15
BOTHELL CITY HALL │18415 101 ST AVE NE, BOTHELL, WA 98011│ PHONE 425.806.6400 │ www.bothellwa.gov Page 1 of 2 Updated 12/18 LAND USE AND PLANNING REVIEW FEES 2019 C Submit this completed form at City Hall, or use www.MyBuildingPermit.com to submit your application online. DEVELOPMENT SERVICES BUILDING COMMUNITY RISK REDUCTION ENGINEERING PLANNING PERMIT SERVICES TRANSPORTATION The following fees are effective January 1st, 2019. These fees include up to 3 review cycles. The 4th review and any additional reviews are billed hourly. See Form D for hourly rates. A 5% technology surcharge is included to all fees listed, unless otherwise noted. PLANNING FEES DUE AT SUBMITTAL Accessory Dwelling Unit Planning Review $741 + 5% Tech Fee Annexation Hourly Form D Appeals $1,714.65 Bothell Municipal Code Amendments Hourly Form D Boundary Line Adjustment $983.85 Comprehensive Plan Amendments (property specific) Hourly Form D Conditional Use Permit $6,779.85 Critical Areas Alteration $3,668.70 Critical Areas Exemption Hourly Form D Director's Interpretation $2,890.65 Final Plat $4,887.00 + 5% Tech Fee Final Plat - additional per lot (after 5) $355.00 + 5% Tech Fee Final Short Plat $3,944.85 First Pre-application meeting (for actions initiated by single-family homeowners) $762.30 First Pre-application meeting $1,681.05 All subsequent pre-application meetings, project review, and any additional staff time spent on processing a development applicant's proposal prior to and following submittal of a formal land use or building permit application shall be billed monthly at the applicable staff hourly rate, including benefits and overhead. First-time Tenant Improvement $226 + 5% Tech Fee Personal Wireless - Type I $1,161.30 Personal Wireless - Type II $1,883.70 Planned Unit Development - Final (without plat) $2,342.55 Planned Unit Development - Preliminary (without plat) $7,472.85 Plat Alteration Hourly Form D Plat Vacation $4,586.40 Preliminary Plat 13,206.00 + 5% Tech Fee Preliminary Plat - additional per lot (after 5) 538.00 + 5% Tech Fee Preliminary Short Plat $7,450.80 PUD - Major Modification $4,752.30 PUD - Minor Modification $778.05 Reasonable Use Permit Hourly Form D Request for Extension of Construction Noise Hours $177.45 Safe Walk to School review for residential developments $2,512.00 SEPA $1,041.60

Submit this completed form at City Hall, or use www ... · Assisted Living, Nursing Home, Group Home Bed $1,234 Industrial Light Industry/Manufacturing Industrial Park SF GFA $8.67

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

BOTHELL CITY HALL │18415 101ST AVE NE, BOTHELL, WA 98011│ PHONE 425.806.6400 │ www.bothellwa.gov

Page 1 of 2 Updated 12/18

LAND USE AND PLANNING REVIEW FEES 2019 C

Submit this completed form at City Hall, or use www.MyBuildingPermit.com to submit your application online.

DEVELOPMENT SERVICES BUILDING COMMUNITY RISK REDUCTION ENGINEERING PLANNING PERMIT SERVICES TRANSPORTATION

The following fees are effective January 1st, 2019. These fees include up to 3 review cycles.

The 4th review and any additional reviews are billed hourly. See Form D for hourly rates.

A 5% technology surcharge is included to all fees listed, unless otherwise noted.

PLANNING FEES DUE AT SUBMITTAL Accessory Dwelling Unit Planning Review $741 + 5% Tech Fee

Annexation Hourly – Form D

Appeals $1,714.65

Bothell Municipal Code Amendments Hourly – Form D

Boundary Line Adjustment $983.85

Comprehensive Plan Amendments (property specific) Hourly – Form D

Conditional Use Permit $6,779.85

Critical Areas Alteration $3,668.70

Critical Areas Exemption Hourly – Form D

Director's Interpretation $2,890.65

Final Plat $4,887.00 + 5% Tech Fee

Final Plat - additional per lot (after 5) $355.00 + 5% Tech Fee

Final Short Plat $3,944.85

First Pre-application meeting (for actions initiated by single-family homeowners) $762.30

First Pre-application meeting $1,681.05

All subsequent pre-application meetings, project review, and any additional staff time spent on processing a development applicant's proposal prior to and following submittal of a formal land use or building permit application shall be billed monthly at the applicable staff hourly rate, including benefits and overhead.

