Project Specifics Client Ergon Energy Location Gladstone, QLD Year Completed 2007 Size / Quantities 132/66kV; 2 x 80MVA Transformers Services Provided Primary Design and Layouts Switchyard Materials Selection Earthing & Lightning Design Secondary Systems Design Protection Scheme Auxiliary Power Systems Full Detailed Drawings SCADA & Communication Panels Protection Relay Settings Delivery Method Design Consultant for Constructor Background: To cater for the expanding industrial development and port facilities to the north of Gladstone, Ergon Energy decided to establish a major bulk supply substation to be supplied directly from the adjacent Gladstone Power Station. This was to be Ergon’s first 132kV substation in Qld and consisted of four bays in “Breaker and a Half” circuit configuration, two 80MVA transformers and six outgoing 66kV bays, as well as a Ripple Controller. Outgoing bays from this substation would also supply the new Port Curtis 66/11kV substation adjacent to the Gladstone Ports Corporation to cater for the expansion at this facility. Welcon designed both substations in parallel with design documentation delivered in stages to meet the tight project schedule and installation methodology. SUCCESS STORIES Ergon Energy Gladstone North 132kV Bulk Supply Substation Enquiries: Steve Williams Principal Engineer. Phone: (07) 4976 0600 SS01

SUCCESS - welcon.com.au€¦ · SS01 . Welcon Technolocies ELECTRICAL ENGINEERING SPECIALISTS . Author: Steve Williams Created Date: 12/9/2014 10:59:05 AM

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SUCCESS - welcon.com.au€¦ · SS01 . Welcon Technolocies ELECTRICAL ENGINEERING SPECIALISTS . Author: Steve Williams Created Date: 12/9/2014 10:59:05 AM

Project Specifics

Client Ergon Energy

Location Gladstone, QLD

Year Completed 2007

Size / Quantities 132/66kV; 2 x 80MVA Transformers

Services Provided

Primary Design and Layouts

Switchyard Materials Selection

Earthing & Lightning Design

Secondary Systems Design

Protection Scheme

Auxiliary Power Systems

Full Detailed Drawings

SCADA & Communication Panels

Protection Relay Settings

Delivery Method Design Consultant for Constructor

Background: To cater for the expanding industrial development and

port facilities to the north of Gladstone, Ergon Energy

decided to establish a major bulk supply substation to

be supplied directly from the adjacent Gladstone Power

Station.

This was to be Ergon’s first 132kV substation in Qld and

consisted of four bays in “Breaker and a Half” circuit

configuration, two 80MVA transformers and six outgoing

66kV bays, as well as a Ripple Controller.

Outgoing bays from this substation would also supply

the new Port Curtis 66/11kV substation adjacent to the

Gladstone Ports Corporation to cater for the expansion

at this facility.

Welcon designed both substations in parallel with

design documentation delivered in stages to meet the

tight project schedule and installation methodology.

SUCCESS STORIES

Ergon Energy

Gladstone North 132kV Bulk Supply Substation

Enquiries: Steve Williams Principal Engineer. Phone: (07) 4976 0600