Upload
tadhg
View
25
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Summer Projects. CCUMC Conference Planning. ccumc.unlv.edu October 3-7 Keynotes Entertainment (karaoke, fremont street) On Campus Tour Setting up and supporting the technology All presentations capture and on youtube – search for ccumc2012. Grant Hall Remodel. - PowerPoint PPT Presentation
Citation preview
Summer Projects
CCUMC Conference Planning
• ccumc.unlv.edu• October 3-7• Keynotes• Entertainment (karaoke, fremont street)• On Campus Tour• Setting up and supporting the technology• All presentations capture and on youtube –
search for ccumc2012
Grant Hall Remodel
• Building Mechanical Systems Replaced (P and C)
• Three new teaching labs with AV
• GRA-246 now a public lab
Practice Lab - CEB• Psychology Clinic for
Psychology and Education
• 22 Counseling Rooms• IP Based Video
Cameras and Microphones
• State of the Art System (only one in the country using system)
TEC-112/113 Renovation
• Asbestos Abatement
• New Carpet, Paint• New Furniture• New Computers• New AV
Software Updates
• Adobe CS6• SPSS 20• Autocad 2013• Better consistency of User Interface across
facilities
Lab Upgrades (Computers)
• Computer Upgrades in 10 Labs Across Campus• Wri-C211• CEB-212, CEB-309A• CEB 211/212• BEH-102, BEH-240• CBC125/129• FDH-245• FMA-110
New Engineering Tutoring Center
• TBE-A207• Assisted with Layout• Matt Buk supports
the computers• Combination project
between OIT, Academic Success Center, and College of Engineering
New Graduate Commons • Beautiful New Space• Specifically for
Graduate Students
• AV systems for Group Collaboration
• Conference Room• Mac’s Coming !!
VCL Project Planning
• Virtual Computer Lab• Use existing facilities• VCL available after hours or during slow times• After Novell to AD project complete
Other OIT Projects (finished/upcoming)
• TBE-A311 Lab now on OIT Network• Residence Hall Students using ACE for
networking authentication• New OIT wireless in Residence Halls• Web Campus to become Blackboard Learn