First-time Tenant Improvement $226 + 5% Tech Fee

Personal Wireless - Type I $1,161.30

Personal Wireless - Type II $1,883.70

Planned Unit Development - Final (without plat) $2,342.55

Planned Unit Development - Preliminary (without plat) $7,472.85

Plat Alteration Hourly – Form D

Plat Vacation $4,586.40

Preliminary Plat 13,206.00 + 5% Tech Fee

Preliminary Plat - additional per lot (after 5) 538.00 + 5% Tech Fee

Preliminary Short Plat $7,450.80

PUD - Major Modification $4,752.30

PUD - Minor Modification $778.05

Reasonable Use Permit Hourly – Form D

Request for Extension of Construction Noise Hours $177.45

Safe Walk to School review for residential developments $2,512.00

SEPA $1,041.60

BOTHELL CITY HALL │18415 101ST AVE NE, BOTHELL, WA 98011│ PHONE 425.806.6400

Page 2 of 2 Updated 12/18

LAND USE AND PLANNING REVIEW FEES

C

SEPA Exemption Hourly – Form D

Shoreline Conditional Use $7,640.85

Shoreline Substantial Development $7,471.80

Shoreline Exemption $1,861.65

Shoreline Variance $7,640.85

Sign permits – first sign $645 + 5% Tech Fee

Sign permits – additional sign(s) applied concurrently $188 + 5% Tech Fee

Single Family Planning Review $164.00+ 5% Tech Fee

Site Plan Review $8,715.00

Site Rezone application fee Hourly – Form D

Subdivision - Major Modification $4,752.30

Subdivision - Minor Modification $778.05

Subdivision - Vacate $4,752.30

Transitory Accommodation review $2,945.25

Variance $4,028.85

Zoning Confirmation letter $237.30

For Hourly rate applications, fees are charged per form D hourly rate billing:

An applicant shall pay for all work done by, or on behalf of, the City in connection with the processing and review of the application, including public hearing presentations and hearing body findings, conclusions and decisions. The Applicant shall be invoiced for actual costs by the Community Development and Public Works staff to provide for reimbursement of municipal employee time. The charges will be based on the applicable staff hourly rate of the employee performing the review, including benefits and overhead. Payments shall be paid to the City upon demand. Maintenance bonds will not be released until all fees are paid in full. The applicant shall be responsible for the cost of legal counsel review, hearing examiner review, all recording fees associated with final plats, binding site plans and all other development documents requiring recording, consultants, and any additional required studies, and for reimbursement of municipal employee time.

BOTHELL CITY HALL │18415 101ST AVE NE, BOTHELL, WA 98011│ PHONE 425.806.6400 │ www.bothellwa.gov

Page 1 of 3 Updated 12/18

2019 IMPACT FEES X

DEVELOPMENT SERVICES BUILDING COMMUNITY RISK REDUCTION ENGINEERING PLANNING PERMIT SERVICES TRANSPORTATION

Impact fees are one-time charges assessed by local governments against a new development project to help pay for new or expanded public facilities that will directly address the increased demand created by that development. Local governments must establish a rate schedule for each type of development activity that is subject to impact fees, specifying the fee to be imposed for each type of system improvement (RCW 82.02.060). When applicable, a credit for impact fees is given when requested by the applicant, once the demolition permit for the existing structure has passed a final inspection.

FIRE IMPACT FEES Due at building permit issuance, unless otherwise permitted. See BMC 21.16 for more information.

Type of Development Unit Fire Impact Fee

RESIDENTIAL Per dwelling unit $204.46

RESIDENTIAL (Sprinklered) Per dwelling unit $198.44

NONRESIDENTIAL

Hotel/Motel/Dormitory per sq. ft. 0.74

Retirement & Medical Care Facility per sq. ft. 1.00

Commercial:

Office per sq. ft. 0.11

Arts & Recreation per sq. ft. 0.26

Retail per sq. ft. 0.37

Restaurant/Lounge per sq. ft. 3.62

Medical/Dental Office per sq. ft. 0.84

Industrial/Manufacturing per sq. ft. 0.04

Warehouse per sq. ft. 0.02

Institutions:

Government & Utilities per sq. ft. 0.51

Education per sq. ft. 0.23

Church per sq. ft. 0.12

SCHOOL IMPACT FEES Payable directly to: Northshore School District, NSD Capital Projects Office, 22105 23rd Dr SE, Bothell WA 98021 (2nd floor). Phone: 425-408-7866 Email: [email protected] Office Hours: 8am – 3:30pm

Please call or email to ensure appropriate office personnel will be available to accept payment.

Proof of payment required prior to building permit issuance.

See Bothell Municipal Code 21.12 for more information. Unit Type Impact Fee per Unit

Single family (detached dwelling unit) $16,038

Multifamily $1,818

BOTHELL CITY HALL │18415 101ST AVE NE, BOTHELL, WA 98011│ PHONE 425.806.6400

Page 2 of 3 Updated 12/18

2019 IMPACT FEES

X

PARK IMPACT FEES Due at building permit issuance, unless otherwise permitted. See BMC 21.08 for more information.

TYPE OF DEVELOPMENT UNIT PARK IMPACT FEE PER UNIT

OPEN SPACE IMPACT FEE PER UNIT

COMBINED TOTAL IMPACT FEE PER UNIT

Residential by size

Less than 500 sq. ft. Dwelling unit $1,535.88 $81.37 $1,617.26

500 – 999 sq. ft. Dwelling unit $2,277.69 $120.67 $2,398.37

1,000 – 1,999 sq. ft. Dwelling unit $3,240.34 $171.68 $3,412.02

2,000 or more sq. ft. Dwelling unit $3,955.08 $209.55 $4,164.63

Nonresidential Sq. ft. $1.08 $0.05 $1.13

TRAFFIC IMPACT FEES Due at building permit issuance, unless otherwise permitted. See BMC 17.045 for more information.

