Team Tech Competition

Submission InstructionsSubmission Deadline: Initial Proposal, January 15

Team Tech Award CoordinatorTerri [email protected] Phone: 425-269-2378

General InformationThe Society of Women Engineers welcomes participation in the Team Tech Competition. All submissions throughout the year are to be submitted via email directly to the Team Tech Awards Coordinator.

The Initial Proposal deadline is January 15. The top teams will present their projects at the Society of Women Engineers Annual Conference. Awards for the winning teams will be presented during the Celebrate SWE! Awards event.

Specific questions concerning the Team Tech Competition can be directed to Terri Morse at [email protected].

Team Tech Competition Packet (last up-date Feb. 2014) Page 1

Page 2: Submission Instructionssocietyofwomenengineers.swe.org/.../TT_Team_Tech_Packet.docx · Web viewHow is the team meeting its schedule and associated milestones? Was re-planning required?

TEAM TECH COMPETITION CRITERIAThe Team Tech Competition could be one of the most exciting, challenging, and rewarding endeavors in your college experience.

In 1992 the Society of Women Engineers launched a new Collegiate Section Competition sponsored by the Boeing Company called "Team Tech". The competition was established to emphasize the key role of teamwork and interface with industry in the engineering educational process.

A team from every region will be sponsored to compete at the SWE Annual Conference in October, where a panel of judges will review oral presentations along with previously submitted team reports. Team Tech Competition winners will be announced at the Celebrate SWE! Banquet and will receive:

1st Place $5,000 ($400 per team member; remaining funds donated to sponsoring SWE Student Section)

2nd Place $2,500 ($200 per team member; remaining funds donated to sponsoring SWE Student Section)

3rd Place $1,250 ($100 per team member; remaining funds donated to sponsoring SWE Student Section)

EligibilityThe qualifications for each team entering the Team Tech competition are:

Teams shall consist of 4 to 12 students Over 50% of the team shall consist of active SWE members Team members shall represent a minimum of three (3) different engineering disciplines Teams shall be composed of undergraduates (including December graduates of that fiscal year). A

maximum of one (1) graduate student will also be allowed. Each team member is limited to giving $100 toward the project (preferably $0). Instead, we

encourage the team to solicit In-Kind contributions and conference expenses support from the company they are working with or their SWE section.

TimelineSeptember – December Form team, identify company and an industrial advisor to work with,

identify projectJanuary 15 Submit initial proposal package March 15 Submit interim advisor evaluation report

Submit team progress report Submit design document

June 1 Submit final report Submit final company/advisor evaluation Submit draft presentation

October Finalists compete by presenting their projects at the SWE Annual Conference

Judging BasisJudging will be based on team reports, industrial advisor evaluations and oral presentations. Teams are evaluated in the following five areas:

1. Ability of the team to work together,2. Use of engineering processes, 3. Product, 4. The quality of the results, and 5. The ability of the team to work with industry.

Team Tech Competition Packet (last up-date Feb. 2014) Page 2

Page 3: Submission Instructionssocietyofwomenengineers.swe.org/.../TT_Team_Tech_Packet.docx · Web viewHow is the team meeting its schedule and associated milestones? Was re-planning required?

Team Tech Competition Packet (last up-date Feb. 2014) Page 3

Page 4: Submission Instructionssocietyofwomenengineers.swe.org/.../TT_Team_Tech_Packet.docx · Web viewHow is the team meeting its schedule and associated milestones? Was re-planning required?

GUIDELINESStep 1: Form Team, Identify Company and an Industrial Advisor to Work With, Identify Project(September – December)

Identifying your team, company or industrial partner you want to work with, an Industrial Advisor to act as coach, and a project the sponsoring company can benefit from is the key to success. The qualifications for the team are:

Teams shall consist of 4 to 12 students. A majority (over 50%) of the team shall be active members of SWE. There shall be a minimum of 3 different engineering disciplines represented by the team members. Teams shall be composed of undergraduates (including December graduates of that school year).

One (1) graduate student will be allowed. Each team member is limited to giving $100 toward the project (preferably $0). Instead, we

encourage the team to solicit In-Kind contributions and conference expenses support from the company they are working with or their SWE section.

