  • 7/31/2019 Store Installation Applebees

    1/13

    TableTop Media Proprietary Confidential Information Available under NDA

    On Site Installation(Applebees Specific)

    Version 1.0

    Date:October 21, 2011

  • 7/31/2019 Store Installation Applebees

    2/13

    Statement of Work

    Version 1.0

    2

    TableTop Media Proprietary Confidential Information Available under NDA

    Table of Contents

    1.1 Onsite Hardware Installation............................................................................... 3

  • 7/31/2019 Store Installation Applebees

    3/13

    Statement of Work

    Version 1.0

    3

    TableTop Media Proprietary Confidential Information Available under NDA

    1.1 Onsite Hardware Installation

    1)IntroductionThis document describes the TableTop Media Restaurant Level network equipment, the installation

    requirements and process. The wireless access point cabling and installation must be complete prior to the

    installation of this equipment.

    2)Equipment to Install

    DMS Device management Server

    Aruba 650 Wireless controller

    UPS Uninterruptible Power Supply

    Patch Cables

    3)Considerations / Potential Challenges

    Locating an installation location for the equipment will be the most challenging part of the installation. You

    will need to locate well ventilated space for the equipment, an available power outlet and reasonable access to

    the customers Point of Sale LAN Switch. Note: Restaurant ERJ Chilis Management has been instructed to

    place an 8 1/2 Label marking the space for the equipment.

    TABLETOP MEDIA ZIOSK

    DEVICE MANAGEMENT SERVER, WIRELESS CONTROLLER AND UPS INSTALLATION

    LOCATION

    This space (minimum of 2 x 2 x 2) needs to remain clean and clear for the installation

    of this equipment. Space should be close to both an available electrical outlet and the

    POS Switch.

    - One electrical power outlet will be required for UPSo This may require that an existing outlet be utilized. If this is the case then a power strip can be

    used to expand the power outlet.

    - One RED patch cable will be installed from the Aruba 650 Wireless Controller to Applebees POS Switch

  • 7/31/2019 Store Installation Applebees

    4/13

    Statement of Work

    Version 1.0

    4

    TableTop Media Proprietary Confidential Information Available under NDA

    - The preferential orientation of the equipment is:

    o The UPS vertical with the front voltage indicator panel viewable.

    Second choice would be horizontal with front voltage indicator panel viewable

    Final choice would be horizontal with top viewable

    o The DMS horizontal with the front viewable. Ensure the ventilation is on top. Second choice would be horizontal with front facing to the left (this will keep the power

    button closest to the front facing side)

    Final choice would be Vertical with front viewable

    o The Aruba 650 Controller horizontal on top of the DMS with the front viewable

    Second choice would be horizontal to the right of the DMS with the front viewable.

    Final choice would be vertical between the DMS and UPS with the front viewable.

    4)Equipment

    Equipment will be shipped to the store to arrive two days prior to the scheduled installation.

    Box with:o UPS

    Box with:

    o DMS Device management server

    o Aruba 650 Wireless Controller

    o Two(2) power cords.

    o Power Strip

    o Extension Cord

    o Patch Cables

    Four(4) seven foot green

    One(1) ten foot blue

    One(1) twenty-five foot blue

    One(1) seven foot black

    One(1) ten foot red

    One(1) twenty five foot red

    One(1) seven foot orange

    One(1) three foot orange

    One(1) seven foot white

    One(1) seven foot yellow

    o One(1) USB Cable

    o One(1) Serial to RJ45 adapter

    o 5 or 8 port Gigabit SwitchBox(s) with:

    o Battery Charger(s) up to two per box

    o Battery Charger feet Two feet with 8 screws for one of the chargers

  • 7/31/2019 Store Installation Applebees

    5/13

    Statement of Work

    Version 1.0

    5

    TableTop Media Proprietary Confidential Information Available under NDA

    Box(s) with:

    o Batteries

    5)Installation Steps- Identify Equipment installation location and orientation

    - Clear and clean location. Ensure there is adequate ventilation

    - Identify electrical power outlet

    - Identify ERJ Chilis Cicso Rotuer and port for TableTop connectivity.

    - Remove all equipment from packaging.