Notes: SF GLA = Square Feet Gross Leasable Area, SF GFA Square Fee Gross Floor Area

Land Uses Unit of Measure Effective January 1, 2019

Cost Per New Trip Generated $7,406

Residential

Single Family (Detached) Dwelling $7,005

Multifamily Dwelling $4,222

Senior Housing & Accessory Dwelling Dwelling $1,570

Commercial - Services

Bank SF GFA $36.48

Day Care SF GFA $37.05

Hotel/Motel Room $5,605

Service Station with or without minimart and/or carwash. Fueling Position $13,792

Quick Lubrication Vehicle Shop Servicing Positions $12,363

Automobile Care Center SF GLA $10.27

Movie Theater Seat $275

Health Club SF GFA $16.43

Marina Berth $1,062

Institutional

Elementary /Junior High School Student $481

High School Student $468

University/College Student $919

Church SF GFA $4.07

Hospital SF GFA $7.45

Assisted Living, Nursing Home, Group Home Bed $1,234

Industrial

Light Industry/Manufacturing Industrial Park SF GFA $8.67

Warehousing/Storage SF GFA $3.26

Mini Warehouse SF GFA $2.65

Restaurant

Restaurant SF GFA $40.81

Fast Food Restaurant SF GFA $65.36

Commercial - Retail Retail Shopping Center SF GLA $13.37

Supermarket > 5,000 SF SF GFA $29.88

Convenience Market < 5,000 SF SF GFA $61.38

BOTHELL CITY HALL │18415 101ST AVE NE, BOTHELL, WA 98011│ PHONE 425.806.6400

Page 3 of 3 Updated 12/18

2019 IMPACT FEES

X

Furniture Store SF GFA $0.92

Car Sales - New/Used SF GFA $19.30

Nursery/Garden Center SF GFA $20.42

Pharmacy/Drugstore SF GFA $14.30

Hardware/Building Materials Store < 25,000 SF SF GFA $11.33

Discount Merchandise Store (Free Standing) SF GFA $12.49

Video Rental SF GFA $20.82

Home Improvement Superstore > 25,000 SF SF GFA $5.38

Miscellaneous Retail SF GLA $13.37

Commercial - Office

Administrative Office SF GFA $14.43

Medical Office/Clinic SF GFA $25.72

Traffic Impact Additional Administrative Fee: The cost of administering the impact fee program for traffic impact fees shall also include an amount equal to three percent (3%) of the amount of the traffic impact fee calculated in the Rate Study. The administrative fee is not creditable or refundable under Bothell Municipal Code 17.045.010. The administrative fee, in addition to the actual impact fees, shall be paid by the developer to the City at the same time as the impact fee is paid.

BOTHELL CITY HALL │18415 101ST AVE NE, BOTHELL, WA 98011│ PHONE 425.806.6400 │ www.bothellwa.gov

Page 1 of 4 Updated 12/18

PUBLIC WORKS FEES - 2019 E

DEVELOPMENT SERVICES BUILDING COMMUNITY RISK REDUCTION ENGINEERING PLANNING PERMIT SERVICES TRANSPORTATION

Development Review Technology Surcharge: A 5% technology surcharge will be added to all fees listed other than state, impact, mitigation or facility charges.

Type of Development:

Single Family Multi-Family/Duplex Commercial Subdivision

(New/Addition) (New/Addition) (New/Addition) (Plat/PUD/Short Plat)

Fees that may be required: Grading Grading Grading Grading

Right-of-way1,2 Right-of-way1,2 Right-of-way1,2 Right-of-way1,2

Sanitary side sewer Sanitary side sewer Sanitary side sewer Sanitary sewer

Storm side sewer drain Water meters Water meters Water meters

Water meter Facility charges Facility charges Facility charges

Facility charges Main line taps3 Main line taps3 Main line taps3

Main line taps3 Traffic mitigation4 Traffic mitigation4 Traffic mitigation4

LID Traffic impact4 Traffic impact4 Traffic impact4

Traffic impact4 Concurrency4 Concurrency4 Concurrency4

Water/Sewer/Fire Flow Late comers Late comers Late comers

Single Family Site Review

Water/Sewer/Fire Flow Water/Sewer/Fire Flow Water/Sewer/Fire Flow

Safewalk review

Water Facility Charges2:

3/4" or Meter size 5/8" meter 1" meter 1.5" meter 2” meter 3" meter 4" meter 6" meter 8" meter

Amount $4,828 $10,496 $24,439 $37,716 $81,047 $123,474 $250,691 $407,098

Sewer Facility Charges: Single family .................................. $3,047.00

Commercial and Multi-family ......... $3,047.00 per single-family equivalent as determined by the METRO Capacity Form

Storm Drainage Facility Charges: Citywide: .............................................................................................. $1,333.00 per Impervious Surface Unit Downtown Sub-Basin Area: ................................................................ $14,055.00 per Impervious Surface Unit * Impervious Surface Unit = 2000 sf of New or Replaced Impervious Surface

Fire flow analysis (Water Availability, City of Bothell Service area) .......... $177.00

