Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
OUR VISIONTo be the club of choice in our
chosen competition.
OUR MISSIONTo engage, promote, develop, innovate
and provide opportunities within our game.
Strategic Plan July 20202
KEITH PHILLIPSPresident
BRIAN TORPYExecutive Offi cer
The Plan has been presented to all team members.The Plan communicates our Club’s Vision, Mission and Key Performance Areas (KPA’s) and is reviewed annually. The Plans KPA are linked to the Club’s annual budget and business plan.Actual results against annually adopted Key Performance Indicators (KPI’s) are reported to the management committee on a monthly basis. Team members individual target KPI’s are included in their annual performance worksheets. These KPI’s are used by as a tool to determine team members annual performance .This Plan is used by management to assist in the delivery of deliver clearly identifi ed outcomes for the club.
EXECUTIVE SUMMARY1 November 2019This strategic plan was adopted by the Management Committee of the Eastern Suburbs DRLFC (the Club) in July 2019 and applies to the 2020 to 2022 seasons.
Strategic Plan July 2020 3
1 IMAGES REPRESENTED ARE INDICATIVE ONLY AND ARE INCLUDED ONLY TO SUPPLEMENT THE DRAWINGS.
2 DRAWINGS AND SPECIFICATIONS TAKE PRECENDENCE OVER 3D VIEWS.3 DEPICTIONS OF THE FOLLOWING, INCLUDING BUT NOT LIMITED TO:
BUILDING ELEMENTS, COLOURS, EQUIPMENT, FINISHES, FIXTURES, MATERIALS AND LIGHT FITTINGS ARE NOT NECESSARILY A TRUE REPRESENTATION OF THE FINAL PRODUCT. SCHEDULES AND OTHER DOCUMENTS SHOULD BE SOUGHT TO VERIFY THE FINAL SELECTIONS.
3D VIEW DISCLAIMER
For
Project DrawingRevisions
Project No. Drawing No. [email protected]
116 Brookes Street | PO Box 480 | Fortitude Valley QLD 4006
A R C H I T E C T U R E
B R I S B A N E
488 Victoria Street, Richmond | PO Box 3306, Burnley North | VIC 3121
M E L B O U R N E
07 3851 9100
03 8412 3400
bspn.com.au
THIS IS A CAD DRAWING. UNDER NO CIRCUMSTANCES ARE MANUAL ALTERATIONS BE MADE. FIGURED DIMENSIONS TAKE PREFERENCE TO SCALE. VERIFY AND CHECK ALL DIMENSIONS ON SITE.
COPYRIGHT IS RESERVED. REPRODUCTION OF THIS DRAWING OR ELECTRONIC DATA WITHOUT THE WRITTEN PERMISSION OF BSPN ARCHITECTURE IS NOT PERMITTED.
Scale 1 : 100 at A1
P2A10.01B2000063
PROPOSED GRANDSTANDAND TRAINING FACILITY
Drawn MB
EASTS LEAGUES CLUB
3D VIEWS
33DD VViieeww 3333
33DD VViieeww 4444
33DD VViieeww 1111 33DD VViieeww 5555
33DD VViieeww 2222
P1 2020-06-25 PRELIMINARY
P2 2020-07-03 D.A ISSUE
1 IMAGES REPRESENTED ARE INDICATIVE ONLY AND ARE INCLUDED ONLY TO SUPPLEMENT THE DRAWINGS.
2 DRAWINGS AND SPECIFICATIONS TAKE PRECENDENCE OVER 3D VIEWS.3 DEPICTIONS OF THE FOLLOWING, INCLUDING BUT NOT LIMITED TO:
BUILDING ELEMENTS, COLOURS, EQUIPMENT, FINISHES, FIXTURES, MATERIALS AND LIGHT FITTINGS ARE NOT NECESSARILY A TRUE REPRESENTATION OF THE FINAL PRODUCT. SCHEDULES AND OTHER DOCUMENTS SHOULD BE SOUGHT TO VERIFY THE FINAL SELECTIONS.