When selecting your team consider people who can work together, are dedicated to the project, and can directly contribute to the technical success of your project.

Identifying the company or industrial partner you want to work with involves investigating established company relationships that exist with your school, or approaching a new company that interests the team. For schools that are located in areas with limited Industrial development, previous teams have met with success by working with government or public works agencies (i.e. water, sewer districts).

Once you’ve identified a company or several potential companies to further pursue – work with them in identifying a project that they would be interested in sponsoring, and your team would be interested in doing. Things you should consider include: Can you accomplish this project start to finish within approximately a 6-month period of time? Does it provide hands-on experience? Are the resources available through the company or your school for you to deliver an end product? Does it have the potential to offer a positive return to the company? Is it applicable to a number of engineering disciplines?

Here are some winning Project ideas from previous years: Design and development of an alternative manufacturing process for automotive wheel deburring

(University of Kentucky and Alumitech) Design and prototype a window that changes from clear to translucent (Iowa State University and

Pella Windows) Design of a cellular phone for people with limited dexterity (University of Illinois-Urbana and

Motorola) Development of an ozonation water treatment system for Pseudomonas growth (University of

South Florida and Dunedin Water Plant) Design of an ergonomically improved cashier workstation (Louisiana State University and

Delchamps, Piggly Wiggly, and Super Fresh)

The role of the Industrial Advisor is to provide your team assistance (a sounding board) in identifying or working with a company, and coaching you in the progress of your project. It can be an advisor from your school, a willing SWE member from a local section, or an interested employee from the company you are working with. They should be willing to:

Provide assistance in helping the team select a project Provide counseling on team membership, project plan, and ideas on interfacing with industry Submit an interim evaluation – due March 15 Submit a final evaluation – due June 1 Assist the team in preparing a final presentation and making travel arrangements to the SWE

Annual Conference - October.

Team Tech Competition Packet (last up-date Feb. 2014) Page 4

Page 5: Submission Instructionssocietyofwomenengineers.swe.org/.../TT_Team_Tech_Packet.docx · Web viewHow is the team meeting its schedule and associated milestones? Was re-planning required?

They can be a first tier resource in questions such as: advice on proper engineering process, overcoming stumbling blocks, how to interface with industry in soliciting financial support, writing the progress or final report, etc. Their experience can serve as a coaching mechanism to speed the team’s learning process along.

Step 2: Submit Initial Proposal Package(January 15)

The Project Initial Proposal Package must be submitted to the Team Tech Award Coordinator anytime after September 1, but no later than January 15. (Form A)

The Initial Proposal Package includes: Preliminary team roster, Industrial Advisor, and proposed Industry Sponsors Proposed team project Major project milestones and deliverables Estimated team labor Estimated budget (including projected source of funds)

All Teams and candidate projects will be evaluated against the qualifications. Approval or specific suggestions to gain approval will be returned to you within one month of your application.

Step 3: Submit Interim Advisor Evaluation Report, Team Progress Report, and Design Document(March 15)

Don't wait until you get approval to proceed - you've now got between 5-8 months to complete your project. During that time both you and your Industrial Advisor will be responsible for submitting a report along with a design document to the Team Tech Award Coordinator on your progress by March 15. See Forms B and C.

Industrial Advisor interim evaluation report includes (this should be fully shared with the team to assist them in receiving performance feedback, making appropriate corrections, and improving performance for the final report):

Ability of the Team to Work Together – roles, relationships, obstacles Use of engineering processes – processes used, resulting benefit, alternatives considered Product – Accomplishments, schedule performance, re-planning Quality of the Results – team learning and experiences, positive return to company or society Ability of the Team to work with Industry – Industrial contacts, building relationships

Team progress report (not to exceed 5 pages) includes: Final team roster, including industrial partners Target market or purpose of the project Schedule status (based on original milestones and deliverables) Updated Budget and labor estimates

Team design document should include: List of requirements you are trying to satisfy and project constraints issued by the company. A proposed design description that meets those requirements Any design diagrams/graphics describing the design Any requirements or design analysis results supporting your proposed design

When sending the Progress Reports and Design Document do not bind information, and make sure information will be easily read when copied/printed in black and white. All team materials get copied and sent to multiple people during the course of the competition - binding, or unreadable color inks are an unnecessary expense that can hurt the readability of a copied version of your report. E-mail submittal with attached files is preferred (assuming formatting transfers properly). Team Tech Competition Packet (last up-date Feb. 2014) Page 5

Page 6: Submission Instructionssocietyofwomenengineers.swe.org/.../TT_Team_Tech_Packet.docx · Web viewHow is the team meeting its schedule and associated milestones? Was re-planning required?

