SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
PETROCARABOBO SA BASIC ENGINEERING DESIGNFOR SRU&TGT
3 - 03/10/2012
Tecnimont KT PETROCARABOBOUPGRADER
Claus Section - 500 t/d - 03/04/2013
Venezuela LS - Lump Sum BEDPFaja del Orinoco region
2 -Tail Gas Treatment - 1 000 t/d -/
Lukoil Neftochim Bourgas NEW SULPHUR RECOVERYUNIT SRU-4
0 - 30/05/2012
Tecnimont KT BURGAS REFINERY NEWH-OIL COMPLEX
Claus Section Amine Acid Gas 300 t/d - 30/11/2014
Bulgaria LS - Lump Sum /Bourgas
0 -Tail Gas Treatment Amine Acid Gas 300 t/d -/
Raffineria di Milazzo REALIZZAZIONE UNITA'SRU3,OGA2, SWS3
0 - 09/05/2012
Tecnimont KT RAFFINERIA DI MILAZZO Claus Section Amine Acid Gas 110 t/d - 15/05/2015Italy LS - Lump Sum /Milazzo
0 -Sour Water Treatment - 81 t/d -/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 1 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
TOTAL E&P ITALIA TEMPA ROSSA OIL CENTRE,LPG STORAGE CENTER,WELLSITES AND CORLETO TIEINS
0 - 05/04/2012
ATITECNIMONT/TECNIMONTKT
TEMPAROSSA PROJECT Claus Section Amine Acid Gas 80 t/d - 14/05/2016
Italy LS - Lump Sum /Corleto Perticara
0 -Tail Gas Treatment Amine Acid Gas 80 t/d -/
0 -Incinerator Amine Acid Gas 80 t/d -/
SAIPEM 150 MBOPD EARLYPRODUCTION FACILITIES FORJURASSIC PRODUCTION
0 - 05/12/2011
Tecnimont KT JURASSIC PROJECT Claus Section Physical solvent acid gas 1 100 t/d - 16/04/2012Kuwait LS - Lump Sum BEDPNorth Kuwait
0 -Tail Gas Treatment Physical solvent acid gas 1 100 t/d -/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 2 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
S.C. IPIP SA SUPPLY OF BASIC ANDEXTENDED BASIC DESIGNPACKAGE
0 - 31/08/2011
Tecnimont KT BUSHEHR PETROCHEMICALCOMPLEX
Claus Section - 200 t/d - 30/06/2012
Iran LS - Lump Sum BEDPBandar Assaluyeh
0 -Claus Section - 200 t/d -/
0 -Tail Gas Treatment - 400 t/d -/
OJSC Khabarovsk Oil Refinery SALES AND PURCHASE OFCLAUS MODULAR PACKAGE
0 - 06/08/2011
Tecnimont KT OJSC KHABAROVSK OILREFINERY
Claus Section Physical solvent acid gas 8 t/d - 15/10/2012
Russia LS - Lump Sum E PKhabarovsk
Kuwait National Petroleum Co.(KNPC)
INCINERATOR PACKAGES 2 - 07/07/2011
Tecnimont SpA KNPC MAA REFINERY Incinerator - 0.00 - 07/09/2013Kuwait LSTK - Lump Sum TurnKey E PMina Al Ahmadi
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 3 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Petrochina YunnanPetrochemical Co. Ltd.
SULPHUR RECOVERY UNIT260 KTA CAPACITY
0 - 23/06/2011
Tecnimont KT YUNNAN REFINERY PROJECT Amine Regeneration Amine Acid Gas 820 t/d - 23/11/2011China LS - Lump Sum BTianjin
0 -Claus Section - 875 t/d -/
0 -Tail Gas Treatment - 875 t/d -/
0 -Sulphur Degassing - 875 t/d -/
Bangchak Petroleum PublicCompany Co.
