STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032 18 - 19 FD05 Transfer Message 033 20 - 22 OCA 48 Mbps Troubleshooting Procedure 034 23 FD05 Crew Choice Downlink 039 24 FD05 EVA Deltas 040 25 FD05 LiOH Swap 041 26 - 44 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST Approved by FAO: Gail Hansen Last Updated: Nov 20 2009 8:35 AM GMT JEDI (Joint Execute package Development and Integration), v3.0

STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title

029A 1 - 14 FD05 Flight Plan Revision

030 15 - 16 FD05 Mission Summary

031 17 FD04 MMT Summary

032 18 - 19 FD05 Transfer Message

033 20 - 22 OCA 48 Mbps Troubleshooting Procedure

034 23 FD05 Crew Choice Downlink

039 24 FD05 EVA Deltas

040 25 FD05 LiOH Swap

041 26 - 44 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST Approved by FAO: Gail Hansen

Last Updated: Nov 20 2009 8:35 AM GMT JEDI (Joint Execute package Development and Integration), v3.0

Page 2: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 029A - FD05 FLIGHT PLAN REVISION

END OF PAGE 1 OF 14, MSG 029A

1 MSG INDEX 2 3 MSG NO. TITLE 4 MSG029 FD05 Flight Plan Revision 5 MSG030 FD05 Mission Summary 6 MSG031 FD04 MMT Summary 7 MSG032 FD05 Transfer Message 8 MSG033 OCA 48 Mbps Troubleshooting Procedure 9 MSG034 FD05 Crew Choice Downlink 10 MSG035 FD05 PAO Event Summary-CBS News / WTVF-TV, Nashville, TN / Fox 11

News Radio 12 MSG036 FD05 PAO Event Summary-Tom Joyner Syndicated Radio Show 13 MSG037 FD05 PAO Event Summary-ESPN SportsCenter / BET News / WRIC-TV, 14

Richmond, VA 15 MSG039 FD05 EVA Deltas 16 MSG040 FD05 LiOH Swap 17 MSG041 4.007 HRF Ultrasound Board Replacement and Test 18 19 20 1. Post-Sleep Cryo Config 21

22

For today's Post-Sleep cryo config, O2 Tanks 1 and 2 and H2 Tanks 1 and 5 will 23

be active. 24 25

R1 O2,H2 MANF VLV TK1 (two) - OP (tb-OP) 26

O2 TK2 HTRS A,B (two) - AUTO 27 28

A15 CRYO TK5 HTRS O2 A,B (two) - OFF 29 30 Pre-Sleep Cryo Config 31

32

√MCC for deltas prior to configuring for Pre-Sleep. 33 34

For tonight's Pre-Sleep cryo config, Manifold 1 will be closed with O2 and H2 35

Tanks 1 and 5 active. 36 37

A15 CRYO TK5 HTR O2 A - AUTO 38 39

R1 O2 TK2 HTRS A,B (two) - OFF 40

O2,H2 MANF VLV TK1 (two) - CL (tb-CL) 41 42 43 44 45 46 47 48 49 50

1

Page 3: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 029A - FD05 FLIGHT PLAN REVISION

END OF PAGE 2 OF 14, MSG 029A

1 2. Shortly after the completion of the EVA today we lost the SSV video. To troubleshoot 2

the loss of SSV video to the ground, request the crew check the following configuration 3 and setting on the SSV machine. These steps can be found in the Photo/TV Flight 4 Supplemt book, page FS 1-9 under the Config SSV settings. 5

6 IN SEL - NTSC 7 Mode - 3 8 OUTRATE - 2 9 SSV Pwr - on 10 Check Pwr LED illum 11 Check ENC DATA LED flickering 12 Check FRM DATA LED flickering 13 Check FILL FRM pulsing 14

15 3. Reminder- Please make sure that you leave IDPs powered ON for at least 30 seconds 16

prior to powering OFF. This is a lifetime issue for the heads on the hard drive of the IDP. 17 18 4. Payload Updates: 19 20

ABRS 21 Pen & Ink ASSY OPS with the following (2 location updates): 22 ABRS ASCENT FILTER CHANGEOUT, pg. 139, MATERIALS 23 WAS: 24 6x6 Ziplock Bag P/N 528-50000-2 25 IS: 26 6x6 Ziplock Bag P/N 528-50000-2 (located in ABRS Stowage Bag, MF28G) 27 ABRS TRANSFER MDDK TO ISS, pg 145, PARTS 28 WAS: 29 EXPRESS RACK Data Cable (38”) (683-44267-2) (JPM1F6_F1) 30 IS: 31 EXPRESS RACK Data Cable (38”) (683-44267-2) (LAB102_M1) 32

33 SPINAL 34 During data collection it is helpful to raise the seat pan of the CDR seat slightly 35 above the center console. For consistency between subjects, the lap belt should be 36 tight enough to ensure contact with the seat, though subjects may not feel good 37 contact. 38 39 HRF Ultrasound Board 40 Scorch, today you will be performing the HRF Ultrasound Board Replacement 41 activity. Reference JEDI MSG 041: 4.007 HRF ULTRASOUND BOARD 42 REPLACEMENT AND TEST on ISS. Reminder, please be mindful of Electrostatic 43 Discharge when handling electronic components. 44

45 5. REPLACE PAGES 2-14 AND 2-16, 3-44 THROUGH 3-53. 46 47 48 49 50 51

2

Page 4: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

FLT PLN/129/FLT

FD05

HOBAUGH

WILMORE

MELVIN

BRESNIK

FOREMAN

SATCHER

REPL

ANNE

D

2-14

S T S - 1 2 9

08

0910

1112

1314

1516

1718

19GMT 11/20/09 (324)

12

1314

1516

1718

1920

2122

23004/00

MET

Day 003

CDR

SLEEP

L O GPOST SLEEP

S P I N A L

S P I N A L

C L C TPOST SLEEP

P A O

E V E N T

N 2 *

N 2 *LIOH SWAP

C W C # 5

I N I T

C W C T E R M

C W C # 6

I N I T

C W C T E R M

C W C X F E R

MEAL

I M U

HRF1

ULTRA

SOUND

EXERCISE

XFER OPS

C W C X F E R

PLT

SLEEP

POST SLEEP

L O G

S P I N A L

POST

SLEEP

P A O

E V E N T

E X E R C I S E

S P I N A L

C L C TMEAL

XFER OPS

XFER OPS

XFER OPS

MS1

SLEEP

X F E R

U P D A T E

M C I U

L O GPOST SLEEP

S P I N A L

S P I N A L

C L C T

A B R S

F I L T E R

C / OABRS XFER

M D D K C K

A B R S

S A M P L E #

P A O

E V E N T

MEAL

EXERCISE

OCA

48MB

TRBL

SHOOT

XFER OPS

MS2

SLEEP

EVA

TOOL

CONFIG

E_LK PREP

L Q D S L V A

POST SLEEP

MEAL

L O G

BSA

INIT

B S A - T

EMU SWAP

B A T T /

M E T O X

I N S T L

S P I N A L

S P I N A L

C L C TEXERCISE

XFER OPS

XFER OPS

MS3

SLEEP

MEAL

EVA

TOOL

CONFIG

E_LK PREP

POST SLEEP

A S P I R I N

EXERCISE

EMU SWAP

S P I N A L

S T A N D I N G

H G H T

S P I N A L

C L C TSPINAL

OPERATOR

B A T T /

M E T O X

I N S T L

S P I N A L

POST

EVA

CONF

POST

SLEEP

MS4

SLEEP

L O GPOST SLEEP

MEAL

A S P I R I NL Q D S L V A

S P I N A L

S P I N A L

C L C T

J E M R M S

D / A P R E P

JRMS

MNVR

STOW

P A O

E V E N T

JRMS

FIN

ACT

PT3

E X E R C I S E

XFER OPS

XFER OPS

XFER

OPS

S P I N A L

S T A N D I N G

H G TPOST

SLEEP

DAY/NIGHT

ORBIT

5758

5960

6162

6364

TDRS

W E ZBIAS -XLV -ZVV

ORB ATT

WS4/PDGF1

MT/SSRMS POS

*RPRS INIT

*RPRS TERM

#RETRIEVE

NOTES

2-14

FD05

HOBAUGH

WILMORE

MELVIN

BRESNIK

FOREMAN

SATCHER

REPL

ANNE

D

S T S - 1 2 9

08

0910

1112

1314

1516

1718

19GMT 11/20/09 (324)