3D VIEW DISCLAIMER
For
Project DrawingRevisions
Project No. Drawing No. [email protected]
116 Brookes Street | PO Box 480 | Fortitude Valley QLD 4006
A R C H I T E C T U R E
B R I S B A N E
488 Victoria Street, Richmond | PO Box 3306, Burnley North | VIC 3121
M E L B O U R N E
07 3851 9100
03 8412 3400
bspn.com.au
THIS IS A CAD DRAWING. UNDER NO CIRCUMSTANCES ARE MANUAL ALTERATIONS BE MADE. FIGURED DIMENSIONS TAKE PREFERENCE TO SCALE. VERIFY AND CHECK ALL DIMENSIONS ON SITE.
COPYRIGHT IS RESERVED. REPRODUCTION OF THIS DRAWING OR ELECTRONIC DATA WITHOUT THE WRITTEN PERMISSION OF BSPN ARCHITECTURE IS NOT PERMITTED.
Scale 1 : 100 at A1
P2A10.01B2000063
PROPOSED GRANDSTANDAND TRAINING FACILITY
Drawn MB
EASTS LEAGUES CLUB
3D VIEWS
33DD VViieeww 3333
33DD VViieeww 4444
33DD VViieeww 1111 33DD VViieeww 5555
33DD VViieeww 2222
P1 2020-06-25 PRELIMINARY
P2 2020-07-03 D.A ISSUE
1 IMAGES REPRESENTED ARE INDICATIVE ONLY AND ARE INCLUDED ONLY TO SUPPLEMENT THE DRAWINGS.
2 DRAWINGS AND SPECIFICATIONS TAKE PRECENDENCE OVER 3D VIEWS.3 DEPICTIONS OF THE FOLLOWING, INCLUDING BUT NOT LIMITED TO:
BUILDING ELEMENTS, COLOURS, EQUIPMENT, FINISHES, FIXTURES, MATERIALS AND LIGHT FITTINGS ARE NOT NECESSARILY A TRUE REPRESENTATION OF THE FINAL PRODUCT. SCHEDULES AND OTHER DOCUMENTS SHOULD BE SOUGHT TO VERIFY THE FINAL SELECTIONS.
3D VIEW DISCLAIMER
For
Project DrawingRevisions
Project No. Drawing No. [email protected]
116 Brookes Street | PO Box 480 | Fortitude Valley QLD 4006
A R C H I T E C T U R E
B R I S B A N E
488 Victoria Street, Richmond | PO Box 3306, Burnley North | VIC 3121
M E L B O U R N E
07 3851 9100
03 8412 3400
bspn.com.au
THIS IS A CAD DRAWING. UNDER NO CIRCUMSTANCES ARE MANUAL ALTERATIONS BE MADE. FIGURED DIMENSIONS TAKE PREFERENCE TO SCALE. VERIFY AND CHECK ALL DIMENSIONS ON SITE.
COPYRIGHT IS RESERVED. REPRODUCTION OF THIS DRAWING OR ELECTRONIC DATA WITHOUT THE WRITTEN PERMISSION OF BSPN ARCHITECTURE IS NOT PERMITTED.
Scale 1 : 100 at A1
P2A10.01B2000063
PROPOSED GRANDSTANDAND TRAINING FACILITY
Drawn MB
EASTS LEAGUES CLUB
3D VIEWS
33DD VViieeww 3333
33DD VViieeww 4444
33DD VViieeww 1111 33DD VViieeww 5555
33DD VViieeww 2222
P1 2020-06-25 PRELIMINARY
P2 2020-07-03 D.A ISSUE
1 IMAGES REPRESENTED ARE INDICATIVE ONLY AND ARE INCLUDED ONLY TO SUPPLEMENT THE DRAWINGS.
2 DRAWINGS AND SPECIFICATIONS TAKE PRECENDENCE OVER 3D VIEWS.3 DEPICTIONS OF THE FOLLOWING, INCLUDING BUT NOT LIMITED TO:
BUILDING ELEMENTS, COLOURS, EQUIPMENT, FINISHES, FIXTURES, MATERIALS AND LIGHT FITTINGS ARE NOT NECESSARILY A TRUE REPRESENTATION OF THE FINAL PRODUCT. SCHEDULES AND OTHER DOCUMENTS SHOULD BE SOUGHT TO VERIFY THE FINAL SELECTIONS.