BASIC ENGINEERINGPACKAGE
0 - 03/04/2011
Tecnimont KT LICENSE AND ENGINEERINGAGREEMENT FOR TGT UNIT
Tail Gas Treatment Amine Acid Gas ,Sour waterstripper
65 t/d - 31/12/2012
Thailand LS - Lump Sum BEDPBangkok
SCOP BASIC ENGINEERING DESIGNPACKAGE FOR HPU/SRU
0 - 09/03/2011
Foster Wheeler Energy Ltd NEW NASSIRIYA REFINERYPROJECT
Claus Section Amine Acid Gas 2 100 t/d - 10/09/2011
Iraq LS - Lump Sum /Nassiriya
0 -Tail Gas Treatment - 150 000 Nm3/h -/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 4 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Petropars ENGINEERING SERVICES 0 - 15/02/2011Tecnimont SpA SOUTH PARS 12 Claus Section Sour water stripper 10 800 t/d - 31/12/2011Iran R - Reimbursable ESouth ParsKuwait National Petroleum Co.(KNPC)
ENGINEERING SERVICES ONSULPHUR PACKAGE
0 - 15/02/2011
Tecnimont SpA ACID GAS REMOVAL PLANT Claus Section Sour water stripper 9 600 t/d - 31/12/2011Kuwait R - Reimbursable EMina Al Ahmadi
Raffineria di Milazzo FRONT END UNITA'SRU3-OGA2-SWS3
0 - 13/09/2010
Tecnimont KT FEED PER NUOVE UNITA'SRU3-OGA2-SWS3 EINTERCONNECTING
Claus Section Amine Acid Gas 110 t/d - 01/01/2011
Italy R - Reimbursable FEEDMilazzo
0 -Amine Regeneration Amine Acid Gas 160 m3/h -/
0 -Sour Water Treatment Amine Acid Gas 110 m3/h -/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 5 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Nynas AB NYNASHAM REFINERYSR3&TG1 PROJECT
1 Technip KTI SpA 03/06/2010
- SULPHUR RECOVERY, TAILGAS TREATMENT &DEGASSING UNIT (SR3&TG1)
Amine Regeneration Amine Acid Gas ,Sour waterstripper
48 t/d DIPARAR
30/09/2012
Sweden LSTK - Lump Sum TurnKey E P CNynashamn
1 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water
stripper24 t/d DIPA
RAR/
1 Technip KTI SpAIncinerator Amine Acid Gas ,Sour water
stripper48 t/d DIPA
RAR/
1 Technip KTI SpASulphur Degassing Amine Acid Gas ,Sour water
stripper30 t/d DIPA
RAR/
1 Technip KTI SpATail Gas Treatment Amine Acid Gas ,Sour water
stripper48 t/d DIPA
RAR/
Khuzestan Oil Refining Company KHUZESTAN REFINERYPROJECT
1 Technip KTI SpA 28/04/2010
- BEDP FOR SOUR WATERSTRIPPER UNIT WITHAMMONIA RECOVERY
Sour Water Treatment Sour water stripper 9 216 t/d - 16/11/2011
Iran LS - Lump Sum BAbadan
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 6 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Ministry of Oil/South OilCompany (SOC)
BASIC DESIGN &ENGINEERING PACKAGE
1 Technip KTI SpA 25/02/2010
Technip KTI SpA KARBALA REFINERYEXPANSION PROJECT
Amine Regeneration Amine Acid Gas ,Sour waterstripper
360 t/d - 15/09/2010
Iraq LS - Lump Sum BEDPKarbala
1 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water
stripper180 t/d -
/1 Technip KTI SpA
Incinerator Amine Acid Gas ,Sour waterstripper
360 t/d -
/1 Technip KTI SpA
Sulphur Degassing Amine Acid Gas ,Sour waterstripper
360 t/d -
/1 Technip KTI SpA
Sulphur Forming Amine Acid Gas ,Sour waterstripper
360 t/d -
/1 Technip KTI SpA
Tail Gas Treatment Amine Acid Gas ,Sour waterstripper
360 t/d RAR
/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 7 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Socar & Turcas SOCAR & TURCAS RAFINARIA.S.