1 All work requiring a right-of-way permit requires proof of personal property and public liability insurance by providing the city with a Certificate of Insurance in the amount of $1,000,000 naming the City as additional insured for all contractors. Certificate shall be in the format approved by the City Attorney. 2 All work requiring a right-of-way permit requires a bond. Acceptable forms of bonding as follows. All bonds shall be on forms provided by the City of Bothell: 1) Surety bond from an accredited bonding agency, 2) Cash set aside or an assignment of funds (funds are retained in a bank account rather than with a bonding company), 3) Cash held in trust by City (check or credit card in the bond amount required) 3 Any work on A.C. pipe will require a separate permit from Puget Sound Air Pollution Control Agency prior to start of work (206) 343-8800. 4 In addition to Traffic Concurrency and Traffic Impact fees, Interlocal Traffic Mitigation fees for Snohomish County may also be a condition of SEPA. (Residential subdivisions creating less than 10 PM Peak hour trips are exempt from concurrency requirements and do not need a concurrency application. This does not preclude them from requirements such as traffic fees, safewalk, frontage improvements, sight distance or other traffic analysis related work. See Form W for Traffic Impact Fees.)

BOTHELL CITY HALL │18415 101ST AVE NE, BOTHELL, WA 98011│ PHONE 425.806.6400

Page 2 of 4 Updated 12/18

PUBLIC WORKS FEES - 2019

E

Development Review Technology Surcharge: A 5% technology surcharge will be added to all fees listed other than state, impact, mitigation or facility charges.

Public Works construction permit review fees include up to 3 reviews at fixed rates listed. 4th review and other additional reviews are to be billed at hourly rates. See Billing Form D.

Grading Permits

Base charge ....................................................................................... $1,696.00

Charge per disturbed acre with no land use entitlement ................. $2,135.00

Charge per disturbed acre with land use entitlement ..................... $2,308.00

Water Service Permits Fees

Water Meter Processing Fee ................................................................... $40.00/each meter

Water Main Tap

for a single residence or as a standalone permit ........................ $242.00/each

associated with a development project ...................................... $632.00

Existing Service Line to Property and Meter Box:

¾” (5/8”) meter ............................................................................. $469.00

1” meter ........................................................................................ $532.00

1 ½” meter .................................................................................... $796.00

2” meter ........................................................................................ $976.00

Backflow Assembly Inspection - 2 inch or smaller ................................. $219.00

Backflow Assembly Inspection - 3 inch or larger ................................... $715.00

Water utility infrastructure improvements

Water utility base charge ....................................................................... $506.00

Water utility fee per 100 lineal feet of improvements .......................... $1,870.00

Sewer Permits Fees

Side Sewer Processing Fee .................................................................... $53.00

Side sewer connection - Single family ................................................... $249.00

Side sewer connection – Detached condominium .................................. $249.00

Side sewer connection – Multi-family duplex & up ................................. $632.00 base + $468.00/ea. unit

Side sewer connection – Commercial .................................................... $632.00 ea

Sewer Main Tap

for a single residence or as a standalone permit ................................ $715.00

associated with a development project ............................................ $1,046.00

Repair/modify existing side sewer line(s) – Single family ....................... $249.00

Repair/modify existing side sewer line(s) – Commercial/Multi-family .... Hourly Billing

Sewer utility infrastructure improvements

Sewer utility base charge ...................................................................... $506.00

Sewer utility fee per 100 lineal feet of improvements .......................... $1,557.00

Stormwater Permits Fees

Residential storm drain inspection fee ................................................... $242.00

Stormwater utility infrastructure improvements

Stormwater utility base charge .............................................................. $506.00

Stormwater utility fee per 100 lineal feet of improvements ..................... $575.00

Stormwater detention facility (plus pass through consultant charges) ... $882.00

BOTHELL CITY HALL │18415 101ST AVE NE, BOTHELL, WA 98011│ PHONE 425.806.6400

Page 3 of 4 Updated 12/18

PUBLIC WORKS FEES - 2019

E

Development Review Technology Surcharge: A 5% technology surcharge will be added to all fees listed other than state, impact, mitigation or facility charges.

Right-of-way Permits (also see footnotes 1, 2 & 3 on page 1)

Driveway and sidewalk –right of way invasion permit ................................ $566.00 (includes utility connection/improvement outside of paved road, traffic control plans not associated with street cuts)

Right of way permit ............................................................................... $1,113.00 base charge

Right of way review and inspection per 100 lineal feet ............................. $514.00

Safe Walk to School review for residential developments ..................... $2,603.00

Franchise Utility Right-of-way:

Minor ROW Permit ............................................................................. $828.00

Major ROW Permit ............................................................................ $599.00 plus Hourly Billing (form D)

Street Cut Mitigation Fee for all Right-of-way permits. The fee is based upon the cost of overlay for permanent repair of damage and/or deterioration of streets and shoulders caused by trenching/utility operations.