12

1314

1516

1718

1920

2122

23004/00

MET

Day 003

CDR

SLEEP

L O GPOST SLEEP

S P I N A L

S P I N A L

C L C TPOST SLEEP

P A O

E V E N T

N 2 *

N 2 *LIOH SWAP

C W C # 5

I N I T

C W C T E R M

C W C # 6

I N I T

C W C T E R M

C W C X F E R

MEAL

I M U

HRF1

ULTRA

SOUND

EXERCISE

XFER OPS

C W C X F E R

PLT

SLEEP

POST SLEEP

L O G

S P I N A L

POST

SLEEP

P A O

E V E N T

E X E R C I S E

S P I N A L

C L C TMEAL

XFER OPS

XFER OPS

XFER OPS

MS1

SLEEP

X F E R

U P D A T E

M C I U

L O GPOST SLEEP

S P I N A L

S P I N A L

C L C T

A B R S

F I L T E R

C / OABRS XFER

M D D K C K

A B R S

S A M P L E #

P A O

E V E N T

MEAL

EXERCISE

OCA

48MB

TRBL

SHOOT

XFER OPS

MS2

SLEEP

EVA

TOOL

CONFIG

E_LK PREP

L Q D S L V A

POST SLEEP

MEAL

L O G

BSA

INIT

B S A - T

EMU SWAP

B A T T /

M E T O X

I N S T L

S P I N A L

S P I N A L

C L C TEXERCISE

XFER OPS

XFER OPS

MS3

SLEEP

MEAL

EVA

TOOL

CONFIG

E_LK PREP

POST SLEEP

A S P I R I N

EXERCISE

EMU SWAP

S P I N A L

S T A N D I N G

H G H T

S P I N A L

C L C TSPINAL

OPERATOR

B A T T /

M E T O X

I N S T L

S P I N A L

POST

EVA

CONF

POST

SLEEP

MS4

SLEEP

L O GPOST SLEEP

MEAL

A S P I R I NL Q D S L V A

S P I N A L

S P I N A L

C L C T

J E M R M S

D / A P R E P

JRMS

MNVR

STOW

P A O

E V E N T

JRMS

FIN

ACT

PT3

E X E R C I S E

XFER OPS

XFER OPS

XFER

OPS

S P I N A L

S T A N D I N G

H G TPOST

SLEEP

DAY/NIGHT

ORBIT

5758

5960

6162

6364

TDRS

W E ZORB ATT

BIAS -XLV -ZVV

MT/SSRMS POS

WS4/PDGF1

NOTES

*RPRS INIT

*RPRS TERM

#RETRIEVE

3

Page 5: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

FLT PLN/129/FLT

FD05

10.2

DPRS

HOBAUGH

WILMORE

MELVIN

BRESNIK

FOREMAN

SATCHER

NO UNISOLATED EXERCISE

[MT Translate]

REPL

ANNE

D

2-16

S T S - 1 2 9

20

2122

2311/21

0102

0304

0506

07GMT 11/20/09 (324)

004/00

0102

0304

0506

0708

0910

1112

MET

Day 004

CDR

SLEEP

PMC

A/G

PRE SLEEP

PRE SLEEP

R M S G R P L

E L C 2

P A O

E V E N T

P R E S L P

EVA PROC

REVIEW

PLT

SLEEP

EVA PROC

REVIEW

PRE SLEEP

EXERCISE

MS1

SLEEP

X F E R

T A G U P

X F E R

B R I E F

PRE SLEEP

R M S G R P L

E L C 2

P A O

E V E N T

M D D K C K

P R E S L P

EVA PROC

REVIEW

MS2

SLEEP

PRE

SLEEP

MASK PB/TOOL

CONFIG

EVA PROC

REVIEW

EVA TOOL

CONFIG

PRE SLEEP

MS3

SLEEP

PRE

SLEEP

MASK PB/TOOL

CONFIG

PRE SLEEP

EVA PROC

REVIEW

EVA TOOL

CONFIG

MS4

SLEEP

PRE SLEEP

EVA PROC

REVIEW

EVA

TOOL

CONFIG

P A O

E V E N T

P R E S L P

E X E R C I S EDAY/NIGHT

ORBIT

6566

6768

6970

7172

TDRS

W E ZBIAS -XLV -ZVV

ORB ATT

WS4/PDGF1

XLATE AND W/O

WS2/PDGF2

MT/SSRMS POS

NOTES

2-16

FD05

10.2

DPRS

HOBAUGH

WILMORE

MELVIN

BRESNIK

FOREMAN

SATCHER

NO UNISOLATED EXERCISE

[MT Translate]

REPL

ANNE

D

S T S - 1 2 9

20

2122

2311/21

0102

0304

0506

07GMT 11/20/09 (324)

004/00

0102

0304

0506

0708

0910

1112

MET

Day 004

CDR

SLEEP

PMC

A/G

PRE SLEEP

PRE SLEEP

R M S G R P L

E L C 2

P A O

E V E N T

P R E S L P

EVA PROC

REVIEW

PLT

SLEEP

EVA PROC

REVIEW

PRE SLEEP

EXERCISE

MS1

SLEEP

X F E R

T A G U P

X F E R

B R I E F

PRE SLEEP

R M S G R P L

E L C 2

P A O

E V E N T

M D D K C K

P R E S L P

EVA PROC

REVIEW

MS2

SLEEP

PRE

SLEEP

MASK PB/TOOL

CONFIG

EVA PROC

REVIEW

EVA TOOL

CONFIG

PRE SLEEP

MS3

SLEEP

PRE

SLEEP

MASK PB/TOOL

CONFIG

PRE SLEEP

EVA PROC

REVIEW

EVA TOOL

CONFIG

MS4

SLEEP

PRE SLEEP

EVA PROC

REVIEW

EVA

TOOL

CONFIG

P A O

E V E N T

P R E S L P

E X E R C I S EDAY/NIGHT

ORBIT

6566

6768

6970

7172

TDRS

W E ZORB ATT

BIAS -XLV -ZVV

MT/SSRMS POS

WS4/PDGF1

XLATE AND W/O

WS2/PDGF2

NOTES

4

Page 6: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

FLT PLN/129/FLT

05

FD05 EZ ACTIVITIES:

√O

CAC FILTER & MDDK DUCT SCREEN

TEPC (STATUS CHECK)

(ORB OPS, CREW SYS )

HARD REBOOT ALL PGSCs EXCEPT:

STS-1(OCA ROUTER), STS-5(RPOP2),

AND STS-6(WLES)

HOBAUGH

WILMORE

MELVIN

REP

LANN

ED

3-44

STS-

129/

ULF3

FD

08:00

09:00

10:00

11:00

GMT

Date

11/20

(324)

12:00

13:00

14:00

15:00

16:00

MET

Day 003

WE

Z

T D R S

~

~

D / N

O R B 5 7 5 8 5 9

~ ~B I A S - X L V - Z V VA T TCDR

SLEEP

~

SLEEP LOGBOOK

(SDBI 1634)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

On MCC Go: MO13Q AIRLK FAN A-ON

√HUM SEP FOR H2O ACCUMULATION

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 15:22 - 16:02

PLT

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP LOGBOOK (SDBI 1634)

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 15:22 - 16:02

MS1

SLEEP

~

SLEEP LOGBOOK (SDBI 1634)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-44

05

FD05 EZ ACTIVITIES:

√O

CAC FILTER & MDDK DUCT SCREEN

TEPC (STATUS CHECK)

(ORB OPS, CREW SYS )

HARD REBOOT ALL PGSCs EXCEPT:

STS-1(OCA ROUTER), STS-5(RPOP2),

AND STS-6(WLES)

HOBAUGH

WILMORE

MELVIN

REP

LANN

EDST

S-12

9/UL

F3 F

D

08:00

09:00

10:00

11:00

GMT

Date

11/20

(324)

12:00

13:00

14:00

15:00

16:00

MET

Day 003

WE

Z

T D R SD / N

O R B 5 7 5 8 5 9

A T T ~ ~B I A S - X L V - Z V V

CDR

~

SLEEP

SLEEP LOGBOOK

(SDBI 1634)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

On MCC Go: MO13Q AIRLK FAN A-ON

√HUM SEP FOR H2O ACCUMULATION

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 15:22 - 16:02

PLT

~

SLEEP

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP LOGBOOK (SDBI 1634)

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 15:22 - 16:02

MS1

~

SLEEP

SLEEP LOGBOOK (SDBI 1634)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

5

Page 7: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

FLT PLN/129/FLT

05

BRESNIK

FOREMAN

SATCHER

REP

LANN

ED

3-45

STS-

129/

ULF3

FD

08:00

09:00

10:00

11:00

GMT

Date

11/20

(324)

12:00

13:00

14:00

15:00

16:00

MET

Day 003

WE

Z

T D R S

~

~

D / N

O R B 5 7 5 8 5 9

~ ~B I A S - X L V - Z V VA T TMS2

SLEEP

~

LIQUID SLVA SAMPLE (ORB OPS, SDBI)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP LOGBOOK

(SDBI 1634)

MS3

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EVA CREW: TAKE 1 ASPIRIN (325mg)

MS4

SLEEP

~

SLEEP LOGBOOK (SDBI 1634)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EVA CREW: TAKE 1 ASPIRIN (325mg)

LIQUID SLVA SAMPLE (ORB OPS, SDBI)

NOTES

3-45

05

BRESNIK

FOREMAN

SATCHER

REP

LANN

EDST

S-12

9/UL

F3 F

D

08:00

09:00

10:00

11:00

GMT

Date

11/20

(324)

12:00

13:00

14:00

15:00

16:00

MET

Day 003

WE

Z

T D R SD / N

O R B 5 7 5 8 5 9

A T T ~ ~B I A S - X L V - Z V V

MS2

~

SLEEP

LIQUID SLVA SAMPLE (ORB OPS, SDBI)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP LOGBOOK

(SDBI 1634)

MS3

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA CREW: TAKE 1 ASPIRIN (325mg)

MS4

~

SLEEP

SLEEP LOGBOOK (SDBI 1634)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA CREW: TAKE 1 ASPIRIN (325mg)

LIQUID SLVA SAMPLE (ORB OPS, SDBI)

NOTES

6

Page 8: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

FLT PLN/129/FLT

05

HOBAUGH

WILMORE

MELVIN

REP

LANN

ED

A N2 REPRESS USING PAYLOAD N2 VALVES

(ORB OPS, ECLS)

Perform REPRESS SETUP AND INIT

Steps 2-7

MCC will TMBU S/W FDA. H/W already INH.