2 Technip KTI SpA 18/02/2010
Foster Wheeler Italiana SpA CLAUS PROCESS, SULPHURDEGASSING & TAIL GASTREATMENT (TGT)
Claus Section Amine Acid Gas ,Sour waterstripper
430 t/d RAR 23/10/2010
Turkey LS - Lump Sum BIzmit
0 Technip KTI SpASulphur Degassing Amine Acid Gas ,Sour water
stripper430 t/d RAR
/1 Technip KTI SpA
Tail Gas Treatment Amine Acid Gas ,Sour waterstripper
463 t/d RAR
/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 8 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Gasco HABSHAN 5 - GAS FIELDDEVELOPMENT PROJECT
4 WorleyParsons 21/11/2009
MaireTecnimont SpA SULPHUR RECOVERY UNITS &ACID GAS REMOVAL UNITS
Claus Section Amine Acid Gas 1 300 t/d - 01/08/2011
UAE CP - Cost Plus E PHabshan
4 Exxon MobilTail Gas Treatment Amine Acid Gas 1 300 t/d -/
4 Goar AlllisonSulphur Degassing - 1 300 t/d -/
4 WorleyParsonsIncinerator - 1 300 t/d -/
4 -Gas Sweetening - 0.00 t/d -/
4 -Amine Regeneration - 0.00 -/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 9 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Naftan OJSC ENGINEERING AND SUPPLYOF CRITICAL ITEMS
1 - 25/10/2009
STSI SULPHUR RECOVERY UNITNAFTAN REFINERYNOVOPOLOTSK
Claus Section Amine Acid Gas ,Sour waterstripper
113 t/d RAR
Belarus LS - Lump Sum B PNovopolotsk
0 -Tail Gas Treatment Amine Acid Gas ,Sour water
stripper226 t/d RAR
/0 -
Amine Regeneration Amine Acid Gas ,Sour waterstripper
226 t/d RAR
/0 -
Sulphur Degassing Amine Acid Gas ,Sour waterstripper
226 t/d RAR
/1 -
Incinerator Amine Acid Gas ,Sour waterstripper
226 t/d RAR
/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 10 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Egyptian Refining Company SUPPLY OF HYDROGEN &SULPHUR RECOVERY UNITSFOR ERC REFINERY PLANTPROJECT
1 Technip KTI SpA 23/06/2009
GS Engineering & Construction SRU+HPU UNITS FOR ERCREFINERY
Claus Section Amine Acid Gas ,Sour waterstripper
160 t/d - 23/07/2011
Egypt LS - Lump Sum /Mostorod
1 Technip KTI SpATail Gas Treatment - 320 t/d -/
Saudi Aramco MANIFA GAS FACILITIESPROJECT
0 Jacobs Netherland BV 19/06/2009
GS Engineering & Construction SULPHUR RECOVERY UNIT -REACTION FURNACEPACKAGES
Reaction Furnace & Fuel Skid - 1 000 t/d - 15/10/2010
Saudi Arabia LS - Lump Sum E PKhursaniyah
Angarsk Neftechim Company BDEP FOR ANAHITA PROJECT 1 Technip KTI SpA 11/03/2009Sazeh Consultants Engineering &Construction
NEW REFINERY FOR ANORC Claus Section Amine Acid Gas 190 t/d RAR 08/04/2015
Iran LS - Lump Sum BAnahita
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 11 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
NIOEC KHUZESTAN REFINERYPROJECT
0 Technip KTI SpA 29/01/2009
Energy Industries Engineering &Design Company
BASIC ENGINEERING DESIGN- PACKAGE FOR SULPHURRECOVERY AND TAIL GASTREATMENT UNITS
Tail Gas Treatment - 600 t/d RAR 14/05/2009
Iran LS - Lump Sum BAbadan
0 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water
stripper600 t/d RAR
/0 Technip KTI SpA
Sulphur Degassing - 600 t/d RAR/
Hormuz Oil Refinery Company HORMUZ OIL REFINERYPROJECT
0 - 28/01/2009
Sazeh Consultants Engineering &Construction
BASIC ENGINEERING DESIGN- PACKAGE FOR SULPHURRECOVERY AND TAIL GASTREATMENT UNITS
Claus Section Amine Acid Gas ,Sour waterstripper
475 t/d RAR 07/04/2009
Iran LS - Lump Sum BBandar Abbas
0 -Tail Gas Treatment - 475 t/d RAR B
0 -Incinerator - 475 t/d RAR-
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 12 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Polskie Gornictwo Naftowe IGazownctwo SA
LMG PROJECT 0 Jacobs Netherland BV 11/08/2008
Consortium - Polskie Gornictwo Naftowe IGazownctwo SA
WELL SITES AND CENTRALTREATMENT PLANTDEVELOPMENT
Amine Regeneration Natural gas 30 000 Nm3/h - 02/08/2013
Poland LS - Lump Sum E P CLubiatow
0 -Claus Section Amine Acid Gas 60 t/d - B E P C
Pars Oil & Gas Company South Pars Development Phase15 & 16
0 - 24/07/2008
Payandan On Shore Gas TreatmentFacilties
Tail Gas Treatment Sour water stripper 515 000 Mkcal/h MDEA 24/03/2009
