DR.  SHASHI  THAROOR  MP’S  FIVE-­‐‑YEAR  PROGRESS  REPORT  

 

 

THIRUVANANTHAPURAM  CONSTITUENCY  

2009  –  2014  

INITIATIVES  FOR  DEVELOPMENT  AND  WELFARE  OF  CONSTITUENTS  

 

Page 2: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

1. ROADS    

• After   intensive  discussions  with  Union  Minister   for  Road  Transport  and  Highways  and  senior  officials,   succeeded   in  ordering  revival  of  the   long-­‐‑dormant  Kovalam  –  Kaliyikkavila  National  Highway   (NH-­‐‑47)  Bypass  work.  This  has  brought  succour   to   thousands  of   families  whose   lands  and  properties  had  been  ear-­‐‑marked   for   acquisition  as  well  as  for  the  tens  of  thousands  of  road-­‐‑users  who  had  been  denied  a  much-­‐‑needed  quality  infrastructure  facility.    

• The  NHAI  allotted  Rs.  1170  crores  for  the  project.  

• Subsequently,  followed  up  to  have  the  all-­‐‑important  land  acquisition  notification   in   the   matter   issued.   Further,   put   forward   a   practical  plan,   immediately   accepted   by   the   NHAI,   to   have   the   project  undertaken   in   two   parts,   Kazhakuttam-­‐‑Mukkola   and   Mukkola  Kaliyikavila   in  order   to  achieve  a  quick   start   and  avoid  any   further  paralysis   of   the   entire   work   due   to   minor   procedural   and   legal  bottlenecks  in  respect  of  certain  small  stretches.    

• Convened   high-­‐‑level   meeting   attended   by   the   District   Collector,  officials   of   the   NHAI   and   other   State   Government   departments   to  review   the   progress   made   and   devise   a   new   time   schedule   for  completion  of  the  all-­‐‑important  land  acquisition  process.  As  a  result,  the  work  was  completed  in  time  before  the  expiry  of  the  mandatory  one-­‐‑year  period  from  the  date  of   the  preliminary  notification   issued  under  the  ‘National  Highways  Act,  1956’.        

• Took   steps   to   ensure   that,   in   the   first   instance,   the   compensation  package  envisaged  in  the  National  Highways  Act,  1956  was  provided  and  later,  to  utilize  the  arbitration  process  envisaged  therein  to  obtain  more   liberal  and  extra  benefits.  Further,  steps  will  be   taken  to  bring  the   entire   project   under   the   provisions   of   the   recently   enacted   ‘the  Right   to  Fair  Compensation  and  Transparency   in  Land  Acquisition,  

Page 3: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

Rehabilitation   and   Resettlement   Act,   2013’,   to   enable   these  beneficiaries  to  obtain  even  more  benefits  under  the  latest  legislation  on  the  subject.  The  land  acquisition  process  relating  to  the  project  and  disbursement  of  the  compensation  amounts  are  nearing  completion.    

• The  NHAI  has  approved  the  Request  for  Qualification  (RFQ)  for  the  initial  Kazhakuttam-­‐‑Mukkola  stretch.  The  Planning  Commission  has  approved   the   contract   details   and   issued   the   RFQ   and   RFP.     Four  firms  have  been  shortlisted  for  finalizing  the  contract  for  making  the  entire   Kazhakuttam-­‐‑Mukkola   stretch.   The   entire   Kazhakuttam-­‐‑Kaliyikavila   stretch  will   be   completed   as   a   state-­‐‑of-­‐‑the-­‐‑art   four-­‐‑lane  highway.    

• Was  successful   in   obtaining   for   Thiruvananthapuram   constituency  record   allocations   of   Rs.   75.55   crores.   Rs.   35   crore   allotment   was  obtained   for   the   Pallichal-­‐‑Venganoor-­‐‑Vizhinjam   and   Venganoor-­‐‑Pachalloor-­‐‑Kovalam  road.  Further,  sums  of  Rs.  23.5  crores  for  (i)  the  Aakkulam-­‐‑Sreekariyam-­‐‑Mannanthala-­‐‑Kodappanakkunu-­‐‑Vattiyurkavu-­‐‑Kundamankadavu;  and  (ii)  Rs.  14  crores  for  the  Neyyar  dam-­‐‑Shorlacod   road   was   obtained   from   the   Central   Road   Fund  during  2010-­‐‑2011.    

• Funds  were  also  obtained  from  the  Central  Road  Fund  for   two  new  roads.  These  are  Rs.  11  crores  for  a  new  20  km  stretch  from    Vellayani  junction  –  Ukkode  –  Kalliyode-­‐‑Vellayani   junction-­‐‑Pookulam  and  Rs.  12   crores   for   improvement   of   23   kms   of   the   Udayankulangara   –Plamootikada  –Chenkavila-­‐‑  Idichackaplamoodu  road.    

•  As  MP,  substantially  contributed  to  efforts   for  starting  work  on  the  widening   and   re-­‐‑construction   of   the   all-­‐‑important   NH-­‐‑47   stretch  between   Karamana   –   Kaliyikkavila   NH-­‐‑47   the   existing   major   road  life-­‐‑line   serving   the   southern  parts   of   the   constituency.   Successfully  requested   the  Chief  Minister   to   convene   a   break-­‐‑through  high-­‐‑level  meeting  of  Ministers  and  officials  convened  under  his  chairmanship,  

Page 4: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

following  which  the  relevant  land  acquisition  notification  was  issued,  the  prime   action   essential   for   getting   the  work   started.   Successfully  intervened   with   Chief   Minister   and   Finance   Minister   to   make  sufficient   allocations   for   the  work   in   the   State   Budget,   2013-­‐‑14.   The  first   stretch  of   the  project   is  expected   to  be  completed  within  next  2  years.  The  global  tender  for  the  entire  project  has  been  issued.    

• Substantial  allocations  were  obtained  for   the  constituency  under  the  Prime  Minister’s   Grameena   Sadak   Yojana   (PMGSY).   The   details   of  the  projects  and  the  allocations  under  each  are  given  below:    • Dhanuvachapuram  –  Udayinkulangara  road  (Rs.  121.13  lakhs)  

 • Eythukondakani-­‐‑Palappally  road  (Rs.  172.55  lakhs)  

 • Aryanad-­‐‑Mylachal  road  (249.77  lakhs)  

 • Rs.   299.38   lakhs   for   (i)   Amboori-­‐‑Kumbichal   Kadavu   road;     (ii)  

Katthipara-­‐‑Panthaplamoodu;   (iii)   Mylalikara-­‐‑Koranjiman   road;  and  (4)  Kandathitta-­‐‑Paruthipara  road.  

 

Page 5: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

2.  RAILWAYS  

• Made  sustained  efforts  at  highest   levels  and  achieved  key  advances  in   the   development   of   the   Railways   in   the   constituency.   These  include:    

*  14  (Fourteen)  new  trains  for  Thiruvananthapuram  Central.    

The  trains  are:-­‐‑  

-­‐‑  Kochuveli-­‐‑Mangalore  Express  

-­‐‑  Kochuveli-­‐‑Yeshwantpur  Express  

-­‐‑  Tirunelveli  –  Bilaspur  Express  (via  Tvm)  

-­‐‑  Tirunelveli  –  Happa  Express  (from  Tvm)  

-­‐‑  Thiruvananthapuram  –  Kozhikode  Janshatabdi  Express  

-­‐‑  Kochuveli-­‐‑Bhavnagar  Express  

-­‐‑  Thiruvananthapuram-­‐‑Nilambur  Road  Express  

-­‐‑  Kanyakumari-­‐‑Dibrugarh  Express  (via  Tvm)  

-­‐‑  Kollam-­‐‑Nagercoil  MEMU  

-­‐‑  Thiruvananthapuram-­‐‑Chennai  Duronto  Express  

-­‐‑  Kochuveli-­‐‑Porbandor  Express  

-­‐‑    Thjiruvananthapuram-­‐‑Bangalore  Premium  Expreess  

Page 6: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

-­‐‑  Thiruvananthapum  –  Nizammuddin  Express  

           -­‐‑Nagercoil  –  Punaloor  Passenger  

• Actively  pursuing  the  starting  of  a  new  suburban  train  service  on  the  Thiruvananthapuram-­‐‑Chengannur-­‐‑Haripad   sector   to   benefit   daily  passengers.  The  Mumbai  Rail  Vikas  Corporation  is  preparing  a  mega  signal   network   which   will   enable   more   than   one   train   to   proceed  between  two  stations  in  the  same  direction.  

• Actively   pursuing  with   the  Delhi  Metro   Rail   Corporation   the   time-­‐‑bound   implementation   of   the   prestigious   Monorail   Project   for  Thiruvananthapuram.  

• Succeeded   in   obtaining   a   special   package   of   Rs.   10   crores   from   the  Union   Tourism   Ministry   to   implement   a   number   of   projects   for  enhancing  passenger  facilities  and  amenities  at  Thiruvananthapuram  central  station.  Work  on  four  escalators  and  a  new  booking  office  at  the  station  has  been  inaugurated.  

• Out   of   the   5   stations   in   the   country   earmarked   for   upgradation   to  world-­‐‑class  standards,  Thiruvananthapuram  has  been  first  to  get  off  the  blocks   in   terms  of  completing  all   formalities  and   for  proceeding  with  the  actual  works  envisaged.    

• A  project  report  for  the  setting  up  of  a  Railway  Water  Bottling  Plant  for  Thiruvananthapuram  was  completed  and  tender  has  been  called  for  setting  up  the  plant  at  Parassala  by  the  IRCTC.    

• Efforts   made   for   the   setting   up   of   a   Railway   Medical   College   at  Thiruvananthapuram.   Even   though   the   proposal   to   set   up   such  Medical  Colleges  have  not  made  much  headway  in  other  parts  of  the  Country,   in   Thiruvananthapuram   the   matter   is   still   under   active  consideration  for  a  PPP  model  project.  

Page 7: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

 • Personal   visits   and  discussions  with   various  Railway  Ministers   and  

senior   officials   yielded   many   benefits   to   the   constituency   some   of  which  are  the  following:    • Dhanuvachapuram  station  on  the  Tvm-­‐‑Parassala  sector  which  had  

been  only  a  minor  halt  station  has  now  been  allotted  Rs.  2  crores  for  improvement  and  enhancement  of  facilities  and  buildings.  The  related  works  have  been  inaugurated.    

• Increased  funding  was  made  available  for  raising  and  lengthening  the   platform   of   the   Balaramapuram   station   and   for   arranging  other  facilities.    

• Approval   was   granted   for   a   Railway   Over   bridge   (ROB)   at  Nemom.    

• Construction  of  a  new  ROB  at  Kazhakuttam  was  started.    

• Frequency  of  a  number  of  long-­‐‑distance  trains  was  increased.    

• In  fulfillment  of  the  demand  of  the  employees  of  Technopark  and  the  residents  of  Kazhakuttam,  stops  have  now  been  allowed  for  a  number   of   long-­‐‑distance   trains   at   Kazhakuttam   station.   These  include,  the  16649  Mangalore-­‐‑Nagercoil  Express,  16650  Nagercoil-­‐‑Mangalore  Express,  16526  Bangalore-­‐‑Kanyakumari  Express,  16525  Kanyakumari-­‐‑Bangalore   Express,   16620   Thiruvananthapuram-­‐‑Mangalore   Malabar   Express,   16303   Ernakulam-­‐‑Thiruvananthapuram  -­‐‑Vanchinad  Express  

     

Page 8: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

• Additional  stoppages  for  important  trains  at  Parassala  including  the  Jayanti-­‐‑Janata   Express,   Ananthapuri   Express   and   Parashuram  Express,   fulfilling   a   long-­‐‑standing   demand   of   the   people   of   the  region.    

• Additional  coaches  attached  to  the  Nagercoil-­‐‑Kochuveli  passenger  to  solve  the  problem  of  overcrowding  for  the  daily  commuters.        

• The  prestigious   ‘Parashuram  Express  extended  to  Nagercoil   thereby  providing  an  important  direct   link  for  people  of   the  region  with  the  rest   of  Kerala   in   addition   to   increasing   travel   facilities   on   the  Tvm-­‐‑Parassala  sector.      

• The  Madurai-­‐‑Kollam  Passenger  extended  to  Punalur.    

• Actively  worked   for   clearing  various  bottle-­‐‑necks   for   the  starting  of  the   long-­‐‑awaited   MEMU   train   services   between   Kollam   and  Nagercoil.   The   service   which   has   been   started   from   1st   December,  2012   will   significantly   augment   the   rail   travel   services   in   the  constituency.   The   MEMU   service   has   since   been   extended   to  Kanyakumari  as  announced  in  the  Railway  Budget,  2013-­‐‑14.    

•  Improvements   in  services  at  all  stations  located  in  the  constituency,  including   new   footbridges,   elevated   platforms,   computerized  reservation   facilities,  etc.  A  significant  allocation  of  Rs.  6  crores  was  made   for   development   works   at   Kochuveli   station   in   the   Railway  Budget  of  2013-­‐‑14.      

• Efforts  being  made  to  improve  facilities  at  Veli  station.    

 

Page 9: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

• Two   automatic   ticket   vending   machines   were   installed   at  Thiruvananthapuram  Central  which  has  provided  speedier  ticketing  services  to  daily  passengers.    

• Took   the   initiative   to  persuade   the  Railway  administration   to  create    an  exclusive  Office  of  Chief  Administrative  Officer  (a  first  for  Kerala)  to   oversee   development  work   for   the   two  Railway  Divisions   in   the  State  and  to  locate  it  in  Thiruvananthapuram    

• New   Passenger   Reservation   Services   (PRS)   was   started   under   the  MP’s   1000   PRS   scheme   in   the   Civil   Station   premises   at    Kodappanakkunu.   In   addition,   two   more   PRS,   one   at   the     State  Secretariat  and  the  other  at   the  Medical  College  Campus,  have  been  set   up.   This   has   resulted   in   a   quantum   jump   in   services   to   the  travelling   public.   A   new   PRS   centre   at   Technopark   has   also   been  announced  and  will  start  functioning  soon.  

   

Page 10: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

3. VIZHINJAM  PORT    

• Provided   leadership,   both   as   MP   and   as   member   of   the   Board   of  Directors   of   the   Vizhinjam   International   Seaport   Ltd.   (VISL),   for  bringing  about  tangible  progress  on  the  proposal  for  the  construction  of   the   prestigious   seaport.   Intervened   to   have   the   master   plan  modified  and  maintain  the  landlord  model  included.    

• The  change  to  the  Landlord  Model  for  the  project  led  to  smoothening  of   the   preparatory   process   considerably   and   enabled   the   State  Government   to   finally  announce   the  Master  Plan  of   the  Project.   14th  November,   2013.   The   project   received   the   approval   of   the   Central  Government  on  14.11.2014.  After  completion  of  RFQ  requirements  of  the  breakwater  construction  the  tender  process  the  main  work  on  the  port  is  expected  to  commence  in  May,  2014.  

•  Played   key   role   in   pursuing   with   the   Ministry   of   Environment   &  Forests   to   grant   early   approval   for   the   Terms   of   Reference   for   the  Environment   Impact   Study   of   the   project.   Pursued   the   work,  including  through  meetings  with  the  Ombudsman  of  the  High  Court    and   discussions  with  members   of   the   Expert   Committee   reviewing  the  project.  

• Held   detailed   discussions   with   the   Vice-­‐‑Chairman   and   senior  officials   of   the   Planning   Commission   and   played   a   key   role   in  obtaining   the   approval   for   extending   a   20%   viability   gap   for   the  project.  

• Moved  the  Govt.  of  India  to  take  action  for  developing  basic  rail  and  road   infrastructural   facilities   for   the  Vizhinjam  Seaport  Project  area.  A   two-­‐‑km   stretch   from   the   National   Highway-­‐‑   47   bypass   was   got  included   in   the  National  Highway  Authority  Scheme.  The  Railways  have  already  completed  survey  work  for  a  dedicated  8-­‐‑km  rail  track  from  Vedivachankovil  in  Balaramapuram  to  Vizhinjam.  

Page 11: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

• As  a  member  of  the  Board  of  Directors  of  the  Vizhinjam  International  Seaport   Ltd,   worked   assiduously   to   expedite   progress   on   the   port  project,   pursue   environmental   clearances   and   pursue   early   and  effective  implementation.      

Poovar  Shipyard  

Strongly  took  up  with  the  Minister  for  Shipping  Poovar’s  case  for  being  selected  as  the  location  for  the    new  shipyard  proposed  to  be  set  up  on  the   West   Coast   of   the   country.   Provided   detailed   suggestions   for  developing  Poovar  as  a  major  shipyard-­‐‑cum-­‐‑port  and  maritime  hub.  

