Introduction

• Columbia County– David Robinson, P.E., Commissioner

– Dean Knox, Director of Engineering

• Barton & Loguidice, P.C.– Robert Sipzner, P.E., Project Manager

– Jeremy Bourdeau, P.E., Project Engineer

Page 3: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Introduction

• SEMO– Bill Winkler, P.E, Public Assistance

Liaison

– John Thomson, Disaster Assistance Officer

Page 4: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Columbia County Infrastructure

• Columbia County– Northeastern reach of Region 8

– County road maintained = 270+ centerline miles

– County bridges maintained = 137•52 located on county roads

•85 located on town highway

Page 5: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Columbia County Infrastructure

• Bridges– 15 = Reduced load postings

– 6 = Scour critical

Page 6: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Columbia County Infrastructure

• Large culverts– Large culvert structures maintained

= 105•Defined as structures from 5 feet to

just under 20 feet

•Located on county roads only

Page 7: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Columbia County Infrastructure

Total structures County is responsible for

242

Page 8: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Columbia County Bridge Program

• Thru 2014: 7 locally administered, federal aid bridge replacements

• Thru 2011: 4 locally funded bridge replacements

• In 2007: newly instituted, “dedicated” 4-person bridge maintenance/repair bridge crew

Page 9: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Columbia County Bridge Program

• But the County is also required to respond to structure needs due to sudden changes…

Page 10: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Project Locations and Descriptions

Page 11: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Project 1:CR 34 over Hollow Brook

• Town of New Lebanon

CR 34 over

Hollow Brook

Page 12: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

CR 34:Pre-Replacement

• Structure Type: two distinct and abutting structure types– Upstream half of structure:

Dry-laid stone masonry arch

Carrying original road alignment in 1800’s (spring line span = 10.5’)

Page 13: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

CR 34:Pre-Replacement

• Structure Type: two distinct and abutting structure types– Downstream half of structure:

Concrete superstructure on tall abutments

Realigned roadway in 1946 (span = 17.5’)

Page 14: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

CR 34:Pre-Replacement

• In constructing the concrete structure– The stone arch was utilized to

retain the roadway embankment– Result = A single structure integral

and reliant upon the two abutting components

Page 15: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 16: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 17: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 18: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

CR 34:Timeline

• Summer/Early Fall 2004: County subjected to multiple severe storms and flooding events, including hurricane remnants traveling up the eastern seaboard

• 8/29/04 to 9/16/04: Storms resulted in flood damage to CR 34 structure

Page 19: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

CR 34:Timeline

• 50% of Stone Arch Portion Collapsed:– Reducing structure hydraulic

opening

– Severely compromised roadway embankment and fill on remaining structure

Page 20: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

CR 34:Timeline

• 50% of Stone Arch Portion Collapsed:– Stone deposition in stream now

directing flow at remaining arch components

Page 21: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

CR 34:Timeline

• Failure Mode:– Structure Type/Size – Flow

Constriction

– Passage of Excessive Flood Flows

– Alignment to Stream Flow

Page 22: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

CR 34:Timeline

• FEMA declares county as disaster eligible under FEMA disaster No. 1564 DR NY

• Project actions, design and construction funding by federal and local dollars

Page 23: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 24: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

CR 34:Timeline

• B&L retained to perform preliminary and final design, and construction support services: Fall 2004

• Coordination w/SEMO for funding assistance: final report submitted May 2005

• Final design/ROW acquisitions completed: April 2006

• Bidding/award:- May-July 2006

Page 25: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

CR 34:Timeline

• Construction Contractor: A. Colarusso & Son, Inc.