Iran LS - Lump Sum /Bandar Assaluyeh
NIOEC Pars Refinery Project 1 Technip KTI SpA 24/07/2008Technip KTI SpA Sulphur Recovery,Tail Gas
Treatment & Liquid SulphurDegassing Unit
Claus Section Amine Acid Gas ,Sour waterstripper
62 t/d - 09/03/2009
Iran LS - Lump Sum FEEDShiraz
1 Technip KTI SpATail Gas Treatment - 62 t/d RAR/
1 Technip KTI SpASulphur Degassing - 62 t/d -/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 13 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
NIOEC Tabriz Shariar Refinery Project 2 Technip KTI SpA 21/07/2008Nargan Engineers andConstructors Company
Sulphur Recovery,Tail GasTreatment & Liquid SulphurDegassing Unit
Claus Section Amine Acid Gas ,Sour waterstripper
180 t/d - 15/12/2008
Iran LS - Lump Sum FEEDTabriz
1 Technip KTI SpATail Gas Treatment - 360 t/d RAR/
2 Technip KTI SpASulphur Degassing - 180 t/d -/
NIOEC Abadan Refinery Project 2 Technip KTI SpA 20/07/2008Namvaran Consulting EngineringCompany
Sulphur Recovery,Tail GasTreatment & Liquid SulphurDegassing Unit
Claus Section Amine Acid Gas ,Sour waterstripper
230 t/d - 15/12/2008
Iran LS - Lump Sum FEEDAbadan
1 Technip KTI SpATail Gas Treatment - 460 t/d RAR/
2 Technip KTI SpASulphur Degassing - 230 t/d -/
Canadian Natural Resources Ltd HORIZON OIL SANDSPROJECT
1 Technip KTI SpA 11/07/2008
Technip Italy SpA SULPHUR RECOVERY UNIT Claus Section Amine Acid Gas ,Sour waterstripper
600 t/d - 30/08/2011
Canada LS - Lump Sum E PFort McMurrey
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 14 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Nynas Refinery AB SR-3 AND TG-1 1 Technip KTI SpA 10/07/2008Technip KTI SpA SULPHUR RECOVERY,TAIL
GAS TREATMENT, & SULPHURDEGASSING UNIT
Claus Section Amine Acid Gas ,Sour waterstripper
24 t/d - 31/07/2011
Sweden TF - Rates /Nynashamn
1 Technip KTI SpATail Gas Treatment - 48 t/d RAR/
Ministry of Oil/South OilCompany (SOC)
Crude Oil Process Plant -Degassing Station
1 Technip KTI SpA 10/07/2008
Progetti Europa & Global S.p.A. Sulphur Recovery Unit Claus Section Amine Acid Gas 18 t/d - 10/07/2011Iraq LS - Lump Sum FEEDNahar Bin Ummar
1 Technip KTI SpASulphur Degassing - 18 t/d -/
Galp Energia SA Revamp Existing Unit (23 t/d) &New SRU (27 t/d)
1 Technip KTI SpA 27/03/2008
Technip KTI SpA Tail Gas Treatment (50 t/d) Claus Section Amine Acid Gas ,Sour waterstripper
27 t/d - 27/10/2008
Portugal LS - Lump Sum FEEDPorto
1 Technip KTI SpATail Gas Treatment - 50 t/d RAR/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 15 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Egyptian Refining Company Egyptian Refinery Project 3 Technip KTI SpA 11/02/2008Consortium - GS Engineering &Construction/Mitsui
Technology Lisensor forhydrogen and sulphur recovery
Claus Section Amine Acid Gas ,Sour waterstripper
160 t/d - 01/06/2008
Egypt LS - Lump Sum /Mostorod
1 Technip KTI SpA- Tail Gas Treatment - 320 t/d RAR
/
Motor Oil Hellas New CDU Complex 1 Technip KTI SpA 25/01/2008Technip Italy SpA Sulphur Recovery Unit, Tail Gas
TreatmentClaus Section Sour water stripper 83 t/d - 25/05/2009
Greece LS - Lump Sum ECorinth
1 -Tail Gas Treatment - 166 t/d RAR/
Total Italia SpA Tempa Rossa Project 2 Technip KTI SpA 10/08/2007Technip Italy SpA Sweetering & Sulphur Recovery
Unit (GRU-SRU)Claus Section - 30 t/d - 15/10/2007
Italy TF - Rates FEEDCorleto Perticara
1 -Tail Gas Treatment - 50 t/d RAR Multipurpose/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 16 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Grupa Lotos SA Refinery Residue UpgradeProject
1 Technip KTI SpA 21/06/2007
Technip Italy SpA Sulphur Recovery Unit, Tail GasTreatment, Amine Regeneration and Sour Water Treatment
Tail Gas Treatment - 150 t/d RAR 08/10/2009
Poland LSTK - Lump Sum TurnKey B E P CGdansk
2 -Claus Section Amine Acid Gas ,Sour water
stripper75 t/d -
/Ecopetrol S.A Proyecto Hidrotratamiento de
Combustibiles Refineria1 - 18/05/2007
Technip KTI SpA Modular Claus Unit Claus Section Amine Acid Gas ,Sour waterstripper
