Upload
britanni-kinney
View
29
Download
0
Embed Size (px)
DESCRIPTION
Strangeness Reconstruction with ITTF. Lee Barnby. Introduction. New code (Gene just told you) What we did Results: a chronology Future plans. What we did. ITTF tracking run and tracks added to StEvent I ran 2 jobs New V0 finder looking only at ITTF tracks - PowerPoint PPT Presentation
Citation preview
ITTF Review - BNL 24 September 2002
Strangeness Reconstruction with ITTF
Lee Barnby
24 September 2002
ITTF Strangeness - Lee Barnby 2
Introduction
• New code (Gene just told you)• What we did• Results: a chronology• Future plans
24 September 2002
ITTF Strangeness - Lee Barnby 3
What we did
• ITTF tracking run and tracks added to StEvent
• I ran 2 jobs– New V0 finder looking only at ITTF
tracks– New V0 finder looking only at orginal– Otherwise I’d get 4x as many V0s
• Separately run analysis• All this is for real central data
24 September 2002
ITTF Strangeness - Lee Barnby 4
Why only real central data?
• Real central data production worked- hijing data had SVT, this is extra
complication because tracks with SVT points have different set of cuts
- We have no experience with SVT V0s (yet) so conclusions would be difficult
- Also ran over embedding output to get increased Lambda sample but ran out of time looking at that
24 September 2002
ITTF Strangeness - Lee Barnby 5
Armenteros Plot
pT(a
rm)
_
K0
neutral
+
-
p||+
p||-
pT(arm)
pT(arm)
|| ||
|| ||
p p
p p
24 September 2002
ITTF Strangeness - Lee Barnby 6
ITTF as of lastweek
24 September 2002
ITTF Strangeness - Lee Barnby 7
ITTF Last week
Ratio =0.69
24 September 2002
ITTF Strangeness - Lee Barnby 8
Original tracksNot due to V0Finder…
24 September 2002
ITTF Strangeness - Lee Barnby 9
Original tracks
Ratio = 0.75
24 September 2002
ITTF Strangeness - Lee Barnby 10
ITTF this weekend
24 September 2002
ITTF Strangeness - Lee Barnby 11
Original tracks – this weekend (same of course)
24 September 2002
ITTF Strangeness - Lee Barnby 12
ITTF latest –Forward field
Ratio = 0.70
24 September 2002
ITTF Strangeness - Lee Barnby 13
Original tracks latestForward field
Ratio = 0.78(previously 0.75)
Yield comparsionLam. O: 1360 I:1063Lbar. O:1061 I:740
i.e. 22% reduction for Lam, 30% reduction forLbar
24 September 2002
ITTF Strangeness - Lee Barnby 14
ITTF latestReverse field
Ratio = 1.3 !!!
Charge signs are switched
Lambda and anti-Lambda get switched
24 September 2002
ITTF Strangeness - Lee Barnby 15
Latest original tracks
Reverse fieldRatio = 0.78
(Just to show you itsNot the V0 finder)
24 September 2002
ITTF Strangeness - Lee Barnby 16
K0 Masses as function of ptFrom ITTF
1.0GeV
0.4GeV
2.0GeV
24 September 2002
ITTF Strangeness - Lee Barnby 17
K0 Masses as function of ptFrom original
ITTF reduced at all pt, needs to bequantified
2.0GeV
1.0GeV
0.4GeV
24 September 2002
ITTF Strangeness - Lee Barnby 18
Future plans - testing
• Check change in efficiency from simulation– Can actually do full analysis for central data
and compare results (K0 would be better than Lambda though)
• Try to track down reasons for efficiency loss– All comparisons use same cuts, may have to
optimize cuts separately for each
• Other particles Xi, kink kaons– Xi is similar, kink daughters are short tracks in
outer TPC
24 September 2002
ITTF Strangeness - Lee Barnby 19
Longer term
• V0 finder could use Kalman extrapolation and look for overlap of cones and not a fixed distance of closest approach – Requires very good knowledge of errors of
course– Should be driven by physics for spectra
reproducibility of cut quantity distributions in MC is important. For HBT, flow etc. efficiency and putiry important.
24 September 2002
ITTF Strangeness - Lee Barnby 20
Conclusion
• I think we can use this