Poonthura,  Valiyathura  Fishing  Harbours  

Actively  pursuing  with  the  Central  Government  the  cases  of  developing  the   fishing   harbours   at   Poonthura   and   Valiyathura   in  Thiruvananthapuram.  

 

Page 12: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

4. HIGH  COURT  BENCH  

• Sustained   intervention   made   with   Central,   State   and   judicial  authorities   for   the   re-­‐‑establishment   of   a   High   Court   Bench   in  Thiruvananthapuram.      

• The   interventions   included  personal  meetings  with   three   successive  Chief  Justices  of  the  Kerala  High  Court  to  extend  their  consent  for  a  bench.   Following   these   sustained   interventions   Chief   Justice  Bennurmath   conducted   hearings   in   Thiruvananthapuram   in   2009-­‐‑2010.   The   matter   was   also   discussed   with   the   Chief   Minister   and  Union   Law   Ministers.   These   efforts   finally   yielded   positive   results  when   the   Hon’ble   Chief   Justice   of   the   Kerala   High   Court   recently  issued   orders   constituting   a   5-­‐‑Judges   Committee   to   look   into   the  issue.    

• Introduced  a  Private  Member’s  Bill   for   the   setting  up  of  Benches  of  High  Courts   in   State  Capitals   to   clinch   the   issue.  Bill  was   listed   for  consideration  during   the  Monsoon  Session,   2012.  The  Bill   could  not  be   taken  up   for   consideration  only  because  of   the   total  wash-­‐‑out  of  the  Session  due  to  obstruction  by  the  Opposition.      

Page 13: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

5. EDUCATION  

In  the  short  period  since  re-­‐‑induction  to  the  Union  Council  of  Ministers  in  November,  2012   (as  Minister  of  State   in   the  Ministry  of  Human  Resource  Development)   was   able   to   bring   about   achievements   in   the   education-­‐‑related  matters  in  the  constituency.  

• The   foundation   stone   of   the   capital   city’s   campus   of   the   Central  University  of  Kerala  was   laid  by   the  Prime  Minister  on  4th   January,  2014.   Vigorously   and   successfully   argued   in   favour   of   locating   at  Thiruvananthapuram   the   prestigious   Off-­‐‑Campus   site   of   Central  University   of   Kerala   set   up   in   Thiruvananthapuram   to   offer   an  integrated  BA/MA  Course  in  International  Relations.    

• Succeeded   in   relocating   the   proposed   regional   office   of   the   Central  Board   of   Secondary   Education   (CBSE)   at   Thiruvananthapuram.  Earlier,  the  nearest  regional  office  was  at  Chennai.  The  location  of  the  new   Regional   Office   at   Thiruvananthapuram   will   benefit   students  and  parents  of  CBSE  Schools  in  the  area  immensely.  

• A   new   Regional   Office   of   the   AICTE   for   Kerala   and   Lakshwadeep  was   established   at   Thiruvananthapuram.   A   new   four   storeyed  building  for  the  Office  was  constructed  and  inaugurated  in  a  record  time  of  180  days.  

• Succeeded   in   getting   a   significant   allotment   of  Rs.   33   crores   for   the  AICTE  in  Kerala  during  2012-­‐‑13.  

• Action  was   taken   to   include   studies   on   Sree  Narayana  Guru   in   the  CBSE  syllabus.  

•  Successfully   pursued   the   setting   up   of   a   Chair   in   the   name   of  Mahatma  Ayyankali  in  the  Central  University  of  Kerala,  Kasargode.  

Page 14: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

• Arrangements  made  for  admission  with  scholarships  for  25  students  from   the   BPL   category   for   undertaking   MBA/BBA   courses   in  prominent   educational   institutions   throughout   India.   The   funds   for  purpose   were   made   available   from   the   Chandran   Tharoor  Foundation.  

• Coordinated   with   Bharti   Foundation   and   Chandran   Tharoor  Foundation  (CTF)  to  bring  educational  assistance  to  schools  catering  to  underprivileged  children  in  the  district.  

• Successfully   intervened   with   CBSE   to   allot   three   new   centres   in  Kerala  for  the  JEE  Exam,  2013.  The  new  offline  Centres  were  set  up  in  Thrissur,  Kottayam  and  Thiruvananthapuram.    Thiruvananthapuram  already  had  an  online  centre  and  the  starting  of  an  offline  centre  also  made  it  the  only  city  in  Kerala  to  have  both  an  online  centre  as  well  as  offline  centre  for  the  examination.  This  brought  relief  to  thousands  of  candidates  from  Kerala  who  were  earlier  forced  to  travel  to  centres  both  within  and  outside  the  state.    

• Successfully  intervened  to  have  a  test  centre  for  the  prestigious  CAT  (for  entrance  to  IIM  etc.)  at  Thiruvananthapuram  from  the  CAT,  2013  onwards.  Earlier,  the  only  other  Centre  in  the  State  was  at  Kochi.    

• Intervened   successfully   for   accommodating   aspirants   from   Kerala  appearing   for   the   National   Medical   PG   Entrance   Examination   at  Centres  in  Kerala  itself.      

• Intervened  successfully  to  have  a  centre  for   the  All   India  PG  Dental  NEET   Examination   at   Thiruvananthapuram.     Earlier,   Chennai   was  the  only  Centre  in  South  India  for  the  Examination.    

Page 15: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

• Rs  4  Crores  allotted   for  establishment  of  SC/ST  Hostels  at   the  Govt.  Engineering  College,  Barton  Hill  and  Govt.  College  of  Engineering  at  Thiruvananthapuram.  

• Rs  1  Crore  allotted  for  establishing  a  Research  Park  at  the  College  of  Engineering,  Thiruvananthapuram.    

• Sustained   effort   is   on   for   setting   up   a   Regional   Centre   of   National  Board  of  Examinations  at  Thiruvananthapuram.  

 • Succeeded   in   obtaining   under   the   Rashtriya   Madhyamik   Shiksha  

Abhiyan   (RMSA)  of   the  Union  HRD  Ministry  an  outlay  of  Rs.  59.71  crores   for   2012-­‐‑13   for   improving   physical   facilities,   quality  enhancement   and   social   equity   in   Govt.   Secondary   Schools   in   the  State.   This   will   include,   among   others,   financial   assistance   for  upgradation  of  112  Schools  in  the  State.    

• Got   substantial   allotment   of   Rs.   120   crores   for   Kerala   under   the  Rashtriya  Uchhasthan  Shiksha  Abhiyan  Programme.    

• Rs.   105   crores   allotted   for   the  Malappuram   campus   of   the   Aligarh  Muslim  University.    

• Intervened   successfully   in   getting   approval   of   the   State   Govt.   for  allotting  70  acres  of  land  at  Malappuram  for  an  off-­‐‑campus  centre  of  the  prestigious  English  and  Foreign  Languages  University   (EFFLU),  Hyderabad      

• Strongly   intervened   for   locating   the   proposed   ‘Knowledge   City’  project  of  the  State  Government  in  Thiruvananthapuram.    

Page 16: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

• Took  steps   to  cancel   the   termination  of  Training  Colleges  under   the  National  Centre  for  Teacher  Education.    

• Set  up  coaching-­‐‑cum-­‐‑  guidance  centre   for  SC/ST  students  under   the  Ministry  of  Labour.    

• Efforts  being  made  to  set  up  a  regional  center  of  the  National  Board  of  Examinations  at  Thiruvananthapuram.          

Page 17: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

6. AIRPORT    •        Strong   and   repeated   personal   intervention   to   have   the   work   on   the  International   Terminal   at   Thiruvananthapuram   International   Airport  completed.  The  Airport  is  now  fully  operational.  

• Took  action  to  ensure  completion  of  work  amounting  to  Rs.  50  crores  on  the  Hangar  Unit  of  Air  India  at  Thiruvananthapuram  Airport.  The  Unit  was  made  operational  on  16th  December,  2011.  

• A  major   investment   of  Rs.   130   crores  was   obtained   for   the  Airport,    The  projects  which  will  be   implemented  using  this  allotment  within  14   months   include   a   Rs.   70   crore   parallel   taxi-­‐‑way,   a   fourth   aero-­‐‑bridge  for  Rs.  20.98  crores,  new  turning  pad  for  Rs.  15.77  crores,  Rs.  an  additional  apron  for  Rs.  14  crores  and  additional  security  systems  for  Rs.  10.36  crores.,  etc.  

•        Intervened  strongly  to  reduce  User  Development  Fee  in  respect  of  new  terminal   at   Thiruvananthapuram   International   Airport.   Constant   and  effective   intervention   whenever   necessary   in   all   matters   concerning  facilities   and   problems   of   air   passengers.   Intervened   to   bring   about  improvements  in  parking  facilities.    

• Successfully   took  up  with   the  Centre   the  starting  of  Visa-­‐‑on-­‐‑Arrival  (VoA)  facilities  at  Thiruvananthapuram  and  Kochi  Airports  to  benefit  citizens  of  11  countries  and  enhance  tourism  to  Kerala.    

• Working   with   State   government   on   providing   the   “multi—nodal  hub”   and   “Aeropolis”   concept   to   link   the   airport   by   road,   rail,   sea  and  canal  as  well  as  to  develop  ancillary  facilities.    

• Obtained   approval   for   starting   of   logistics   post   air   services   from  Thiruvananthapuram  Airport.    

Page 18: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

7. HEALTH  SERVICES  

• Effective   intervention   to   ensure   speedy   completion   of   the  construction   of   the   buildings   and   related   infrastructure   of   the     six  super-­‐‑specialty   departments   in   the   Thiruvananthapuram   Medical  College  Hospital  complex  involving  a  cost  of  Rs.  179  crores  under  the  Prime   Minister’s   Swasthya   Suraksha   Yojana.   Project.   These   super-­‐‑specialty  departments  have  already  started  functioning.  

• Was   successful   in   getting   Rs.   10   crores   allocated   for   completing  building  works  at  the  Central  Ayurveda  Institute  at  Poojappura.    

• Obtained  approval  for  a  new  Virology  Lab  of  the  Union  Ministry  of  Health  &  Family  Welfare  at  Thiruvananthapuram.  

• Personally  intervened  with  the  Union  Health  Minister  and  succeeded  in  obtaining  financial  assistance  for  treatment  of  individual  cases.  The  total  assistance  so  obtained  was  to  the  tune  of  Rs.  57.35  lakhs.  

• Took  up  individual  cases  of   financial  assistance  for   treatment  under  the  Prime  Minister’s  Relief  Fund.  The  total  assistance  so  obtained  was  to  the  tune  of  Rs.  43.91  lakhs.  

• Intervened  successfully  with  the  Union  Health  Ministry  for  including  the  Govt.  Medical  College,  Thiruvananthapuram  as  Regional  Centre  for  the  new  National  Geriatric  Programme.  

•  Active   intervention   for   facilitating   the   next   stage   of   expansion   and  development   of   the   Sree   Chitra   Institute   of   Medical   Sciences   &  Technology,  Thiruvananthapuram.    

• Took  up  and  pursued   the   case   for   raising   the   status  of   the  Regional  Cancer  Centre,  Thiruvananthapuram  to  that  of  a  National  Institute  for  Cancer  Research    at  a  cost  of  Rs.  120  crores..  

Page 19: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

 • AYUSH   holistic   treatment   centres   started   in   Neyyatinkara   and  

Poonthura    

• Succeeded   in   getting   additional   allotment   of   funds   for   improving  facilities  at  the  ESI  hospitals  at  Pettah,  Peroorkada  and  Karamana.    

• Succeeding   in   obtaining   approval   for   establishing   an   ESI   Super-­‐‑specialty  hospital,  including  trauma  care  facilities,  at  Kazhakuttam.    

• Efforts  made  to  raise  Peroorkada  Mental  Health  Centre  to  the  level  of  a   ‘Centre   of   Excellence’   under   Central   Scheme.   Though   initially  successful,   the   decision  was   reversed   under   pressure   from   the   then  LDF  State  Government.  Central  Government  has  nonetheless  granted  Rs   3   crores   for   Perrorkada..  MP   brought   Central  Health  Minister   to  visit   the   Peroorkada   Centre   and   he   has   promised   further   support  under  the  forthcoming  Five-­‐‑Year  Plan.    

•  Made   a   strong   intervention   with   the   military   authorities   to   make  major   improvements   in   the   functioning   of   the   ECHS,   Thirumala   to  resolve  many   long-­‐‑pending   functional   and   infrastructural   problems.  This   has   led   to   significant   changes   in   the   working   of   that   facility  bringing   relief   to   thousands   of   ex-­‐‑servicemen   and   their   families  belonging  to  the  constituency.  

 • Intervened   immediately   with   the   Union   Health   Ministry   when  

production   of   vital   medicines   used   by   patients   suffering   from   the  skin-­‐‑disease   ‘Psoriasis’   was   stopped   with   at   the   Central   Ayurveda  Institute,  Poojapura.  The  production  of  the  medicines  was  re-­‐‑started  bringing  great   relief   to   tens  of   thousands  of  patients   suffering   from  the  disease  in  the  State.      

Page 20: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

8. DRINKING  WATER    

• Successfully   intervened   with   the   Minister   of   Environment   and  Forests  for  granting  in-­‐‑principle  approval  for  raising  the  water   level  at  Peppara  Dam  to  augment  water   supply   for  Thiruvananthapuram  city.  Also,   took  up  with  State  Government  the  need  for  taking  long-­‐‑term  measures   for  meeting  Thiruvananthapuram  city’s  water  needs  by  laying  of  a  10  km  connecting  pipe-­‐‑line  to  transport  water  from  the  Neyyar   dam   to   the   Aruvikkara   reservoir   and   for   construction   of  check   dams   along   the   33   km   canal   connecting   Peppara   dam   to   the  Aruvikkara  reservoir.  

• Intervened  with   the  Vizhinjam  International  Seaport  Limited   (VISL)  to   incorporate   a   Rs.   36   crore   turnkey   water   project   using   its  Corporate  Social  Responsibility  funds  to  meet  the  requirements  of  the  people  residing  in  Vizhinjam  and  surrounding  areas.  

• Successfully  intervened  with  the  Ministry  of  Urban  Development  for  allotment   of   an   additional   Rs.   10   crores   under   JNNURM   for  providing  adequate  water  supply  in  the  panchayats  newly  added  to  Thiruvananthapuram  Corporation.  

 

Page 21: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

9. URBAN  WASTE  MANAGEMENT  

• Obtained   central   government   funds   to   the   tune   of  Rs.   80   crores   for  setting   up   1070   lakh   litre   sewerage   treatment   plan   at  Muttahara   in  Thiruvananthapuram.  

• Took   initiative   to   include   Thiruvananthapuram   Corporation   as   a  under   the   Urban   Infrastructure   and   Governance   (UIG)   Scheme’s  ‘Mission  City’   programme   and  got   allotment   of  Rs.   24.56   crores   for  the  purpose.  

• Obtained   from   the   Central   Ministry   of   Urban   Development  additional   central   allocation   (ACA)   of   Rs.   10.45   crores   for  Thiruvananthapuram   Corporation   for   drinking   water   schemes   and  Rs.  2.94  crores  for  garbage  disposal  under  JNNRUM  funding.  

• Succeeded   in   obtaining   Rs.   57   lakhs   for   Thiruvananthapuram  constituency  for  the  ‘Total  Sanitation  Campaign’  mounted  under  the  Central   Rural   Sanitation   Programme   of   the   Ministry   of   Rural  Development.  

Page 22: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

10.  CONSERVATION  OF  WATER  BODIES  

• Provided   active   leadership   for   action   to   save   and   preserve   the  Vellayani  lake.    Obtained  Rs.  50  lakhs  central  government  assistance    for  the  purpose.    

• Succeeded   in   getting   a   major   sum   of   Rs.   24.56   crores   under   the  National   Lake   Conservation   Scheme   for   conservation   of   the   Veli-­‐‑Akkulam  backwater  lakes  in  the  city.  

• Provided  leadership  and  financial  support  for  the  work  to  clean,  de-­‐‑weed  and  develop  the  Valiakulam  water  body  in  Chenkal  panchayat.  

11.  AGRICULTURE  

Actively   intervened  with  concerned  departments  of   the  State  and  Central  Governments   and   was   successful   in   obtaining   the   following   schemes    under  the  Rashtriya  Krishi  Vikas  Yojana  (RKVY)  for  Thiruvananthapuram  constituency:-­‐‑  

• Cleaning  and   renovation  of  Asarikulam    water  body   (pond)to  facilitate     agricultural   activities     in   the   Keezhkolla   ela   in  Chenkal   panchayat.     A   sum   of     Rs.   66.91   lakhs   was   made  available  for  the  purpose.  