55 t/d - 18/02/2008
Colombia LS - Lump Sum E PBarrancabermeja
China PetrochemicalInternational Co.Ltd
Tiajing Petrochemical IntegratedProject
1 Technip KTI SpA 18/12/2006
Technip KTI SpA Sulphur Recovery Unit Tail Gas Treatment - 630 t/d RAR 28/05/2007China LS - Lump Sum B FEEDTianjin
2 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water
stripper315 t/d -
/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 17 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Saudi Aramco Jubail Export Refinery 3 Technip KTI SpA 01/12/2006Technip Italy SpA Sulphur Recovery Unit, Amine,
Tail Gas Treatment, Sour WaterStripper & Hydrogen Plant
Claus Section Amine Acid Gas ,Sour waterstripper
400 t/d - 30/06/2007
Saudi Arabia R - Reimbursable B FEEDAl Jubail
3 Technip KTI SpATail Gas Treatment - 400 t/d RAR B FEED
Dragon Aromatic (Xiamen) Co.Ltd
Aromatic Plant 2 Technip KTI SpA 13/11/2006
Technip KTI SpA Sulphur Recovery Unit Claus Section Amine Acid Gas ,Sour waterstripper
130 t/d - 13/05/2007
China LS - Lump Sum B FEEDXiamen
1 Technip KTI SpATail Gas Treatment - 260 t/d RAR/
Motor Oil Hellas Topping Unit Expansion Project 1 Technip KTI SpA 23/10/2006Technip Italy SpA Sulphur Recovery Unit Claus Section Amine Acid Gas ,Sour water
stripper90 t/d - 31/01/2007
Greece LS - Lump Sum E P CCorinth
1 Technip KTI SpATail Gas Treatment - 90 t/d -/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 18 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Hellenic Petroleum SA Elefsis Refinery Upgrade Project 1 Technip KTI SpA 11/09/2006Technip KTI SpA Sulphur Recovery Unit Tail Gas Treatment - 280 t/d RAR 20/04/2007Greece LS - Lump Sum B FEEDElefsis
2 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water
stripper140 t/d -
/
Qatar Liquified Gas Company Plateau Maintenance ProjectAGX Project
2 - 07/07/2006
Technip Italy SpA FEED Phase of PMP AGX onShore Treatment Facilities SRU,TGT, Liquid Sulphur Storage andHandling
Claus Section Amine Acid Gas ,Sour waterstripper
480 t/d - 31/03/2007
Qatar LS - Lump Sum B FEEDRas Laffan
2 -Tail Gas Treatment - 480 t/d RAR Multipurpose/
Grupa Lotos SA Gdansk Refiney ResidueUpgrading Project
2 Shell 01/07/2006
Technip Italy SpA Sulphur Recovery Units Claus Section Amine Acid Gas ,Sour waterstripper
120 t/d SCOT 30/11/2007
Poland LS - Lump Sum FS FEEDGdansk
Canadian Natural Resources Ltd Horizon Oil Sands Projects 2 - 21/06/2006Technip KTI SpA EDS for phase III Support Units
Sulphur RecoveryClaus Section Amine Acid Gas ,Sour water
stripper600 t/d - 31/12/2006
Canada R - Reimbursable B FEEDFort McMurrey
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 19 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
NIOEC Esfahan Refinery 2 Technip KTI SpA 01/06/2006Technip Italy SpA Engineering Design for Amine
and Sour Water Systems UnitClaus Section Amine Acid Gas ,Sour water
stripper300 t/d - 31/10/2006
Iran LS - Lump Sum B FEEDEsfahan
1 Technip KTI SpATail Gas Treatment - 600 t/d RAR/
Okta AD Skopje Okta Refinery Project 1 - 22/05/2006Technip KTI SpA Sulphur Recovery Unit Claus Section Amine Acid Gas 14 t/d - 25/10/2007Macedonia LS - Lump Sum B E P CSkopje
INA Industrija Nafte D.D. Sisak Refinery 2 Technip KTI SpA 22/12/2005Technip KTI SpA Sulphur Recovery Unit Claus Section Amine Acid Gas ,Sour water
stripper65 t/d - 22/07/2007
Croatia LSTK - Lump Sum TurnKey B E P CSisak
2 Technip KTI SpATail Gas Treatment - 65 t/d RAR/
NIOEC Bandar Abbas CondensateRefinery
2 Technip KTI SpA 25/11/2005
Technip Italy SpA Sulphur Recovery Unit for GasCondensate Recovery
Claus Section Amine Acid Gas ,Sour waterstripper
85 t/d - 30/05/2006
Iran LS - Lump Sum B FEEDBandar Abbas
1 Technip KTI SpATail Gas Treatment - 170 t/d RAR/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 20 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Saudi Aramco Khursanya Gas Plant (KGP)Project
2 - 27/09/2005
Bechtel Technip Joint Venture(BTJV)