    - Connect Serial to RJ45 adapter to DMS. Tighten two thumb screws until Snug. (these pictures need

    to be updated with new label indincating that the white patch cable is placed into the ALT NIC port

    instead of how noted here as do not use.)

    Pic 1 - Rear of DMS ports with label Pic 2 - Rear of DMS with Serial adapter Pic 3 - Full rear view of DMS with Serial adapter

    6)Install all patch cables in the Aruba 650 Wireless Controller

    o Seven (7) foot Green cables to port Zero(0), port One(1), port Two(2) and port (3)

    o Red cable to Port Four(4) (Ten or Twenty Five Foot depending on distance to Cicso Router)

    o Blue cable to Port Four(5) (Ten or Twenty Five Foot depending on distance to Cicso Router)

    o Orange (3) seven foot cable to Port Five(6)

    o White Cable to Port Six(7)

    o Yellow Cable to Serial Port

    o Insert the power cable. Right rear.

  • 7/31/2019 Store Installation Applebees

    6/13

    Statement of Work

    Version 1.0

    6

    TableTop Media Proprietary Confidential Information Available under NDA

    Pic 4 - Aruba 650 controller with all cables installed

    7)Install DMS Cables

    - Place the DMS with the rear facing you

    -

    Place the Aruba 650 controller on top of the DMS with the back facing you. This will be the rear view ofthe equipment when installed in its final location.

    - Place the 5 Port Gigabit Switch on top of the Aruba 650 Controller.

    - Label the 5 Port Gigabit Switch TTM Gigabit Switch as shown in the picture above.

    - Connect all the patch cables to the DMS

  • 7/31/2019 Store Installation Applebees

    7/13

    Statement of Work

    Version 1.0

    7

    TableTop Media Proprietary Confidential Information Available under NDA

    o Install the USB cable in the USB slot just to the left of the Serial Adapter

    o Install the 7 foot orange cable into port 3 of the 5 Port Gigabit Switch

    o Install the 7 foot white cable into port 1 of the 5 Port Gigabit Switch

    o Install the 3 foot Orange patch cable from the Aruba 650 Controller into port 5 of the 5 Port

    Gigabit Switch

    o

    o Install the 7 foot Orange patch cable from port 3 in the 5 Port Gigabit Swith in NIC 2 on the DMS

    o Install the Yellow patch cable in the Serial to RJ5 Adapter

    o Install the Black patch cable in NIC 1

    o Install the White patch cable from the 5 Port Gigabit Switch in ALT NIC

    o Install the power cable in the DMSo Install the power cord in the 5 Port Gigabit Switch

    Pic 5 - DMS with patch and USB

    8)Install the UPS

    o Plug in the extension cord and/or the power strip if required

    o Remove the protective plastic power cover

    o Label the UPSTableTop Media UPS. Affix the label to the UPS horizontally based upon how

    the UPS will be oriented when put in place.

    o Plug in the UPS. Ensure the plug is labeled TableTop UPS

  • 7/31/2019 Store Installation Applebees

    8/13

    Statement of Work

    Version 1.0

    8

    TableTop Media Proprietary Confidential Information Available under NDA

    o Turn on the UPS. You will need to hold the power button down until the blue UPS Indicator

    panel display illuminates. It will display the voltage. It should be between 114 to 120. It may

    fluctuate in this range. If it is consistently below 114, please locate a different power source for

    the UPS.

    Pic 7 - DMS in outlet with label on plug TableTop UPS

    Pic 8 - UPS installed in preferred Vertical orientation. Laying down in a horizontal position may be required.

    9)Placing the hardware in installation location

    - Place the DMS and Wireless controller in installation location.