3D VIEW DISCLAIMER
For
Project DrawingRevisions
Project No. Drawing No. [email protected]
116 Brookes Street | PO Box 480 | Fortitude Valley QLD 4006
A R C H I T E C T U R E
B R I S B A N E
488 Victoria Street, Richmond | PO Box 3306, Burnley North | VIC 3121
M E L B O U R N E
07 3851 9100
03 8412 3400
bspn.com.au
THIS IS A CAD DRAWING. UNDER NO CIRCUMSTANCES ARE MANUAL ALTERATIONS BE MADE. FIGURED DIMENSIONS TAKE PREFERENCE TO SCALE. VERIFY AND CHECK ALL DIMENSIONS ON SITE.
COPYRIGHT IS RESERVED. REPRODUCTION OF THIS DRAWING OR ELECTRONIC DATA WITHOUT THE WRITTEN PERMISSION OF BSPN ARCHITECTURE IS NOT PERMITTED.
Scale 1 : 100 at A1
P2A10.01B2000063
PROPOSED GRANDSTANDAND TRAINING FACILITY
Drawn MB
EASTS LEAGUES CLUB
3D VIEWS
33DD VViieeww 3333
33DD VViieeww 4444
33DD VViieeww 1111 33DD VViieeww 5555
33DD VViieeww 2222
P1 2020-06-25 PRELIMINARY
P2 2020-07-03 D.A ISSUE
THE NEW ‘TIGERS HQ’ Our vision is to deliver the Intrust Super Cup’s leading Centre of Excellence
FIRST FLOOR WILL INCLUDE:
1 COACHES’ BOXES
2 BOARD ROOM
3 CORPORATE BOXES
4 MEDIA BOXES
5 ADMINISTRATION OFFICES
► GROUND SEATING CAPACITY: 4000
GROUND FLOOR WILL INCLUDE:
6 GYMNASIUM
7 EDUCATION FACILITIES
8 CHANGE ROOMS
9 MERCHANDISE OUTLET
10 CATERING FACILITIES
5
7 109
1
8
432
9
UR V
ALUE
SUR
VAL
UES
UR V
ALUE
SUR
VAL
UES
4 Strategic Plan July 2020
HOneSty & integrity reSPect reSilience
teaMWOrK aSPiratiOnal accOuntaBility
FIRST FLOOR WILL INCLUDE:
1 COACHES’ BOXES
2 BOARD ROOM
3 CORPORATE BOXES
4 MEDIA BOXES
5 ADMINISTRATION OFFICES
► GROUND SEATING CAPACITY: 4000
GROUND FLOOR WILL INCLUDE:
6 GYMNASIUM
7 EDUCATION FACILITIES
8 CHANGE ROOMS
9 MERCHANDISE OUTLET
10 CATERING FACILITIES
OOUR
VAL
UES
UR V
ALUE
S
5Strategic Plan July 2020
KEY
PERF
ORM
ANC E
ARE
AS
KEY
PERF
ORM
ANS
6 Strategic Plan July 2020
1. FOOTBALL OPERATIONS
2. BUSINESS OPERATIONS
5. COMMUNITYENGAGEMENT
3. PEOPLE &CULTURE
4. FINANCE & GOVERNANCE
6. CLUBFACILITIES
SENIORS
1. Finish in the Top 3 on the Intrust Super Cup ladder annually and win at least one premiership within the next 3 years.
a. Drive facility development objectives
b. Secure the right people – coaches, support staff and players
c. Incentivise Players
d. Achieve annual satisfaction ratings.