Sulphur Recovery UnitEquipment
Claus Section Amine Acid Gas 900 t/d - 02/03/2006
Saudi Arabia LS - Lump Sum B E PKhursaniyah
3 -Tail Gas Treatment - 1 000 t/d Superclaus/
Mazeikiu Nafte AB Modernization Program 0 - 28/08/2005Technip KTI SpA New Crude Oil and Preflash Fired
HeatersTail Gas Treatment Amine Acid Gas ,Sour water
stripper0.00 t/d RAR 15/05/2006
Lithuania LS - Lump Sum B PMazeikiai
0 -Tail Gas Treatment Amine Acid Gas ,Sour water
stripper226 t/d RAR
B P
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 21 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
NIOEC Esfahan Refinery upgrading ofSulphur Recovery Unit
1 Technip KTI SpA 17/07/2005
Technip Italy SpA Sulphur Recovery Unit, Tail GasTreatment
Claus Section Amine Acid Gas ,Sour waterstripper
600 t/d - 17/03/2006
Iran LS - Lump Sum BEsfahan
1 Technip KTI SpATail Gas Treatment - 600 t/d RAR/
1 -Claus Section Amine Acid Gas ,Physical
solvent acid gas100 t/d -
/1 Technip KTI SpA
Tail Gas Treatment - 100 t/d RAR/
Total South Pars Oil Development Project 2 - 20/05/2005Technip KTI SpA Sulphur Recovery Unit, Tail Gas
Treatment and DSO Recoveryand Hydrogen Plant
Tail Gas Treatment - 330 t/d RAR Multipurpose 20/05/2006
Iran LS - Lump Sum B FEED151
2 -Claus Section Amine Acid Gas ,Off-gas 330 t/d - B FEED
Bangchak Petroleum PublicCompany Co.
Bangchak Refinery 1 - 12/05/2005
Technip KTI SpA Sulphur Recovery Unit Claus Section Amine Acid Gas ,Sour waterstripper
50 t/d - 30/10/2005
Thailand LS - Lump Sum B FEEDBangkok
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 22 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Sinopec Qingdao Refining &Chemical Co.
Sinopec Qingdao SulphurRecovery Unit
2 Technip KTI SpA 10/03/2005
Technip KTI SpA Sulphur Recovery Unit Claus Section Amine Acid Gas ,Sour waterstripper
375 t/d - 10/03/2006
China LS - Lump Sum B FEEDQingdao
1 Technip KTI SpATail Gas Treatment - 757 t/d RAR/
OC Alliance Sulphur Recovery Facilities 2 Technip KTI SpA 17/01/2005Technip KTI SpA Sulphur Recovery Unit, Tail Gas
Treatment, RAR, ARUClaus Section Amine Acid Gas ,Sour water
stripper20 t/d - 15/08/2005
Russia LS - Lump Sum B FEEDKhabarovsk
1 Technip KTI SpATail Gas Treatment - 40 t/d RAR/
Enoc Processing Company L.L.C Jebel Ali Refinery 2 Technip KTI SpA 22/12/2004Technip KTI SpA Sulphur Recovery Unit, Tail Gas
Treatment UnitClaus Section Amine Acid Gas ,Sour water
stripper26 t/d - 22/12/2005
UAE LS - Lump Sum B FEEDJebel Ali
1 Technip KTI SpATail Gas Treatment - 35 t/d RAR/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 23 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Hindustan Petroleum CorporationLtd
Visakh Refinery- 2nd Train 1 BP Amoco 09/12/2004
Technip KTI SpA Sulphur Recovery Unit Claus Section Amine Acid Gas ,Sour waterstripper
65 t/d - 26/05/2005
India LS - Lump Sum B FEED PVisakhpatman
1 BP AmocoTail Gas Treatment - 65 t/d CBA/
FPCL (SaudiAramco+Exxon+Sinopec JV)
Fujian Petrochemical IntegratedProject
1 Technip KTI SpA 12/11/2004
Technip KTI SpA Sulphur Recovery Unit, Tail GasTreatment, RAR 744
Tail Gas Treatment - 744 t/d RAR 26/04/2005
China LS - Lump Sum B FEEDFujian
2 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water
stripper372 t/d -
/
NIOEC Arak Refinery Expansion &Products Upgrading Project
2 Technip KTI SpA 21/10/2004
JGC Corp Amine Units and AmineRegeneration Units
Claus Section Amine Acid Gas ,Sour waterstripper
320 t/d - 14/03/2005
Iran LS - Lump Sum B FEEDArak
1 Technip KTI SpATail Gas Treatment - 640 t/d RAR/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 24 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
ERG Raffinerie Mediterranee Srl (Ergmed)
Northern Refinery 1 Technip KTI SpA 01/06/2004
Technip KTI SpA Sulphur Recovery Unit, Tail GasTreatment
Tail Gas Treatment - 150 t/d RAR 15/05/2006
Italy LS - Lump Sum B E P CPriolo
2 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water
stripper75 t/d -
/
Petrochina Co. DalianPetrochemical Co.
