Submitted by the Chair of theWLTP Informal Group

Informal document No. GRPE-68-15(68th GRPE, Jan. 2014, agenda item 3(a)) 

Status report of the WLTP Informal Group

Report to GRPE No. 68by Stephan Redmann

Page 2: Submitted by the Chair of the WLTP Informal Group Informal document No. GRPE-68-15 (68th GRPE, Jan. 2014, agenda item 3(a)) Status report of the WLTP Informal

WLTP IG Meetings

June 2008 – Jan. 2010 1st – 4th WLTP IG meeting

2010 – 2013 WLTP IG was inactive

8th January 2014 5th WLTP IG meeting

Start of WLTP Phase 1B

Page 3: Submitted by the Chair of the WLTP Informal Group Informal document No. GRPE-68-15 (68th GRPE, Jan. 2014, agenda item 3(a)) Status report of the WLTP Informal

Status of WLTP Phase 1

67th GRPE: Working document GRPE/2013/13 amended by

(11/2013) Informal document GRPE-67-04-Rev.1

WLTP Phase 1A

162th WP.29: 1) Adoption of Phase 1A gtr documents

(03/2014) 2) Technical reports

3) Mandate for WLTP Phase 1B

Page 4: Submitted by the Chair of the WLTP Informal Group Informal document No. GRPE-68-15 (68th GRPE, Jan. 2014, agenda item 3(a)) Status report of the WLTP Informal

WLTP Phase 1b Roadmap

WP.29

GRPE

WLTP

2014 2015 20161 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6

Fix organization, responsibilitiesand time schedule

Phase2 ToR

5 6 7 8 9 10

gtr informaldocument

Round Robin

167

168

169

71 7370 726968

gtr formaldocument

Slig

ht

mo

difi

catio

n

11 12 13

Phase2

14

Page 5: Submitted by the Chair of the WLTP Informal Group Informal document No. GRPE-68-15 (68th GRPE, Jan. 2014, agenda item 3(a)) Status report of the WLTP Informal

WLTP Phase 1b Organization (WLTP-05-03)

WLTP Informal Group Chair : RedmannVice Chair : KOBAYASHICo-TSs : ICHIKAWA / KolesaDrafting Coord.: Dubuc

E-Lab. Sub-group Co-Chairs : Ohlund / NIIKUNICo-TS : ICHIKAWA / Hartmann

Task Forces

IG designates responsible CPs/Individual expertfor each open task.

Page 6: Submitted by the Chair of the WLTP Informal Group Informal document No. GRPE-68-15 (68th GRPE, Jan. 2014, agenda item 3(a)) Status report of the WLTP Informal

Open issues list: WLTP-05-04

Key issues: Subgroup EVUtility Factors, phase specific calculation formula, shortened test procedure

Cycle / ProcessDownscaling, gearshifting , number of tests

Road & Dyno Load DeterminationWindtunnel method, torque meter method, on-board anemometry, default running resistances

GeneralNormalization procedures, Ambient temp. correction test

Validations/ Round Robin exercise

Open issues Phase 1B

Page 7: Submitted by the Chair of the WLTP Informal Group Informal document No. GRPE-68-15 (68th GRPE, Jan. 2014, agenda item 3(a)) Status report of the WLTP Informal

Parallel activities of the European Union in 2014:

• Normalization procedures (WLTP-05-13)

Correction algorithms for variations in the WLTP testing

1) Chassis dynamometer test (vehicle state, test execution, meas. Equipm.)

2) Road load determination (coast-down test: ambient conditions,

vehicle state, test execution, test circuit)

Draft report on 21 methods: end January 2014,

discussions on EU implementation in 2014

Interest of CPs to harmonize these procedures (partly) in Phase 1B?

Feedback requested until 14th February 2014.

Page 8: Submitted by the Chair of the WLTP Informal Group Informal document No. GRPE-68-15 (68th GRPE, Jan. 2014, agenda item 3(a)) Status report of the WLTP Informal

• Ambient Temperature Correction Test (WLTP-05-14)

Method already discussed and drafted in Phase 1A

Validation of family concept is on-going, participation of CPs welcomed

• Utility Factors (EV vehicles)

Current gtr: regional UFs.

EU develops revised UFs to improve representativeness,

including the methodology to develop UF.

Page 9: Submitted by the Chair of the WLTP Informal Group Informal document No. GRPE-68-15 (68th GRPE, Jan. 2014, agenda item 3(a)) Status report of the WLTP Informal

Next meetings

Preparatory Telephone/Web Conference, 2 weeks in advance

of each IG meeting

6th WLTP IG Meeting, Vienna, Austria

3 day meeting, end March / beginning April 2014 (date tbc)

7th WLTP IG Meeting, Geneva

June 2014, preceding GRPE (date tbc)