3-46

STS-

129/

ULF3

FD

12:00

13:00

14:00

15:00

GMT

Date

11/20

(324)

16:00

17:00

18:00

19:00

20:00

MET

Day 003

WE

Z

T D R S

~

~~

D / N

O R B 5 9 6 0 6 1 6 2

~ ~B I A S - X L V - Z V VA T TCDR

SPINAL ELONGATION STND HEIGHT LOG (CC) SUBJ

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

N2 REPRESS USING PAYLOAD N2 VLVS A

LiOH SWAP

Ref. Transfer List: Items 9,10,17,

18, 729, 729A, & MSG 040

SHUTTLE/ISS H2O CNTR FILL

(ORB OPS, ECLS)INIT FILL #5

Ref. MSG 017

SHUTTLE/ISS H2O CNTR FILL

(ORB OPS, ECLS)

Perform FILL TERMINATION

SHUTTLE/ISS H2O CNTR FILL

(ORB OPS, ECLS)INIT FILL #6

Ref. MSG 017

MEAL ~

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

HRF USND-ULTRASOUND: 4.007 ULTRASOUND CHANNEL

BOARD REPLACEMENT AND TEST

Perform Steps 1.3-1.17.

Ref. Resupply Xfer List; Item 59

Ref. MSG 029, Item 4

& Ref. MSG 041

CWC TRANSFER

Transfer 1 CWC to ISS

PLT

SPINAL ELONGATION STND HEIGHT LOG (CC) SUBJ

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MEAL ~

TRANSFER OPS

Ref. Transfer List & MSG 032

TRANSFER OPS

Ref. Transfer List & MSG 032

MS1

DAILY TRANSFER LIST UPDATE

Ref. Transfer List & MSG 032

L17 Check MCIU filter screen

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SPINAL ELONGATION STND HEIGHT LOG (CC) SUBJ

ABRS ASCENT FILTER CHANGEOUT

(ASSY OPS, PAYLOADS)

Ref. MSG 029, Item 4

ABRS TRANSFER MDDK TO ISS

(ASSY OPS, PAYLOADS)

Ref. Transfer List: Items 51,52.1,

& MSG 029, Item 4

CGBA and ABRS STATUS CK (Cue Card)CGBA, ABRS

GLACIER UNPACK AND POWERUP

(ASSY OPS, PAYLOADS) Perform Step 1 Only

This is the ABRS SAMPLE RETRIEVE

Ref. Transfer List: Item 25

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 16:59 - 17:36

MEAL ~

OCA 48 Mbps TROUBLESHOOTING

Ref. MSG 033

NOTES

3-46

05

HOBAUGH

WILMORE

MELVIN

REP

LANN

ED

A N2 REPRESS USING PAYLOAD N2 VALVES

(ORB OPS, ECLS)

Perform REPRESS SETUP AND INIT

Steps 2-7

MCC will TMBU S/W FDA. H/W already INH.

STS-

129/

ULF3

FD

12:00

13:00

14:00

15:00

GMT

Date

11/20

(324)

16:00

17:00

18:00

19:00

20:00

MET

Day 003

WE

Z

T D R SD / N

O R B 5 9 6 0 6 1 6 2

A T T ~ ~B I A S - X L V - Z V V

CDR

SPINAL ELONGATION STND HEIGHT LOG (CC) SUBJ

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

N2 REPRESS USING PAYLOAD N2 VLVS A

LiOH SWAP

Ref. Transfer List: Items 9,10,17,

18, 729, 729A, & MSG 040

SHUTTLE/ISS H2O CNTR FILL

(ORB OPS, ECLS)INIT FILL #5

Ref. MSG 017

SHUTTLE/ISS H2O CNTR FILL

(ORB OPS, ECLS)

Perform FILL TERMINATION

SHUTTLE/ISS H2O CNTR FILL

(ORB OPS, ECLS)INIT FILL #6

Ref. MSG 017

~

MEAL

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

HRF USND-ULTRASOUND: 4.007 ULTRASOUND CHANNEL

BOARD REPLACEMENT AND TEST

Perform Steps 1.3-1.17.

Ref. Resupply Xfer List; Item 59

Ref. MSG 029, Item 4

& Ref. MSG 041

CWC TRANSFER

Transfer 1 CWC to ISS

PLT

SPINAL ELONGATION STND HEIGHT LOG (CC) SUBJ

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MEAL

TRANSFER OPS

Ref. Transfer List & MSG 032

TRANSFER OPS

Ref. Transfer List & MSG 032

MS1

DAILY TRANSFER LIST UPDATE

Ref. Transfer List & MSG 032

L17 Check MCIU filter screen

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SPINAL ELONGATION STND HEIGHT LOG (CC) SUBJ

ABRS ASCENT FILTER CHANGEOUT

(ASSY OPS, PAYLOADS)

Ref. MSG 029, Item 4

ABRS TRANSFER MDDK TO ISS

(ASSY OPS, PAYLOADS)

Ref. Transfer List: Items 51,52.1,

& MSG 029, Item 4

CGBA and ABRS STATUS CK (Cue Card)CGBA, ABRS

GLACIER UNPACK AND POWERUP

(ASSY OPS, PAYLOADS) Perform Step 1 Only

This is the ABRS SAMPLE RETRIEVE

Ref. Transfer List: Item 25

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 16:59 - 17:36

~

MEAL

OCA 48 Mbps TROUBLESHOOTING

Ref. MSG 033

NOTES

7

Page 9: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

FLT PLN/129/FLT

05

BRESNIK

FOREMAN

SATCHER

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

REP

LANN

ED

3-47

STS-

129/

ULF3

FD

12:00

13:00

14:00

15:00

GMT

Date

11/20

(324)

16:00

17:00

18:00

19:00

20:00

MET

Day 003

WE

Z

T D R S

~

~~

D / N

O R B 5 9 6 0 6 1 6 2

~ ~B I A S - X L V - Z V VA T TMS2

~

MEAL ~

SPINAL ELONGATION STND HEIGHT LOG (CC) SUBJ

EXERCISE

TRANSFER OPS

Ref. Transfer List & MSG 032

TRANSFER OPS

Ref. Transfer List & MSG 032

MS3

MEAL ~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

SPINAL ELONGATION HEIGHT LOG

(ASSY OPS, CUE CARD)

Perform OPS

SPINAL ELONGATION STND HEIGHT LOG (CC) SUBJ

POST EVA CONFERENCE

Media Format: Crew Preference

Discuss EVA and Future Impacts

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MEAL ~

SPINAL ELONGATION STND HEIGHT LOG (CC) SUBJ

ROBOTICS: 1.109 JEMRMS DEACTIVATION PREP

ROBOTICS: 1.173 JEMRMS MNVR TO STOWED POSN

AFTER EE LUBE

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 16:59 - 17:36

ROBOTICS: 1.101 JEMRMS FINAL ACTIVATION

Prior to step 1.1 Press POWER OUT button

(to undepressed position) and verify

"RESET" illuminated.

TRANSFER OPS

Ref. Transfer List & MSG 032

SPINAL ELONGATION HEIGHT LOG (CC) OPS

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

3-47

05

BRESNIK

FOREMAN

SATCHER

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

REP

LANN

EDST

S-12

9/UL

F3 F

D

12:00

13:00

14:00

15:00

GMT

Date

11/20

(324)

16:00

17:00

18:00

19:00

20:00

MET

Day 003

WE

Z

T D R SD / N

O R B 5 9 6 0 6 1 6 2

A T T ~ ~B I A S - X L V - Z V V

MS2

~ ~

MEAL

SPINAL ELONGATION STND HEIGHT LOG (CC) SUBJ

EXERCISE

TRANSFER OPS

Ref. Transfer List & MSG 032

TRANSFER OPS

Ref. Transfer List & MSG 032

MS3

~

MEAL~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS) EXERCISE

SPINAL ELONGATION HEIGHT LOG

(ASSY OPS, CUE CARD)

Perform OPS

SPINAL ELONGATION STND HEIGHT LOG (CC) SUBJ

POST EVA CONFERENCE

Media Format: Crew Preference

Discuss EVA and Future Impacts

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MEAL

SPINAL ELONGATION STND HEIGHT LOG (CC) SUBJ

ROBOTICS: 1.109 JEMRMS DEACTIVATION PREP

ROBOTICS: 1.173 JEMRMS MNVR TO STOWED POSN

AFTER EE LUBE

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 16:59 - 17:36

ROBOTICS: 1.101 JEMRMS FINAL ACTIVATION

Prior to step 1.1 Press POWER OUT button

(to undepressed position) and verify

"RESET" illuminated.

TRANSFER OPS

Ref. Transfer List & MSG 032

SPINAL ELONGATION HEIGHT LOG (CC) OPS

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

8

Page 10: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

FLT PLN/129/FLT

05

HOBAUGH

WILMORE

MELVIN

REP

LANN

ED

B N2 REPRESS USING PAYLOAD N2 VALVES

(ORB OPS, ECLS)

Perform REPRESS TERM AND RECONFIG

Steps 8-12

MCC will TMBU S/W FDA. Do not ENA H/W.