Sulphur Recovery Unit Facility 3 Technip KTI SpA 09/03/2004
Technip Italy SpA Sulphur Recovery Unit, Tail GasTreatment
Claus Section Amine Acid Gas ,Sour waterstripper
260 t/d - 30/12/2004
China LS - Lump Sum B FEEDDalian
2 Sirtec NigiTail Gas Treatment - 390 t/d RAR/
Motor Oil Hellas Refinery Expansion 2005 1 Technip KTI SpA 01/01/2004Technip Italy SpA Sulphur Recovery Unit Claus Section Amine Acid Gas ,Sour water
stripper70 t/d - 31/12/2005
Greece LS - Lump Sum FS E P CCorinth
1 Technip KTI SpATail Gas Treatment - 70 t/d RAR/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 25 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
IES (Italiana Energia e ServiziSpA)
Sulphur Recovery Facilities 1 WorleyParsons 05/12/2003
Technip KTI SpA Sulphur Recovery Unit Claus Section Amine Acid Gas ,Sour waterstripper
62 t/d - 03/08/2005
Italy LS - Lump Sum B E P CMantova
Saudi Aramco Riyadh Refinery 1 - 23/10/2003Technip Italy SpA Sulphur Recovery Unit & Sulphur
Degassing 3rd TrainClaus Section Amine Acid Gas ,Sour water
stripper70 t/d - 31/10/2005
Saudi Arabia LS - Lump Sum E P CSRiyadh
1 Goar AlllisonSulphur Degassing - 70 t/d -/
Turkmenneftegas New Diesel Hydrotreater Project 1 - 23/06/2003Technip Germany Sulphur Recovery Unit, RAR
MultipurposeTail Gas Treatment - 23 t/d RAR Multipurpose 31/12/2005
Turkmenistan LS - Lump Sum B E PTurkmenbashi
1 -Claus Section Amine Acid Gas ,Sour water
stripper23 t/d -
/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 26 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
NIOEC Teheran Refinery 2 Technip KTI SpA 27/05/2003Technip KTI SpA New Sulphur Recovery Unit
(110t/d) Revamp (102 t/d) &TailGas Treatment (212 t/d)
Claus Section Amine Acid Gas ,Sour waterstripper
110 t/d - 27/11/2007
Iran LS - Lump Sum B FEEDTehran
1 Technip KTI SpATail Gas Treatment - 212 t/d RAR/
Sinopec International JinlingCompany
Sulphur Recovery Plant 1 - 22/05/2003
Technip KTI SpA Sulphur Recovery Unit, Tail GasTreatment
Tail Gas Treatment - 300 t/d RAR 30/06/2005
China LS - Lump Sum B FEED PNanjing
1 -Claus Section Amine Acid Gas ,Sour water
stripper300 t/d -
/
Sinopec International Company Sulphur Recovery Plant 1 Technip KTI SpA 21/05/2003Technip KTI SpA Sulphur Recovery Unit, Tail Gas
TreatmentClaus Section Amine Acid Gas 160 t/d - 30/12/2004
China LS - Lump Sum B FEED P SUNanjing
1 Technip KTI SpATail Gas Treatment - 160 t/d -/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 27 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
IES (Italiana Energia e ServiziSpA)
Sulphur Recovery Facilities 0 WorleyParsons 13/05/2003
Technip KTI SpA Revamping Sulphur Recoverywith Oxygen Enrichment
Claus Section Amine Acid Gas ,Sour waterstripper
62 t/d - 30/10/2003
Italy LS - Lump Sum FEEDMantova
Takreer Unleaded Gasoline Low SulphurGas Oil Project
1 - 04/09/2002
Technip Italy SpA Sulphur Recovery Unit 406 Tail Gas Treatment - 50 t/d CBA 30/11/2004UAE LS - Lump Sum B FEED PRuwais
1 -Claus Section Amine Acid Gas ,Sour water
stripper50 t/d -
/
Dolphin Energy Ltd Dolphin Project Upstream andCompression Facilities
2 Technip KTI SpA 01/08/2002
Technip KTI SpA Sulphur Recovery Unit, Tail GasTreatment, RAR Multipurpose
Claus Section Amine Acid Gas ,Off-gas 585 t/d - 28/02/2003
Qatar LS - Lump Sum B FEEDRas Laffan