Street cut mitigation base fee ..................................................................... $53.00

Fee per lineal feet of opening ..................................................................... $23.00

Public Area Use Permit fees:

Sidewalk only outdoor dining and/or general usage permit fee ................. $125.00

Outdoor dining permit fee – flexible zone

Applications received on or before March 15th ......................................... $150.00

Applications received after March 15th ..................................................... $450.00

Monthly use charge (paid at permit issuance based on permit duration) ........ $.09 per sq ft

Public Area Use Permit with railing ......................................................... $150.00

Annual renewal (no substantial changes) ................................................. $100.00

Traffic control devices for public area use permits .................................... $174.00

Traffic signals

New signal (plus pass through County costs) .................................. $3,563.00

Signal modification (plus pass through County costs) ..................... $2,470.00

Safe Walk to School review for residential developments ..................... $2,603.00

Traffic Concurrency Capacity Reporting & Monitoring Surcharge

Traffic Concurrency Base Charge ……………………………………………………………………………$2,239.00

“Minor Development” (at least 3 peak hour trips but less than 20) ............ $994.00

“Medium Development” (project generates 20-50 peak hour trips) ........ $1,982.00

“Major Development” (project generates more than 50 peak hour trips) $3,302.00

An applicant shall pay for all work performed by, or on behalf of, the City in connection with the processing, reviewing, checking, computing, and inspecting and correcting for compliance with City codes of the plans or other documents provided by the applicant for all work associated with the street excavation, including inspection and processing of maintenance bond. Fees provide for reimbursement of municipal employee time, the charges will be based on the hourly rate of the employee performing the review multiplied by an overhead factor furnished by the Finance Division on a yearly basis. Any cost differential between the minimum and actual costs shall be paid to the City upon demand.

Hydrant Use Permits

Hydrant Permit .................................................................................... $126.00

Hydrant Use Deposit* ....................................................................... $1,000.00

City Meter Damage Deposit .............................................................. $1,000.00

BOTHELL CITY HALL │18415 101ST AVE NE, BOTHELL, WA 98011│ PHONE 425.806.6400

Page 4 of 4 Updated 12/18

PUBLIC WORKS FEES - 2019

E

Hydrant Meter Rental (monthly) ........................................................... $119.00

Water Cost per 100cf or 748 gals .......................................................... $14.00

Additional Fees:

Residential Site Review and Inspection ................................................... $599.00

Street Vacation application ................................................. Hourly Billing (form D)

**Applicant is responsible for the cost of appraisal & recording fees

Fire Flow Analysis or Hydraulic Analysis .................................................. $184.00

Flushing / Dechlorination / Disinfection Service ..................................... $1,046.00

Television Pipeline Inspection Service ............. $178.00 per hour (Depending on availability) (3 hr minimum)

Re-inspection Fee .................................................................................... $166.00

Public Works Variance Hourly (see Billing Form D)

Rockery/retaining wall (plus pass through consultant charges) ................ $418.00

BOTHELL CITY HALL │18415 101ST AVE NE, BOTHELL, WA 98011│ PHONE 425.806.6400 │ www.bothellwa.gov

Page 1 of 2 Updated 12/18

BUILDING PERMIT FEES 2019 A

DEVELOPMENT SERVICES BUILDING COMMUNITY RISK REDUCTION ENGINEERING PLANNING PERMIT SERVICES TRANSPORTATION

Development Review Technology Surcharge:

A 5% technology surcharge will be added to all fees listed other than state, impact, mitigation or facility charges.

Type of Development – Submittal Fees:

Single Family Multi-Family Commercial Commercial

Remodel/Tenant Improvement New/Addition

Plan Check1 Plan Check1 Plan Check1 Plan Check1

5% Technology Fee Fire Plan Check2 Fire Plan Check2 Fire Plan Check2

5% Technology Fee 5% Technology Fee 5% Technology Fee

1st time tenant: $218 (planning) Consultant Plan Review1

Type of Development – Fees Due at Permit Issuance:

Single Family Multi-Family Commercial Commercial

Remodel/Tenant Improvement New/Addition

Building Permit Fee Building Permit Fee Building Permit Fee Building Permit Fee

Energy Code Review3 Energy Code Review3 Energy Code Review3 Energy Code Review3

State Fee4 State Fee4 State Fee4 State Fee4

5% Technology Fee 5% Technology Fee 5% Technology Fee 5% Technology Fee

Mechanical & Plumbing Mechanical & Plumbing Mechanical & Plumbing Mechanical & Plumbing

Storm Drain Inspection Traffic Impact* Traffic Impact* Traffic Impact*

Single Family Site Review and Inspection5

Fire Impact* Fire Impact* Fire Impact*

Park Impact* Park Impact* Park Impact*

Single Family Planning Review8

School Impact* Hazmat Review- if required6 Hazmat Review- if required6

Traffic Impact*

Fire Impact*

Park Impact*

School Impact*

ADU Planning Review7

* Applicable to all new development and development changing the existing use: Impact Fees - see Form X

1: Building Plan Check that requires consultant review: Plan Check fee + Consultant review fees. 2: Fire Plan Check Fee (all new commercial and multi-family bldgs, or 1st Time/Change of Use TI): $.08 per square foot 3: Review fees to ensure compliance with the Washington State Energy Code: New Single Family building $163, Residential

Remodel/Addition: $163, New Multi-family building: $324 per structure + $85 per unit; New Commercial building: $324, Tenant Improvement: $163.

4: Residential: $6.50 State fee for each building permit + $2.00 for each residential unit after the first unit. Commercial (mixed use or non-residential): $25 State fee for each building permit + $2.00 for each residential unit after the first unit.