3-48

STS-

129/

ULF3

FD

16:00

17:00

18:00

19:00

GMT

Date

11/20

(324)

20:00

21:00

22:00

23:00

00:00

MET

Day 003

WE

Z

T D R S

~

~ ~

~

D / N

O R B 6 2 6 3 6 4

~ ~B I A S - X L V - Z V VA T TCDR

SPINAL ELONGATION OPERATOR PROCEDURE

(ASSY OPS, PAYLOADS)

Steps 5, 6

N2 REPRESS USING PAYLOAD N2 VLVS B

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS

) Perform FILL TERMINATION

CWC TRANSFER

Transfer 1 CWC to ISSMEAL~

EXERCISE

TRANSFER OPS

Ref. Transfer List & MSG 032

PLT

EXERCISE

~

SPINAL ELONGATION OPERATOR PROCEDURE

(ASSY OPS, PAYLOADS)

Steps 5, 6

MEAL~

TRANSFER OPS

Ref. Transfer List & MSG 032

MS1

SPINAL ELONGATION OPERATOR PROCEDURE

(ASSY OPS, PAYLOADS)

Steps 5, 6

MEAL~

EXERCISE

TRANSFER OPS

Ref. Transfer List & MSG 032

NOTES

3-48

05

HOBAUGH

WILMORE

MELVIN

REP

LANN

ED

B N2 REPRESS USING PAYLOAD N2 VALVES

(ORB OPS, ECLS)

Perform REPRESS TERM AND RECONFIG

Steps 8-12

MCC will TMBU S/W FDA. Do not ENA H/W.

STS-

129/

ULF3

FD

16:00

17:00

18:00

19:00

GMT

Date

11/20

(324)

20:00

21:00

22:00

23:00

00:00

MET

Day 003

WE

Z

T D R SD / N

O R B 6 2 6 3 6 4

A T T ~ ~B I A S - X L V - Z V V

CDR

SPINAL ELONGATION OPERATOR PROCEDURE

(ASSY OPS, PAYLOADS)

Steps 5, 6

N2 REPRESS USING PAYLOAD N2 VLVS B

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS

) Perform FILL TERMINATION

CWC TRANSFER

Transfer 1 CWC to ISS

~

MEAL

EXERCISE

TRANSFER OPS

Ref. Transfer List & MSG 032

PLT

~EXERCISE

SPINAL ELONGATION OPERATOR PROCEDURE

(ASSY OPS, PAYLOADS)

Steps 5, 6

~

MEAL

TRANSFER OPS

Ref. Transfer List & MSG 032

MS1

SPINAL ELONGATION OPERATOR PROCEDURE

(ASSY OPS, PAYLOADS)

Steps 5, 6

~

MEAL

EXERCISE

TRANSFER OPS

Ref. Transfer List & MSG 032

NOTES

9

Page 11: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

FLT PLN/129/FLT

05

BRESNIK

FOREMAN

SATCHER

REP

LANN

ED

3-49

STS-

129/

ULF3

FD

16:00

17:00

18:00

19:00

GMT

Date

11/20

(324)

20:00

21:00

22:00

23:00

00:00

MET

Day 003

WE

Z

T D R S

~

~ ~

~

D / N

O R B 6 2 6 3 6 4

~ ~B I A S - X L V - Z V VA T TMS2

EVA 2 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 039

~

ISS EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP

Ref. MSG 039

MEAL~

ISS EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE

(INIT) Ref: STS-129 BATTERY RECHARGE CC

ISS EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE

(TERM) Ref: STS-129 BATTERY RECHARGE CC

EMU SWAP FOR EVA 2

(EVA, AIRLOCK CONFIG)

ISS EVA SYSTEMS:1.515 EMU METOX/LIOH/BATTERY

REPLACEMENT

Ref: STS-129 CONSUMABLES TRACKING CC (EVA)

SPINAL ELONGATION OPERATOR PROCEDURE

(ASSY OPS, PAYLOADS)

Steps 5, 6

MS3

MEAL~

EVA 2 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 039

~

ISS EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP

Ref. MSG 039

EMU SWAP FOR EVA 2

(EVA, AIRLOCK CONFIG)

SPINAL ELONGATION OPERATOR PROCEDURE

(ASSY OPS, PAYLOADS)

Steps 5, 6

SPINAL ELONGATION OPERATOR PROCEDURE

(ASSY OPS, PAYLOADS)

Perform OPS, Steps 5,6

Ref. MSG 029, Item 4

ISS EVA SYSTEMS:1.515 EMU METOX/LIOH/BATTERY

REPLACEMENT

Ref: STS-129 CONSUMABLES TRACKING CC (EVA)

MS4

MEAL~

SPINAL ELONGATION OPERATOR PROCEDURE

(ASSY OPS, PAYLOADS)

Steps 5, 6

EXERCISE

~

TRANSFER OPS

Ref. Transfer List & MSG 032

TRANSFER OPS

Ref. Transfer List & MSG 032

NOTES

3-49

05

BRESNIK

FOREMAN

SATCHER

REP

LANN

EDST

S-12

9/UL

F3 F

D

16:00

17:00

18:00

19:00

GMT

Date

11/20

(324)

20:00

21:00

22:00

23:00

00:00

MET

Day 003

WE

Z

T D R SD / N

O R B 6 2 6 3 6 4

A T T ~ ~B I A S - X L V - Z V V

MS2

~

EVA 2 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 039

ISS EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP

Ref. MSG 039

~

MEAL

ISS EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE

(INIT) Ref: STS-129 BATTERY RECHARGE CC

ISS EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE

(TERM) Ref: STS-129 BATTERY RECHARGE CC

EMU SWAP FOR EVA 2

(EVA, AIRLOCK CONFIG)

ISS EVA SYSTEMS:1.515 EMU METOX/LIOH/BATTERY

REPLACEMENT

Ref: STS-129 CONSUMABLES TRACKING CC (EVA)

SPINAL ELONGATION OPERATOR PROCEDURE

(ASSY OPS, PAYLOADS)

Steps 5, 6

MS3

~

MEAL ~

EVA 2 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 039

ISS EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP

Ref. MSG 039

EMU SWAP FOR EVA 2

(EVA, AIRLOCK CONFIG)

SPINAL ELONGATION OPERATOR PROCEDURE

(ASSY OPS, PAYLOADS)

Steps 5, 6

SPINAL ELONGATION OPERATOR PROCEDURE

(ASSY OPS, PAYLOADS)

Perform OPS, Steps 5,6

Ref. MSG 029, Item 4

ISS EVA SYSTEMS:1.515 EMU METOX/LIOH/BATTERY

REPLACEMENT

Ref: STS-129 CONSUMABLES TRACKING CC (EVA)

MS4

~

MEAL

SPINAL ELONGATION OPERATOR PROCEDURE

(ASSY OPS, PAYLOADS)

Steps 5, 6

~

EXERCISE

TRANSFER OPS

Ref. Transfer List & MSG 032

TRANSFER OPS

Ref. Transfer List & MSG 032

NOTES

10

Page 12: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

FLT PLN/129/FLT

05

HOBAUGH

WILMORE

MELVIN

REP

LANN

ED

3-50

STS-

129/

ULF3

FD

20:00

21:00

22:00

23:00

GMT

Date

11/20

(324)

00:00

01:00

02:00

03:00

04:00

MET

Day 004

WE

Z

T D R S

~~ ~~

D / N

O R B 6 5 6 6 6 7

~ ~B I A S - X L V - Z V VA T TCDR

PRIVATE MEDICAL CONFERENCE

L9 PAYLOAD STATION A/G(two) - OFF

Perform via A/G 2

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

ELC 2 GRAPPLE

(PDRS, ELC NOMINAL OPS)

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 02:05 - 02:32

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW

Ref. EVA 2 BRIEFING CARD

(EVA, TIMELINES)

Ref. MSG 042

PLT

EVA PROCEDURE REVIEW

Ref. EVA 2 BRIEFING CARD

(EVA, TIMELINES)

Ref. MSG 042

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

~

MS1

TRANSFER TAGUP

Coordinate with transfer counterparts

TRANSFER BRIEF

Call down status to MCC

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

ELC 2 GRAPPLE

(PDRS, ELC NOMINAL OPS)

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 02:05 - 02:32

CGBA and ABRS STATUS CK(Cue Card) CGBA only

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW

Ref. EVA 2 BRIEFING CARD

(EVA, TIMELINES)

Ref. MSG 042

NOTES

3-50

05

HOBAUGH

WILMORE

MELVIN

REP

LANN

EDST

S-12

9/UL

F3 F

D

20:00

21:00

22:00

23:00

GMT

Date

11/20

(324)

00:00

01:00

02:00

03:00

04:00

MET

Day 004

WE

Z

T D R SD / N

O R B 6 5 6 6 6 7

A T T ~ ~B I A S - X L V - Z V V

CDR

PRIVATE MEDICAL CONFERENCE

L9 PAYLOAD STATION A/G(two) - OFF

Perform via A/G 2

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

ELC 2 GRAPPLE

(PDRS, ELC NOMINAL OPS)

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 02:05 - 02:32

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW

Ref. EVA 2 BRIEFING CARD

(EVA, TIMELINES)

Ref. MSG 042

PLT

EVA PROCEDURE REVIEW

Ref. EVA 2 BRIEFING CARD

(EVA, TIMELINES)

Ref. MSG 042

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

MS1

TRANSFER TAGUP

Coordinate with transfer counterparts

TRANSFER BRIEF

Call down status to MCC ~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

ELC 2 GRAPPLE

(PDRS, ELC NOMINAL OPS)

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 02:05 - 02:32

CGBA and ABRS STATUS CK(Cue Card) CGBA only

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW

Ref. EVA 2 BRIEFING CARD

(EVA, TIMELINES)

Ref. MSG 042

NOTES

11

Page 13: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

FLT PLN/129/FLT

05

BRESNIK

FOREMAN

SATCHER

REP

LANN

ED

3-51

STS-

129/

ULF3

FD

20:00

21:00

22:00

23:00

GMT

Date

11/20

(324)