Step 4: Submit final Written Report and final Advisor Evaluation(June 1)

Its now time for both you and your Industrial Advisor to summarize your team's results, as well as select a presenter for your presentation should you go to the SWE Annual Conference. The Industrial Advisor final evaluation, Team Final Report, and Presenter Travel Information must be submitted to your SWE Team Tech Award Coordinator by June 1 (see Forms D, E, F, and G) along with a draft copy of the presentation.

Industrial Advisor final evaluation report includes (this should be fully shared with the team to assist them in receiving performance feedback, making final adjustments for the team presentation at Conference):

Ability of the Team to Work Together – roles, relationships, obstacles Use of engineering processes – processes used, resulting benefit, alternatives considered Product – Accomplishments, schedule performance, re-planning Quality of the Results – team learning and experiences, positive return to company or society Ability of the Team to work with Industry – Industrial contacts, building relationships

Team final report (not to exceed 10 pages) includes: Executive summary (1 paragraph) of project and results Any changes in team roster and industrial partners Project Results - Success or failure and why Lessons Learned - What would you do different next time Final schedule and budget

Team Presenter Travel Information includes name, and addresses for contacting presenter at School or during summer break.

Again, when sending the Final Reports do not bind information, and make sure information will be easily read when copied/printed in black and white. All team materials get copied and sent to multiple people during the course of the competition - binding, or unreadable color inks are an unnecessary expense that can hurt the readability of a copied version of your report. E-mail submittal with attached files is acceptable (assuming formatting transfers properly).

At least one competing team from each Region will proceed to the Annual Conference competition. You will be notified of final selection and arrangements by September 15th (month prior to Annual Conference).

Step 5: Finalists compete by presenting their projects at the SWE Annual Conference(October/November)

National competition involves preparing and giving a final presentation. Your Industrial Advisor can assist your team in helping select the presenter, preparing the final presentation, and even critiquing the result.

Each competing team will be provided one airfare for the selected presenter. Registration, hotel, and meal expenses, as well as travel for additional members of the team are the team's responsibility. In line with our competition goals of interfacing with industry, we are asking teams to use their industrial contacts to solicit support for those expenditures. Again, look to your Industrial Advisor and Industrial Supporters to provide valuable assistance in helping you obtain financial support. Following are the directions on how to submit the travel expenses for the presenter.

Travel Arrangements:

Travel costs for one presenter will be provided through SWE headquarters - (312) 596-5223, FAX (312) 596-5252, E-MAIL: [email protected].

Team Tech Competition Packet (last up-date Feb. 2014) Page 6

Page 7: Submission Instructionssocietyofwomenengineers.swe.org/.../TT_Team_Tech_Packet.docx · Web viewHow is the team meeting its schedule and associated milestones? Was re-planning required?

If you prefer to drive as opposed to fly - SWE headquarters has agreed to reimburse expenses to you direct, equivalent to paying for an airline ticket. You may need to include a comparable airfare estimate using advance purchase.

A Team Tech practice session and final competition by each of the competing teams will take place in the initial days of the SWE Annual Conference. The practice session is an opportunity to check out the facilities and equipment, dry run your presentation, and get direct feedback from the Team Tech Coordinator to improve.

You will have 15 minutes for the presentation with 5 additional minutes allocated to answer questions from the floor. It is important to stay within those 15 minutes. Any overrun cuts into the question and answer period for the judges. Only one person is allowed to give the verbal presentation - although additional team members or school representatives are welcome to provide background support (e.g. handle PC or props, answer questions at end of presentation, etc.). The presenter is also welcome to introduce any other members that are there.