5: $599.00 Residential site review and inspection - New Construction and Additions: Prior to issuance of residential building permits (multi-family or single family), site plans for residential construction are reviewed for consistency with applicable City codes and design and construction standards and specifications, which may include water lines, sanitary sewer lines, storm water retention/detention and drainage systems, streets, curbs, gutters, driveways, sidewalks and easements. Subsequent to permit issuance, required site inspections are performed.

6: Fire Department Hazmat Consultant review: if Hazardous Materials Inventory Statement peer review is required, then an additional consultant review fee is charged to applicant by the peer reviewer.

7: Accessory Dwelling Unit fees: see ADU submittal checklist. 8: Single Family Planning Review: $164

BOTHELL CITY HALL │18415 101ST AVE NE, BOTHELL, WA 98011│ PHONE 425.806.6400 │ www.bothellwa.gov

Page 2 of 2 Updated 12/18

BUILDING FEES 2019 A

Development Review Technology Surcharge:

To reimburse the City for costs specifically related to electronic development review and permit tracking, a 5% technology surcharge will be added to all fees listed other than state, impact, mitigation or facility charges.

Determining the Building Permit Fee: Square foot value multipliers are based on Building Valuation Data from ICC, updated February/August. The following square footage multipliers are used to determine new construction valuations. See ICC for current table.

New living area ......................................... $120.75/sq.ft Garage/Storage/Shed ........................... $47.80/sq.ft. Deck .............................................................. 18.50/sq.ft. Carport .................................................... 18.50/sq.ft. Heated basement........................................ 120.75/sq.ft. Unheated basement ................................ 21.00/sq.ft.

Total Valuation Permit Fee Per BMC Table 20.02.155-A

$1 to $500 $28.50

$501 to $2,000 $28.50 for the first $500 + $3.65 for each additional $100 or fraction thereof, to and

including $2,000

$2,001 to $25,000 $83.00 for the first $2,000 + $16.80 for each additional $1,000 or fraction thereof, to and

including $25,000

$25,001 to $50,000 $470.00 for the first $25,000 + $12.00 for each additional $1,000 or fraction thereof, to and

including $50,000

$50,001 to $100,000 $772.50 for the first $50,000 + $8.40 for each additional $1,000 or fraction thereof, to and

including $100,000

$100,001 to $500,000 $1,192.50 for the first $100,000 + $6.75 for each additional $1,000 or fraction thereof, to

and including $500,000

$500,001 to $1,000,000 $3,878.50 for the first $500,000 + $5.75 for each additional $1,000 or fraction thereof, to

and including $1,000,000

$1,000,001 and up $6,730.50 for the first $1,000,000 + $4.50 for each additional $1,000 or fraction thereof.

Determining the Plan Check Fee (this fee is due at application submittal): Multiply the building permit fee by .65 to determine plan check fee.

Additional Types of Permits: (5% technology surcharge is added to the following fees)

Plumbing and Mechanical Permits ......... See Plumbing and Mechanical Permit Application for Fees. Residential IRC

design building permits are combination permits, and include plumbing and mechanical

Residential or Commercial pool .............. Permit Fee, Plan Check Fee based on Valuation, 5% Tech Fee + State Fee

Commercial hot tub ................................. Permit Fee & Plan Check Fee based on Valuation, 5% Tech Fee + State Fee

Demolition ............................................... Main Structure: $340.00 + 5% Tech Fee + State Fee

Accessory Structure: $60.00 + 5% Tech Fee + State Fee

Historic Structure demolition permits: $339 + 5% Tech Fee + State Fee +

hourly Planning Review fee

Moved Buildings – into or within City ....... Pre-move inspection fee $259.00 + 5% Tech Fee. Foundation permit for

moved buildings shall be in addition to the pre-move inspection fee, based on valuation, or actual costs (additional

traffic control costs, etc.). See BMC 20.04.060 for additional information.

Mobile Home Installation ........................ $312.05 (291.00 + 5% Tech Fee + State Fee)

Residential Re-roof ................................. $137.75 (125.00 + 5% Tech Fee + State Fee)

Commercial Re-roof ................................ Permit Fee & Plan Check Fee based on Valuation, 5% Tech Fee + State Fee

Fence over 6 feet .................................... Permit Fee & Plan Check Fee based on Valuation, 5% Tech Fee + State Fee

Signs ....................................................... Permit Fee & Plan Check Fee based on Valuation, 5% Tech Fee + State Fee

+ Planning Review Fee of $645.00 for 1st sign, plus $188.00 for each additional sign applied for simultaneously.

Title Elimination Inspection ..................... $171.15 (163 + 5% Tech Fee)

Adult Family Home Inspection ................ $171.15 (163 + 5% Tech Fee)

Building Department Re-inspection Fee . $171.15 (163 + 5% Tech Fee)

Additional Plan Review Fee per hr (applicant revisions or reviews after 3rd review)………………$171.15 (163 + 5% Tech Fee)

BOTHELL CITY HALL │18415 101ST AVE NE, BOTHELL, WA 98011│ PHONE 425.806.6400 │ www.bothellwa.gov

Page 1 of 4 Updated 12/18

NON-RESIDENTIAL - MIXED USE - MULTI-FAMILY PLUMBING AND/OR MECHANICAL

Submit your application online at www.MyBuildingPermit.com. Online application required for plumbing or mechanical for buildings over 4,000 square feet

8

DEVELOPMENT SERVICES BUILDING COMMUNITY RISK REDUCTION ENGINEERING PLANNING PERMIT SERVICES TRANSPORTATION

Permit Application for: Plumbing Mechanical Both

The permit and plan review fee for the installation, replacement, relocation or repair of each non-residential, mixed use or multi-family plumbing or mechanical permit is calculated according to the valuation of the work to be done.

