8
Sulphur River Regional Mobility Authority (SuRRMA) E. Delbert Horton, Ph.D., P.E. Chairman

Sulphur River Regional Mobility Authority ( SuRRMA )

Embed Size (px)

DESCRIPTION

Sulphur River Regional Mobility Authority ( SuRRMA ). E. Delbert Horton, Ph.D., P.E. Chairman. SuRRMA’s Three County Region (in Paris District). State Hwy 24 Project Map. 10.4 Mile Project. State Hwy 24 Project. - PowerPoint PPT Presentation

Citation preview

Page 1: Sulphur  River Regional Mobility Authority ( SuRRMA )

Sulphur RiverRegional Mobility Authority

(SuRRMA)

E. Delbert Horton, Ph.D., P.E.

Chairman

Page 2: Sulphur  River Regional Mobility Authority ( SuRRMA )

SuRRMA’s Three County Region(in Paris District)

Page 3: Sulphur  River Regional Mobility Authority ( SuRRMA )

State Hwy 24 Project Map

10.4 Mile

Pro

ject

Page 4: Sulphur  River Regional Mobility Authority ( SuRRMA )

State Hwy 24 Project• For over 30 years, our community leaders have urged the

Texas Legislature, TxDOT, and the Texas Transportation Commission to upgrade and widen State Hwy 24 from a 2-lane highway to a 4-lane divided highway from I-30 Exit 101 to US 271.

• Gives 4-lane access through Hunt, Delta and Lamar Counties to I-30 and supports public safety and economic development.

• Only Stretch of SH 24 that has not been upgraded to a 4-lane divided highway is 10.4 mile gap from FM 64 SW to FM 904 in Delta County (the SH 24 project).

Page 5: Sulphur  River Regional Mobility Authority ( SuRRMA )

State Hwy 24 Project• In 2008, SuRRMA became operational to focus

on transportation needs in the Sulphur River Region (Hunt, Delta and Lamar Counties).

• Results of SuRRMA’s Long Range Project Plan selected SH 24 as one of its Priority Projects.

• SH 24 Project was recently approved for Proposition 12 funding in Paris District.

Page 6: Sulphur  River Regional Mobility Authority ( SuRRMA )

State Hwy 24 Project• SuRRMA is sponsoring the project and acting as

the local funding conduit to provide TxDOT required local funding.

• Local funding will be used for acquiring ROW and adjusting utilities by TxDOT.

• SuRRMA has arranged for SIB Loans with local governments providing the credit backing and security to leverage the local funding.

Page 7: Sulphur  River Regional Mobility Authority ( SuRRMA )

SuRRMA Future Plans

• As our British friends across the pond say --- “Mind the Gap”---

• Closing the SH 24 Gap is the near term focus for SuRRMA.

Page 8: Sulphur  River Regional Mobility Authority ( SuRRMA )

SuRRMA Highway 24 Project

•Thank You for TxDOT’s Support

•Questions?