• Conservation   works   of   the   Venkulam   waterbody   in   Karode  Panchayat  to  facilitate  rice  cultivation  in  the  area.  A  sum  of  Rs.  90  lakhs  was  made  available  for  the  purpose.  

 

 

 

Page 23: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

12.  FISHERIES  

Succeeded   in   obtaining   sanction   for   the   following   schemes   under  NABARD  funding  in  Thiruvananthapuram  :-­‐‑  

• Rs.  232.90  lakhs  for  drinking  water  scheme  for  the  fishing  villages  of  Karikulam  and  Poovar.  

• Rs.   256.50   lakhs   for   developing   modern   fish   landing   centres   at  Parithiyur,  Poovar  and  Puthiyathura  villages.  

• Rs.   138.70   lakhs   for   constructing   water   channels   in   Adimalathura,  Ambalathumoola  and  Kottukal  villages.  

• Rs.  59.85  lakhs  for  constructing  a  solar  fish  drying  unit  at  Poovar  

• Rs.  34  lakhs  for  a  drinking  water  project  at  Kollengode  fishing  village  

• Rs.   34.40   lakhs   for   constructing   a   beach   road   at   Pulluvila   fishing  village  

• Ensured  higher   allocations  of   central   assistance   for   the   construction  of   houses   for   fisher   folk   under   the   National   Fishermen’s   Housing  Scheme.  

• Succeeded   in   obtaining   funds   to   the   tune   of   Rs.   8   crores   for  constructing   a   new   building   for   the   Central   Marine   Fisheries  Research  Institute  (CMFRI)  to  enable  the  Unit  to  continue  functioning  in  Vzhinjam.  The  work  was  completed  on   time  and  made  ready  for  inauguration.  

 

 

Page 24: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

13.  HOUSING  

• Vigorously   intervened   with   Central   Government   Ministries   and  guided   the   required   modification,   of   the   State   Government’s  proposal  for  construction  of  residential  structures  at  a  total  cost  of  Rs.  71.28  crores  to  rehabilitate  1032  families  living  in  crowded  huts  in  the  Harbour  Ward   of   Thiruvananthapuram   city   under   the   Rajiv   Awas  Yojana.  

• Successfully   intervened   with   the   National   Housing   Bank   to   issue  revised  guidelines  in  respect  of  ‘Reverse  Mortgage  Loan’  by  national  banks  to  allow  those  who  have  inherited  properties  to  also  be  eligible  to   apply   for   the   loan.   This   change   has   been   widely   appreciated  nation-­‐‑wide  by   thousands  of  people  who  were  enabled   to  apply   for  the  loan  facility  which  had  been  denied  to  them  till  now.    

14.  DEVELOPMENT  OF  TOURISM  

• Successfully   intervened   with   the   central   Ministry   of   Tourism   to  provide   a   special   Rs.   10   crore   package   for   enhancing   facilities   to  maintain  Kovalam’s  reputation  as  a  major  international  tourist  centre.  

• Succeeded   in  obtaining  funding  of  Rs.  2  crores   from  the  Ministry  of  Shipping   for  developing  a  children’s  park,  museum  and  other  basic  facilities  in  the  Vizhinjam  Light  House  and  surrounding  areas  .  

• Successfully  pursued  and  got  included  Thiruvanthapuram  airport  as  one   of   the   airports   where   bulk   arrival   permits   were   extended   to  tourists  arriving  from  abroad.  

 

 

Page 25: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

15.  CENTRAL  GOVERNMENT  INSTITUTIONS.  

• Served   effectively   as   elected   representative   of   Lok   Sabha   on   the  Institute  Body  of   the  Sre  Chitra  Tirunal   Institute  of  Medical  Science  and  Technology,  (SCTIMST),  Thiruvananthapuram.  

• Served   as   ex-­‐‑officio   member   of   the   governing   body   of   the   Rajiv  Gandhi   Biotechnology   Centre   (RGBC),   Thiruvanathapuram.  Effectively  intervened  with  Union  Health  Ministry  to  rush  testing  kits  and   other   equipment   to   Thiruivanathapuram   for   use   by  RGBCC   in  the  campaign  to  control  Chickenguneya  and  Dengue  outbreaks  in  the  city  and  other  parts  of  the  State.      

• Intervened   effectively   with   the   Government   of   India   to   pursue  Central   takeover   of   the   ‘Centre   of   Earth   Science   Studies’,  Thiruvananthapuram,   in   order   to   elevate   its   resource   base   and  capacity  for  excellence.  

• Successfully   intervened  with   the  Centre   for   cancelling   the  proposed  move   for   closing   the   branch   office   of   the   NFDC   at  Thiruvananthapuram.   The   office   has   now   been   allowed   to   be  continued  at  new  premises  at  Vellayani.    

• Successfully   intervened   to   ensure   that   the   newly   created   Regional  Office  of  the  CPWD  for  Kerala  is  located  at  Thiruvananthapuram.      

• Successfully   pursued   with   the   Central   Department   of   Labour   for  establishing  a   sub-­‐‑centre  of   the  ESI  at  Thiruvananthapuram  and   for  setting  up      a  ‘Centre  of  Excellence’  facility  in  the  Kazhakuttam  ITI  for  Women.          

Page 26: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

16.  DEVELOPMENT  OF  SCIENCE  &  TECHNOLOGY    

• Successfully  intervened  for  ensuring  the  establishment  of  a  Rs.  110   crore   Bio   -­‐‑Innovation   Center   of   the   Rajiv   Gandhi  Biotechnology  Centre    at  Akkulam.      

• Succeeded   in   obtaining   approval   for   setting   up   a   National  Centre  for  Molecular  Materials  at  Thiruvanathapuram    at  a  cost  of  Rs.  76.7  crores.    

• Approval   was   obtained   for   setting   up   a   Model   Science   &  Technology  village  at  Kottukal.    

• Successfully   pursued   the   case   for   including  Thiruvananthapuram   in   the   Union   Ministry   of   Non-­‐‑Conventional  Energy  Sources  ‘Solar  City’  project.    

• Obtained  approval  of   the  Ministry  of  Home  Affairs   for  setting  up  ‘Radiation  Detection  Dosimeter’  in  Thiruvanathapuram,      

Page 27: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

17. INFORMATION  TECHNOLOGY  

• Convinced  Oracle  Corporation,  the  second  largest  IT  company  in  the  world,  to  start  its  operations  from  Technopark.  Oracle  is  the  first  international  IT  giant  to  enter  Kerala  and  its  entry  has  already   had   significant   impact   on   employment   and   other  benefits   by   motivating   other   global   majors   to   set   up   their  centres  in  Thiruvananthapuram.    

• Ensured   that   infrastructure   facilities   including   buildings  were  made   available   for   the   Third   Phase   development   of  Technopark,  Thiruvananthapuram.    

• Successfully   pursued   approval   for   development   of   C-­‐‑DAC,  Software  Development  Park  of  India,  etc.  

 18. INDUSTRY  

 • Approval  for  releasing  Rs.  17  crores  out  of  a  total  package  of  Rs.  

39.34  crores  for  developing  a  Textile  Centre  Infrastructure  Park  at  Thiruvananthapuram.    

• Efforts   are   being   made   to   start   a   Global   Support   Center   of  ‘Ernst   &   Young’   at   the   Kinfra   Film   and   Video   Park   in  Thiruvananthapuram.  

 

Page 28: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

19. POSTAL  SERVICES  

• Intervened   successfully  with   the  Ministry   of   Communications  to   give   a   quantum   fillip   to   postal   services   in  Thiruvananthapuram   by   getting   approval   for   construction   of  three   major   infrastructure   projects   involving   construction   of  post   office   complexes   at   Poojapura,   Sasthamangalam   and  Karamana  and  for  significantly  enhancing  postal  services  in  the  city  and  its  environs.  

20. SPORTS  

• Was  effectively  involved  with  the  State  Government’s  efforts  to  make   a   start   in   creating   a   state-­‐‑of-­‐‑the-­‐‑art   modern   stadium   at  Kariyavattom  in  Thiruvananthapuram  for  the  National  Games  that  can  also  be  used  for  cricket  in  the  future.  

• Played   a   crucial   role   in   gaining   an   IPL   team   for   Kerala.   This  placed  Kerala  cricket  on  the  national  and  world  map,  enhanced  possibilities   for   local   cricketers,   and   attracted   many   more  visitors   and   tourists   to   our   state.   Despite   the   subsequent  disbanding  of   the       team,   the   boost   to  Kerala   cricket   remains,  and   the   possibility   of   Thiruvananthapuram   getting   a   cricket  stadium  of  international  standard  has  also  been  strengthened.      

Page 29: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

 21. OTHER  

 • Obtained   central   assistance   of   Rs.   1,5   crores   for   modernization   of  

facililites  at  Poojappura  Central  prison.  

• Provided   a   secure   fibre-­‐‑glass   boat   at   Amboori   crossing   from   the  Chandran  Tharoor  Foundation   in  order   to  ensure  safety  of   the   local  public   following   the   tragic  death  of   a   young   student   in   an   accident  there.    

• Made   vigorous   and   sustained   efforts   with   the   Central   Ministry   to  obtain  environment  clearance  certificate  for  re-­‐‑starting  the  renovation  work  of  the  famous  pilgrimage  Shrine  at  Vettucaud.  As  a  result,  the  work   has   now   re-­‐‑started   and   the   re-­‐‑construction   is   expected   to   be  completed  very  soon.  

• Obtained   assistance   of   Rs.   1.24   crores     under   the   Central     Suvarna  Jayanti  Gram  Rozgar  Scheme  for  raising  BPL  families  to  APL  level.  

• Arranged,   through     funds     provided   by   the   Chandran   Tharoor  Foundation,  a  sea-­‐‑outing  at  Kochi  for  81  students  and  accompanying  teachers  of  the  Government  Vocational  Higher  Secondary  School  for  the  Deaf,  Thiruvananthapuram  

• Took   a   principled   and   consistent   stand   on   the   issue   of   banning  ‘Hartals’  and  Bandh’  for  the  greater  good  of  the  long-­‐‑suffering    public  and  the  State.        

• Strongly  took  up  with  the  Ministry  of  Finance  the  case  of  improving  pension  facilities  for  EPF  beneficiaries  across  the  country.      

Page 30: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

• Strongly   took   up   with   the   Chief   Minister   the   case   for   providing  reservation   in   the   State   Government   services   for   ex-­‐‑servicemen  hailing  from  the  State.    

• Provided  support  and  personal  resources  for  meals  and  recreational  outings  for  inmates  of  various  Homes  for  the  Aged,  orphanages  and  students  of  the  School  for  Hearing,  Thiruvananthapuram.  

• E-­‐‑Toilets   were   set   up   in   selected   schools   and   water   purifiers   were  distributed   in   schools   in   the   coastal   areas   through   the   Chandran  Tharoor  Foundation.  

Page 31: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

 

22. QUALITY  OF  LIFE  /  CULTURE    

• Personally   intervened   to   bring   the   world-­‐‑renowned   Hay   Literary  Festival,   which   had   never   before   been   held   in   India,   to  Thiruvananthapuram   in   November,   2010.   The   annual   event  showcased  international  celebrities,  writers,  artists  and  policy  makers  who   converged   on   Kerala’s   capital   to   brighten   the   intellectual  horizon  of  the  city.  The  Festival  was  held  for  a  second  year  running  in  November,  2011.  

• Put  forward  proposal  and  successfully  pursued  with  the  ‘National  Flag   Foundation   of   India’   to   install   the   National   Flag   at   the  Kanakakkunu  Palace   grounds   in   Thiruvananthapuram   city.     The  iconic   flag   is   one   of   the   tallest   and   largest   in   the   country   and   a  spectacular  adornment  to  the  city  today.  

• Actively   pursuing   proposal   to   issue   a   commemorative   postage  stamp  in  honour  of  the  father  of  Malayalam  language,  Thunjathu  Ramanujan  Ezhuthachan.  

• Took   up   proposal   and   succeeded   in   getting   the   Department   of  Posts   to   issue  a  commemorative  postage  stamp  in  honour  of  Shri  C.V  Raman  Pillai.    

• Actively   pursuing   proposal   to   issue   a   commemorative   postage  stamp  in  honour  of  Dr.  Palpu  the  great  social  reformer.    

• Successful  in  getting  Central  Government  a  major  allocation  of  Rs.  26  crores  for  renovating  the  iconic  Tagore  Centenary  Hall  Cultural  Complex  in  Thiruvananthapuram.  

 

Page 32: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

•  Action   taken   to  make  Barcelona   city   of   Spain   the   ‘Twin  City’   of  Thiruvananthapuram.   Through   the   MP’s   negotiations,   avenues  were   opened   for   cooperation   for   development   in   the   fields   of  tourism,  urban  development,  sports,  etc.  The  possibility  of  world-­‐‑class   training   in   football   was   also   raised   in   liaison   with   FC  Barcelona,  including  arranging  training  by  experts  from  Barcelona  for   children   of   coastal   areas.   Representatives   from   Barcelona  arrived  in  Thiruvananthapuram  three  times  and  held  discussions.  The   agreement   only   required   approval   by   the  Thiruvananthapuram  Corporation,  but  as  a  result  of  petty  politics  by  the  Left-­‐‑dominated  Municipal  Corporation,  the  agreement  was  sadly  allowed  to  lapse.  

•        As  a  precursor  to  the  above-­‐‑mentioned  agreement,  world-­‐‑class  artists   in   various   disciplines   were   brought   to  Thiruvananthapuram   from   Barcelona   and   they   performed   in  events  held  over  three  days  on  23rd,  24th  and  25th  May  2010  in  the  city.  

 

 

Page 33: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

 

23.  NON-­‐‑RESIDENT  INDIAN’S  WELFARE    

• Successfully   intervened  with   the   Prime  Minister   arguing   in  favour  of  removing  NRI  remittances  from  the  Service  Tax  net  This   resulted   in   the   Prime   Minister,   then   holding   direct  charge   of   the   Finance   portfolio,   to   get   the  Central   Board   of  Direct   Taxation   (CBDT)   to   issue   a   clarification   that  remittances   by   NRIs   will   not   be   brought   under   the   new  Service  Tax  regulations.  This  has  provided  immense  relief  to  millions   of   expatriates   and   notably   the   large   Keralite  diaspora  in  the  Gulf  countries.  

 • Successfully   lobbied   for   the   setting  up  of  Sri  Lankan,    UAE  

Consulates   in   Kerala   in   Thiruvananthapuram.   This   will  provide  major   consular   services   and   other   conveniences   in  general   to   the   people   of   the   region   in   particular   to   the  constituents   of   Thiruvananthapuram   Parliamentary  constituency   in   particular.   The   move   is   also   expected   to  influence  other  countries  to  locate  their  consulates  in  the  city.  Succeeded   in  setting  up  an  honorary  consulate  of  Sri  Lanka  in   the   city.   A   proposal   for   a   Trade   Office   of   the   UK   High  Commission  is  under  consideration.  

Page 34: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

24.  WORK  AS  UNION  MINISTER  OF  STATE  FOR  FOREIGN  AFFAIRS  

 

• Your  MP’s  work  as  Minister  of  State  for  External  Affairs  (2009-­‐‑10)   the   period   in   which   he   was   holding   that   Office,   was  nationally  appreciated.  In  that  short  11  months,  he  succeeded  in  opening  new  vistas  for  India  in  Africa,  travelled  extensively  to  the  countries  under  his  charge,  became  the  first  Indian  Minister  to   visit   Haiti   after   the   disastrous   earthquake   in   that   country  which  drew  international  attention  due  to  the  large  number  of  casualties,   and  made  path-­‐‑breaking   progress   in   relations  with  countries  of  Africa,  Latin  America  and  the  Gulf  region.  

•  He   initiated   new   policy-­‐‑planning   activities   on   the   Indian  Ocean  and  represented  India  effectively  at  many  global  events,  creating   new   relationships   especially   with   the   Francophone  countries  in  Africa.  

• Received   appreciation   from   all   quarters   for   guiding   and  implementing   Haj   pilgrimage   arrangements   in   an   exemplary  manner.   These   efforts   led   to   the   pilgrims   completing   their  pilgrimage  with  enhanced  safety  and  without  having   to  make  any  complaints.    

• Made   improvements   in   the   functioning   of   passport   offices.  Action   taken   to   start   Passport   Seva   Kendras   (PSK’s)   at  Vazhuthacaud   in   the   city   and   at   Neyyatinkara.     The  Neyyatinkara  PSK  came  into  existence  only  due  to  the  decision  made  by  the  MP,  as  the  Minister  of  State.    

