambath installation. All electrical connections must be performed by a licensed electrician in accordance with Local and National Electric Codes.

Electrical Installation Instructions

Steambath Generators Models: TSG-7 and TSG-10

The Steamist “TSG” Generator operates with a TSC control mounted inside and optional TSR remote control located outside the steamroom. It’s small enough in size to be tucked away using very little space in a vanity, closet, or basement, but large enough to provide steam for most residential baths.The Steamist “TSG” Steambath Generator comes factory assembled, carefully wired and tested.

NOTE: The “TSG” Generators are designed only to work with the"TSC" Control.

1. Pre-Installationa) Proper electrical supply (208 or 240 Volt): See rating

label on Steam Generator and Chart on page 4. Determine proper size of wire, voltage, amperage, and phase for the Steam Generator. Only UL rated 90°C wire can be used.

b) In-line fuse/circuit breaker required: Fuse/circuit breaker to be installed must be sized in accordance with chart on back page. Do NOT install a GFI (Ground Fault Interrupter) to this equipment (per article 210-8 in the National Electric Code).

c) Route power supply cable to the location where the Steam Generator will be installed (before walls are closed).

2. Electrical Rough-ina) Route appropriate power cable to the location the Steam

Generator will be installed. If receptacle is desired, mount the box for the receptacle near the location of the Steam Generator (see Figure 3).

NOTE: The plug and receptacle require a rating of no less than 250V and proper amperage. Refer to chart on page 4 for amperage rating.

After the walls are complete, the Steam Generator and Control can be wired.

3. Steam Generator Electrical Installation WARNING: All power to the Steam Generator must be turned off.

a) Remove the four screws holding the electrical access cover and remove cover.

b) Locate the supply line knockout. Mount proper strain

relief into knockout hole.c) Strip back power cable’s outer insulation jacket

eight inches and insert into Steam Generator. Strip back insulation ½" from the three (3) incoming wires (two power and one ground).

d) Insert ground wire into grounding lug located on the right side of the electrical compartment and secure.

CAUTION: Be sure the ground wire does not come in contact with a live electrical part.

e) Locate the terminal block in the upper portion of the electrical box. Insert power wires into the power lugs on the right of the terminal block and secure.

4. Optional Auto Drain Valve Connection a) Open knockout for Auto Drain Valve conduit

connection.b) Route flexible conduit from valve to knockout and

secure. c) Connect two wires from valve to the two place terminal strip provided (see Figure 2).

Figure 1 - Steam Generator

®

Page 6: Steambath Generator Models: TSG-7 and TSG-10 · ... Do NOT use a “saddle valve” or piercing ... shower opening must be sealed. ⅜" Shutoff Valve ... Access Requirements Models:

01/09 Pub. No. 204-A- 2 -

®

®

Power SupplyL1 & L2

The Steam Generator is installed in an upright position.The proper sized 90°C wire and circuit breaker have been used.The circuit breaker is NOT a GFI (Ground Fault Interrupter) type.The Steam Generator is properly grounded.The circuit breaker or disconnect switch is on.Water supply is open to the Steam Generator.

Electrical Installation Instructions

Checklist Models: TSG-7 and TSG-10

Figure 2 - Internal Electrical Connections

Before starting, insure that the conditions of the following checklist have been met:The proper size Steam Generator has been selected by using the sizing page in the “Full Line Brochure,” “Pricing Guide,” or “The Generator Sizing Guide” in the Residen-tial Systems/Steambath Product Information section of the Steamist website - www.steamist.com.CAUTION: An improperly sized Steam Generator will NOT produce the amount of steam necessary to reach selected temperature.The proper voltage Steam Generator has been selected (i.e., 208V or 240V). A 208V Generator operating on 240V will damage the heating element, and a 240V Generator operating on 208V will result in a 25% loss of power.