00:00

01:00

02:00

03:00

04:00

MET

Day 004

WE

Z

T D R S

~~ ~~

D / N

O R B 6 5 6 6 6 7

~ ~B I A S - X L V - Z V VA T TMS2

ISS EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT

MASK PREBREATHE

~

EVA PROCEDURE REVIEW

Ref. EVA 2 BRIEFING CARD

(EVA, TIMELINES)

Ref. MSG 042

EVA 2 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 039

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS3

ISS EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT

MASK PREBREATHE

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW

Ref. EVA 2 BRIEFING CARD

(EVA, TIMELINES)

Ref. MSG 042

EVA 2 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 039

~

MS4

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EVA PROCEDURE REVIEW

Ref. EVA 2 BRIEFING CARD

(EVA, TIMELINES)

Ref. MSG 042

EVA 2 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 039

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 02:05 - 02:32

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)EXERCISE

~

NOTES

3-51

05

BRESNIK

FOREMAN

SATCHER

REP

LANN

EDST

S-12

9/UL

F3 F

D

20:00

21:00

22:00

23:00

GMT

Date

11/20

(324)

00:00

01:00

02:00

03:00

04:00

MET

Day 004

WE

Z

T D R SD / N

O R B 6 5 6 6 6 7

A T T ~ ~B I A S - X L V - Z V V

MS2

~

ISS EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT

MASK PREBREATHE

EVA PROCEDURE REVIEW

Ref. EVA 2 BRIEFING CARD

(EVA, TIMELINES)

Ref. MSG 042

~EVA 2 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 039

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS3

~

ISS EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT

MASK PREBREATHE

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW

Ref. EVA 2 BRIEFING CARD

(EVA, TIMELINES)

Ref. MSG 042

~EVA 2 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 039

MS4

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW

Ref. EVA 2 BRIEFING CARD

(EVA, TIMELINES)

Ref. MSG 042

EVA 2 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 039

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 02:05 - 02:32

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

NOTES

12

Page 14: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

FLT PLN/129/FLT

05

HOBAUGH

WILMORE

MELVIN

NO

UNISOLATED

EXERCISE

(MT XLATE)

CREW

WAK

E @

04/1

3:00

REP

LANN

ED

UPDATE

β21+MASK

Box 20,

21, 26

3-52

STS-

129/

ULF3

FD

00:00

01:00

02:00

03:00

GMT

Date

11/20

(324)

04:00

05:00

06:00

07:00

08:00

MET

Day 004

WE

Z

T D R S

~

~~ ~

D / N

O R B 6 7 6 8 6 9 7 0

~ ~B I A S - X L V - Z V VA T TCDR

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PLT

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS1

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-52

05

HOBAUGH

WILMORE

MELVIN

NO

UNISOLATED

EXERCISE

(MT XLATE)

CREW

WAK

E @

04/1

3:00

REP

LANN

ED

UPDATE

β21+MASK

Box 20,

21, 26

STS-

129/

ULF3

FD

00:00

01:00

02:00

03:00

GMT

Date

11/20

(324)

04:00

05:00

06:00

07:00

08:00

MET

Day 004

WE

Z

T D R SD / N

O R B 6 7 6 8 6 9 7 0

A T T ~ ~B I A S - X L V - Z V V

CDR

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS1

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

13

Page 15: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

FLT PLN/129/FLT

05

BRESNIK

FOREMAN

SATCHER

NO

UNISOLATED

EXERCISE

(MT XLATE)

CREW

WAK

E @

04/1

3:00

REP

LANN

ED

3-53

STS-

129/

ULF3

FD

00:00

01:00

02:00

03:00

GMT

Date

11/20

(324)

04:00

05:00

06:00

07:00

08:00

MET

Day 004

WE

Z

T D R S

~

~~ ~

D / N

O R B 6 7 6 8 6 9 7 0

~ ~B I A S - X L V - Z V VA T TMS2

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

ISS EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT

MASK PREBREATHE

~

MS3

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

ISS EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT

MASK PREBREATHE

~

MS4

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-53

05

BRESNIK

FOREMAN

SATCHER

NO

UNISOLATED

EXERCISE

(MT XLATE)

CREW

WAK

E @

04/1

3:00

REP

LANN

EDST

S-12

9/UL

F3 F

D

00:00

01:00

02:00

03:00

GMT

Date

11/20

(324)

04:00

05:00

06:00

07:00

08:00

MET

Day 004

WE

Z

T D R SD / N

O R B 6 7 6 8 6 9 7 0

A T T ~ ~B I A S - X L V - Z V V

MS2

~

SLEEP

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~ISS EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT

MASK PREBREATHE

MS3

~

SLEEP

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~ISS EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT

MASK PREBREATHE

MS4

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

14

Page 16: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 030 - FD05 MISSION SUMMARY

1 2 3 4 5 6

Good morning Atlantis! Great work on EVA1 yesterday. Hope you have a wonderful day of transfer and no FI! YOUR CURRENT ORBIT IS: 187 X 180 NM NOTAMS: TWO CHANGES (ADDED HNL & KKI) 7

8 9

10 11 12 13 14 15 16 17 18 19 20

EDW - LAKEBED RWY 15/33 GREEN - ELS ONLY. RWY 18L - UNUSABLE. NOR - LAKEBED RUNWAYS GREEN. NTU - RWYS 05R/23L CLOSED. YQX - TACAN YQX CH74 OTS. LAJ - TACAN LAJ45 OTS. PTN - AIRFIELD CLOSED. HNL- TACAN HNL CH95 OTS. GUA - RWY 06R/24L CLOSED. RWY O6L REIL OTS. KKI- RWY 15R/33L CLOSED. 15L/33R USABLE. IKF - NOT USABLE. NO AGREEMENT. BEN - NOT RECOMMENDED/NOT SUPPORTED

NEXT 2 PLS OPPORTUNITIES: 21

22 23 24 25

EDW22 ORB 64 – 3/23:26 SCT250 7 230/09P14 EDW22 ORB 80 – 4/23:49 FEW300 7 280/09P15 OMS TANK FAIL CAPABILITY: 26

27 28 29 30

L OMS FAILS: NO R OMS FAILS: NO LEAKING OMS PRPLT BURN: 31

32 33 34 35

L OMS LEAK: ALWAYS BURN RETROGRADE R OMS LEAK: ALWAYS BURN RETROGRADE OMS QUANTITIES(%) 36

37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

L OMS OX = 38.5 R OMS OX = 38.8 FU = 38.5 FU = 38.4 Subtract interconnect counter for current OMS quantities.

END OF PAGE 1 OF 2, MSG 030 15

Page 17: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 030 - FD05 MISSION SUMMARY

END OF PAGE 2 OF 2, MSG 030

1 DELTA V AVAILABLE: 2

3 4

OMS 382 FPS ARCS (TOTAL ABOVE QTY1) 35 FPS 5

6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

TOTAL IN THE AFT 417 FPS ARCS (TOTAL ABOVE QTY2) 66 FPS FRCS (ABOVE QTY 1) 38 FPS AFT QTY 1 85 % AFT QTY 2 47 % THERE ARE NO FAILURE/IMPACT/WORK AROUNDS FOR TODAY.

16

Page 18: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 031 (21-0448) - FD04 MMT SUMMARY

Page 1 of 1

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16 17

18

19

20

21

22

23

The MMT met today to review mission progress, orbiter systems and TPS assessments. The mission is progressing per the nominal timeline and EVA 1 was underway during the MMT. Atlantis and her crew are doing great and no new system anomalies were discussed. Damage Assessment Team: The DAT provided their final summary to the team, and the MMT concurred with the DAT’s unanimous recommendation to clear the TPS for entry. All of the imagery and inspection imagery has been fully analyzed. The RCC had a typical number of interesting RCC features to review, and that review has concluded that the RCC is in great shape. For the TPS, only four areas required further analysis. These four areas were all very minor and cleared with standard analysis techniques. See Figure 1 for a summary of these four areas. Additionally, the lighting for the Starboard ET door 800 mm pictures was marginal. However, additional analysis with the 400 mm pictures confirmed that the door is completely closed.

Figure 1 - TPS Damage Summary

Page 1 of 1, MSG 031 (21-0448)

17

Page 19: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 032 (21-0449) - FD05 TRANSFER MESSAGE Page 1 of 8

1 2 3 4 5 6 7

Good Morning Leland and Mike, After yesterday’s amazing bit of transfer, you are now 29% complete! Today you have about 13hrs of transfer scheduled and the timelined transfers for today include the NOD1 Midbay Outfitting items, the ABRS and support equipment and the LiOH swap. Transfer Notes 8

9

10 11 12 13

14 15 16 17 18 19 20 21 22 23 24

• Item 401: Leland, you reported return bag 401 as complete but you did not mention

the sub items that should have been stowed inside the bag. Please confirm that the four sub items (401.1 thru 401.4) are packed inside this bag for return.

• Item 421: Leland, you called down last night during the brief that bag 421 would not fit into the Middeck Locker location. Our records show that there is only an EDSU in the CTB and the dimensions given to us show the EDSU being smaller than a CTB. When either of you have time can you look in the bag and let us know what else is packed in there? We currently do not have room to put CTB 421 into any 5 MLE bag locations.