Page 35: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

• Whenever   such  help  was   sought  by   the   constituents  or  others  from  Kerala,   the  MP’s  Office  and  he  himself  personally  as   the  Minister   of   State,   intervened   speedily   and   directly     in   cases  where  they  were  facing  problems  relating  to  visas,  repatriation,  compensation  claims,  transportation  home  of  mortal  remains  of  deceased  persons,  etc.    

Page 36: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

25. AS  MEMBER,  LOK  SABHA  

(In-­‐‑between  his  two  stints  as  Minister  of  State)  

• Was  the  Member-­‐‑Convenor  of   the  Parliamentary  Forum  on  Disaster  Management,  and  a  member  of  the  Standing  Committee  on  External  Affairs,  the  Consultative  Committee  on  Defence,  the  Public  Accounts  Committee  and  the  Joint  Parliamentary  Committee  on  Telecoms.  The  five   Committee   assignments   reflected   an   unusual   level   of  responsibility  and  trust  in  the  MP.    

• Participated   prominently   in   many   of   the   important   debates   which  took  place   in   the  House  during  his   tenure,   including  on   the  Lokpal  Bill,   the  Motion  of  Thanks  on   the  President’s  Address,   the  Demand  for  Grants  of  the  Ministry  of  External  Affairs,  the  Demand  for  Grants  of   the   Ministry   of   Commerce   and   Industry,   on   ‘Black   Money’,  Copyright  Rules  and  the  at  the  Special  Sitting  held  to  commemorate  the   60th  Anniversary   of   Parliament.   Your  MP’s   speeches   during   the  debates,   interventions   and   questions   have   been  widely   appreciated  by   leaders  and  other  prominent  members  of   the  parties   represented  in  the  House,  cutting  across  political  lines.    

• Raised   many   specific   issues   relating   to   the   Constituency   through  Parliament   Questions,   interventions   in   debates.   Raised   the   issue   of  the   garbage   crisis   in   Thiruvananthapuram   city   through   a   Special  Mention.    Another  issue  which  was  raised  through  a  Special  Mention  was   the   need   for   enforcing   safety   measures   and   guidelines   for  transportation  of  school  children.        

Page 37: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

• Introduced   a   Private   Member’s   Bill   on   the   all-­‐‑important   subject   of  setting  up   of  High  Court   Benches   in   State  Capitals.   The  Bill,  which  could   have   added   momentum   to   the   setting   up   of   a   High   Court  bench   at  Thiruvananthapuram   received   selection   through   the   ballot  and  was  slated  for  consideration  of  the  House,  but    that  day’s  sitting  was  cancelled  due  to  disruption  of  the  proceedings  by  the  opposition  benches   and       its   consideration   was   thus,   most   unfortunately,  aborted.        

           

Page 38: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

MEMBER  OF  PARLIAMENT  LOCAL  AREA  DEVELOPMENT  SCHEME                                                                                                                          (MPLADS)  

 • Ranks   first   among   the   20   Lok   Sabha   MPs   from   the   state  

expending   107.60   %   of   the   allotted   MPLAD   funds   as   on  02.12.2013.  

• Rs.  7.20  crore  was  ear-­‐‑marked  for  creation  of  durable  assets  like  roads  and  bridges.    

• Rs.  3.76  crore  was  expended  for  installation  of  new  street  lights  and  for  rural  electrification.  

• Infrastructure   for   Anganwadis,   libraries,   Public   Parks   and  Cultural   Centres   were   built   using   Rs.   3.64   crore   from   the  MPLAD  funds.  

• Educational  and  Health  Care  sectors  received  Rs.  3.25  crore  and  Rs.  2.10  crore  respectively.  

• Rs.   1.15   crore   was   ear-­‐‑marked   for   drinking   water   supply  schemes  in  the  Constituency.  

 

The   name,   location   and   other   details   of   the   works/projects   undertaken  through  the  funds  under  the  MPLAD  Scheme  are  given  below:  

 

 

Page 39: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

Sl  No   Name  of  Work  

Amount  sanctioned          (Rs.in  lakhs)  

Panchayat/  Corpn.  Ward  

    KAZHAKUTTAM          

1  

Setting  up  of  a  High  Mast  Lighting  System  at  the  Chempazhanthi  Jn  in  the  Chempazhanthi  ward  of  the  Copn   4.50   Corpn  Chempazhanthi  

2  

Concreting  of  the  Kariyil-­‐‑Thekkethil  Kshethram  road  in  the  Kazhakuttam  ward  of  the  Tvpm  Corporation  (SC  Work)   1.80   Corpn  Kazhakuttam  

3  

Construction  of  a  side  wall  and  concreting  of  the  road  to  the  Ambalathinkara  Settlement  Colony  in  the  Kazhakuttam  ward  of  the  Tvpm  Corporation  (SC  Work)   3.20   Corpn  Kazhakuttam  

4  Construction  of  building  at  Mannanthala  Govt.  High  School(11-­‐‑12)   15.00   Corpn  Mannanthala  

5  

‘Extension  of  KSEB  electric  lines  and  providing  street  lights  at  various  locations  in  the  Mannanthala  Ward  of  the  Tvpm  Corporation’     4.20   Corpn  Mannanthala  

6  Setting  up  of  a  Highmast  lighting  System  at  Mannanthala  Jn  

4.20  Corpn.  Mannathala  

7  

Construction  of  a  Community  Hall  in  the  Chencheri  Laksham  veedu  SC  Colony  in  the  Mannamthala  ward  of  the  Tvpm  Corpn  (SC  Work)  

7.00  Corpn.  Mannathala  

8  

Construction  of  drinage  channel  from  Kuzhiyam  peroorkonam  towards  from  karimbukonam  mudippuradevi  Temple  in  the  Edavukkod  ward  of  Tvpm  Corpn.   3.00   Corpn  Sreekariyam  

9  Setting  up  of  High  Mast  LED  Lighting  System  at  the  Muckolackal  Bypass  Jn  Attipra  ward  of  Tvpm  Corpn   5.54   Corpn.  Attipra  Ward  

10  Setting  up  of  an  LED  High  Mast  Light  at  Madavoorpara  in  the  No.3  Corpn.  Ward  Kattaikonam   7.00   Corpn.  Kattaikkonam  

11  

Setting  up  of  a  bus  waiting  shed  at  the  Kizhakke  Chandavila  Jn  Chandavila  Ward  of  Tvpm  Corporation   1.80   Corpn.  Chanthavila  

Page 40: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

12  

Metalling  and  tarring  of  the  Amballoor  -­‐‑  Palliyamparambu  -­‐‑  Mannara  Road  in  the  Chandavila  Ward  of  Kazhakuttom/Tvm  Corporation   5.00   Corpn.  Chandavila  Road  

13  Samskarikanilayam  at  Chandavila  Jn  in  the  Chandavila  Ward  of  Tvpm  Corpn   7.00   Corpn.  Chanthavila  

14  Setting  up  of  an  LED  High  Mast  Light  at  theMar  Ivanios    College  Step  Jn.,  Nalanchira   5.54   Corpn.  Nalanchira    Ward  

15  Construction  of  a  Bus  waiting  shed    at  the  Main  Gate  side    Mar  Ivanious  College  Jn.  In  the  Nalanchira     1.50   Corpn.  Nalanchira    Ward  

16  Construction  of  a  Bus  Shelter  at  the  Mar  Ivanious  College  Jn.  In  the  Nalanchira  ward   1.50  

Corpn.  Nalanchira  Corpn.  Ward  

17  Construction  of  a  Library  building  at  Kattachakonam  Govt.  School,Nalanchira(11-­‐‑12),     5.00   Corpn  Nalanchira  

18  

Purchase  and  installation  of  12  Computers  for  the  Pallithura  Hr.  Secondary  School  -­‐‑  Thiruvananthapuram   3.50   Corpn.  Pallithura  

19  

Supply  of  two  computers  each  to  the  St.  Mary'ʹs  HSS,  Pattom,  Govt.  HS  Kattachalkonam  and  St.Gorettii'ʹs  HSS  Nalanchira   1.75  

Corpn.  Nalanchira  Corpn.  Ward  

20  Setting  up  of  High  Mast  Lighting  system  at  Prasanth  Nagar  Jn.  in  Akkulam  ward  of  the  Corporation   4.50    Corpn.  Akkulam  

21  

Setting  up  a  state-­‐‑  of-­‐‑  the  art  Pediatric  oncology  Intensive  Care  Unit  at  Regional  Cancer  Centre.   25.00  

Corpn.  Medical  College  

22  Purchase  and  installation  of  Medical  Equipments  for  the  SAT  Hospital,  Medical  College,  TVpm   10.00  

Corpn.  Medical  College  ward  

23  

Providing    sewage  facility  for  the  Burma  Road  East  Residents’  Association  on  the  Kerala  Kaumudi  Road  in  the  Medical  College  Ward  of  the  Thiruvananthapuram  Corpn   4.00  

Corpn.  Medical  College  ward  

24  Infant  resuscitator  unit  for  Sree  Avitom  Thirunal  Hospital,Thiruvananthapuram(11-­‐‑12),     1.20   Corpn.  Medical  College  

Page 41: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

25  Construction  of  building  at  B.Ed  Training  centre  at  HSS  medical  college(10-­‐‑11),     23.00   Corpn.  Medical  College  

26  Vishrama  Sangetham  at  Medical  college  Hospital  Tvpm(09-­‐‑10),     26.05   Corpn.  Medical  College  

27  

Metalling  and  tarring  of  the  EMS  Nagar  -­‐‑  Kattela  Road  in  the  Cheruvaikkal  Ward  of  the  Thiruvananthapuram  Corporation   4.00   Corpn.  Cherumukha  

28  Setting  up  of  a  High  Mast  Lighting  System  at  theKIMS  Hospital  Junction,  Venpalavattom.   5.54   Corpn.  Anamukham  

    KOVALAM       204.86  

1  

Side  wall  and  earth  filling  for  the  Leader  Shri  K.Karunakaran  road  in    Palachalkonam  Ward  of  the  Balaramapuram  Panchayat     5.00   Balaramapuram  

2  Nellivila  SC  Colony  Drinking  Water  Supply  scheme  in  the  Balaramapuram  G  P   4.50   Balaramapuram  

3  Setting  up  of  High  Mast  Lighting  system  at  Balaramapuram  Jn   4.50   Balaramapuram  

4  Concreting  of  the  Chamavila-­‐‑Karickattuvila  Road    in  Balaramapuram   3.00   Balaramapuram  

5  Supply  of  two  Computers  to  Lutheran  LPS,  Anthiyoor   0.50   Balaramapuram  

6  Supply  of  two  computers  to  the  Mutharamman  Kovil  HSS,  kttukalkonam  kattachalkuzhi   0.49   Balaramapuram  

7  Supply  of  2  computers  for  the  Athiyanoor  DV  LPS  Thalayal  in  the  Balarampuram  G  P   0.60   Balaramapuram  

8  

Metalling  and  tarring  of  the  Vallachal  Vilakom-­‐‑Puthiyal  SC  Colony  Road  in  the  Anthiyoor  ward  of  the  Balaramapuram  GP  (SC  Work)   4.00   Balaramapuram  Gpt  

9  

Construction  of  side  wall  and  formation  of  the  road  from  Parakkonam  toThumbod  in  the  Office  ward  of  the  Balaramapuram  Grama  Panchayat  (SC  Work)   6.00   Balaramapuram  

Page 42: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

10  Metalling  and  tarring  of  the  Kochukada  Palachalkonam  Rd,  Balaramapuram   7.00   Balaramapuram  

11  Supply  of  2  computers  for  the    DV  UPS  Thalayal,  Balarampuram  in  the  Balaramapuram  G  P   0.65   Balaramapuram  

12  Purchase  &  installation  of  2  computers  for  the  LVLPS  School,  Mukkola   0.60   Corpn  Mulloor  

13  

Side  wall  construction  and  concreting  of  foot  path  to  the  Valanvila  SC  Colony  in  the  Mulloor  Ward  of  Tvpm  Corpn  (SC  Work)   6.00   Corpn.  Mullooor  

14  Setting  up  of  a  High  Mast  Lighting  System  at  the  Mukkola  Junction     4.50   Corpn.  Mulloor  

15  Const  of  footpath  and  side  drain  in  thuppanchikudi  Purayidam  in  Vizhinjam  gpt(09-­‐‑10),     2.50   Corpn  Vizhinjam  

16  Construction  of  Kunnannoor  Pappanoor  foot  bride  across  valiyathodu  in  vizhinjam(10-­‐‑11),     10.00  

Corpn  Vizhinjam  Corp  Ward  

17  Setting  up  of  a  Highmast  lighting  System  at  the  fish  landig  centre  (South),  G.V.  Raja  Road,  Vizhinjam.  

4.20   Corpn.  Vizhinjam  Corp  Ward  

18  

Installation  of  New  High  Pressure  Filter  at  water  Pumping  Station  for  the  Vizhinjam  Panchayat  Community  Drinking  Water  Supply  Scheme  (11-­‐‑12),     10.00  

Corpn  Vizhinjam  Corp  Ward  

19  Purchase  &  installation  of  2  computers  for  the  Govt.  Harbour  area  LP  School,  Vizhinjam   0.60   Corpn.  Vizhinjam  

20  Setting  upof  High  Mast  Light  at  Mohideenpalli  Junction  in  Vizhinjam  harbour(11-­‐‑12)   4.20  

Corpn.  Vizhinjam  Corp  Ward  

21  

Purchase  and  installation  of  a  suitable  submersible  pump  set  for  the  for  the  Vizhinjam  community  Drinking  Water  Supply  Scheme     8.66  

CorpnVizhinjam  Corp  Ward  

22  

Setting  up  of  LED  High  Mast  Lighting  System  at  the  Vizhinjam  Jn  in  the  Vizhinjam  ward  of  the  Thiruvananthapuram  Corpn.   5.54   Vizhinjam  

Page 43: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

23  

Setting  up  of  a  High  Mast  Lighting  System  before  Sree  Neelakeshi  Temple  at  Mekkumkara  in  the  Venganoor  G  P   5.54   Venganoor  

24  Setting  up  of  an  LED  High  Mast  Lighting  System  at  at  the  St.  Mary'ʹs  Church  Jn,  Kottappuram  Vizhinjam     5.54   Corpn  Vizhinjam  

25  

Concreting  of  Footpath  in  the  Kadakulam  (Fishermen  Township  Project  Colony)  in  the  Kottappuram  ward  of  Tvpm  Corpn.       5.00   Corpn.    Kottappuram  

26  

Purchase  and  installation  of  Seven  Computers  for  the  St.  Mary'ʹs  Higher  Secondary  School,  Vizhinjam,  Kottappuram   2.10   Corpn  Kottappuram  

27  Purchase  and  installation  of  Two  Computers  for  the  St.  Mary'ʹs  LPS  Vizhinjam  Kottapuram   0.60   Corpn  Kottappuram  

28  School  auditorium  Regional  Fisheries  VHSS  Valiyathura   7.00   Corpn.  Beemapally    

29  Pipeline  ext  and  providing  publc  tap  at  Kallliyoor  Kurumi  road(09-­‐‑10),     0.45   Kalliyoor  

30  Metattaling  and  tarring  of  mannam  memorial  road  in  kalliyoor  grama  Panchyat(10-­‐‑11),     5.00   Kalliyoor  

31  Sidewall  construction  and  concreting  at  santhivila  KC  villas  pathway(10-­‐‑11),     5.00   Kalliyoor  

32  Kannamkuzhi  Settlement  Colony  Nadapatha  concrete  and  Drainage  Construction  (11-­‐‑12)SC,   4.00   Kalliyoor  

33  

Metalling  and  tarring    of  the  Parankimamvila  -­‐‑  Kayalkkara  Road  in  the  Kakkamoola  Ward  of  the  Kalliyoor  Grama  Panchayat  (SC  Work)   7.00   Kalliyoor  

34  

Setting  up  of  a  High  Mast  Lighting  System  at  the  SreeVellayani  Devikshethram  Junction  in  the  Kalliyoor  Grama  Panchayat   4.50   Kalliyoor  

35  

Palapooru  CSI  church  Kayalkara  Eda  road  concreting  and  side  protection  wall  in  ward  No.21  of  Kalliyoor  G  P   3.00   Kalliyoor  

36  

Metalling  &  Tarring  of  the  Vallamcode-­‐‑Puthuval  Thakidiyil  Pravachambalam  road  in  the  Kalliyoor  G  P     5.00   Kalliyoor  

Page 44: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

37  Purchase  &  installation  of  2  computers  for  the  RCLPS,  Peringamala  in  the  Kalliyoor  Panchayat   0.60   Kalliyoor  

38  

Construction  of  a  drainage  channel  and  Footpath  in  the  Kannamkuzhi  settlement  colony  in  the  Kalliyoor  Gramapanchyat   5.00   Kalliyoor    

39  Metalling  &  Tarring  of  the  Sasthamkovil  Nada  Vavila  Temple  road     5.00   Kalliyoor  GP  

40  Purchase  and  installation  of  2  computers  for  SALP  School  in  Kakkamoola  in  the  Kalliyoor  Gpt   0.50   Kalliyoor  GP  

41  

Metalling  and  tarring  of  the  Kannamkuzhy  -­‐‑  Gurumandiram  Road  in  the  Kannamkuzhy  ward  of  the  Kalliyoor  Grama  Panchayat   7.00   Kalliyoor  

42  

Extension  of  drinking  water    pipe  line  and  providing  public  tap  in  the  Santhivila  Puthenvila  Lane  of  the  Kalliyoor  Grama  Panchayat   2.00   Kalliyoor  

43  Setting  up  of  an  LED  High  Mast  Lighting  System  at  the  Kakkamoola  Jn  in  the  Kalliyoor  Grama  Panchayat   5.54   Kalliyoor  

44  ‘Construction  of  a  building  for  the  Kanjiramkulam  Primary  Health  Centre’.    