Page 7: Steambath Generator Models: TSG-7 and TSG-10 · ... Do NOT use a “saddle valve” or piercing ... shower opening must be sealed. ⅜" Shutoff Valve ... Access Requirements Models:

01/09 Pub. No. 204-A- 3 -

^

^

MENU

^̂^̂

1 2

®

Electrical Installation Instructions

Figure 3 - Typical Installation Models: TSG-7 and TSG-10

The TSC Control MUST be installed inside (Required).

Inside InstallationControl should be mounted

four feet from the floor. Select a location convenient to the

bather but not in a direct line of Shower or Body sprays and not directly above the steam head.

Page 8: Steambath Generator Models: TSG-7 and TSG-10 · ... Do NOT use a “saddle valve” or piercing ... shower opening must be sealed. ⅜" Shutoff Valve ... Access Requirements Models:

- 4 -

®

01/09 Pub. No. 204-A

®

Electrical Installation Instructions

BoardInterconnect

A C RelayBoard

BoardInterconnect

SensorProbe

15VDC

15 VDCPower Supply

250VAC

From 240A C Relay PCB

240V

AC

To 250VACon P/S Board

Note: Ground must be on a heater flangebolt.

WaterSolenoid

Valve

TerminalBlock

OptionalAuto Drain

Valve

Water Level Probe

TerminalBlock

WH

GY

GN

BL BL

BN

BN

BK

BK

GroundLug

RH2_L1

RH3_L1

RH1_L1

RH2_L2

RH3_L2

RH1_L2

F1

F2

HeatingElements

Sensor

L1

L2

GND

FieldConnections

P1P2

RD

RD

RD

RD

BK

BK

RDBK

BK

BK

BK

15VDC

15VDC Out

Tank

FrameGND

ProcessorBoard

P1

P2

P3

P4

0.5AMP

Wiring Diagram Models: TSG-7 and TSG-10

L1

L2

ModelNo.

*Max. Cu. Ft.For Area Up To KW Volt Phase Amps

Wire Size 90ºCCopper AWG

LineFuse

TSG-7 220 7.5 240208

11

3136

88

4050

Specification Chart

TSG-10 375 10 240208

11

4248

66

6060

1 2

3 4

5 6

7 8

Dip Switch Settings for Multiple Steam Generators on Processor Board:

Generator 1 = 1 and 2 up

Generator 2 = 1 down and 2 up

Generator 3 = 1 up and 2 down

Generator 4 = 1 and 2 down

UP

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

P3GND

GN

GN

FillLight

DrainLight

Test

Sw

itch

RD

DS

1

DS

2

DS

3

DS

4

DS

5W

DT

FAIL

CO

M F

AIL

SY

S F

AIL

TES

T

SY

S O

K

East Coast Office: 25 E. Union Ave., East Rutherford, NJ 07073 • Tel: 800-577-6478 • Fax: 201-933-0746

West Coast Office: 315 W. Pondera St., Suite F, Lancaster, CA 93534 • Tel: 800-355-6478 • Fax: 661-940-1617 ®

Page 9: Steambath Generator Models: TSG-7 and TSG-10 · ... Do NOT use a “saddle valve” or piercing ... shower opening must be sealed. ⅜" Shutoff Valve ... Access Requirements Models:

Specifications

Features5-year parts warranty - 2-year labor warrantyGenerator typically can be installed up to 25 ft. from the bathing areaDiagnostic LED Displays Stainless Steel ConstructionSolid-State Circuitry

Codes/StandardsUL 499UL/CUL Listed

Required EquipmentTSC Control

Required Electrical ServiceDedicated circuit required: See Specification Chart for proper electrical requirements

Product InformationWater Supply - ⅜" Compression FittingSteam Line - ¾" Brass BPT male threadPressure Relief Valve - ¾" NPT female threadDrain Line - Capped ½" Brass NPT male thread

GeneratorWeight - 40 lbs.

Installation NotesSteam Generators can be typically mounted within 25 ft. of the bathing area.Steam Generators should be accessible for service.Do not install in attic.Do not install generators outside, in a moist, humid area or in an area where parts may freeze or corrode.Steamhead to be mounted 18" above floor or 6" above rim of tub and as far from the seating area as possible.

