Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Ankara Asfaltı Yeşilbağlar Mah. Turgutpaşa Cad. No.76/3 Pendik – İstanbul

TURKIYE

Tel: +90 (216) 652 20 34 Fax: +90 (216) 652 20 35

7/24 Mobile Assist: +90 532 244 50 22

E-mail:

[email protected]

[email protected] Web: www.olimpikgroup.com

Steel House Industrial Works Construction Engineering

Page 2: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Introduction

➢ We are a General Contracting company, who provides all services at all

Turn Key construction stages, from design to start-up phase for:

▪ Residential House Projects

▪ Industrial Plants and Warehouses

▪ Business Centers, Shopping Malls and Hotels

▪ Chemical Industrial Facilities

➢ OLIMPIK was established in 1985 in Istanbul.

In Y2000 converted as Group Companies and named as OLIMPIK

Company.

➢ After Y2004, as Company we have decided to expand our bussines and

experience to other countries.

➢ Also since Y1999 as OLIMPIK, we have completed many project as

Subcontractor

Page 3: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Introduction

➢ IN OFFICES: 62person working

➢ IN FACTORY: 110 person working

➢ IN CONSTRUCTION: according to size of project numbers are

changing ( Total # 655 person)

➢ Y2005 OLIMPIK UKRAINE established: for Epicenter shopping center

construction works in Kyiv , hospital prj 201 M usd

➢ Y2009 OLIMPIK LIBYA established: for general construction works in

Misurata city, Stadium project completed 60M usd.

➢ Y2011 OLIMPIK MACEDONİA established: for specific construction

works in Skopje city, completed projects total amount 100M usd.

➢ Y2013 OLIMPIK RUSSIA established: specific shopping mall and big

size residential project for in Min Vodny city. Total completed project

value is 300M usd.

➢ Y2015 OLIMPIK ROMANIA established: for specific residential project in

İasi city, 4 high raised floor building prj. / 52 floors , project value 139M

usd.

Page 4: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Introduction – Offices/Sales Agencies

➢ Y2014 = AGENT OFFICE in RAK / UAE

➢ 40M usd Sales – Villa Project

➢ Y2014 = AGENT OFFICE in STOCKHOLM / SWEDEN

➢ 66M usd Sales- Mall Project

➢ Y2015 = AGENT OFFICE in KUWAIT City

➢ Ongoing projects – KOC Housing Project 20M KWD (proccesing to

signature).

➢ Y2015 = AGENT OFFICE in RIYADH / SAUDI ARABIA

➢ Housing project 205M usd in Riyadh (proccesing to signature)

Page 5: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Headquarter Office Structure

Altan Kılıçarslan

CEO

Bussines Development /

Zafer K.

Russia / UkraineOffice

Osman B.

Europe / Macedonia Office

Mehmet A.

Other Office & Agents

Financial Manager

Levent Dalgıç

Technical Director

Fulya H.

Turkiye Organisation

Finance& Accounting Department

Project & SalesDepartment

OLIMPIK LIBYA

Mustafa Hareshi

Page 6: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Project Organization Chart

Structural Design

SUBCONTRACTOR

HSE

TECHNICIAN

CIVIL ENGINEER

TECHNICIANS

SURVEYORS

PROJECT

ENGINEER

Architectural Design

Mechanical Design

Electrical Design

LOGISTICS / CUSTOMS

DESIGN OFFICE CHIEF

ARCHITECT

DRAFTSMAN

SECURITY

WAREHOUSE

KEEPER

DRIVER

CLEANER

Civil Works

Mechanical

Piping

Instrumentation

Electrical

PLANNING

ENGINEERACCOUNTANT

PERSONNEL

PROJECT MANAGER

PROJECT ENGINEER PM ASSISTANT

PLAN. & COST CONTR.

MNGR.ENGINEERING MNGR

CONSTRUCTION

MNGR.

QA / QC

MNGR.

MECHANICAL

ENGINEER

TECHNICIAN

ELECTRICAL

ENGINEER

TECHNICIAN

HSE MNGR.ACCOUNT. & ADMIN.

MNGR.

PROC. & CONTR.

MNGR.

Page 7: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

OLIMPIK Staff

➢ OLIMPIK Europe / Macedonia : current total 39 only for

office➢ In previous projects:

➢ 16 Engineer + 5Architect + 11Administrative +13 Technician

➢ Rest are workers (109 persons)

➢OLIMPIK Istanbul: current total 98➢ Engineer + Architect + Administrative – 62 person

➢ Factory - 31 person – other 79

➢ Istanbul head office group mainly gives financial and logistics

support to sites

➢OLIMPIK RUSSIA: 130 person

➢OLIMPIK UKRAINE: 136 person

➢OLIMPIK LIBYA : 24 person

➢OLIMPIK ROMANIA . 78 person

Page 8: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Scope of Services

• Conceptual Design

• Soil Investigation (Geotechnical)

• Topographic Survey

• Preparation of Design Basis

• Design & Engineering works (preliminary, basic & detail)