• Construction Begins: September 2006

• Construction Shutdown: October 2006-June 2007 due to in-stream work restrictions

• Construction of replacement structure completed: October 2007

Page 26: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Project 2:Wire Road over Klein Kill

• Town of Livingston

CR 34 over

Hollow Brook

Wire Road over

Klein Kill

Page 27: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Wire Road: Pre-Replacement

• Structure Type:– Low volume roadway, joining CR 10

and CR 31

– Superstructure - 32 foot, single span jack arch

– Substructures - masonry abutments founded on rock

– Year built - 1935

Page 28: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Wire Road:Pre-Replacement

• Structure Type:– Begin right wingwall replaced with

concrete wingwall/tie-back system -1989

– Remaining wingwalls stone masonry construction

Page 29: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 30: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 31: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 32: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Wire Road:Timeline

• Early Spring 2004, Town of Livingston Supervisor observed major longitudinal roadway cracking at the end of bridge approach

• End left wingwall shifted outward, resulting in roadway longitudinal crack formation, 5’ in from the edge of rail

• Immediate determination for road closure until actions can be taken

Page 33: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Wire Road:Timeline

• Failure Mode:– Type of Construction/Age

– Overload or Excessive Runoff

– Sudden Shifting of Wall (Instability)

Page 34: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 35: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 36: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Wire Road:Timeline

• B&L retained to perform preliminary and final design, and construction support services: Spring 2004

• Final design complete: May 2005• ROW negotiations: May-December

2005• ROW completed: December 2005

Page 37: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Wire Road:Timeline

• Bidding/Award: January – May 2006

• Construction Contractor: Wm. J. Keller & Sons Construction Corporation

• Construction of replacement structure completed: October 2006

Page 38: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

County Route 34 Structure Replacement

Page 39: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 40: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

CR 34: Design/Construction Issues and Obstacles

• Monitoring of roadway for any continued deterioration encroachment, until replacement structure completed

Page 41: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 42: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 43: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 44: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 45: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

CR 34: Design/Construction Issues and Obstacles

• Monitoring of roadway for any continued deterioration encroachment, until replacement structure completed

• Coordination with FEMA/SEMO to allow for full replacement

Page 46: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

CR 34: Design/Construction Issues and Obstacles

• Coordination with FEMA/SEMO to allow for full replacement– Original Funding - $90,000 for Stone

Arch Reconstruction

– Would not correct Hydraulic or Structural Issues

Page 47: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

CR 34: Design/Construction Issues and Obstacles

• Coordination with FEMA/SEMO to allow for full replacement-

Two Feasible Alternatives1. Wingwall Replacement

2. Full Structure Replacement (Recommended)

FEMA Funding -$220,000 for Alt. 1

Page 48: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

CR 34: Major Issues and Obstacles

• Massive structure removal of the tall, concrete structure section

• In-stream permitting restrictions

Page 49: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 50: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 51: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

CR 34:Major Issues and Obstacles

• Massive Structure Removal of the Tall, Concrete Structure Section

• In-Stream Permitting Restrictions • Tie-in with Varying Rock

Topography

Page 52: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 53: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 54: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

CR 34:Structure Replacement

• Replacement Structure = precast concrete 3-side rigid frame

• Span = 18’ clear span, 19’-10” along skew

• Out-to-Out Width = 45’-3”• Height = 10’ frame rise, 25’ streambed

to roadwayFinal Construction Cost = $540,000

Page 55: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 56: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 57: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Wire Road Bridge Replacement

Page 58: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 59: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Wire Road: Major Issues and Obstacles

• Coordination with adjacent landowners opposed to the project/acquisition of right-of-way

• Coordination with three overhead utility lines and the need to relocate interfering poles

Page 60: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Wire Road: Major Issues and Obstacles

• Considerations for re-use or retention of original abutment stones

• Two distinct foundation types at each abutment

Page 61: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 62: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 63: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 64: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 65: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Wire Road:Bridge Replacement

• Replacement Structure = P/S box beam

• Span = 80’-0”• Out-to-Out Width = 28’-0”Final Construction Cost = $615,000

Page 66: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 67: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 68: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:
Page 69: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Summary

• Sudden Structure Failures• Emergency Response Actions• Use of Local (County) Funds• Design/Construction Challenges

Page 70: SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT …...Bridge Program • Thru 2014: 7 ... Microsoft PowerPoint - SUDDEN PARTIAL BRIDGE FAILURE AND THE REPLACEMENT PROCESS.ppt Author:

Questions?