    - Attach USB cable to the UPS

    - Plug the Wireless Controller into a BATTERY BACKUP OUTLET on the UPS

    - Plug the DMS into a BATTERY BACKUP OUTLET

    - Plug the 5 Port Gigabit Switch into a BATTERY BACKUP OUTLET

  • 7/31/2019 Store Installation Applebees

    9/13

    Statement of Work

    Version 1.0

    9

    TableTop Media Proprietary Confidential Information Available under NDA

    - Run and connect the RED customer cable from the Aruba 650 Controller to an open port on Applebees

    POS Switch. Ensure the cable is labeled on the customer side with TableTop

    - Run and connect the BLUE customer cable from the Aruba 650 Controller to the ????????? Applebees

    Bordband Router. Ensure the cable is labeled on the customer side with TableTop

    -- Plug the four(4) green cables into the Wireless Access Point patch panel. Ensure that the cables are

    connected as follows:

    o Port 0 on Aruba 650 Controller to Port 1 on the Access Point patch panel.

    o Port 1 on Aruba 650 Controller to Port 2 on the Access Point patch panel

    o Port 2 on Aruba 650 Controller to Port 3 on the Access Point patch panel

    o Port 3 on Aruba 650 Controller to Port 4 on the Access Point patch panel

    - Verify Port Connectivity. Port 0 through 7 on the Aruba Controller should have two Green Lights on

    each port. This could take up to 10 minutes for the controller to completely boot and individual port

    lights to come on.

    - Tie wrap all cables to ensure a clean and neat environment. Tie wrapping cables should ensure that

    they will not become tangled with other cables. Again; all cables:

    o UPS Power Cord

    o DMS Power Cord

    o Aruba 650 Power Cord

    o USB from DMS to UPS cable

    o All Cables from Aruba 650 to DMS

    o All Cables from Aruba 650 to Wireless Access Point Patch Panel. These should be individually tie

    wrapped

    o Red Patch cable from Aruba 650 to customer POS switch/router. Ensure this cable is secured

    and neat all the way from the controller to the POS switch/router. This may require tie wrapsand tie wrap mounts all along the path from the Aruba 650 Controller to the POS switch/router

    - Ensure all the equipment is now properly arranged and in its final position. Installation should be

    impeccable.

  • 7/31/2019 Store Installation Applebees

    10/13

    Statement of Work

    Version 1.0

    10

    TableTop Media Proprietary Confidential Information Available under NDA

    - Ensure ALL tie wrap ends have been trimmed.

    - Ensure All trimmed tie wrap ends have been picked up from work area and properly disposed of.

    - Ensure any other trash (tie wraps, packaging, labels, stickers, etc.) have been collected and properly

    disposed of.

    - Verify that each access points proper individual lights have activated.

    Required Photos

    The following photos will be required:

    - UPS power plug plugged into power outlet with proper label

    - Rear of UPS with all three power connections plugged into BATTERY BACKUP Outlets (outlets with

    white border) and the USB cable connected.

    o DMS power cableo Aruba 650 Power Cable

    o Gigabit power adapter

    o USB Cable to DMS

  • 7/31/2019 Store Installation Applebees

    11/13

    Statement of Work

    Version 1.0

    11

    TableTop Media Proprietary Confidential Information Available under NDA

    - Rear of DMS with all cables attached

    - UPS in its final installation location, TableTop UPS label and front voltage indicator light on and visible

    - Front of Aruba 650 Controller powered on with all cables attached. Indicator lights will be visible to

    ensure all equipment is connected and functional.

  • 7/31/2019 Store Installation Applebees

    12/13

    Statement of Work

    Version 1.0

    12

    TableTop Media Proprietary Confidential Information Available under NDA

    - DMS and Aruba 650 Controller front view in final installation postion

    - Wireless Access Point patch panel with all four(4) green cables plugged in. Access Point Panel will be

    labeled with corresponding port number and TableTop Access Points. Access Point Panel labels will

    be visible in the photo.

    - RED Patch cable labeled and plugged into the Customer POS Switch/Router

    - BLUE Patch cable labeled and plugged into the Customer Switch/Router (10/21/11 Note: We have yet

    to complete this process at Applebees so do not have a sample photo available.)

  • 7/31/2019 Store Installation Applebees

    13/13

    Statement of Work

    Version 1.0

    13

    TableTop Media Proprietary Confidential Information Available under NDA

    - Full shot of the UPS/DMS/Aruba 650 Wireless Controller and Access Point Patch Panel

    - Full shot of Equipment location in office (for Help Desk support staff to have a visual of the layout of

    the office and the location of the TTM Equipment in relationship to the office door and other office

    equipment such as the customer Terminal/keyboard/mouse location.)

    - Full shot of Equipment location in office taken from the office door

    Same Picture as photo above.