13.00  Kanjiramkulam  

45  

Construction  of  fish  Marketing  Shed  inside  Kanjiramkulam  Public  Market   5.00  

Kanjiramkulam  

46  

Construction  of  a  Samskarika  Nilayam  in  the  Puliyadichanvila  Karichal  Ward  of  the  Kanjiramkulam  Gpt  (SC  Work)     9.00   Kanjiramkulam  

47  Purchase  of  10  computers  for  the  Kanjiramkulam  Govt.  College  in  the  Kanjiramkulam  Gpt   3.00   Kanjiramkulam  

48  Setting  up  of  a  High  Mast  Light  at  Kanjiramkulan  Jn  in  the  Kanjiramkulan  Grama  Panjchayat   5.54   Kanjiramkulam  

49  

Construction  of  a  basket  ball  court  in  the  St.  Helen’s  High  School,  Lourdupuram  in  the  Chali  ward  of  the  Kanjiramkuklam  Grama  Panchayat   7.00   Kanjiramkulam  

Page 45: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

50  

Concreting  of  the  Road  from  Perumkulam  to  Pechamkara  Naalampara  in  the  Moonnumukku  ward  of  the  Kanjiramkulam  Grama  Panchayat  (SC  Work)   4.00   Kanjiramkulam  

51  

‘Concreting  of  the  Parayamvilakom  Chidambaram  Plavila  Road  in  the  Oottara  ward  of  the  Kanjiramkulam  Grama  Panchayat  (SC  Work)   4.00   Kanjiramkulam  

52  Const  of  Canopy  shed  for  fishermen  at  Kochupally  in  Karumakulam  gpt(09-­‐‑10),     5.00   Karumkulam  

53  Construction  of  comfort  station  at  Leo  13th  HSS  pulluvila(10-­‐‑11),     5.00   Karumkulam  

54  Construction  of  a  Community  Hall  for  the    Karumkulam  Grama  Panchayat  

20.00  Karumkulam  

55  

construction  of  building  for  an  Anganwadi  and  a  PH  Sub  Centre  in  the  Karuthanvila  area  of  Azhangal  Ward  No.  X  of  the  Karumkulam  Gram  Panchayat    

10.00  

Karumkulam  

56  Setting  up  of  a  High  Mast  Lighting  System  near  St.  Nicholas  Church  in  the  Karimkulam  G  P   4.50   Karumkulam  

57  Setting  up  of  High  Mast  LED  Lighting  System  at  the  Pulluvila  Jn     5.54   Karumkulam  

58  

Installation  of  Pump  set  and  extension  of  pipe  lines  for  launching  a  drinking  water  supply  scheme  at  Oottukuzhy  Nambiathi  in  the  Pampukala  ward  of  Karimkulam  Gpt   4.00   Karumkulam  

59  Tarring  of  pumphouse  Puliyorkonam  Kariyara  Puthalam  Road  in  Kottukal  panchayat  (09-­‐‑10),     5.00   Kottukal  

60  construction  of  sidewall  at  Attaramoola  kizhakkumbhagom  thekkekarathode(10-­‐‑11),     2.50   Kottukal  

61  Pipeline  extention  at  therivila  cheruvila  in  kottukal(10-­‐‑11),     1.39   Kottukal  

62  

Sree  Narayanapuram  Charuvila  Pottavila  Road  -­‐‑    Poovar  west  Branch  Chanel  Bridge  and  side  wall    Construction  at  Kottukal  Grama  Panchayat  

8.00  Kottukal  

Page 46: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

63  

Mettaling  and  tarring  and  side  wall  construction  of  the  Payattuvila  -­‐‑  Panapazhanji  in  the  Payattuvila  Ward  of  the  Kottukal  GP   6.00   Kottukal  

64  

Metalling  and  tarring  of  the  Kollakonam  -­‐‑  Yakshiyamman  Kovil  Road  in  the  Kollakonam  ward  of  Kottukal  Grama  Panchayat   5.00   Kottukal  

65  

Concreting  and  side  wall  construction  for  the  Kuzhiyamvila-­‐‑Poovannarathalackal  SC  Colony  Road  in  the  Kottukal  Grama  Panchayat  (SC  Work)   2.00   Kottukal  

66  Construction  of  a  building  for  the  Kottukal  PH  Centre  Kottukal  Panchayat     5.00   Kottukal    

67  

‘Metalling,  sidewall    and  side  drain  construction  of  the  Karinthalivila  SC  Colony  Road  in  the  Kottukal  Grama  panchayat  (SC  Work)’     5.00   Kottukal    

68  

Side  wall  construction  and  metalling  and  tarring  of  the  Cheenivila  Vettakalam  road  in  Kottukal  Grama  Panchayat(SC  Work)   5.00   Kottukal    

69  

Setting  up  of  an  LED  High  Mast  Lighting  System  at  Kochupally  Adimalathura  Jn.  In  the  Kottukal  Grama  Panchayat   5.54   Kottukal  

70  Kizhanguvila  Nediyakala  side  wall  construction  and  road  formation  in  Poovar  GPT(09-­‐‑10),     4.00   Poovar  

71  Installation  of  computer  and  computer  at  MVHSS  Arumanoor  in  poovar(10-­‐‑11),     2.42   Poovar  

72  

Side  wall  construction,  metalling  and  tarring  of    the  Arumanoor  -­‐‑  Thottuvarambu          Road  in  the  Poovar  Gram  Panchayat  and  (SC  Work)   5.00   Poovar  

Page 47: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

73  

Concreting  of  the  Panchikkala  CSI  Church  -­‐‑  Madathuvilakom  Road  in  the  Poovar  Grama  Panchayat   5.00   Poovar  

74  

Extension  of  the  KSEB  electric  lines  from  Arumanoor  Ganapathiyan  Kovil  -­‐‑Madathuvilakom  to  Chekkadi  in  the  Ward  No  XV  and  Plankala  -­‐‑  Kanchampazhanji  footpath  and  Convent  -­‐‑  Thoovaramthottam  Street   3.00   Poovar  

75  

Side  wall  construction  and  Metalling  of  the  Karimpupacha  Mannadi-­‐‑Vellayamkadavu  in  the  Arumanoor  Ward  of  the  Poovar  Grama  Panchayat   5.00   Poovar  

76  

Extension  of  water  supply  lines  and  providing  public  taps  at  Arumanoorthura,  Kollapazhanji,  Idupadickal  areas  in  the  Kalaithottam  ward  of  Poovar  Grama  Panchayat   4.00   Poovar  

77  Setting  up  of  a  Bus  waiting  shed  at  Arumanoor  MVHSS  Junction  in  the  Poovar  GP   1.80   Poovar  

78  

Providing  2  Solar  Lighting  Systems  by  the  Kundamathinkulam  in  the  Soolankudi  Ward  of  the  Poovar  Grama  Panchayat   0.90   Poovar  Gpt  

79  

Setting  up  of  an  LED  High  Mast  Lighting  System  at  the  Arumanoor  Sree  Nainar  Deva  Temple  in  the  Poovar  Grama  Panchayat          

80  Setting  up  of  an  LED  High  Mast  Lighting  System  at  the  Poovar  Jn.  in  the  Poovar  Grama  Panchayat   5.54   Poovar    

81  

Construction  of  a  building  for  the  Tagore  Social  Development  Cultural  Centre  and  Public  Library  in  the  Beach  Erickilavila  ward  of  the  Poovar  Grama  Panchayat   7.00   Poovar  

Page 48: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

82  

Construction  of  Class  Rooms  for  the  Mahatma  Ayyankali  Smaraka  Upper  Primary  School,Venganoor     10.00   Corpn.  Venganoor  

83  Const  of  muttacadu  Govt  hospital  road  at  Venganoor  gpt(09-­‐‑10),     4.00   Corpn.  Venganoor  

84  Purchase  &  installation  of  5  computers  for  the  Higher  Secondary  School  for  Girls,  Venganoor   1.50   Corpn.  Venganoor  

85  Concrteing  of  the  Lakshmivilakom  Road  in  Venganoor  (SC  Work)   5.00   Corpn.  Venganoor    

86  Concreting  of  the  Thrippalliyoor  Temple  Road  (II  Reach)in  the  Venganoor  Gram  Panchayat   2.00   Venganoor  

87  

Extension  of  water  supply  line  from  Kidarakuzhi  Swagath  nagar  road  to  Ooruvilakam  Chanthavilakam  road,  Carmel  road  to  Pandaravilakam  public  way  in  the  Venganoor  ward  of  Tvpm  Corpn.   2.50   Corpn.Venganoor  ward  

88  Metalling  and  tarring  of  Thripalliyoor  venniyoor  mahavishnu  temple  road(10-­‐‑11),     5.00   Venganoor  

89  Concreting  kavadivilakom  sisilipuram  lakshamveedu  Edavazhi(SC)(10-­‐‑11),     1.00   Venganoor  

90  

Construction  of  side  wall  and  culvert  and  metalling  of  the  Edaparambu-­‐‑Chembankuzhy  Road  in  the  Kalluvettankuzhy  ward  of  the  Venganoor  Grama  Panchayat   10.00   Venganoor  

91  

Metalling  and  tarring  of  the  Puthankanam-­‐‑Ankalackal-­‐‑Midwife  Centre  Road  in  the  Mangalathukonam  ward  of  Venganoor  Grama  Panchayat   7.00   Venganoor  

92  Concreting  of  the  Nellivilakathu  Road  in  Ward  No.  V  of  the  Venganoor  Grama  Panchayat  (SC  Work)     5.00   Venganoor  

93  Concreting  of  Vande  Metaram  road  at  Uchakkada  in  Venganoor  GP  (SC  WORK)   5.00   Venganoor  

94  Concreting  of  the  Thrippaliyoor  Temple  ela  Road  in  the  Venganoor  Grama  Panchayat   2.00   Venganoor  

Page 49: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

95  

Construction  of  side  wall  and  concreting  of  the  Kamukinkuzhy-­‐‑Cherukonam  Canal  Bund  Road  in  the  Cherukonam  IHDP  Colony  in  the  Kovalam  ward  of  the  Venganoor  Gama  Panchayat  (SC  Work)   5.00   Venganoor  Gpt  

96  

Construction  of  a  side  wall  and  concreting  of  the  foot  path  near  Kunniyodu  Sastha  temple  at  Muttakkadu  -­‐‑  Venganoor   5.00   Venganoor  Gpt  

97  

Setting  up  of  an  LED  High  Mast  Lighting  System  at  Kattunada  Mudippura  Temple  Jn  at  Mangalathukonam  in  the  Venganoor  Grama  Panchayat   5.54   Venganoor  

98  

Setting  up  of  an  LED  High  Mast  Lighting  System  at  Azhakulam  Devi  Temple  in  the  Venganoor  Grama  Panchayat   5.54   Venganoor  

    NEMOM       488.1  

1  

Construction  of  sewage  line  and  4  manholes  along  the  Manacaud  valiyapally  Road  in  the  Kalippankulam  Ward  of  Tvpm  Corpn   2.00   Corpn  Kalippankulam  

2  Construction  of  a  Dining  Hall  for  the  Govt.  LP  School,  Kamaleswaram   5.70   Corpn  Kamaleswaram  

3  Installation  of  Focus  light  lamps  National  Highway  JN  Karaman(09-­‐‑10),     6.10   Corpn  Karamana  

4  Melarannoor  Mayadevi  Temple  Road/Prem  Nagar  road  erath  filling,  netalling  abd  tarring   1.50  

Corpn  Karamana  Corp  Ward  

5  Construction  of  Thottuvarambu  road  adjacent  to  Melaranoor  railway  gate  ,Karamana(11-­‐‑12),     4.00  

CorpnKaramana  Corp  Ward  

6  construction  of  sidewall  and  cleaning  of  azhankalthodu  Neeramankara(10-­‐‑11),     6.00   Karamana  

7  

Setting  up  of  a  Children'ʹs  Park  in  the  Govt.  Pattom  Thanupillai  Memorial  School,  Sreevraham  in  the  Manacaud  Ward  of  the  Tvpm  Corpn   4.00   Corpn  Manacaud  

8  Setting  up  of  a  Digital  X-­‐‑Ray  Unit  at  the  Iranimuttam  Govt.  Hospital   15.00   Karamana  

9  Construction  of  a  Building  for  the  Grameena  Grandhasala  at  Pachaloor   8.00   Corpn  Pachalloor  

Page 50: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

10  

Metalling  and  tarring  of  the  Bund  Road  from  Azhenkal  to  Karamana  Bridge  in  the  Pappanamcod  Ward  of  the  Corpn   10.00   Corpn  Pappanamcod  

11  Setting  upof  a  High  Mast  Lamp  at  Estate  Junction  Pappanamcode(11-­‐‑12),     4.20   Corpn.  Pappanamcode  

12  

Construction  of  laboratory  building  for  the  Govt.  Nrithalaya  Hospital,  Poojappura   12.00  

Corpn  Poojappura  

13  

Construction  of  a  Bus  Waiting  Shed  at  the  Poojappura  Jn   1.80  

Corpn  Poojappura  

14  Purchase  and  Instlation  of  Two  Computers  for  the  MSC  LPS  -­‐‑  Thrivikramangalam,  Poojappura   0.60   Corpn  Poojappura  

15  Construction  of  computer  room  for  Thirumala  UPS(09-­‐‑10),     6.70   Corpn  Thirumala  

16  Purchase  and  installation  of  2  computers  for  the  Govt.  LPS  Mangadu,  Thirumala,  Tvpm   0.50   Corpn  Thirumala  

17  Purchasing  of  Laboratory  supplies  at  Abraham  Memorial  HSS  Thirumala(09-­‐‑10),     1.00   Corpn.  Thirumala  

18  Setting  up  of  a  High  Mast  Lighting  System  at  the  Thirumala  Junction  in  Thirumala  Corpn.  ward     4.50      

19  Setting  up  of  a  computer  lab  in  the  Govt.  High  School,  Kaladi   3.50  

Corpn.    kaladi  Corpn.  Ward  

20  Construction  of  a  Building  for  the  Gramodharana  Sangam  Grandha  Shala  ,  Kalady,  Tvpm   8.00   Corpn  Kalady  

21  supply  of  two  computers  for  WLP  School,  Koliyakode  ,  Nemom  ward  of  Tvpm  Corpn.   0.50   Corpn.    Nemom  ward  

22  

‘Construction  of  an  Auditorium  building  for  the  Government  UP  School  in  the  Ambalathara  ward  of  the  Thiruvananthapuram  Corporation’     10.00   Corpn  Ambalathaa  

23  Metalling  &  Tarring  of  Kaliyickal-­‐‑Kunnuvila  Road    in  the  Nemom  ward  of  Tvpm  Corpn   6.50   Corpn.  Nemom  

Page 51: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

24  Setting  up  of  High  Mast  Lighting  system  at  Plankala  Jn  of  the  Nemom  ward     4.50   Corpn.  Nemom  ward  

25  Setting  up  of  High  Mast  Lighting  system  at  Paruthikuzhy  Jn   4.50   Corpn.  Nemom  ward  

26  

Setting  up  of  a  High  Mast  lamp  at  Padasseri-­‐‑Attukal  Road  (Corporation  Road)  close  to  Attukal  Bhagavathy  Temple    

4.20  

Corpn.  Attukal  

27  

Installation  of  High  mast  Lighting  System  at  the  Konchiravila  Temple  Jn.  in  the  Attukal  ward  of  Tvpm  Corpn.   5.54   Corpn.  Attukal  

28  Construction  of  a  Stage  Platform  in  the  Konchiravila  Govt.  UP  School(11-­‐‑12)     1.50   Corpn.  Konchiravila  