Plumbing work valuation: Mechanical work valuation:

PROPERTY INFORMATION

Project/Business/Tenant name

Existing tenant? Yes No If no, associated Tenant Improvement Application #

Site Address: Suite No:

Parcel No: ______________________________________

Property Owner:

Mailing Address: City State Zip

Phone: ( _____ ) ____________________________ E-Mail:

PRIMARY CONTACT INFORMATION This person is designated by the applicant to receive all communications, correspondence, determinations, and notices required by applicable development regulations.

Contact Person: Company Name:

Relationship to the Applicant

Mailing address City State Zip

Phone ( _____ ) ____________________________ E-Mail:

APPLICANT This person is designated by the applicant to receive all communication

Applicant (If different from Contact Person):

Mailing address City State Zip

Phone ( _____ ) ____________________________ E-Mail:

CONTRACTOR

Contractor Company Name (Must be provided prior to permit issuance):

Contact Name: _____________________________________ E-Mail:

Mailing address City State Zip

Phone ( _____ ) ___________________________________WA State UBI No:

Contractor’s L&I License No: Exp. Date: Contractor’s City Business License #:

State Laws require verification of current Contractor’s License — City business license required by Bothell Municipal Code Title 5

OWNER IS CONTRACTOR – I have read RCW18.27.010 relating to definitions of general contractors and specialty contractors and RCW 18.27.110, which prohibits issuing

permits without proof of registration, and owner is contractor.

OFFICE USE ONLY PERMIT NUMBER: PLAN NUMBER:

PRJ#

BOTHELL CITY HALL │18415 101ST AVE NE, BOTHELL, WA 98011│ PHONE 425.806.6400

Page 2 of 4 Updated 12/18

NON-RESIDENTIAL - MIXED USE - MULTI-FAMILY PLUMBING AND/OR MECHANICAL

8

PLUMBING & MECHANICAL PERMIT FEE SCHEDULE FOR MULTI-FAMILY, MIXED-USE, AND NON-RESIDENTIAL

1. Permit Fee: See Table below to determine the Plumbing and/or Mechanical Permit fee due at issuance. 2. Plan Review Fee: When plans are required to be submitted for review, a plan review fee equal to 40% of the Mechanical

Permit fee shall be paid at the time of submittal. 3. Technology Fee: A 5% fee will be added for all permit and plan review related services.

The valuation table below applies to all Multi-Family, Mixed-Use, and Non-Residential Plumbing and Mechanical Permits, unless otherwise noted. Fees listed are in addition to Plan Review, WA State Surcharge, 5% Technology Fee, and any applicable Stop Work Order/Special Investigation Fees. Total Valuation Equal To:

*$0.00-$1,000.00 Up to $1,000.00 .......................................................................................... $68.00

*$1,001.00-$2,000.00 For the first $1,000.00 ................................................................................. $71.00 Per Additional $100.00 or Portion Thereof, Up to $2,000.00 $6.00

*$2,001.00-$25,000.00 For the first $2,000.00 ............................................................................... $130.00 Per Additional $1,000.00 or Portion, Up to $25,000.00 ............................... $20.00

*$25,001.00-$50,000.00 For the first $25,000.00 ............................................................................. $534.00 Per Additional $1,000.00 or Portion, Up to $50,000.00 ............................... $15.00

*$50,001.00-$100,000.00 For the first $50,000.00 ............................................................................. $845.00 Per Additional $1,000.00 or Portion, Up to $100,000.00 ............................. $14.00

*$100,001.00-$500,000.00 For the first $100,000.00 ........................................................................ $1,321.00 Per Additional $1,000.00 or Portion, Up to $500,000.00 ............................. $12.00

*$500,001.00-$1,000,000.00 For the first $500,000.00 ........................................................................ $4,326.00 Per Additional $1,000.00 or Portion, Up to $1,000,000.00 ............................ $8.00

*$1,000,001.00-$5,000,000.00 For the first $1,000,000.00 ..................................................................... $7,563.00 Per Additional $1,000.00 or Portion, Up to $5,000,000.00 ............................ $6.00

*$5,000,001.00 and up For the first $5,000,000.00 ................................................................... $23,958.00 Per Additional $1,000.00 ............................................................................... $5.00

*The initial permit fees include the first two levels of dwelling units/sleeping units. For each additional level there is a charge of $30 per unit in addition to the initial permit fee. (does not include townhouses and detached single family units on one lot, which are charged using the percentage of building permit fee for new single family construction).