2. Cement a NRL Licence bid
a. Complete Business Plan, including fi nancial model
b. Develop social medial platforms
c. Develop brand, kit and merchandise
3. Maintain NRL Affi liation model with the Melbourne Storm.
a. Ongoing communication
b. Biannual Review
c. Review of Agreement
JUNIOR AFFILIATES & WOMEN’S GAME
1. Junior Affi liations – develop a target approach as to clubs and schools to support and to what extent.
a. Maintain junior affi liate relationships as per MOUs
2. Foster and grow the Women’s’ game.
a. Support Affi liate clubs to foster and develop programs
b. Maintain Affi liate School Program
111KE
Y PE
RFO
RMAN
C E A
REAS
7Strategic Plan July 2020
1FOOTBALL OPERATIONS
8 Strategic Plan July 2020
1. Increase Media Exposure:
a. Approach and build relationship with media outlets including preparation of media releases/articles.
b. Increase production of social media releases and articles.
2. Develop new Marketing Plan, with consideration of branding, motto, e-news, database, neighbour relations, Tiger TV, and community groups.
3. Improved Revenue Diversifi cation:
a. Determine options to diversify revenue and trial agreed activities.
b. Consider commercial opportunities for the redeveloped Langlands Park including – gymnasium, allied health, and education.
1. Develop a Volunteer/Employee Recruitment & Retention Strategy:
a. Development Plan;
b. Raise profi le of activities within the community;
c. Build networks;
d. Targeted skills set approach where appropriate;
e. Consider a rewards program.
22 33
KEY
PERF
ORM
ANKE
Y PE
RFO
RMAN
SS
KEY
PERF
ORM
ANKE
Y PE
RFO
RMAN
CC E A
REA
E AR
EASS 22BUSINESS OPERATIONS 33PEOPLE & CULTURE
9Strategic Plan July 2020
441. Governance Model Review:
a. Conduct evaluation;
b. Constitution review;
c. Management Committee decision – Committee v Board Structure;
d. Implement to Board Structure if approved by the Committee and members at AGM.
2. Develop and Implement a coordinated Grant Strategy:
a. Develop a long-term fi nancial plan;
b. Identify operational and capital grants;
c. Implement strategy in conjunction with the Junior Division.
1. Develop a community engagement plan, including the:
a. Increased utilisation of players and coaching staff;
b. Increase utilisation of social media to engage with fans and the greater community;
2. Develop a social responsibility program including:
a. Establishment of charity partners who have a nexus with the Club;
b. Identifi cation and implementation of a social program which will provide benefi ts to the local community and the Club.
44FINANCE & GOVERNANCE 55KE
Y PE
RFO
RMAN
KEY
PERF
ORM
ANCC E
ARE
AE
AREA
SS 55COMMUNITY ENGAGEMENT
10 Strategic Plan July 2020
1. Security of Tenure – Langlands Park:
a. Finalisation of Head Lease;
b. Finalisation of Sub-Lease to Eastern Suburbs Leagues Club;
c. Application for freehold title or 30-year lease.
2. Identify and secure 2nd training venue.
3. Complete the Langlands park redevelopment project within 3 years.
66KE
Y PE
RFO
RMAN
KEY
PERF
ORM
ANCC E
ARE
AE
AREA
SS 66CLUB FACILITIES
TIGERS CLUB STRUCTURE
Strategic Plan July 2020 11
ESDRLFC Inc.Board
ESDRLFC Inc.Board
HASTINGS DEERING COLTS
BRISBANE TIGERS
AFFILIATE CLUBS
FLAGSTONE TIGERSEASTS TIGERS
U6 – OPEN GRADES
AFFILIATE SCHOOLS
YARRABILBA TIGERS
MAL MENINGA CUP
INTRUST SUPER CUP
BHP WOMEN’S
Strategic Plan July 202012
TIGERS ORGANISATIONAL STRUCTURE
ESDRLFC Inc.Board
PATHWAYS
ATHLETIC PERFORM. MANAGER
CEO
ADMIN.& FINANCE
MARKETING & PROM.
SPONSOR. MANAGER
ISC ASSIST. COACH
COLTS HEAD COACH
COLTS S&C COACH
ISC HEAD COACH FACILITIES DOCTOR
WELLBEING
ISC S&C COACH
HEAD OF FOOTBALL
TEAM MANAGERS
CLUB PHYSIOSPORTS
TRAINERS