15
Steel ReUse Cleveland Steel and Tubes Ltd Roy Fishwick Managing Director Your logo ASBP 2021 Metals Recycling & Reuse Kindly supported by

Steel ReUse

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Steel ReUse

Steel ReUse

Cleveland Steel and Tubes Ltd

Roy Fishwick

Managing Director

Your logo

ASBP 2021

Metals Recycling & Reuse

Kindly supported by

Page 2: Steel ReUse

Surplus/waste?? 600,000 T cancelled project

Page 3: Steel ReUse

Steel is a great material and 95%+ is currently recycled

Steel can do better than that!! - properties don’t deteriorate - REUSE

Cannot reuse ;

Steel that’s be subject to Radioactivity

Steel that has been subject to fire (need to check the history of the building, standards on the re-use of steel after a fire etc)

Steel that’s been subject to fatigue ( may need to carry out further inspections for micro-cracking of the steel)

Recycle – saves 70% carbon vs new

Reuse – saves 96% carbon vs new

Recycle – that’s enough?

Page 4: Steel ReUse

Can we reuse?

YESCPR – one of 7 tenets is sustainability – principle

Eurocode 3 – Part 1 –

Performance qualities

Page 5: Steel ReUse

Basic Reuse Protocol

Specify the required properties

Establish test frequency

Test

Compare results to spec

Steel Construction Institute

Page 6: Steel ReUse

Specification

Specification is key

Specifications include modern grades, how can you hope

to reuse?

Specify by performance criteria – not by size and grade

Minimise usage

EAF vs BOF – this is a GLOBAL emergency. Is ticking all

your own “green” boxes really making a difference or just

punting the problem to someone else

Feedback Loops

Cosmetic expectations for cosmetic situations

Page 7: Steel ReUse

Traditional Model

Building Required

Design

Procurement

Contractor

AlternativeMaterial/Product

Materials sourced

Complete

New Material –

Always availableSpecific Lead timesPrice list costsDesign from catalogues

Page 8: Steel ReUse

Current/Future Reuse Model - Conundrum

TIME

Available material Specification

Availablematerial

Estimating / QS / Design

Available material

Procurement

Available material

Contractor

MaterialWhat's on site ?

What else is there available?

What do you own ?

What is “normal” supply model? (Do you have to do something new?)

End of Life

Page 9: Steel ReUse

Film Sets to Farm Gates

Page 10: Steel ReUse

Hunterston Turbine

Page 11: Steel ReUse

Prop-agating Props

Page 12: Steel ReUse

NTS Building

Page 13: Steel ReUse

London Olympic Stadium

• Sub title in PT Sans

2010/11

>2000T Irish gas pipe

Greenest games ever

Page 14: Steel ReUse

Niche

-Developing market (unless you want tubes!)

-Need to be flexible in design requirements

-Don’t go for all or nothing solution – some reuse better then none

-See what assets you have already AND WHO ELSE MIGHT WANT THEM – FUEL THE CIRCULAR ECONOMY

-Its already happening and more and more are talking about it

Page 15: Steel ReUse

Contact details

Roy Fishwick

[email protected]

07836742670

www.cleveland-steel.com