• Apostollization (if needed)

• Preparation of Bidding Documents

• Permit Applications

• Civil + Architectural + Electrical + Mechanical Construction +

Equipment Installation

• Implementation of large Construction Projects

Page 9: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Health, Safety & Environment

➢ OLIMPIK initiated implementation of OHSAS 18001

➢ Always a full time HSE Engineer reporting to Head Office

➢ As needed HSE Technicians

➢ Reward & Fines system in place

➢ HSE Policy and Manual

➢ Sequential responsibility of all level people

Page 10: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Health, Safety & Environment Overall

Performance

as of Today

• 8,186,000 Working Hours

• 4 LWDC (Lost Work Days Case)

• 0 Environmental issue

• According to US Occupational Safety and

Health Administration criteria

FR = 0.25

FR (frequency rate) = # injuries/illnesses × 200,000 / total hours worked

Page 11: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Quality Assurance

➢ We have obtained ISO Certificate for ISO 9001

➢ QA/QC Manager reporting to Head Office

➢ As needed QA/QC Engineers / Technicians

➢ Always to use materials manufactured as per applicable

standards and regulations

➢ QC Check Lists are prepared according to valid EU & Mk

Standards at the beginning of the job

➢ Hiring Third Party for tests and controls of special manufacturing

(SS, welds, etc.)

➢ Quality Policy and Manual are customized according to the

needs of each project

➢ All Our Construction Materials are certified w ANAB-CE-TSE-ISO

Page 12: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Project Management & Reporting

➢ We believe in that the most important tool of PM is REPORTING

➢ Coordination Procedure

➢ Daily Site Reports

➢ Work Schedule, revised weekly according to developments at works

➢ Financial reporting as per actual status at site, including forecasts

➢ Cost Control Reports, showing cost trends of the project

➢ Procurement Schedule and Follow-up Report

➢ Document Follow-up Report

➢ HSE Report

➢ NCR Follow-up Report

➢ Monthly Project Report

➢ Cost saving studies for alternatives & Value Engineering

Page 13: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Contracts

➢We are working generally with FIDIC* Contracts

➢ Unit Price Basis

➢ Open book as Cost+Fee

➢ Lump-sum

➢Take all responsibility of the Project as “General Contractor”

➢ Selection of major sub-contractors together with our Client

* Federation Internationale Des Ingenieurs Conseils

International Federation of Consulting Engineers

Page 14: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

RESIDENTAL PROJECT

&

REFERANCES

Page 15: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

VILLA PROJECTs in 5 yrs

TURKEY – over 600 Villas- 45.6 M usd

Page 16: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

HOUSING PROJECT LAGUN

Istanbul – 650 House- 120.000m2

86 M usd Project Cost

Page 17: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

UAE PALACE PROJECT

8.000m2- 10M usd

Page 18: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

RUSSİA CITY COMPLEX

Vodny – 900 house – 43.2M usd

Page 19: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

LABOR CAMP PROJECT

Turkey – 600workers- 4,2M usd

Page 20: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

LIFE CONTAINERs for REFUGEEs

Turkey – 650 cont. 3,6M usd

Page 21: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

HOTEL PROJECT

Misurata – 60 rooms 4.4M usd

Page 22: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

OLIMPIK STEEL FACTORY

Page 23: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

PROJECT’s

&

REFERANCES

Page 24: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Colgate Palmolive Relocation Project

6,4M USD

Project Duration: 12 months (2004)

Client: Colgate-Palmolive Consultant: Foster Wheeler

Type of Contract: General Contractor for structural, architectural,

mechanical, electrical, process, instrumentation and

infrastructural works

Type of Construction: Columns- Precast Walls- Precast

Roof decking Coil coated galvanized sandwich steel panels

Construction Area: 26,000 m2, Under Roof Area: 11,000 m2

PROJECT REFERENCES

Page 25: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Colgate-Palmolive Factory / Turkey

15M USD

Project Duration: 22 months (2006)

Client: Colgate Palmolive Temizlik Urunleri San. ve Tic. A.S.

Consultant: Or Yapı Denetim Ltd. Sti.

Type of Contract: Lump-sum for Civil, Mech. and Partly Elec.

Type of Construction: Precast and In-situ Reinforced

Concrete, Steel Structure Columns, Beams, Trusses, Purlins

Walls: Sandwich Steel Panels, Precast Reinforced Concrete

Panels, Decorative Concrete Blocks

Roof Decking: Trapezoidal Composite Panel and PVC Membr,

Total Construction Area: 16,480 m2

Total Under Roof Area: 7,470 m2

PROJECT REFERENCES

Page 26: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Ramstore Shopping Mall Macedonia

19.2 M Euro Project Cost

Project Duration: 10,5 months (2007 - 2008)

Client: Ramstore Macedonia DOO

Type of Contract: Turn key

Type of Construction: Reinforced Concrete

Columns: Reinforced Concrete

Walls: Sandwich steel panels, Aluminum Curtain Walls

Roof decking: Trapezoidal steel sheet, RW

Total Construction Area: 17,487 m2

Total Closed Area: 25,086 m2

FAST-TRACK Project,

where opening date was announced

Before construction

PROJECT REFERENCES

Page 27: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Kurtkoy Manufacturing Plant Turkey