29  Supply  of  a  10  computer  lab  in  the  Vazhamuttom  Govt  HS  Pachalloor   5.00   Corpn.  Pachalloor  

30  Purchase  and  installation  two  Computers  for  the  Pachalloor  LP  School   0.50   Corpn.  Pachalloor  

31  Setting  up  of  a  bus  waiting  shed  at  the  the  Thiruvallam  UP  School  Jn.   1.80   Corpn.  Thiruvallam  

32  

Construction  of  side  wall  for  the  Varuvila  -­‐‑  Mulluvila  Road  in  the  Punchakari  Ward  of  the  Thiruvananthapuram  Corporation   7.00   Corpn.  Punchakari    

33  Construction  of  a  stage  for  the  BNV  LP  School,  Punchakari,  Thiruvallam   5.00   Corpn.  Punchakari  

34   Computer  lab  for  the  LPS,  Thiruvallam   0.49   Corpn.  Thiruvallam  

Page 52: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

35  Setting  up  of  a  High  Mast  Lighting  System  at  the  Pachalloor  Jn   5.54   Corpn.  Pachalloor  

36  

Laying  of  SW  line  and  construction  of  manholes  at  Pulichivila,  in  the  Velanvilakathu  Harijan  Colony  

7.23  

Corpn.Melarannur  

37  Purchase  &  installation  of  5  computers  for  the  Pappanamcode  Govt.  High  School,  Pappanamcode   1.50   Corpn.Pappanamcode  

38  

Construction  of  a  laboratory  building  for  the  Nemom  Taluk  Hospital  at  Santhivila  Jn.  in  the  Ponnumangalam  Ward  of  Tvpm  Corpn.     8.00   Corpn  Ponnumangalam  

39  

Setting  up  of  High  Mast  Lighting  System  at    the  Thiruvallam  Jn  in  the  Thiruvallam  ward  of  Tvpm  Corpn.   5.54   Corpn.  Thiruvallam  

    NEYYATTINKARA       159.3  

1  Construction  of  building  for  Govt:UPS    Puthuchal,  Plavila,  Athiyannoor  Panchayat  

11.50  Athiyannoor    

2  Metalling  and  tarring  of  Pongil  Kurvikkala  Channel  bund  rd  in  Athiyannoor  gpt(09-­‐‑10),     5.00   Athiyannoor  

3  Supply  of  two  computers  for  MKM  LPS,  Pongin,  Mulluvila   0.49   Athiyannoor  

4  Purchase  and  installation  of  2  Computers  for  the  Govt.  LPS  Thongal,  Nellimood   0.60   Athiyannoor  

5  

Metalling  and  tarring  and  side  wall  construction  of  Ramapuram  Chettivilakom  -­‐‑  Idathumoola  SC  Colony  Road  in  the  Athiyannoor  Grama  Panchayat  (SC  Work)   6.50   Athiyannoor    

6  

Construction  of  Thoppuvila  Channel  Bridge  at  Thannimood  Ward  Athiyannur     7.00  

Athiyannoor    

7  

Construction  of  an  Auditorium  stage  and  providing  allied  facilities  for  the  Deshabhivardini  Grandha  Shala  and  Reading  Room    at  Nellimoodu  in  Athiyannoor  Grama  Panchayat.   6.00   Athiyannoor  

Page 53: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

8  Mariyapuram  Harijan  Colony  road  Tarring  in  Chenkal  gpt(SC)(09-­‐‑10),     5.00   Chenkal  

9  Metalling  and  Tarring  of  valiyakulam  panayarakal  Mariyapuram  in  chenkal(10-­‐‑11),   5.00   Chenkal  

10  Const  of  box  Culvert  at  Kollayil  Branch  Canal  Udiyankulalngara  Azhakikonam  rd(09-­‐‑10)   3.00   Chenkal  

11  Thrikkannapuram  marayikulam  Ambedkar  road  metalling  and  tarring(10-­‐‑11),     5.00   Chenkal  

12  Metalling  of  Chavaloor  Potta-­‐‑Uttamkulam  Vaniyamkala  Road(10-­‐‑11)SC   4.00   Chenkal  

13  

Asharikulam  –  Amachakulam  Bund  Construction  

5.00  

Chenkal  

14  

Setting  up  of  a  High  Mast  Lighting  System  at  the  Udiyamkulangara  Junction  in  the  Chenkal  Grama  Panchayat   4.50   Chenkal  

15  

Extension  of  water  supply  line  to  Valiyavila  road  near  Udiyankulangara  in  the  Kachottukonam  ward  of  the  Chenkal  Grama  Panchayat   2.00   Chenkal  

16  

Purchase  and  Instllation  of  2  Computers  for  the  RCLP  School  Kochottukonam  in  the  Chenkal  Grama  Panchayat   0.60   Chenkal  

17  Metalling  and  tarring  of  Periya  Veedu-­‐‑Vlathankara  road  in  the  Vlathankara  East  ward  of  chenkal  G  P   5.00   Chenkal  

18  Construction  of  a  building  for  Anganwadi  at  Vlathankara  ward,  Chenkal  Panchayat  

5.00  

Chenkal  Panchayat  

19  Setting  up  of  LED  High  Mast  Lighting  System  at  the  Pazhaya  Uchakada  Jn  in  the  Karod  Grama  Panchayat.   5.54   Karod  

Page 54: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

20  Purchase  and  instalation  of  two  computers  for  the  Govt.  KVHS  Ayira   0.50   Karod  

21  Concreting  of  the  Kollavila-­‐‑Pattavila  footpath  in  the  Venkulam  Ward  of  the  Karod  Grama  Panchayat  

10.00   Karod    

22  

 Construction  of  Foot  Bridge  above  the  irrigation  canal  near  Ponkuzhi  Temple  in  Karode  Panchayat,  ward-­‐‑10  

5.00  

Karod    

23  Const  of  Samskarika  Nilayam  at  Ambanavila  ward  Karod  gpt(09-­‐‑10),     5.00   Karode  

24  

Concreting  of  Pathway  at  Veliyamkottukonam-­‐‑  Mannaravila-­‐‑Narayana  Gurudeva  Mandiram  in  Karode(10-­‐‑11),     6.00   Karode  

25  Concreting  of  kamparavila  ponvila  chanal  bund  road  karode  (10-­‐‑11),     5.00   Karode  

26  Construction  of  an  Anganvadi  Building  in  the  Ambilikonam  ward  of  Karode  G  P   9.00   Karode  

27  Concreting  of  the  Themmanam  vila  -­‐‑  Kallanpotta  Road  in  the  Maradi  Ward  of  Karod  Grama  Panchayat   7.50   Karode  

28  Drinking  water  supply  scheme  for  the  Kallampotta  area  of  the  Puthusseri  ward  of  Karode  Panchayat   5.00   Karode  

29  

community  drinking  water  supply  scheme  'ʹPanayarakavila  Drinking  water  supply  scheme  in  the  Kakkavila  Ward  of  the  Karod  Gpt"ʺ   5.00   Karode  G  P  

30  

Concreting  of  the  Erickalathuvila-­‐‑    Valiyavilakom-­‐‑Thacharackal  Road  in  the  Kanthalloor  Ward  of  the  Karod  Grama  Panchayat     3.00   Karod  

Page 55: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

31  Construction  of  building  for  a  Samskarika  Nilayam  in  the  Njarakala  ward  of  Karode  G  P   7.00   Karod  

32  M  and  T  of  Thekuthai  kakkali  chackochi  vilakam  road  in  perumpozhinji  ward  in  kulathoor  (09-­‐‑10),     5.00   Kulathoor  

33  Construction  of  pumphouse  and  50  HP  pump  set  installation  at  mavilakadvu  lift  irrigation(10-­‐‑11),     6.45   Kulathoor  

34  

Setting  up  of  LED  High  Mast  Lighting  System  at  the  near  the  Kollamkod  Public  Stadium  in  the  Kulathoor  Grama  Panchayat   5.54   Kulathoor  

35  

Concreting  of  Therummal-­‐‑Kanivilakom  footpath  in  the  Poozhikunnu  Ward  of  Kulathoor  Grama  Panchayat   7.00   Kulathoor  

36  

Purchase  &  Installation  of  5  computers  for  the  St.  Mathews  High  School,  Pozhiyoor  in  the  Kulathoor  G  P   1.50   Kulathoor  

37  Construction  of  Kulathoor    Govt.  HSS  Auditorium       10.00  

Kulathoor  GP  

38  

Construction  of  a  Building  in  Pozhiyoor  Govt.Hospital,  Pozhiyoor,  Kulathoor  Panchayat   10.00  

Kulathoor  Panchayat  

39  

Setting  up  of  a  High  Mast  Lighting  System  at  the  CSI  Church  Junction,  Amaravila  in  the  Neyyattinkara  Municipality.   5.54   Neyyatinkara  Municipality  

40  Setting  up  of  a  High  Mast  Lighting  System  at  the  Neyyattinkara  Hospital  Junction     4.50   Neyyattinkaa  Municipality  

41  Construction  of  building  for  Anganwadi  in  the  Mambazhakara  ward  of  Neyyattinkara  Municipality   7.00   Neyyattinkara  

42  Metalling  and  Tarring  at  Thottathukadavu  road  in  Neyyattinkara(10-­‐‑11),     5.00   Neyyattinkara  Muncipality  

Page 56: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

43  Metalling  and  Tarring  Vadakinkara  Asarivilakom  road  in  neyyattinkara(10-­‐‑11)   5.00   Neyyattinkara  Muncipality  

44  Concreting  at  NSS  Karayogam  road  Neyyattinkara(10-­‐‑11),     1.00   Neyyattinkara  Muncipality  

45  

Construction  of  a  Community  Hall  at  the  Kadavamkod  SC  Colony  in  the  Perumpazhathur  ward  of  Neyyatinkara  Municipality.  (SC  Work)   8.00  

Neyyattinkara  Munici.  Perumpazhathur  

46  ‘Construction  of  a  Water  Tank  in  the  Panagattukari  Ward  of  the  Neyyattinkara  Municipality’     10.00  

Neyyattinkara  Municipality  

47  

Setting  up  of  a  Children’s  Park  at  Irumbil  ward,  Neyyattinkara  Muncipality   5.00   Neyyattinkara  

Municipality  

48  

Construction  of  side  wall  and  concreting  of  the  Chandramangalam  Canal  Bund  Road  in  the  Muttackad  Ward  of  the  Neyyattinkara  Municipality  (SC  Work)   5.00  

Neyyattinkara  Municipality  

49  

Extension  of  Water  supply  line  to  Pinnavavila  Kunnathu  Road  in  Ooruttukala  ward  of  Neyyattinkara  Municipality   5.00  

Neyyattinkara  Municipality  

50  

Installation  of    high  pressure  pump  sets  for  the  KWA    pumping  House  at  Aruvipuram  in  the  Perumpazhathoor  ward  of  Neyyatinkara  Municipality     7.30  

Neyyattinkara  Municipality  Perumpazhathur    

51   Building  Const  for  GOVT  HSS  Neyyatinkara(09-­‐‑10),     5.00   Neyyetinkara  Muncipality  

52  Supply  of  two  computers  for  BFM  LPS,  Perumpazhuthoor-­‐‑CSI  Corporate  Management   0.50   Perumpazhuthoor  

53  

Construction  of  a  public  utility  hall  on    the  second  floor  of  the  Perumpazhuthoor  Service  Co-­‐‑operative  Bank  building,  Neyyattinkara   7.00  

Neyyattinkara  Municipality  Perumpazhathur    

Page 57: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

54  

Sidewall  construction  and  earth  filling  for  the  Moolathilkonam  -­‐‑  Pourasamithy  Road  in  the  Puthanambalam  ward  of  Neyyattinkara  Municipality  (SC  Work)   6.00   Neyyetinkara  Muncipality  

55  Construction  of  Latrine  at  Govt.  L.  P.  School,Puthenkada.   2.50   Thiruppuram  

56  Arumanoorkada  laksham  veedu  colony  road  metalling  and  tarring(SC)(10-­‐‑11),     5.00   Thiruppuram  

57  

Metalling  and  tarring  of  Cholanvila-­‐‑Cherukari    Harijan    Colony  Road  excluding  the  extent  between  Ch.  69.10  m  and  97.70  m  in  Ward  No  IX  of  Thirupuram  Grama  Panchayat  

3.60  

Thiruppuram  

58  Metalling  &  Tarring  of  the  Gramakonam  Perumasseri  road  in  the  Pazhayakada  ward  of  Thiruppuram  G  P   5.00   Thiruppuram  

59  Concreting  of  Kakkad  Chellappan  Pillai  Memorial  road  in  the  Pazhayakada  ward  Thiruppuram  G  P   5.00   Thiruppuram  

60  

Purchase  &  installation  of  2  computers  for  the  St.  Joseph'ʹs  LP  School,  Mulluvila  in  the  Thiruppuram  G  P   0.60   Thiruppuram  

61  Metalling  and  Tarring  of  pathanavila  Bund  road  in  Thirupuram(10-­‐‑11),     5.00   Thirupuram  

62  

Construction  of  a  building  for  the  inpatient  wing  of  the  Ayurvedic  Hospital  at  Eruvaikkonam  on  the  first  floor  of  the  existing  building  in  the  Thirupuram  G  P   10.00   Thirupuram  

63  

Concreting  of  the  Melepattavilakam-­‐‑Pattavilakam  footpath  in  the  Plamthottam  ward  of  Thirupuram  G  P  (SC  work)   2.00   Thirupuram  

64  

Construction  of  a  building  for  the  Primary  Health  Centre  at  Paraniyam  in  Pathanavila  ward  of  Thirupuram  G  P   8.00   Thirupuram  G  P  

    PARASSALA       333.76  

Page 58: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

1  

Const  of  a  foot  brige  across  Neyyar  Reservoir  at  Panthaplamood  Thodumala  in  Amboori  pt(ST)(09-­‐‑10),     15.00   Amboori  

2  

Construction  of  a  building  for  the  Tribal  ITI  at  Kuttamala  in  the  Amboori  Grama  Panchayat  (ST  Work)   24.00   Amboori  

3  

Metalling  and  tarring  of  the  II  Reach  of  the  Road  from  Chackapara  to  Thenmala  ST  Settlement  Colony  (ST  Work)   10.00   Amboori  

4  Purchase  and  installation  of  2  computers  LP  School  Kovilloore,  Kudappanamood  Amboori  GP   0.60   Amboori  

5  

Purchase  &  Installation  of  5  computers  for  the  St.  Thomas  Higher  Secondary  School,  in  the  Amboori  G  P   1.50   Amboori  

6  Purchase  and  installation  of  2  computers  for  the  St.  Geroge'ʹs  LP  School,  Amboori   0.60   Amboori  

7  

Extension  of  KSEB  electric  lines  for  street  lights  in  the  Thodumala  ward  of  the  Amboori  Grama  Panchayat  (ST  Work)   6.50   Amboori  

8  

Metalling  &  Tarring  of  a    new  road  from  chackapara  to  Thenmala  settlement  colony  via  Ayyavilakom,  Karikuzhi,  Sainkhinkonam,  Puravimala  colonies-­‐‑ST  work   15.00   Amboori  G  P  

9  

Construction  of  a  Road  from  Shankinkonam  to  Puravimala  ST  Colonies  in  the  Amboori  Grama  Panchayat.  (ST  Work)   10.00   Amboori  G  P  

10  Setting  up  of  a  High  Mast  Lighting  System  at  the  Amboori  Junction  in  the  Amboori  G  P     4.50   Amboori  G  P  

11  

Construction  of  an  Extension  Hall  for  the  Chackappara  Anganwadi  in  the  Tribal  Settlement  Colony  of  Thodumala  Ward,  Amboori  Grama  Panchayat  (  ST  Work)   5.00   Amboori    

12  

Formation  and  metalling  of  the  Chackapara-­‐‑Thenmala  Road  in  the  Amboori  Grama  Panchayat  III  Reach   11.00   Amboori  

Page 59: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

13  

Earth  work  and  concreting  of  Kondaketty-­‐‑Aalampanthi  road  in  the  Thekkupara  ward  of  Amboori  G  P     5.00   Amboori  

14  Setting  up    of  a  High  Mast  Lighting  System  at  the  Ottasekharamangalam  Jn.  in  the  Ariyancode  G  P   5.00   Ariyancode  

15  Const  of  School  auditorium  Govt  VHSS  Keezharoor(09-­‐‑10),     5.00   Aryancode  

16  

Metalling  and  side  wall  construction  of  the  Mandapathara-­‐‑Maryancode  Kovilvila  Road  in  the  Aryancode  Panchayat   5.00   Aryancode  

17  Purchase  and  Instllation  of  5  Computers  for  the  LMS  Higher  Secondary  School  -­‐‑  Chempoor   1.50   Aryancode  