The Transfer List Excel file, FD05_Transfer_List_STS129.xls, locations are:

• Shuttle: C:\OCA-up\transfer (KFX machine) • Station: K:\OCA-up\transfer

FD05 Choreography 25

31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

• Items 51 & 52.1: Transfer ABRS locker and a CTB per ABRS TRANSFER activity 26

• Items 9, 10, 17, 18, 729, & 729A: Transfer LiOH per LIOH SWAP activity 27

• Item 25: Transfer KFTs per ABRS SAMPLE RETRIEVE activity 28

• Items 31, 32, 33, 34, 35, 36, & 37: Transfer MIDBAY items for FD05 OUTFITTING 29 activities 30 Please incorporate uplink pages as follows (we’ve listed the updates in the order they printed out for you): In the Transfer List RESUPPLY tab Replace the following pages:

Resupply 6, 7, 9, 10 and 11 In the Transfer List RETURN tab Add the following pages: Return 11

Page 1 of 8, MSG 032 (21-0449) 18

Page 20: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 032 (21-0449) - FD05 TRANSFER MESSAGE Page 2 of 8

Page 2 of 8, MSG 032 (21-0449)

1 2 3

Changes to the Transfer List are detailed below: MIDDECK RESUPPLY 4

5 6 7 8

Items 29.1 - 29.6 - added temp stow location Items 30.1 - 30.9 - added temp stow location Items 39.1 - 39.6 - added temp stow location MIDDECK RETURN 9

10 11

Item 900 - new item FD06 Choreography 12

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

• Generic Transfer Ops 13 Have a fantastic day and let us know if you have any questions! - The STS-129 Transfer Team

19

Page 21: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 033 ‐ OCA 48 MBPS TROUBLESHOOTING PROCEDURE 

1 2 3 4 5

OCA 48 Mbps Troubleshooting Figure 2 is a diagram of the OCA connections to the DTV MUX. 1 - 48 Mbps Test with Ground 6

7 On MCC GO, perform “RECONFIGURE OCA DOWNLINK RATE (ORB OPS, PGSC), Part C - 48 Mbps” 8

9 10 11 12 13 14 15

(page 12-20) with the following notes/deltas:

A. In step 1.4, a reminder that the BYPASS switch is a 3 position switch B. Do not perform step 1.5 (do not turn MUX/VTR/CC - OFF) C. In step 3, after setting the OCA rate, verify on the OCA Control Panel App, bottom

left side, that “Local OCA / Xmt (bps)” displays “48,000,000” (ref figure 1)

16 17 18

Figure 1

D. Do perform step 4 (Boot up 48 Mbps) 19 20 21 22 23 24

Notify MCC when setup is complete When AOS Ku, MCC will attempt to lock on OCA 48 Mbps downlink. 2 - Router Reboot 25

26 27 28 29

If MCC cannot lock on OCA 48 Mbps downlink, restart (reboot) the OCA Router. After reboot, verify OCA Xmt rate is still 48,000,000 (ref figure 1). When AOS Ku, MCC will attempt to lock on OCA 48 Mbps downlink. 3 - Cable Loopback Test 30

31 If MCC cannot lock on OCA 48 Mbps downlink, perform “OCA LOOPBACK TEST (ORB OPS, PGSC), step 4.1” (page 12-23). 32

33 34 35 36 37 38 39 40

Notify MCC of results of loopback test. If loopback test passes, perform step 4.2 to end the test and reconnect the P3, P4 cables to the MUX. Problem lies downstream of OCA connection to the MUX.

END OF PAGE 1 OF 3, MSG 033 

20

Page 22: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 033 ‐ OCA 48 MBPS TROUBLESHOOTING PROCEDURE 

END OF PAGE 2 OF 3, MSG 033 

1 2 3 4 5

If loopback fails, the P3 or P4 legs of the OCA cable or the hi rate pins in the P1 connector are suspect. Perform the 1st step in 4.2 to end the test. √MCC to determine if spare OCA cable should be installed. 4 - Reconfigure OCA to 2 Mbps 6

7 On MCC Go, RECONFIGURE OCA DOWNLINK RATE 8 (ORB OPS, PGSC) 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

Part D then A, (including step 4) Notify MCC when complete

21

Page 23: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG

 033

 ‐ OCA

 48 MBP

S TR

OUBLESHOOTING PRO

CEDURE

 

1 2 3 4 5

Figu

re 2

- D

TV M

UX

Con

nect

ion

END OF PA

GE 3 OF 3, M

SG 033

  

PWR ‐O

NMux Bypass ‐ B

YPFR

 

OCA

 I/F Ca

ble, P4 (data) 

OCA

 I/F Ca

ble, P3 (clock) 

 OCA

 PL MAX Clock & 

Data lines plug in here 

22

Page 24: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 034 - FD05 CREW CHOICE DOWNLINK

END OF PAGE 1 OF 1, MSG 034

1

TDRS AOS LOS Delta (min)

Notes

W 04/03:01 04/03:30 29

W 04/04:32 04/04:41 9 2

Note: Please notify MCC-H 10 minutes prior to the event to allow for ground network 3

configuration. 4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

23

Page 25: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 039 (21-0456) - FD05 EVA DELTAS Page 1 of 1

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

Mike, four things: 1. Comm Cap We suspect, just as you did, the comm issue during EVA 1 was due to the partially peeled back MBED which allowed some moisture to get into the ear canal and affect comm. From previous experience, this moisture should dry out and your prime comm cap will be go for EVA 2. There is already a call out in E-Lk Prep, step 7, for you to inspect MBEDs and replace if necessary. Spare MBEDs are in the EMU Servicing Kit. We would like you to replace both of the MBEDs in your prime comm cap to ensure we keep moisture out of both ear canals. After removing the old MBEDs, you can clean the area with a damp cloth, dry with a dry cloth, make sure completely dry, and then apply new MBEDs. Your back up comm cap is in your ECOK which should be in the A/L during EVA Prep. You can swap to your back up in the event there is a comm issue with your prime comm cap. 2. As a reminder, please isolate the three adjustable tethers from the MMOD shield task and the wipes used during the lubing tasks yesterday. The adjustable tethers (S/N 1009, 1032, 1034) will eventually need to go to the EVA Tools Transfer Bag during EVA Transfer to Shuttle on FD 9. Any unused wipes can go in the “done” mesh bag. Any used wipes should be placed in a ziplock bag and then placed in shuttle dry trash. 3. We will have further details on EVA 2 for you later in the day, but, big picture, we will not be performing the Node 2 zenith CBCS flap closure and we will now be deploying the S3 zenith inboard PAS during EVA 2. 4. WVS issues during EVA 1 It appears that Mike’s WVS power button may have been bumped by his PGT during the PAS deploy task. This coincides with when his WVS began to have issues. Photo TV has confirmed that if the power button on the WVS is pressed on the edge of the button rather than the center, or if it is partially depressed, it can cause the noisy video reception experienced during the EVA. This was also seen on STS-122, and power cycling the WVS cleared the issue. When cycling the WVS power button be sure to press firmly in the center of the button. The power cycle of Mike’s WVS at the end of EVA 1 did not appear to clear the issue. Photo TV will be reviewing the video from EVA 1 today to ensure there is not a more serious switch issue. There is no spare on board ISS to swap to, so the plan is to use this same unit for the remaining EVAs. Both WVS units will be replaced on STS-131.

Page 1 of 1, MSG 039 (21-0456) 24

Page 26: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 040 (21-0457) - FD05 LIOH SWAP Page 1 of 1

Page 1 of 1, MSG 040 (21-0457)

1 FD5 LiOH Swap 2 3 Today, you will swap 18 LiOH cans from the Shuttle (8 used, 10 unused) with 16 unused 4 LiOH cans from the ISS stockpile. Transfer details are provided below. 5 6 Details: 7 8

Retrieve STS-126 cans 18-23, STS-119 cans 35-39 and STS-127 cans 27-31 (total 9 16) pregathered at ISS NOD2D2 and transfer them to Shuttle middeck. 10

11

Remove STS-129 cans 1-8 (used) from the LiOH Box. Install socks from any 8 ISS 12 stockpile cans coming to Shuttle. 13

14

Remove STS-129 cans 24-31 from the LiOH Box (socks already installed). 15 16

Place the 16 cans from ISS in the LiOH Box. 17 18

Remove STS-129 cans 32, 33 from External Airlock Floor Bag (socks already 19 installed). 20

21

Transfer STS-129 cans 1-8 and 24-33 (total 18) to ISS NOD1S4_D2. 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

25

Page 27: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 1 OF 19, MSG 041

OBJECTIVE: Ultrasound (USND). The purpose of this procedure is to replace the Control Board, Analog

Board, and all of the eight Channel Boards in the HRF Ultrasound unit one or more of which may be malfunctioning. Crew will then activate the unit, and run tests to determine the operational status of the HRF Ultrasound unit.

PARTS: ESD Bubble Wrap Bag (containing HRF Ultrasound boards) (ten) Ultrasound Keyboard HRF Ultrasound Keyboard Cable HRF Ultrasound Monitor Cable Multi-Use Bracket (two) Laptop Desk (two) HRF FSD (Flat Screen Display) HRF Common Cables Kit

HRF Common Power 28 VDC Cable HRF Ultrasound L12-5 Scanhead

L12-5 Scanhead Transducer Cover L12-5 Scanhead Connector Cover

Static Wrist Tether TOOLS: Kit N: Limited Area Tool Kit

#6 Short Torq Bit Tool Bag 2

6" Extension 3/8" Drive Tool Page Case

Ratchet, 3/8" Drive

26

Page 28: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 2 OF 19, MSG 041

1. CHANNEL BOARD REPLACEMENT

Figure 1. - HRF Rack 1 with HRF Ultrasound Hardware Stowage Locations.

NOTE Figure 1 is a Crew Requested HRF Rack 1 Stowage Overview and can be

used for familiarization with hardware locations.

1.1 Locate three ziplock bags (3 X 5 acceptable). Label one ziplock bag 'Bolt A, the next 'Bolt B', the last 'Bolt C.'

27

Page 29: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 3 OF 19, MSG 041

Figure 2. - HRF Ultrasound Front Panel Bolt Reference Guide.