Rough-in NotesAccess: 28" L x 18" W x 20" H (35" L with Auto Drain)

02/09 Pub. No. 213-A

Steam Generator

TSG-10

Model: TSG-10

- 1 -

*Refer to sizing guidelines to accurately determine the proper size generator for the installation.

Steam Generator Specification Chart

10 375 240/1/42208/1/48

66

6060

ModelNumber

ProductNumber

KWRating

Max. Cu. Ft.Range*

Volts/Phase/Max. Amps

Wire Size 90°CCopper AWG

LineFuse

17½" x 6½" x15½"

DimensionsL x W x H

TSG-10 10201021

®

Page 10: Steambath Generator Models: TSG-7 and TSG-10 · ... Do NOT use a “saddle valve” or piercing ... shower opening must be sealed. ⅜" Shutoff Valve ... Access Requirements Models:

WARNING HOLD THIS FITTING SECURELY WITH A PIPE WRENCH WHILE MAKING A PLUMBING CONNECTION TO THE WATER INLET IN ORDER TO PREVENT INTERNAL DAMAGE TO THE WATER SOLENOID VALVE. 009-1054

SER NO. NO. SIZE

IN.

MODEL SET

PSIG

CAP

LBS/HR

ELD

ER

LY P

ER

SO

NS

, P

RE

GN

AN

T W

OM

EN

O

R

THO

SE

S

UFFE

RIN

G

FRO

M

HE

AR

T D

ISE

AS

E,

HIG

H

BLO

OD

P

RE

SS

UR

E, D

IAB

ETE

S O

R N

OT IN

GO

OD

HE

ALTH

MU

ST

NO

T US

E TH

IS D

EV

ICE

UN

LES

S D

IRE

CTE

D B

Y PH

YS

ICIA

N.

ALS

O

STE

AM

BATH

ING

SH

OU

LD

BE

AV

OID

ED

W

HILE

IN

TOX

ICATE

D.

009-2006

WA

RN

ING

CA

UTIO

N: Shut off M

ain Power

Switch B

efore Opening D

oor. H

eating Element Located Inside.

009-3019

C US ® LISTED 995C

STEAMBATH GENERATOR

MODEL NO.

SERIAL NO.

HEATER LOAD VOLTS PH MAX AMPS kW

CONTROL CIRCUIT VOLTS AMPS 50/60 HZ

SERVICE BY AUTHORIZED PERSONNEL ONLY A PRODUCT OF STEAMIST CO., RUTHERFORD, NJ

IMPORTANT: INSTALL WITH ARROWS POINTING UP WARNING: Unit must be installed INDOORS, in a DRY, NON-FREEZING location and with arrows pointing up. Service by authrorized personnel only.

NOTE: Read all instructions before installation CAUTION: To prevent internal damage hold all fittings securely while making plumbing connections. NOTE: See Wiring Diagram on reverse side of cover. CAUTION: Turn off electric before removing cover.

NOTE: This is NOT intended to be used for space heating purposes. 009-1081

Mounting Holes

16"

1¾"

6¼"

8¾"

9⅛"

15½"

35/16 "

2¾"

1⅛"

¾" Steam Outlet

Water Inlet ⅜" Compression Fitting

¾" Safety Relief Valve

½" Capped Drain Line for Optional Auto Drain

1¼"

*17½"

Knockouts for Control Cables

Top of Access Panel

Access Panel

*6½"

*Add ¼" to the dimension for the louvers

Front Access Front Side View

Top View

Back View

Specifications

02/09 Pub. No. 213-A

Dimensional Drawing Model: TSG-10

- 2 -

East Coast Office: 25 E. Union Ave., East Rutherford, NJ 07073 • Tel: 800-577-6478 • Fax: 201-933-0746

West Coast Office: 315 W. Pondera St., Suite F, Lancaster, CA 93534 • Tel: 800-355-6478 • Fax: 661-940-1617 ®