Bring your presentation on a PC laptop, along with any special adapter cables. We will provide a standard adapter cable, projector and screen. Other optional equipment available for your presentation is an easel, and table. You might also consider bringing some "hands-on" displays or materials for the audience (although because of Union restrictions in most cities and consideration for other presenters extra display material must be restricted to items that can be hand carried in - immediately prior to presentation). Whatever additional displays or props you bring, be aware of time constraints. You need to be able to set-up and take down in under 5 minutes (within the break time between team presentations). This is where the practice session comes into play – for you to work out all the bugs before the actual competition. Put together the presentation as if you were presenting it in the work environment, trying to relay the results and findings of a design and development project to management. Your Industrial Advisor can serve as a good sounding board for review of your presentation.

In the final competition a panel of judges will review your oral presentations. Your presentation will be judged on the 5 different criteria: 1) The ability of the team to work together; 2) The use of engineering processes; 3) Product; 4) The quality of the results; and 5) The ability of the team to work with industry (see following judges scoresheet). You need to ensure that you speak to all 5 of these areas in your formal presentation. The judges are expecting to hear about all 5 areas - if they are not covered, the judges will assume you did not satisfy those requirements, and will score accordingly. This cannot be expressed any stronger - COVER ALL 5 AREAS in your presentation!

Team Tech Competition Packet (last up-date Feb. 2014) Page 7

Page 8: Submission Instructionssocietyofwomenengineers.swe.org/.../TT_Team_Tech_Packet.docx · Web viewHow is the team meeting its schedule and associated milestones? Was re-planning required?

Judge’s Score sheetCategory and Comments Scoring Criteria - Project Elements

Team Documentation & Presentation Score

Working Together Responsibility Getting along

Good balance of responsibility

---------Team enjoys each other,

conflicts resolved positively

10

Team members recognized

---------Team does what needs to

get done, members cooperate

5

A few members doing all the work---------

Some discord never resolved

0

Working Together

Engineering Processes Plan Requirements Mgmt Lean Application Handling obstacles

Scientific approach evident, leveraging product improvement approaches

---------Generated options when obstacles encountered

10

Plan of approach acknowledged

---------Was able to eventually find

ways around obstacles5

No clear plan

---------Obstacles not handled

well0

Engineering Processes

Product Communication Material organization Complexity Integration

Clear & concise message, good continuity

---------High product complexity

with integrated conclusion10

Satisfactory message, orderly---------

Limited complexity requiring some integration

5

Disorganized message, lacks continuity

---------Narrow complexity with

minimum integration0

Product

Results Accomplishments Leverage replication Relative benefits Schedule performance

Convincing, conclusion clearly supported by data

---------Project resulted in significant benefits

10

Had schedule, partially met objectives

---------Partial benefits (Industry,

Society)5

Weak conclusion, loose tie to supporting data

---------No noticeable benefits

0

Results

Industrial Interface Involvement Support

Clear Industrial involvement and

participation---------

Clear evidence of industry $/material contributions

10

Industrial Partners recognized

---------Evidence of request for

support5

Industry contact never clearly established

---------No effort to solicit industry support

0

Industrial Interface

Penalties Presentation too long Presentation late start Documentation over size Documentation late

DocumentationOver size---------

Late entry -5 each occurrence

---------Never received

-20 for each occurrence

PresentationOver 15 minutes

---------Presentation

Late start-5 each occurrence

Penalties

-

RECOMMENDED PLACEMENT:

TOTAL SCORE:50 points possible

Team Tech Competition Packet (last up-date Feb. 2014) Page 8

Page 9: Submission Instructionssocietyofwomenengineers.swe.org/.../TT_Team_Tech_Packet.docx · Web viewHow is the team meeting its schedule and associated milestones? Was re-planning required?

FORM A: INITITAL PROPOSAL PACKAGEEach team entering the competition must complete the following information. Please submit this form via email to the SWE Team Tech Award Coordinator (Terri Morse, E-mail: [email protected]) anytime after September 1, but no later than January 15.