28

Page 30: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 4 OF 19, MSG 041

CAUTION All bolts must be properly stored in the correct ziplock bag for reuse later.

Mixing of bolts resulting in incorrect bolt installation into HRF Ultrasound could damage both bolt and HRF Ultrasound front panel.

1.2 Using Figure 2 as a guide for bolt location identification and tmpry stowage location into each labeled ziplock bag,

HRF Ultrasound Remove four non-captive bolts and washers (designated Bolt A) at

bottom of HRF Ultrasound front panel using #6 Short Torq Bit with Ratchet, 3/8" Drive and 6" Extension 3/8" Drive. Stow bolts and washers in ziplock bag labeled 'Bolt A.'

Remove six non-captive bolts and washers (designated Bolt B) on

sides of HRF Ultrasound front panel using #6 Short Torq Bit with Ratchet, 3/8" Drive and 6" Extension 3/8" Drive. Stow bolts and washers in ziplock bag labeled 'Bolt B.'

Remove three non-captive bolts and washers (designated Bolt C) at

top of HRF Ultrasound front panel using #6 Short Torq Bit with Ratchet, 3/8" Drive and 6" Extension 3/8" Drive. Stow bolts and washers in ziplock bag labeled 'Bolt C.'

**************************************************************************************************** ***

If any bolts or washers are lost,

�POIC

****************************************************************************************************

Using Grey Tape, attach three ziplock bags labeled 'Bolt A', 'Bolt B' and 'Bolt C' to HRF Ultrasound front panel.

If three ziplock bags labeled 'Bolt A', 'Bolt B' and 'Bolt C' are tmpry

stowed anywhere else other than HRF Ultrasound front panel, �POIC

1.3 Setup G1 Camera on HRF Ultrasound front panel FOV (field of view). HRF Rack 1_A1 1.4 �sw DRAWER C1 POWER – Off

�DRAWER C1 POWER Lt – Off �sw DRAWER D1 POWER – Off �DRAWER D1 POWER Lt – Off

HRF Ultrasound 1.5 �sw Ultrasound POWER – Off

�Ultrasound POWER Lt – Off

~ ~

29

Page 31: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 5 OF 19, MSG 041

Figure 3. - HRF Ultrasound Front Panel Removal Guide.

1.6 Loosen HRF Ultrasound front panel knobs in this order as follows (see Figure 3 for further guidance if necessary):

Turn lower left and right knobs (two) together counterclockwise nine

quarter turns.

Turn upper left and right knobs (two) together counterclockwise nine quarter turns.

30

Page 32: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 6 OF 19, MSG 041

Return to lower left and right knobs (two) and turn together

counterclockwise five quarter turns.

Return to upper left and right knobs (two) and turn together counterclockwise five quarter turns.

Return to lower left and right knobs (two) and turn together

counterclockwise five quarter turns.

Return to upper left and right knobs (two) and turn together counterclockwise five quarter turns.

Return to lower left and right knobs (two) and turn together

counterclockwise five quarter turns.

Return to upper left and right knobs (two) and turn together counterclockwise five quarter turns.

HRF Rack 1_D2 1.7 Open HRF Standard Stowage Drawer until it extends approximately

six inches out of HRF Rack 1.

WARNING

Failure to ensure that all power is removed from the Ultrasound prior to removal of boards could result in electric shock.

HRF Ultrasound 1.8 Rotate all four knobs 90 degrees to unlock HRF Ultrasound front

panel.

1.9 Slide HRF Ultrasound front panel out and tmpry stow.

CAUTION Ultrasound contains parts sensitive to damage by electrostatic discharge

(ESD).

1.10 Retrieve and don Static Wrist Tether and attach to unpainted surface on HRF Rack 1.

31

Page 33: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 7 OF 19, MSG 041

Figure 4. - Board Locations Inside HRF Ultrasound.

WARNING

Printed Circuit Boards (PCB) contain sharp pins, sharp edges, and burrs. The PCBs must be handled by the edges and by using the extractor levers.

NOTE Board levers are similar to Workstation 2 SCSI Hard Drive levers. Reference

figure 5.003 FIGURE 6. WORKSTATION 2 SCSI HARD DRIVE INSTRUCTION can be used for a view of similar levers and functionality.

1.11 Using Figure 4 as a guide for board identification and location,

Using Fine Point Sharpie, label each channel board inside HRF Ultrasound with the location designation given in Figure 4 (for example, channel board at location 1 will be labeled as '1', channel board at location 2 will be labeled as '2', etc) for all channel boards in unit (label can be on any clear space of plastic on channel board).

32

Page 34: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 8 OF 19, MSG 041

Remove top two boards identified as Front End Controller and AIM in Figure 4 by pulling both levers simultaneously on each and sliding one board then the other out of HRF Ultrasound.

Tmpry stow two boards.

1.12 Retrieve ESD Bubble Wrap Bags (containing HRF Ultrasound boards)

(ten). ESD Bubble Wrap Bag Unstow Control Board (ESD Bubble Wrap Bag will have PN

SDG46114579-802 label and may also have label saying 'Front End Controller').

HRF Ultrasound Install Control Board into location identified as Front End Controller in

Figure 4 by sliding into HRF Ultrasound (ensure levers are unlocked for installation). Once Control Board is fully seated turn levers 90 degrees to lock.

ESD Bubble Wrap Bag Unstow Analog Board (ESD Bubble Wrap Bag will have PN

SDG46114580-801 label and second label saying 'Analog Board').

HRF Ultrasound Install Analog Board into location identified as AIM in Figure 4 by

sliding into HRF Ultrasound (ensure levers are unlocked for installation). Once Analog Board is fully seated turn levers 90 degrees to lock.

1.13 Remove channel board (starting with channel board identified as 1 in

Figure 4) by pulling both levers of each simultaneously and sliding channel board out of HRF Ultrasound.

As each channel board is removed, unstow one new channel board

from ESD Bubble Wrap Bag (all remaining ESD Bubble Wrap Bags will have PN SDG46114581-801 label and label saying 'Channel Board') and install into location of old channel board occupied by sliding into HRF Ultrasound (ensure levers are unlocked for installation). Once channel board is fully seated turn levers 90 degrees to lock. Stow old channel board into ESD Bubble Wrap Bag previously occupied by new channel board (swap one for one).

Repeat this step for all remaining channel boards (2 through 8).

When swap is complete, tmpry stow all ten ESD Bubble Wrap Bags.

1.14 Remove Static Wrist Tether.

33

Page 35: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 9 OF 19, MSG 041

Figure 5. - HRF Ultrasound Front Panel Knob Orientation Guide.

1.15 Retrieve HRF Ultrasound front panel from tmpry stow.

Install HRF Ultrasound front panel onto HRF Ultrasound.

Rotate all four knobs 90 degrees to lock HRF Ultrasound front panel. Ensure knobs are holding HRF Ultrasound front panel in correct orientation (see Figure 5 for reference).

HRF Rack 1_D2 1.16 Close HRF Standard Stowage Drawer.

CAUTION 1. Failure to install HRF Ultrasound front panel correctly will result in broken

channel boards. 2. The lower left knob on HRF Ultrasound is the most critical to ensuring HRF

Ultrasound front panel aligns properly.

34

Page 36: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 10 OF 19, MSG 041

Figure 6. - HRF Ultrasound Front Panel Repalcement Guide. HRF Ultrasound 1.17 Tighten HRF Ultrasound front panel upper and lower knobs in this

order as follows (ensure gap is symmetric when progressing from knob to knob) (See Figure 6 for general guide to front panel replacement and Figure 7 for illustration of gap):

Turn lower left knob one full turn clockwise.

Going from lower left knob to lower right knob in counterclockwise

pattern, turn lower right knob one full turn clockwise.

35

Page 37: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 11 OF 19, MSG 041

Going from lower right knob to upper right knob in counterclockwise pattern, turn upper right knob one full turn clockwise.

Going from upper right knob to upper left knob in counterclockwise

pattern, turn upper left knob one full turn clockwise.

Palm strike HRF Ultrasound front panel in areas identifed in Figure 6 above.

Turn knobs in fashion identifed above (counterclockwise pattern, lower

left knob, lower right knob, upper right knob, upper left knob then palm strike) until bottom section of HRF Ultrasound front panel is fully seated.

If at any time lower left knob gets too tight and is difficult to turn,

Palm strike HRF Ultrasound front panel in areas identifed in Figure 6 above.

Once HRF Ultrasound front panel is determined to be seated properly, tighten upper left and upper right knobs to fully seat HRF Ultrasound front panel.

Ensure all four knobs are hand tight.

36

Page 38: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 12 OF 19, MSG 041

Figure 7. - Illustration of Symmetrical Gap When Reinstalling HRF Ultrasound Front Panel.

2. SETTING UP HRF ULTRASOUND SYSTEM HRF Ultrasound 2.1 �sw ULTRASOUND POWER – OFF

�ULTRASOUND POWER Lt – Off

�sw VIDEO TAPE RECORDER POWER – OFF �VIDEO TAPE RECORDER POWER Lt – Off

2.2 Attach Multi-Use Bracket to left seat track of HRF Rack 1 at drawer

level E.

37

Page 39: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 13 OF 19, MSG 041

Secure Laptop Desk to Multi-Use Bracket.

Attach HRF FSD (Flat Screen Display) to upper Laptop Desk.

2.3 Attach Multi-Use Bracket to left side of HRF Rack 1 using fasteners provided at drawer level F.

2.4 Secure Laptop Desk to Multi-Use Bracket.

Place Ultrasound Keyboard on Laptop Desk.