5.9 M USD Project Cost

Project Duration: 10 months (2009) Client: BASF – ELASTOGRAN

Type of Contract: Turn key (including strengthening of the current facility)

Type of Construction: Demolition of the existing structure, Production

Building: Prefabricated Columns & Beams, Polyurethane Sandwich Panel

Facade & Roof, Other structures: Reinforced Concrete

Total Construction Area: 11,130 m2 Total Closed Area: 6,000 m2

Project Value: 5,900,000 USD

Previously PERA has

successfully completed 1st phase

contract of the project which is

“Infrastructural works” with the

same client

BASF - ELASTOGRAN

PROJECT REFERENCES

Page 28: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Johnson Matthey Auto-Catalyst Plant Macedonia

25 M Euro Project Cost

Project Duration: 15 months (started in June ‘11) Client: Johnson Matthey-UK Type of Contract: Turn key

Type of Construction: Steel + Reinforced Concrete Structure, Steel:S400 (euro code)

Project Value: 25,000,000 Euro Total Construction Area: 20,000 m2

PROJECT REFERENCES

Page 29: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

TAV - Alexander the Great Airport Macedonia – 27.5 M Euro

Project Duration: 10 months (2012) Type of Contract: Unit Price

Type of Construction: Reinforced Concrete Structure, Facade & Roof Covers: Rockwool sandwich panels

Project Value: 27,500,000 Euro Total Construction Area: 40,000 m2

PROJECT REFERENCES

Page 30: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Kromberg & Schubert

Automotive Cable Harness Manufacturing Plant

Bitola

13.3 M EuroProject Duration: 11 months (started in Aug ‘13) Client: Kromberg & Schubert Macedonia Type of Contract: Turn key

Type of Construction: Reinforced Concrete Columns + Space Frame Roof, Hardened surface floor

Project Value: 13,300,000 Euro Total Construction Area: 23,000 m2

PROJECT REFERENCES

Page 31: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

KEMET Electronics Corporation LCE Plant SCOPJE

19.2 M Euro Project Cost

Project Duration: 11 months (started in Aug ‘14) Client: KEMET Electronics Skopje Type of Contract: Turn key

Type of Construction: Reinforced Concrete Columns + Space Frame Roof, Hardened surface floor

Project Value: 19,200,000 Euro Total Construction Area: 12,000 m2

PROJECT REFERENCES

Page 32: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Johnson Matthey Auto-Catalyst Plant / Macedonia

17.5 M Euro

Project Duration: 15 months (2015) Client: Johnson Matthey-UK Type of Contract: Turn key

Type of Construction: Steel + Reinforced Concrete Structure, Steel:S400 (euro code)

Project Value: 17,500,000 Euro Total Construction Area: 13,500 m2

PROJECT REFERENCES

Page 33: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

INFRASTRUCTURE

PROJECTs

Page 34: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Anadolu Viyadüğü – 1.050 meters

13.000Tons Iron Bar

54.000m3 Concrete

PROJECT REFERENCES

Page 35: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

TCDD Railway Bridge– 42 meters

8.500Tons Iron Bar

32.000m3 Concrete

PROJECT REFERENCES

Page 36: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Istanbul HW Bridge– 480 meters

180.000Tons Concrete

17.000m3 Beam

PROJECT REFERENCES

Page 37: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Black Sea R. Asphalt Works– 63.000 meters

PROJECT REFERENCES

Black Sea R. Asphalt Works -

63.000metre

Page 38: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

➢2010 – 86M usd

➢2011 – 92M usd

➢2012 – 113M usd

➢2013 – 118M usd

➢2014 – 126M usd

➢2015 – 133M usd

➢2016 – 196M usd

Yearly Turnovers ( profit)

* All figures are taken from 3rd party Audit Company report given to Tax Office

Page 39: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Ongoing Projects

➢ Russia Vodny Project – 2nd. Phase 300 Villas

➢ Romania Housing Complex – 260.000 m2 construction

➢ Local projects in Turkey – 2 Apartment – 12 floors- 56 Flat

➢ Duzce Municipality New Building Project

➢ Local Projects in Istanbul -

Page 40: Steel House Industrial Works Construction Engineering - …olimpikgroup.com/olimpikcompany.pdf · OLIMPIK was established in 1985 in Istanbul. In Y2000 converted as Group Companies

Our Approach

➢ OUR MISSION

Our mission is to provide our customers with quality products and meet their needs

by using the cutting edge technology in the steel and engineering sector, with our

well trained, young and dynamic staff.

➢ OUR VISION

We tolerate no fault in the production so that we apply the quality management

at every single stage of the production and assembly. Our vision is to meet the

needs of our customers in the steel construction sector, improve our competitive

power, enlarge our customer portfolio and expand our activities abroad.