2
Strip Module WG Sessions at AUW • We have been given 2 sessions (3 ½ hours) on Monday, March 26 th – 11:15-13:00 and 14:00-15:45 – See https://indico.cern.ch/conferenceTimeTable.py?confId=158038#all for details of the schedule • We’ll have to iterate on the schedule to make sure everything is covered without too many overlaps with the IT-SC strip: Combined Electrical+Mechanical, ITK-SC plenary, IT-SC readout and plenary sessions – Please let Ingrid and I know of any suggestions for talk topics

Strip Module WG Sessions at AUW

  • Upload
    dillan

  • View
    27

  • Download
    1

Embed Size (px)

DESCRIPTION

Strip Module WG Sessions at AUW. We have been given 2 sessions (3 ½ hours) on Monday, March 26 th 11:15-13:00 and 14:00-15:45 See https://indico.cern.ch/conferenceTimeTable.py?confId=158038#all for details of the schedule - PowerPoint PPT Presentation

Citation preview

Page 1: Strip Module WG Sessions at AUW

Strip Module WG Sessions at AUW

• We have been given 2 sessions (3 ½ hours) on Monday, March 26th

– 11:15-13:00 and 14:00-15:45– See https://indico.cern.ch/conferenceTimeTable.py?confId=158038#all for details

of the schedule• We’ll have to iterate on the schedule to make sure

everything is covered without too many overlaps with the IT-SC strip: Combined Electrical+Mechanical, ITK-SC plenary, IT-SC readout and plenary sessions– Please let Ingrid and I know of any suggestions for talk

topics

Page 2: Strip Module WG Sessions at AUW

Possible topics to cover from this group

• Status and plans for 250 nm program: modules and multi-modules, petalets

• Building 180 status• Report from ABCn130/HCC Conceptual Design Review with a

list of open questions– Top layer (pad) layouts of ASICs with provisional list of external

SMD components needed• Plans for 130 nm ASIC set: hybrids, modules, bus cables, EOS,

SPP, DC-DC converters, general stave/petal electrical layout• Results from 130 nm bonding trials• LOI backup document status