If Multi-Use Bracket and Laptop Desk are in use Unstow and attach Velcro (crew preference) to front, right side

of HRF Rack 1. Secure HRF PC 1 to Velcro (crew preference) (location on HRF

Rack 1 is per crew discretion to avoid cable, handle, and drawer blockage).

Ultrasound Keyboard 2.5 �sw KEYBOARD POWER (right side) – STBY

CAUTION Male end of both HRF Ultrasound Keyboard Cable and HRF

Ultrasound Monitor Cable can be inadvertently mated to another male connector resulting in pin-to-pin damage.

NOTE Cabling Diagram below (Figure 8) can be referenced for the following

steps.

38

Page 40: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 14 OF 19, MSG 041

Figure 8. - Ultrasound Cabling Diagram. HRF Ultrasound 2.6 HRF Ultrasound Keyboard Cable →|← Keyboard Ultrasound Keyboard HRF Ultrasound Keyboard Cable →|← Front Panel (right side) HRF Workstation 2 2.7 �sw POWER 28VDC – OFF

�POWER 28VDC Lt – Off HRF Ultrasound 2.8 HRF Ultrasound Monitor Cable →|← Display HRF FSD HRF Ultrasound Monitor Cable →|← Ultrasound (right side) HRF Workstation 2 2.9 HRF Common Power 28 VDC Cable (P1) →|← J11 28VDC HRF FSD 2.10 HRF Common Power 28 VDC Cable (P2) →|← POWER HRF Ultrasound L12-5 Scanhead 2.11 Remove L12-5 Scanhead Connector Cover and

Tmpry stow. Rotate HRF Ultrasound L12-5 Scanhead connector knob �

39

Page 41: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 15 OF 19, MSG 041

HRF Ultrasound 2.12 Remove Scanhead top port cover.

Turn lever �, remove

HRF Ultrasound L12-5 Scanhead connector end →|← Scanhead (top port)

Turn connector knob � to secure HRF Ultrasound L12-5 Scanhead

connector end

Tmpry stow HRF Ultrasound L12-5 Scanhead Transducer with cover on.

3. ACTIVATING HRF ULTRASOUND SYSTEM

HRF Rack 1_A1 3.1 sw DRAWER C1 POWER → ON

�DRAWER C1 POWER Lt – On sw DRAWER D1 POWER → ON

�DRAWER D1 POWER Lt – On sw DRAWER G1 POWER → ON

�DRAWER G1 POWER Lt – On �sw DRAWER H1 POWER – ON �DRAWER H1 POWER Lt – On

CAUTION

Workstation 2 POWER MAIN switch should remain off for this activity. If POWER MAIN switch is turned on, Workstation 2 may malfunction.

HRF Workstation 2 3.2 sw POWER 28 VDC → ON

�POWER 28 VDC Lt – On **************************************************************************************************** *****

If Workstation 2 POWER MAIN switch is accidentally turned on, wait a minimum of 5 minutes before turning it off to allow the Workstation 2 to reach the appropriate operational state.

**************************************************************************************************** HRF Ultrasound 3.3 �All lights (four) – Off

(two green, two yellow, at top of unit) HRF FSD 3.4 �sw (right side) – US LIVE (middle position)

sw SYSTEM POWER (right side) → ON

NOTE Upon power up of HRF FSD, a yellow light will blink momentarily and can

easily be missed. Crew viewing of this light is not required.

40

Page 42: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 16 OF 19, MSG 041

3.5 pb PANEL POWER (front of HRF FSD) → Press and Hold (until green light illuminates)

�STBY PWR light – On (green) **************************************************************************************************** ********

If error banner appears at any time during HRF Ultrasound operations

Hold down Superkey (Ultrasound Reference Picture, Section F, next to space bar) while pressing 3D key (Ultrasound Reference Picture, Section F, top row).

Repeat until all banners close.

****************************************************************************************************

NOTE ULTRASOUND POWER Lt will not come on until step 3.8.

HRF Ultrasound 3.6 sw ULTRASOUND POWER → ON

Wait 15 seconds. Ultrasound Keyboard 3.7 sw KEYBOARD POWER (right side) → ON HRF Ultrasound 3.8 �ULTRASOUND POWER Lt – On HRF FSD 3.9 Confirm active clock and date appear on screen (will take

approximately one minute). Ultrasound Keyboard 3.10 �all Gain slider bars are centered (Ultrasound Reference Picture,

Section D) Ultrasound Keyboard 3.11 Hold down Superkey (Ultrasound Reference Picture,

Section F, next to space bar) while pressing <0> (zero) key. HRF FSD 3.12 Machine Diagnostics

input in 'User' field – m f g (must be lower case) **************************************************************************************************** ***

If zeroes exist in front of 'mfg', delete them.

****************************************************************************************************

41

Page 43: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 17 OF 19, MSG 041

Press Return.

input in 'Password' field – u s e r (must be lower case)

3.13 sel OK sel Configuration sel Save Installed as Expected

sel OK

sel OK

4. CHECK HRF ULTRASOUND L12-5 SCANHEAD

Ultrasound Keyboard 4.1 pb SCANHEAD → Press (Ultrasound Reference Picture, Section

F, second row) HRF FSD Scanhead

sel L12-5

Tissue Specific Presets

sel Generic (left column)

sel General (right column)

4.2 �Scanhead initiates. **************************************************************************************************** ***********

If L12-5 Scanhead does not initiate,

Proceed through error banners by holding down Superkey (Ultrasound Reference Picture, Section F, next to space bar) while pressing 3D key. (Ultrasound Reference Picture, Section F, Top Row).

Repeat until all banners close.

Continue to next step.

****************************************************************************************************

5. HRF ULTRASOUND SYSTEM SHUTDOWN

NOTE A temporary window, Message, will appear: 'Initiating power-down Will

power down when finished saving files.'

42

Page 44: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 18 OF 19, MSG 041

5.1 On POIC GO Ultrasound Keyboard sw KEYBOARD POWER (right side) → STBY

Wait until blue screen appears on HRF FSD. HRF Ultrasound 5.2 �ULTRASOUND POWER Lt – Off (after a delay)

sw ULTRASOUND POWER → OFF HRF FSD 5.3 pb PANEL POWER (in front) → Press and Hold

�STBY PWR lights – Off sw SYSTEM POWER (right side) → OFF

HRF Workstation2 5.4 sw POWER 28VDC → OFF

�POWER 28VDC Lt – Off HRF Rack 1_A1 5.5 sw DRAWER C1 POWER → OFF

�DRAWER C1 POWER Lt – Off sw DRAWER D1 POWER → OFF

�DRAWER D1 POWER Lt – Off sw DRAWER G1 POWER → OFF

�DRAWER G1 POWER Lt – Off �sw DRAWER H1 POWER – ON �DRAWER H1 POWER Lt – On

HRF Ultrasound 5.6 Turn HRF Ultrasound L12-5 Scanhead connector knob �, detach

Replace SCANHEADS top port cover: turn lever �, replace

5.7 Retrieve L12-5 Scanhead Connector Cover from temporary stow. Replace L12-5 Scanhead Connector Cover.

6. STOW HRF ULTRASOUND SCANHEAD, CABLES, AND INSTALL FRONT

PANEL HRF Workstation 2 6.1 HRF Common Power 28 VDC Cable (P1) ←|→ J11 28VDC HRF FSD 6.2 HRF Common Power 28 VDC Cable (P2) ←|→ POWER (right side) HRF Ultrasound 6.3 HRF Ultrasound Monitor Cable ←|→ Display HRF FSD HRF Ultrasound Monitor Cable ←|→ Ultrasound (right side) HRF Ultrasound 6.4 HRF Ultrasound Keyboard Cable ←|→ Keyboard Ultrasound Keyboard HRF Ultrasound Keyboard Cable ←|→ Front Panel (right side)

6.5 Disconnect Ultrasound Keyboard from Laptop Desk.

43

Page 45: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

MSG 041 - 4.007 HRF ULTRASOUND BOARD REPLACEMENT AND TEST

16NOV09 4.007_MGUEHRFUSNDC007.xml END OF PAGE 19 OF 19, MSG 041

6.6 Disconnect HRF FSD from Laptop Desk.

6.7 Using Figure 4 as a guide for bolt location identification,

Unstow four non-captive bolts and washers from ziplock bag labeled

'Bolt A' and install at bottom of HRF Ultrasound front panel using #6 Short Torq Bit with Ratchet, 3/8" Drive and 6" Extension 3/8" Drive (in locations designated Bolt A). Tighten bolts to hand tight.

Unstow six non-captive bolts and washers from ziplock bag labeled

'Bolt B' and install on sides of HRF Ultrasound front panel using #6 Short Torq Bit with Ratchet, 3/8" Drive and 6" Extension 3/8" Drive (in locations designated Bolt B). Tighten bolts to hand tight.

Unstow three non-captive bolts and washers from ziplock bag labeled

'Bolt C' and install at top of HRF Ultrasound front panel using #6 Short Torq Bit with Ratchet, 3/8" Drive and 6" Extension 3/8" Drive (in locations designated Bolt C). Tighten bolts to hand tight.

6.8 Restow tools, parts, materials as required to original locations.

44

Page 46: STS-129/ULF32009/11/20  · STS-129/ULF3 FD 05 Execute Package MSG Page(s) Title 029A 1 - 14 FD05 Flight Plan Revision 030 15 - 16 FD05 Mission Summary 031 17 FD04 MMT Summary 032

This page is intentionally blank.