BOTHELL CITY HALL │18415 101ST AVE NE, BOTHELL, WA 98011│ PHONE 425.806.6400

Page 3 of 4 Updated 12/18

NON-RESIDENTIAL - MIXED USE - MULTI-FAMILY PLUMBING AND/OR MECHANICAL

8

The following minor work does not require plan review, and a permit may be issued at the Permit

Counter:

Mechanical

New fixtures Mechanical retro-fit

Not related to a Major Tenant Improvement

Addition or relocation of up to 15 diffusers for

existing HVAC equipment provided:

.. Work is limited to ducts and diffusers

.. Building does not have a smoke control

system

.. Ducts do not penetrate a fire rated assembly

OR -

In kind replacement of indoor equipment.

Plumbing (must meet all criteria)

New fixtures Re-plumb

Not related to a Major Tenant Improvement

Existing building space (no new square

footage construction)

10 or less fixtures

Project does not involve medical gas piping, a

commercial kitchen, any food service/food

preparation or a laboratory.

Project does not include an oil/water separator,

grease or waste interceptor, sump/pump or

roof drains/overflow systems.

Describe the work applied for under this permit. Description of Mechanical Work Description of Plumbing Work

___________________________________________ ____________________________________________

___________________________________________ ____________________________________________

___________________________________________ ____________________________________________

Applications requiring plan review: Applicant Staff

Two (2) sets of plans including:

Layout drawing

Types of materials used

Isometric drawings for water supply and waste lines (plumbing)

Gas piping isometrics (mechanical)

Heat Loss Calculations for sizing equipment per WSEC (if applicable) .................................................................

If applicable, provide gas piping analysis that demonstrates gas piping can support new and existing appliances

Equipment weighing 400 lbs or more, which will be placed on or within a structure, shall include 2 sets of engineering details and calculations for the support and seismic anchorage of the units per Section 1613.1 of the IBC and the current version of the ASCE7 standard (in addition to the 2 sets of plans noted above) Exception: Water heaters installed four feet or less above a floor level may be installed per UPC Section 508.2 AND the manufacturers installation instructions.

Roof mounted mechanical devices shall be screened per BMC 12.14.190C & BMC 12.14.190D. Any required screening shall be a height sufficient to obscure the view of any portion of the mechanical device above any sight line. An applicant proposing roof-mounted mechanical devices shall indicate projected sight lines from the ground level at abutting property lines upwards to and past the point of intersection with the top of the side (e.g., a parapet) of the building.

In order to properly size the water meter the following information is required for new plumbing systems:

The elevation of water meter must be noted on the plans or here on the application.

The difference in elevation between the water meter and the highest fixture must be noted on the plans or here on the application.

The overall length from the water meter to the most remote fixture must be noted on the plans or here on the application.

BOTHELL CITY HALL │18415 101ST AVE NE, BOTHELL, WA 98011│ PHONE 425.806.6400

Page 4 of 4 Updated 12/18

NON-RESIDENTIAL - MIXED USE - MULTI-FAMILY PLUMBING AND/OR MECHANICAL

8

Please note:

For roof-mounted mechanical equipment, provide architectural elevation views with your mechanical permit application to verify that new or existing screening is in compliance with the Land Use Code.

Building Code Requirements for Mechanical Installations

When is a separate building permit required?

Many mechanical HVAC installations involve the need to make structural improvements to the building or structure where new HVAC equipment will be installed. A separate building permit is typically needed for structural improvements to allow for review and inspection of those improvements. Some examples of typical structural improvements done as part of an HVAC installation include:

Modifications to an existing roof or elevated floor to carry the weight of new equipment.

Installation of screening as required by the Land Use ordinance.

Connection of wall-mounted installations to an existing building. Building plans and structural calculations are required in most cases to justify existing and/or new construction related to gravity or lateral support of new HVAC equipment. Note: If structural calculations are required by the City of Bothell, the calculations, details, and drawings must be stamped and signed by an engineer licensed in the state of Washington. Structural improvements not listed below require a separate building permit. Note: If a separate building permit is required, the mechanical permit will not be issued until the building permit is approved and issued. If a separate building permit has already been submitted for review or has been issued, it is not necessary to provide the same information with the mechanical permit application except structural calculations for mechanical. New HVAC equipment should not be installed on elevated roofs or decks until necessary structural improvements have been completed and approved by the building inspector and attachment of all roof top equipment to the roof must occur prior to cover. If screening for exterior equipment is required, per the Land Use ordinance, provide lateral and gravity calculations for review. For projects requiring installation of shafts, plans & details showing the location and support of vertical and/or horizontal shafts must be provided. In many cases, shafts must be fire resistance-rated; assembly listing numbers and assembly details must be provided for review.

When is a separate building permit not required?

The following items are considered ancillary to the mechanical work, do not require a building permit, and may be reviewed as part of the mechanical permit:

Seismic connections to prevent overturning of equipment during an earthquake.

Creating an opening in an existing roof and installation of a curb to support new rooftop equipment.

Blocking and/or brackets to support ductwork.

Review of an existing roof or elevated floor assembly for new gravity loads when no structural improvements are needed. This review is necessary to confirm that an existing roof deck, floor framing, or platform is adequate to support the new or replacement installation.

Engineering for gravity is not required for rooftop equipment if the new unit will be in the same location and the weight does not exceed 5% more than the original equipment per IEBC 807.4.(1).