2 Technip KTI SpATail Gas Treatment - 585 t/d RAR Multipurpose/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 28 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Hellenic Petroleum SA HAR Modernization Project 2 BP Amoco 30/05/2002Technip Italy SpA Revamping Sulphur Recovery
Unit and Amine Unit, CBATail Gas Treatment Amine Acid Gas ,Sour water
stripper100 t/d CBA 30/09/2002
Greece LS - Lump Sum B FEEDCorinth
2 BP AmocoClaus Section Amine Acid Gas ,Sour water
stripper100 t/d -
/
Saudi Aramco BERRI FACILITIES GAS PLANT 2 Technip KTI SpA 14/05/2002Technip Italy SpA AIR PREHEATER FURNACE &
SULPHUR RECOVERY UNITClaus Section Amine Acid Gas 900 t/d Superclaus 30/09/2003
Saudi Arabia LS - Lump Sum /Qatif
1 Technip KTI SpAClaus Section Amine Acid Gas 850 t/d Superclaus/
1 Technip KTI SpAClaus Section Amine Acid Gas 750 t/d Superclaus/
2 -Tail Gas Treatment - 900 t/d Superclaus/
Tamoil SA TRC 2000 Project 1 Technip KTI SpA 25/01/2002Technip KTI SpA Sulphur Recovery Unit, RAR Tail Gas Treatment - 25 t/d RAR 31/12/2003Switzerland LS - Lump Sum B E P C SUCollombey
1 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water
stripper25 t/d -
/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 29 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Saudi Aramco RIYADH REFINERY 2 - 01/01/2002Technip Abu Dhabi SULPHUR RECOVERY UNITS &
SULPHUR DEGASSING1ST&2ND TRAIN
Claus Section Amine Acid Gas ,Sour waterstripper
70 t/d - 31/12/2004
Saudi Arabia LS - Lump Sum E PRiyadh
2 Goar AlllisonSulphur Degassing - 70 t/d -/
Motor Oil Hellas New Sulphur Recovery Unit 1 Technip KTI SpA 15/10/2001Technip Italy SpA Sulphur Recovery Unit, Tail
GasTreatment, RARTail Gas Treatment - 110 t/d RAR 30/12/2002
Greece LS - Lump Sum B E P CCorinth
0 Technip KTI SpAClaus Section Amine Acid Gas ,Sour water
stripper0.00 -
/
Kazakhoil Atyrau Refinery 1 BP Amoco 01/01/2001Technip KTI SpA Sulphur Recovery Unit, Tail Gas
Treatment, CBATail Gas Treatment - 25 t/d CBA 31/12/2001
Kazakhistan LS - Lump Sum B FEED P SUAtyrau
1 BP AmocoClaus Section Amine Acid Gas ,Sour water
stripper25 t/d -
/
Indian Oil Corp Ltd. (IOCL) Mathura Refinery 1 Technip KTI SpA 01/01/2001Technip KTI SpA Sulphur Recovery Unit 180
t/d,Tail Gas Treatment, RARTail Gas Treatment - 214 t/d RAR 31/12/2002
India LS - Lump Sum B FEED P SUMathura
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 30 of 31
SULPHUR RECOVERY UNIT REFERENCES
OWNER CONTRACT INFORMATION TRAINS LICENSOR AWARD DATEMAIN CONTRACTOR PROJECT DESCRIPTION UNIT FEEDSTOCK CAPACITY PROCESS COMPLETION DATECOUNTRY CONTRACT TYPE SCOPE OF WORKLOCATION
Q-CHEM Q-Chem Petrochemical Complex 2 Technip KTI SpA 12/12/2000Technip USA Sulphur Recovery Unit, Tail Gas
TreatmentClaus Section Amine Acid Gas 93 t/d - 30/04/2001
Qatar LS - Lump Sum B E P SUMesaieed
1 Technip KTI SpATail Gas Treatment - 186 t/d RAR/
Qatar Liquified Gas Company Sulphur Recovery ExpansionProject
2 Jacobs Netherland BV 02/09/2000
Technip Italy SpA Reject Gas Incinerator Package Claus Section Amine Acid Gas ,Sour waterstripper
244 t/d - 30/03/2002
Qatar LS - Lump Sum E PRas Laffan
2 Jacobs Netherland BVTail Gas Treatment - 244 t/d Superclaus/
Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS ConstructionSupervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
Page 31 of 31