Team Information:Team name/project:Team leader name:Team Contact (if different from leader):Address:Phone:Email:Sponsoring School:Region:

Industrial Advisor Information:Industrial Advisor name:Address:Phone:Email:

Team Members:Name Graduation Year Engineering Disciplines

Proposed Industrial Partners:Company name:Contact name:Phone:

Company name:Contact name:Phone:

Please include the following sections in your report: Proposed Project Description Major Project Milestones / Deliverables Estimated team labor Estimated Budget (specify projected source of funds)

Team Tech Competition Packet (last up-date Feb. 2014) Page 9

Page 10: Submission Instructionssocietyofwomenengineers.swe.org/.../TT_Team_Tech_Packet.docx · Web viewHow is the team meeting its schedule and associated milestones? Was re-planning required?

FORM B: INTERIM ADVISOR EVALUATION FORMThe following information must be completed by the Industrial Advisor for their assigned team and submitted via email to the SWE Team Tech Award Coordinator (Terri Morse, E-mail: [email protected]) with the Team's Progress Report by March 15.

Team Information:Team name/project:Team leader name:Sponsoring School:Region:

Industrial Advisor Information:Industrial Advisor name:Address:Phone:Email:

Please provide answers to all of the following questions:

Ability of Team to work together:1. What's the balance of responsibility and role of each team member? Is it clear? (You may provide

an organization chart.) 2. Describe the form in which members interface with each other.3. Describe the attitudes of team members towards each other and the project. How has the group

overcome any obstacles?

Use of engineering processes:1. What engineering processes has the team incorporated into their project flow?2. What has been the resulting benefit/hindrance to the project?3. What adjustments or alternatives have been made to chosen processes to overcome obstacles?

Product:1. What has the team accomplished toward their project goals?2. How is the team meeting its schedule and associated milestones?3. Was re-planning required? If so, explain why and resulting action.

The quality of the results:1. What has the team learned at this point?2. What new experiences have the team members had as a result of the project?3. What positive return to the company or society has resulted from their activity?

Ability of team to work with Industry:1. Has the team made any contacts with industry? If so, who and in what manner?2. What has been the response from their contacts?3. How has the team built on already established contacts?

Team Tech Competition Packet (last up-date Feb. 2014) Page 10

Page 11: Submission Instructionssocietyofwomenengineers.swe.org/.../TT_Team_Tech_Packet.docx · Web viewHow is the team meeting its schedule and associated milestones? Was re-planning required?

FORM C: TEAM PROGRESS REPORTThe following progress report (not to exceed 5 pages) must be completed by each team and submitted via email to the SWE Team Tech Award Coordinator (Terri Morse, E-mail: [email protected]) by March 15. Attached to the Progress Report should be your Design Document and the Industrial Advisor's Interim Evaluation.

Team Information:Team name/project:Team leader name:Team Contact (if different from leader):Address:Phone:Email:Sponsoring School:Region:

Industrial Advisor Information:Industrial Advisor name:Address:Phone:Email:

Team Members:Name Graduation Year Engineering Disciplines

ndustrial Partners:Company name:Contact name:Phone:

Company name:Contact name:Phone:

Please include the following sections in your report: Target Market or Purpose of the Project Schedule status (based on original Project Milestones / Deliverables) Updated team labor (specify actual hours expended) Updated Budget (specify actual costs and projected source of additional funds)

Attached Design Document should include: List of requirements you are trying to satisfy and project constraints issued by the company. A proposed design description that meets those requirements Any design diagrams/graphics describing the design Any requirements or design analysis results supporting your proposed design

Team Tech Competition Packet (last up-date Feb. 2014) Page 11

Page 12: Submission Instructionssocietyofwomenengineers.swe.org/.../TT_Team_Tech_Packet.docx · Web viewHow is the team meeting its schedule and associated milestones? Was re-planning required?

FORM D: FINAL ADVISOR EVALUATION FORMThe following information must be completed by the Industrial Advisor for their assigned team and submitted via email to the SWE Team Tech Award Coordinator (Terri Morse, E-mail: [email protected]) with the Team's Final Report by June 1.

Team Information:Team name/project:Team leader name:Sponsoring School:Region:

Industrial Advisor Information:Industrial Advisor name:Address:Phone:Email:

Please provide answers to all of the following questions:

Ability of Team to work together:1. What's the balance of responsibility and role of each team member? Is it clear? (You may provide

an organization chart.)2. Describe the form in which members interface with each other.3. Describe the attitudes of team members towards each other and the project. How has the group

overcome any obstacles?