18  Const  of  Canopy  shed  for  fish  Sales  At  Aryankode  Market(09-­‐‑10),     3.00   Aryankode  

19  Const  of  Comfort  station  for  Mylachal  Govt  HSS(09-­‐‑10),     2.00   Aryankode  

20  

Construction  of  a  buiding  for  the  Family  Welfare  Centre  (PH  Sub  Centre)  at  Mylachal  in  the  Aryancode  grama  Panchayat   8.00   Aryankode  G  P  

21  Extention  of  electricity  lines  and  Installation  of  street  lights    in  the    Manjamkode  ward  of  Ariyancode  G  P   2.00   Aryancode  

22  Purchase  and  supply  of  a  Computer  for  the  Aided  Lower  Primary  School,  Vavode-­‐‑Vazhichal   0.25   Kallikadu  G  P  

23  

Construction  of  sidewall  and  M  and  T  in  narakathinkuzhiroad  in  vavodu  ward  in  kallikad  pt(ST)(09-­‐‑10),     15.00   Kallikkad  

24  Drinking  water  supply  scheme  in  the  Vavode  ward  of  the  Kallikkad  Grama  Panchayat   4.00   Kallikkad  

25  Purchase  and  installation  of  2  computers  for  the  UPS  Mylakkara,  in  the  Kallikkad  Gpt   0.50   Kallikkad  

Page 60: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

26  Setting  up  of  a  High  Mast  Lighting  System  at  the  Neyyardam  Junction   4.50   Kallikkad    

27  

Construction  of  Moozhi  Andivilakonam  footpath  and  construction  of  foot  bridge  across  Moozhithodu  in  Kallikkad  Panchayat   4.00   Kallikkad    

28  Setting  up  of  a  bus  waiting  shed  at  the  Mylakkara  Jn  in  the  Kallikkad  Grama  Panchayat     1.80   Kallikkad    

29  Setting  up  of  an  LED  High  Mast  Lighting  System  at  the  Mylakkara  Jn  in  the  Kallikkad  Grama  Panchayat     5.54   Kallikkadu  

30  Setting  up  of  an  LED  High  Mast  Lighting  System  at  the  Kallikad  Jn  in  the  Kallikkad  Grama  Panchayat     5.54   Kallikkadu  

31  Metalling  and  Tarring  of  Manjavilakom  punnackal  kuzhiyarathalala  road  in  kollayil  grama  pt(10-­‐‑11),     5.00   Kollayil  

32  

Construction  of    ‘Mannamkulam  Dobhighat  Project  (SC  Fund)  at  Kollayil  GP   8.00  

Kollayil  

33  

Construction  of  an  open  air  auditorium  for  the  Manjavilakom  Govt.  UPS,  Manjavilakom  in  the  Kollayil  Grama  Panchayat   3.00   Kollayil  

34  Construction  of  building  for  a  Anganvadi  in  the  Panayanmoola  ward  of  Kollayil  G  P   7.00   Kollayil  

35  

Concreting  of  the  Cheruvanamcode-­‐‑Laksham  veedu  colony  road  in  the  Dhanuvachapuram  ward  of  Kollayil  G  P  (SC  Work)       5.00   Kollayil  

36  Concreting  of  the  Mangottukonam  -­‐‑  SC  Colony  Road  in  the  Kollayil  Grama  Panchayat  (SC  Work)   4.00   Kollayil  

Page 61: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

37  

‘Construction  of  a  bathing  ghat  at  the  Parakkulam  public  pond  in  the  Mekolla  ward  of  Kollayil  Grama  Panchayat’     5.00   Kollayil  

38  

Setting  up  of  an  LED  High  Mast  Lighting  System  at  Dhanuvachapuram  Park  Jn.  in  the  Kollayil  Grama  Panchayat   5.54   Kollayil    

39  

Construction  of  the  First  Phase  of  the  OP  Block  for  the  Kunnathukal  Primary  Health  Centre  in  the  Kunnathukal  GPT   10.00   Kunnathukal  

40  

Launching  a  Mini  Water  Supply  Scheme  at  Venkavila  New  Housing  Colonyin  the  Kunnathukal  Gpt  (SC  Work)   4.18   Kunnathukal  

41  

Purchase  and  installation  of  4  Computers  for  the  St.John'ʹs  HSS,  Undancode,  Cehriyakolla  in  the  Kunnathukal  Grama  Panchayat   1.20   Kunnathukal  

42  

Purchase  and  installation  of  2  computers  for  the  MSC  LPS  Cheriyakolla,  Kudayal  PO  in  nthe  Kunnathukal  Gpt   0.50   Kunnathukal  

43  

Purchase  and  installation  of  1  Computer  for  the  LMS  LP  School  in  the  Kuruvad  Ward  of  the  Kunnathukal  Grama  Panchayat   0.30   Kunnathukal  

44  Metalling  &  Tarring  of  Aanavoor  Kallara  road  in  the  Aanavoor  ward  of  Kunnathukal  G  P   6.00   Kunnathukal  

45  Mini  Drinking  Water  Supply  Scheme  at  Elluvila  in  the  Elluvila  ward  of  Kunnathukal  G  P   4.00   Kunnathukal  

46  Setting  up  of  Bus  Waiting  Shed  at  the  Aruviyod  Jn  in  the  Kunnathukal  Grama  Panchayat   1.80   Kunnathukal  

47  Setting  up  of  a  High  Mast  Lighting  System  at  the  Karakonam  Junction     4.50   Kunnathukal  GP  

Page 62: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

48  Purchase  &  Installation  of  2  Computers  for  the  LMS  LPS  Kuttaninnathil,  Kunnathukal   0.60   Kunnathukal  

49  

Side  wall  construction,  earth  filling  and  metalling  of  Areckar-­‐‑Perumkunnam  ST  Colony  Road  (I  Reach)  in  Ottasekharamangalam  Grama  Panchayat  (ST  Work)   10.00   Ottasekaramangalam  

50  

Side  wall  construction,  earth  filling  and  metalling  of  Areckar-­‐‑Perumkunnam  ST  Colony  Road  (II  Reach)  in  Ottasekharamangalam  Grama  Panchayat  (ST  Work)   10.00   Ottasekaramangalam  

51  

Side  wall  construction,  earth  filling  and  metalling  of  Areckar-­‐‑Perumkunnam  ST  Colony  Road  (III  Reach)  in  Ottasekharamangalam  Grama  Panchayat  (ST  Work)   10.00   Ottasekaramangalam  

52  

Providing  2  Computers  to  the  LMS  L.P.S,  Chemboor,  Ottasekharamangalam.   0.50  

Ottasekharamangalam  

53  

Construction  of  a  building  for    the  Cultural  Centre  on  the  1st    Floor  of  the  Anganwadi  building  at    Alachalkonam  in  the  Ottasekharamangalam  Gram  Panchayat    (SC  Wok)(118)   9.00   Ottasekharamangalam  

54  

Setting  up  of  a  High  Mast  Lighting  System  at  the  Mandapathinkadavu  Junction  in  the  Ottasekharamangalam  G  P     4.50   Ottasekharamangalam  

55  Construction  of  the  Aattoor  Elavankuzhi  bridge  in  the  Ottasekharamangalam  G  P   15.00   Ottasekharamangalam  

56  Concreting  of  Kuttara  Stadium  Kakkadu  road  in  Ottasekharamangalam  Pt.(11-­‐‑12),     5.00   Ottasekhramangalam  

57  

Construction  of  building  for  a  Samskarika  Nilayam  in  the  Perumkunnam  ST  Colony,  Thlampazhanji  Ward  of  the  Ottasekharamangalam  Grama  Panchayat  (ST  Work)  

13.50  

Ottashekaramangalam  

58  

Installation  of  solar  lighting  systems  at  2  tribal  centres  of  worship,  Sree  Chamundeswary  Kshethram  and  Sree  Sastha  Kshethram  on  the  Areckarpara  in  the  Ottasekharamangalam  Grama  Panchayat.(ST  Work)   2.50   Ottasekharamangalam  

Page 63: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

59  

Constructions  of  Market  shed  in  Puthenkada,  Parassala.   5.00   Paassala  

60  M  and  T  of  Padanthalumoodu  Devarkulam  rd  in  Parasala   4.00   Parassala  

61  Metalling  and  tarring  of  mukkukada  chirakulam  road  parassala(10-­‐‑11),     5.00   Parassala  

62  Anamundaikal  madhavassery  harijan  colony  road  metalling(SC)(10-­‐‑11),     5.00   Parassala  

63  Thekkumkara  madhavassery  harijan  colony  road  metalling  and  tarring(SC)(10-­‐‑11),     5.00   Parassala  

64  

Construction  of  Manalivila-­‐‑Vannyacode  Bridge  at  Vannyacode,  Parassala     7.15  

Parassala  

65  

Construction  of  a  building  for  an  Anganwadi  (No.159)  in  the  Parassala  Grama  Panchayat.   5.00  

Parassala  

66  

Metalling  and  tarring  of  the  Kuzhivila-­‐‑Vettukad-­‐‑  Manivila  Road  in  the  Nediyamkod  ward  of  the  Parassala  Panchayat  (SC  Work)   5.00   Parassala  

67  Construction  of  a  building  for  the  Govt.  LP  School,  Inchivila   6.00   Parassala  

68  

Concreting  of  the  Peruvila  CSI  Church-­‐‑Pallivila  Vandichira  footpath  in  the  Peruvila  ward  of  the  Parassala  Panchayat   3.00   Parassala  

69  

Metalling  &  Tarring  of  Thekkemomvilakam-­‐‑Kurichivila-­‐‑Machingathottam-­‐‑Thattavila-­‐‑Trinity  Nagar  in  the  Nettuvanvila  ward  of  Parassala  GP   7.00   Parassala  

70  Setting  up  of  a  High  Mast  Lighting  System  at  the  KSRTC  Depot  Jn.  ,  Parassala   5.54   Parassala  

71  Metalling  &  tarring  of  Vettucadu-­‐‑Manivila  road  in  the  Nediyamcode  ward  of  Parassala  G  P   5.00   Parassala  

Page 64: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

72  

Installation  of  a  High  Mast  Lighting  System  at  the  Mahadevar  Temple    Jn.  Parassala  in  the  Parassala  Gpt.   5.54   Parassala  

73  Setting  up  of  High  Mast  Lighting  System  at  Parasuvaickal  Jn.,  in  the  Parassala  G  P   5.54   Parassala  

74  Purchase  &  installation  of  2  computers  for  the  LMS  UPS  Parasuvaickkal,  Parassala   0.60   Parassala  

75  

Construction  of  a  public  crematorium  at  the  Parassala  NSS  Karayogam  cremation  ground  in  the  Town  Ward  of  the  Parassala  Grama  Panchayat’   3.00   Parassala    

76  Purchase  and  installation  of  3  computers  for  the  St.  Joseph’s  UP  School,  Pottayilkada,  Parassala   1.00   Parassala  

77  Otichal  SC  colony  Footpath  Concrete  with  Drainage  construction(09-­‐‑10),     10.00   Perumkadavila  

78  

Tarring  and  Side  wall  constn  of  Thathiyoor  Aruvikkara  Sree  Bhagavathy  Temple  Road  in  Perumkadavilla   5.00   Perumkadavila  

79  

Construction  of  building  for  a  Cultural  Centre  on  the  10  Cents  of  land  available  in  the  IHDP  Colony,  Perunkadavila  (  SC  Work)   18.00   Perumkadavila  

80  

Construction  of  a  building  for  Marayamuttam  Govt.  H.S.S,  Marayamuttam,  Perumkadavila  Panchayat   10.00  

Perumkadavila  

81  

Construction  of  a  building  for  a  P  H  Sub  Centre  in  the  Thrippalavur  Ward  of  the  Perunkadavila  Grama  Panchayat.  

5.00  Perumkadavila  

82  

Metalling  &  tarring  of  the  Malayilkkada  Thenguvilakuzhi  road  in  the  Vadakara  ward  of  Perumkadavila  G  P   5.00   Perumkadavila  

Page 65: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

83  Construction  of  an  Anganwadi  Building  in  the  Pazhamala  ward  of  Perumkadavila  G  P   4.75   Perumkadavila  

84   Setting  up  of  a  High  Mast  Light  at  Perumkadavila  Jn.   4.50   Perumkadavila  

85  

Construction  of  a  building  for  an  Anganwadi  in  the  Ayiroor  Ward  of  the  Perumkadavila  Grama  Panchayat   5.00   Perumkadavila  

86  

Concreting  of    the  footpath  from  the  Anganwadi  to  the  Panakottukonam  SC  settlement  colony  in  the  Aankod  ward  of  Perumkadavila  G  P  (SC  Work)   5.00   Perumkadavila  

87  

Const  of  side  wall  and  concreting  of  Pathway  Vadakara  Bhagavathy  Temple  rd  in  vadakara  ward(09-­‐‑10),     5.00   Perumkadavila  

88  

Setting  up  of  an  LED  High  Mast  Lighting  System  in  front  of  the  Aruvippuram  Temple  in  the  Aruvippuram    ward  of  Perumkadavila  Grama  Panchayat’     5.95   Perumkadavila  

89  Njankuzhi  Pockali  Ramp  Construction  in  Vellarada  gpt(09-­‐‑10),     8.00   Vellarada  

90  Vellarada  Karimaram  Colony  Anganawdi  Building(09-­‐‑10),     4.00   Vellarada  

91  

Side  wall  construction  and  concreting  of  the  Karippukali  –  Plankala  footpath  in  the  Kakkathookki  ward  of  Vellarada  Grama  Panchayat  (SC  Work).   3.00   Vellarada  

92  Construction  of  a  building  for  a  mini  Community  Hall  at  Kallimood  Jn.  in  the  Vellarada  GP   9.00   Vellarada  

93  

Concreting  of  the  footpath  to  the  Malayankavu  Harijancolony  on  the  Krishnapuram  Ward  of  the  Vellarada  Grama  Panchayatco  (SC  Work)   4.00   Vellarada  

Page 66: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

94  Mini  Water  Supply  Scheme  for  the  Orukuzhy  area  in  the  Meethi  Ward  of  the  Vellarada  Grama  Panchayat   1.50   Vellarada  

95  Purchase  and  installation  of  3  Computers  for  the  VPM  High  School,  Vellarada  Grama  Panchayat   0.90   Vellarada  

96  

Purchase  and  installation  of  2  computers  for  the  for  the  Jayamatha  UPS  Manoor,  Dalumugham  in  the  Vellarada  Gpt   0.50   Vellarada  

97  Construction  of  building  for  the  Anganvadi  at  Mylakunnu  in  the  Kiliyoor  ward  of  the  Vellarada  G  P   7.00   Vellarada  

98  Concreting  of  the  Anappara  Poovankuzhy-­‐‑  SC  colony  in  the  Kovilloor  ward  of  Vellarada  G  P   4.00   Vellarada  

99  

Setting  up  of  a  bus  waiting  shed  at  theAruvattukonamJn  in  the  Vellarada  Grama  Panchayat     2.30   Vellarada  

100  Construction  of  Alikkode  -­‐‑  Kaithottumoola  Edathara  Road  (10-­‐‑11),     5.00   Vellarada    

101  Setting  up  of  an  LED  High  Mast  Lighting  System  at  at  the  Koothali  Jn  in  the  Vellarada  Grama  Panchayat   5.54   Vellarada  

102  

Setting  up  of  an  LED  High  Mast  Lighting  System  at  at  the  Sangama  Vedi  Jn  in  the  Vellarada  Grama  Panchayat   5.54   Vellarada  

    THIRUVANANTHAPURAM       561.6  

1  

‘Construction  of  an  Auditorium  building  for  the  Government  UP  School  in  the  Ambalathara  ward  of  the  Thiruvananthapuram  Corporation’    

10.00  

Nemom  

2  

Extension  of  KSEB  electric  lines  and  providing  street  lights  from  Valiyathope  Fatima  Mata  Road  in  the  Valiyathura  ward  of  the  Thiruvananthapuram  Corpn   2.50   Corpn.  Valiyathura    

3  

Setting  up  of  a  bus  waiting  shed  at  the  Karikkakom  Temple  Jn  in  the  Karikkakam  Ward  of  the  Trivandrum  Corporation   1.80   Corpn  Karikkakam  

Page 67: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

4  

Supply  of  20  Computers  for  the  Computer  Lab  in  the  St.  Joseph  Higher  Secondary  School,  Tvpm   5.00  

Corpn  Palayam  

5  

Purchase  of  a  vehicle  for  the  Cornea  Retrieval  Unit  under  the  Community  Outreach  Services  of  the  Regional  Institute  of  Ophthalmology  (Govt.  Ophthalmic  Hospital),  Thiruvananthapuram   4.10   Corpn  Palayam  