Use of engineering processes:1. What engineering processes has the team incorporated into their project flow?2. What has been the resulting benefit/hindrance to the project?3. What adjustments have been made to chosen processes to overcome obstacles?

Product:1. What has the team accomplished toward their project goals?2. How is the team meeting its schedule and associated milestones?3. Was re-planning required? If so, explain why and resulting action.

The quality of the results:1. What has the team learned at this point?2. What new experiences have the team members had as a result of the project?3. What positive return to society has resulted from their activity?

Ability of team to work with Industry:1. Has the team made any contacts with industry? If so, who and in what manner?2. What has been the response from their contacts?3. How has the team built on already established contacts?

Team Tech Competition Packet (last up-date Feb. 2014) Page 12

Page 13: Submission Instructionssocietyofwomenengineers.swe.org/.../TT_Team_Tech_Packet.docx · Web viewHow is the team meeting its schedule and associated milestones? Was re-planning required?

FORM E: FINAL REPORTThe following final report (not to exceed 10 pages) must be completed by each Team and submitted via email to the SWE Team Tech Award Coordinator (Terri Morse, E-mail: [email protected]) by June 1. Attached to the Final Report should be the Industrial Advisors Final Evaluation.

Team Information:Team name/project:Team leader name:Team Contact (if different from leader):Address:Phone:Email:Sponsoring School:Region:

Industrial Advisor Information:Industrial Advisor name:Address:Phone:Email:

Team Members:Name Graduation Year Engineering Disciplines

Industrial Partners:Company name:Contact name:Phone:

Company name:Contact name:Phone:

Please include the following sections in your report: Executive Summary of Project and Results (1 paragraph) Project Results – Success or failure and why Lessons Learned – What would you do different next time? Final Schedule status (based on original Project Milestones / Deliverables) Updated team labor (specify actual hours expended) Updated Budget (specify actual costs and sources of funds)

Team Tech Competition Packet (last up-date Feb. 2014) Page 13

Page 14: Submission Instructionssocietyofwomenengineers.swe.org/.../TT_Team_Tech_Packet.docx · Web viewHow is the team meeting its schedule and associated milestones? Was re-planning required?

FORM F: PRESENTER TRAVEL INFORMATIONNOTE: This form is for information only to assist in tracking Team Tech competition costs/conference arrangements. If you are selected to represent your Region and compete at conference, reimbursement for travel expenses will be coordinated directly with SWE Headquarters - 312-596-5223, ATTN: Lester McNair [[email protected]], 203 N. La Salle Street Suite 1675, Chicago, IL 60601.

Presenter Information:Presenter Name:Team Represent:Current Address:Current Phone:Current Email:Summer Address:Summer Phone:Summer Email:Date Summer Address is effective:City traveling from and returning to:Current dates arriving to and leaving conference:Approximate cost of travel:Hotel where staying at conference (if known):

Any additional comments/information:

Team Tech Competition Packet (last up-date Feb. 2014) Page 14

Page 15: Submission Instructionssocietyofwomenengineers.swe.org/.../TT_Team_Tech_Packet.docx · Web viewHow is the team meeting its schedule and associated milestones? Was re-planning required?

FORM G: REIMBURSEMENT FORM

Required Information:Date of RequestName:Team Tech NameAddress:Phone:Email:

Expenses (Submit electronic reimbursement form and an electronic version of your receipts. If requesting mileage reimbursement, you may need to include a comparable airfare estimate using advance purchase.):Activity Code Description Amount5370-82 TRAVEL

Air/Train Fare (Economy) $Auto travel: # of Miles @ .56/mile $Ground Transport: Limo/ Taxi $

TOTAL EXPENSES SUBMITTED: $

HQ Signature: Date: _____________

Please complete and email to [email protected]. If you prefer to mail, attach original receipts and return to:SWE HeadquartersAttn: Awards 203 N. La Salle St., Suite 1675Chicago, IL 60601

Team Tech Competition Packet (last up-date Feb. 2014) Page 15