6  

‘Setting  up  of  a  High  Mast  Lighting  System  at  Poonthura  Jn.  in  front  of  the  Sree  Sastha  Temple  in  the  Manikyavilakom  ward  of  the  Tvpm  Corpn’   4.50   Corpn  Poonthura  

7  Purchase  and  installation  of  7  Computers  for  the  St.  Mary'ʹs  Higher  Secondary  School,  Vettucadu,  Tvpm   2.10   Corpn  sanghumugham  

8  

Construction  of  a  road  from  the  Kannamthura  St.  Peter'ʹs  Church  towards  Shankumukham  in  the    Shankumukham  ward  of  the  Tvpm  Corpn.   3.19   Corpn  Shankumukham  

9  

Purchase  of  an  Ambulance  Vehicle  for  the  Indian  Red  Cross  Society,  Kerala  State  Branch,  Thiruvananthapuram   7.46   Corpn  Thampanoor  

10  

Setting  up  of  a  High  Mast  Lighting  System  at  the  Aristo  Junction  in  the  Thampanoor  ward  of  the  Thiruvananthapuram  Corpn   5.54   Corpn  Thampanoor  

11  

Construction  of  a  building  for  PH  Sub  Centre  and  Anganwadi  at  Rajaji  Nagar,  in  the  Tampanoor  Ward  of  Thiruvananthapuram  Corporation  (SC  Work)   15.00   Corpn.  Thampanoor  

12  

Purchase  of  an  ambulance  for  the  Kerala  State  Council  for  Child  Welfare  Adoption  Centre  at  Trhycaud,  Thiruvananthapuram   8.94   Corpn  Thycaud  

13  Construction  of  compound  wall  at  C  V  smaraka  Grandhasala(10-­‐‑11),     0.60   Corpn  Thycaud  Corp  Wrd  

14  Purchase  and  installation  of  2  Computers  for  the  St.  Antony  High  School,  in  Valiyathura   0.50   Corpn  Valiyathura  

15  Construction  of  casuality  new  block  building  at  Govt.  Ayurveda  college,TVPM(11-­‐‑12),     16.75   Corpn  Vanchiyoor  Ward  

Page 68: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

16  

Setting  up  of  High  Mast  LED  Lighting  System  at  the  Madre  De  Deus  Church  Jn  at  Vettukad    in  the  Veli  ward  of  Tvpm  Corpn   5.54   Corpn  Veli  ward  

17  

Metalling  &  Tarring  of  the  road  from  the  Kochuveli  Church  Jn.  to  the  Kurishadi  Jn.  in  the  Kochuveli  ward  of  Tvpm  Corpn.   4.50   Corpn  Vettucaud    

18  

Setting  up  of  an  LED  High  Mast  Lighting  System  at  the  Madhavapuram  Kochuveli  Railway  Station  Jn.in  the     5.54   Corpn.  Vettucaud  

19  

Providing  Drinking  Water  Public  Taps  at  Madhavapuram  SC  Colony  in  the  Vettucaud  Ward  of  the  Thiruvananthapuram  Corpn.  (SC  Work)   1.00   Corpn.  Vettucaud  

20  

‘Setting  up  of  a  High  Mast  Lighting  System    at  Beemapalli  Pathekkar  Jn.  in  the  Beemapalli  Ward  of  the  Thiruvananthapuam  Corpn’   4.50   Corpn.  Beemapally    

21  

Setting  up  of  a  Solar  Lighting  System  at  outer  security  area  of  the  Sree  Padmanabha  Swamy  Temple,  Thiruvananthapuram   5.00   Corpn.  Fort  ward  

22  

Purchase  &  installation  of  2  computers  each  Govt.  Fort  HS,  Govt.  Fort  UPS  and  Govt.  Fort  Sanskirit  UP  School   1.80   Corpn.  Fort  ward  

23   Setting  up  of  a  High  Mast  Light  at  Killipalam(11-­‐‑12),     4.20   Corpn.  Karamana  Ward  

24  

Setting  up  of  a  High  Mast    Lighting  System  at  Attakulangara  Junction  in  the  Manacaud  ward  of  Tvpm  Corpn.   5.54   Corpn.  Manacaud  ward  

25  

Funds  for  Relief  and  Rehabilitation  works  in  the  Almora  Dt.  of  Uttarakhand  State  following  unprecedented  natural  calamity  claiming  more  than  1000  lives  in  mid  June,  2013     10.00   Corpn.  Palayam  

Page 69: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

26  

Construction  of  building  at  Poonthura  St.  Thomas  School,  Poonthura  

17.00  

Corpn.  Poomthura  

27  Supply  and  installation  of  5  computers  for  the  St.  Philomina'ʹs  Girls  High  School  in  Poonthura   1.50   Corpn.  Poonthura  ward  

28  

Construction  of  a  Bus  waiting  shed  in  front  of  the  Devi  Temple  at  Shanghumukhom  (towards  Valiyathura)  in  the  Shanghumukhom  ward  of  Tvpm  Corpn.   2.00   Corpn.  Shanghumukhom  

29  

Construction  of  a  Bus  waiting  shed  at  Rajiv  Nagar  on  Shanghumukhom-­‐‑All  Saints'ʹ  College  Road  in  the  Kannamthura  ward  of  Tvpm  Corpn.   2.00   Corpn.  Shanghumukhom  

30  

Construction  of  overhead  Water  Tank  and  installation  of    drinking  water  supply  system  at  Santhi  Nagar,  Thampanoor.  

10.00  

Corpn.  Thampanoor  

31  Purchase  of  a  High  Tech  Ambulance  for  the  Janasree  Sustinable  Development  Mission,  Tvpm  Dist.  Office   13.51  

Corpn.  Thiruvananthapuram  

32  

Construction  of  a  patient'ʹs  and  By-­‐‑Standers'ʹ  waiting    area  at  the  infertility  clinic  in  the  Women  &  Children  Hospital,  Thycaud   6.00   Corpn.  Thycaud  

33  

Supply  and  installation  of  ten  computers  for  the  Govt.  Aided  St.  Roch'ʹs  Convent  School  in  the  Valiyathura  Ward  of  the  Tvpm  Corpn   3.50   Corpn.  Valiyathura  ward.    

34   Setting  up  of  a  High  Mast  Light  in  the  Vanchiyoor  Jn.   4.50   Corpn.  Vanchiyoor  ward  

35  

Supply  and  installation  of  6  computers  for  the  sree  Sharadadevi  Sishuvihar  Upper  Primary  School,  Vazhuthacaud     1.75   Corpn.  Vazhuthacaud  

36  

Purchase  and  installation  of  2  computers  for  the  Govt.  Primary  Teachers  Training  Institute,  Cotton  Hill  in  the  Vazhuthacaud  ward  of  Tvpm  Corpn.     0.60   Corpn.  Vazhuthacaud  

37  Cement  slab  cover  over  the  Canal  at  CSM  Nagar  Vazhuthakadu(09-­‐‑10),     3.00  

Corpn.  Vazhuthacaud  Ward  

Page 70: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

38  

Construction  of  a    stage  platform  with  tress-­‐‑work  roofing  for  Govt.  UP  GS  (Verakupura  kotta  School,  Fort,  Tvpm)   5.00   Corpn.  Ward  /  Fort  

39  Setting  up  of  a  childrens  park  at  Govt.  VHSS  for  the  hearing  impaired,  Jagathy,  Tvpm   6.00   Corpn.Jagathy  ward  

40  Construction  of  Centenary  Memorial  Gate  for  the  Thycaud  Govt.  Model  HS  &  LP  School   4.00   Corpn  Thycaud  

41  Purchase  of  a  School  Bus  for  the  Govt.  Model  Boys  School,  Thycaud,  Tvpm   15.00   Corpn.Thycaud  

42  Construction  of  Nursery  building  at  Govt.  LPS  Mettukada(11-­‐‑12),     5.00   Corpn  Thycaud  

43  

Construction  of  manholes  and    sewage    Channel  for  the  Karyakkar  lane  and  for  the  Cricket  Association  lane  in    Sastha  Gardens  Residential  area  in  the  Thycaud  ward    of  Tvpm     5.00   Corpn  Thycaud  

44  Const  of  Canopy  shed  for  fish  sales  at  Poonthura  market  TVPM(09-­‐‑10   3.00   Corpn.  Poonthura    

    VATTIYOORKAVU          

1  Const  of  Comfort  station  at  Concordiya  UPS  Mannamoola(09-­‐‑10),     1.15   Corpn  Mannamoola  

2   Const  of  Babuji  Library  Buildng  Peroorkada(09-­‐‑10),     5.00  Corpn  Peroorkada  Corp  Ward  

3  Purchase  and  installation  of  2  computers  for  the  St.  Mary'ʹs  Teacher  Training  Institute,  Pattom   0.65   Pattom  

4  

Construction  of  a  drainage  channel,  concreting  and  metalling  and  tarring  of  the  Jann  villa  lane  in  the  Sasthamangalam  Ward  of  the  Corporation   6.00   Corpn  Sasthamangalam  

5  Setting  up  of  the  Soorya  Garden  Public  Park  at  Sasthamangalam   3.00   Corpn  Sasthamangalam  

6  Purchase  &  installation  of  10  computers  for  the  KKD  NSS  Hr.  Secondary  School,  at  Sasthamangalam   3.00   Corpn  Sasthamangalam  

7  

Setting  up  of  an  LED  High  Mast  Lighting  System  at  the  Paippinmood  Jn  in  the  Sasthamangalam  ward  of  the  Tvpm  Corpn’     5.54   Corpn  Sasthamangalam  

Page 71: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

8  Setting  up  of  High  Mast  Lighting  system  at  Kesavadasapuram   4.50   Corpn.    Kesavadaspuram  

9  

Construction  of  a  bridge  across  Kunnathu      Maruppancode  Thodu  near  the  NSS  Karayoga  Mandiram  in  the  Chettivilakom  in  the  Tvpm  Corpn   10.00   Corpn.  Chettivilakom  

10  

Construction  of  a  gallery  and  a  front  arch  in  the  Kanjirampara  VKP  Nagar  Harijan  Colony,  Vattiyoorkavu  (SCWork)   6.00   Corpn.  Kanjirampara  

11  Constuction  of  a  Mini  Community  Hall  in  the    Kannammoola  ward  in  the  Trivandrum  Corpn   8.50   Corpn.  Kannamoola  

12  Setting  up  of  a  high  Mast  Lighting  System  at  the  SAP  Camp  Junction  at  Peroorkada     4.50   Corpn.  Kawadiyar  Ward  

13  

Construction  of  a  small  bridge  across  the  Choozhampala-­‐‑Anchumukku  Canal  in  the  Kinavoor  ward,  Nalanchira  of  the  Tvpm  Corp.   8.50   Corpn.  Kinavoor  

14  Construction  of  a  children'ʹs  Park  near  the  Chathiyod  Pond  in  the  Kinavoor  ward  of  the  Tvpm  Corpn   5.00   Corpn.  Kinavoor  

15  

Metalling  &  Tarring  of  the  Pulikuzhivila  Jn.  -­‐‑Sivaji  Lane-­‐‑Elakkara-­‐‑Kodunganoor  Leksham  Veedu-­‐‑Kodunganoor  Devi  Temple  Bund  road  -­‐‑  SC  Work   7.00   Corpn.  Koduganoor  ward  

16  

Metalling  and  tarring  of  the  Kulasekharam-­‐‑Plavode  Kalagramam  Road  in  the  Kodunganoor  ward  of  the  Corp   7.00   Corpn.  Kodunganoor  

17  

Setting  up  of  an  LED  High  Mast  Lighting  System  at  Kulasekharam  Jn  in  the  Kodunganoor  Ward  of  Tvpm  Corporation   5.54   Corpn.  Kodunganoor  

18  Providing  drinking  water  facility  at  vrindavan  gardens  (10-­‐‑11),     2.86   Corpn.  Kowdiar  

19  Supply  of  two  computers  to  the  Kulasekharm  Govt.  LP  School   0.50   Corpn.  Kulasekharam  

20  Construction  of  Childrens  park  at  pandit  colony  pond  Kuravankonam(09-­‐‑10),     10.75   Corpn.  Kuravanconam    

Page 72: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

21  Setting  up  of  a  High  Mast  Light  at  Devaswom  Board  Jn(11-­‐‑12),     4.20   Corpn.  Kuravanconam    

22  ‘Supply  and  installation  of  six  computers  for  the  LFMSCLP  School,  Vettikonam,  Manikandeswaram’     1.50   Corpn.  Manikandeswaram  

23  Construction  of  a  Bus  waiting  shed  at  Parottukonam  in  the  Nalanchira  ward  of  Tvpm  Corpn.   1.80   Corpn.  Nalanchira  

24  

Setting  up  of  a  High  Mast  Lighting  System  at  the  Nandancod  Jn  of  the  of  the  Nandancod  ward  of  the  Copn   4.50   Corpn.  Nandancod  

25  Construction  of  a  Waiting  Shed  opposite  the  Peroorkada  Bapuji  Grandhashala  at  Peroorkada  Jn.   1.50   Corpn.  Pathirapally  ward    

26  

‘Laying  of  Slabs  over  the  Erappukuzhy  thodu  for  100  m  from  the  Laksham  Veedu  Colony  Bridge  towards  Oottukuzhy  in  the  Pathirippally  ward  of  the  Tvpm  Corpoation’     5.00  

Corpn.  Pathirippalli  Corpn.ward  

27  

Construction  of  Waiting  Room  for  the  patients'ʹ  bystanders  at  Peroorkada  Govt.  Hospital.   20.00  

Corpn.  Peroorkada  

28  

Construction  of  a  Library  Building  for  Bappuji  Grandha  Shala  at  Peroorkada   9.50  

Corpn.  Peroorkada  

29  Purchase  &  installation  of  10  computers  for  the  Govt.  Girls  Higher  secondary  School,  Peroorkada   3.00   Corpn.  Peroorkada  

30  Metalling  &  Tarring  of  the  road  in  the  NPP  Nagar,  Peroorkada   4.00   Corpn.  Peroorkada  ward  

31  

,  ‘Mettalling,  tarring  and  construction  of  a  drainage  facility  for  the  Vettikonam-­‐‑Kuzhivila  Road  in  the      Thuruthummoola  ward  of  the  Tvpm  Corporation’     5.00   Corpn.  Thuruthummoola  

32  Setting  up  of  a  High  Mast  Lighting  System  at  the  Valiyavila  Jn.  In  the  Valiyavila  Ward  of  Tvpm  Corpn   5.54   Corpn.  Valiyavila  

33  

Purchase  and  installation  of  4  computers  for  the  Govt.  High  School  Kachani  in  the  Kachani  ward  of  Tvpm  Corporation     1.25   Kachani  

Page 73: ST's FIVE YEAR REPORT(Eng) AS ON 21.02.2014shashitharoor.in/assets/image/report_img/rep_1263214544.pdf · dr.$shashi$tharoor$ mp’s$five1year$progress$report! thiruvananthapuram$constituency$

   

34  Setting  up  of  a  High  Mast  Lighting  System  at  the  Thoppumukku  Junction,  Vattiyoorkavu   4.50   Corpn.  Vattiyoorkavu  

35  

Const  of  sidewall  at  Vayalikkada  Kadayil  Mudambu  Thodu  Chembukonam  ward  in  Vattiyoorkavu  gpt(09-­‐‑10),     4.00   Corpn.  Vazhottukonam  

36  

Bridge  construction  at        Vayalikada  Kadayilmudumbu  Road   20.50  

Corpn.  Vazhottukonam  

37  Setting  up  of  High  Mast  Light  at  Vellaikadavu,  Vattiyoorkavu(11-­‐‑12),     4.20   Corpn.  Vazhottukonam  

38  Purchase  and  supply  of  a  Mini  School  Bus  for  the  Govt.  School  for  the  Blind,  Vazhuthacaud   5.00   Corpn.  Vazhuthacaud  

39  Setting  up  of  High  Mast  Lighting  system  at  Paruthipara  Jn.   4.50   Corpn.    Kesavadasapuram  

40  

Procurement  of  furniture  for  the  Smart  Class  Room  in  the  NSS  Higher  Secondary  School,  Kesavadasapuram.   3.00   Corpn.    Kesavadasapuram  

41  Setting  up  of  High  Mast  light  at  PMG  Junction  ,Thiruvananthapuram(11-­‐‑12),     4.50   Corpn  Kunnukuzhy  

42  

Construction  of  a  dressing  room  and  providing  truss-­‐‑work  roofing  for  the  stage  platform  at  Barton  Hill  in  the  Kunnukuzhy  ward  of  the  Tvpm  Corporation  (SC  Work)   5.00   Corpn  Kunnukuzhy