Upload
gareth-kaufman
View
27
Download
0
Tags:
Embed Size (px)
DESCRIPTION
SunGuide TM Software Development Project Release 4.0 Kick-off Meeting October 15, 2007. Agenda. Introductions. Agenda. Meeting Objectives. Provide overview of: Development Team Software Architecture Components being implemented Schedule Not an objective: Discuss specific design details. - PowerPoint PPT Presentation
Citation preview
SunGuideSunGuideTMTM Software Development Project Software Development Project
Release 4.0 Kick-off MeetingRelease 4.0 Kick-off MeetingOctober 15, 2007October 15, 2007
Oct 15, 2007Release 4.0 Kickoff Meeting 2
AgendaAgenda
Time Item Lead
1:00 – 1:10 Introductions and Opening Remarks Tillander
1:10 – 1:20 High Level Overview – meeting objectives Heller
1:20 – 1:30 Project Team Heller
1:30 – 2:45
Data FusionGUI / Map
Admin Editor
TSS
Reporting Subsystem
C2C Plugin
General Subsystem Tasks
Data Fusion Engine Tasks
Database
Heller
2:45 – 3:00 Break
3:00 – 3:45Travel Time Enhancements
General Subsystem Tasks, Probe Fusion (driver to TSS),
Probe Fusion Drivers, TSS Modifications
Heller
3:45 – 4:10
General activities:ATIS Coordination TasksDocumentationFAT Deployments
Heller
4:10 – 4:30 Schedule Heller
4:30 – 5:00 Open Discussion / Action Item Summary All
Oct 15, 2007Release 4.0 Kickoff Meeting 3
Introductions
Oct 15, 2007Release 4.0 Kickoff Meeting 4
AgendaAgenda
Time Item Lead
1:00 – 1:10 Introductions and Opening Remarks Tillander
1:10 – 1:20 High Level Overview – meeting objectives Heller
1:20 – 1:30 Project Team Heller
1:30 – 2:45
Data FusionGUI / Map
Admin Editor
TSS
Reporting Subsystem
C2C Plugin
General Subsystem Tasks
Data Fusion Engine Tasks
Database
Heller
2:45 – 3:00 Break
3:00 – 3:45Travel Time Enhancements
General Subsystem Tasks, Probe Fusion (driver to TSS),
Probe Fusion Drivers, TSS Modifications
Heller
3:45 – 4:10
General activities:ATIS Coordination TasksDocumentationFAT Deployments
Heller
4:10 – 4:30 Schedule Heller
4:30 – 5:00 Open Discussion / Action Item Summary All
Oct 15, 2007Release 4.0 Kickoff Meeting 5
Meeting ObjectivesMeeting Objectives
Provide overview of:
– Development Team
– Software Architecture
– Components being implemented
– Schedule
Not an objective:
– Discuss specific design details
Oct 15, 2007Release 4.0 Kickoff Meeting 6
Release 4.0 Development ActivitiesRelease 4.0 Development Activities(includes 3.1 Managed Lane activities)(includes 3.1 Managed Lane activities)
Oct 15, 2007Release 4.0 Kickoff Meeting 7
AgendaAgenda
Time Item Lead
1:00 – 1:10 Introductions and Opening Remarks Tillander
1:10 – 1:20 High Level Overview – meeting objectives Heller
1:20 – 1:30 Project Team Heller
1:30 – 2:45
Data FusionGUI / Map
Admin Editor
TSS
Reporting Subsystem
C2C Plugin
General Subsystem Tasks
Data Fusion Engine Tasks
Database
Heller
2:45 – 3:00 Break
3:00 – 3:45Travel Time Enhancements
General Subsystem Tasks, Probe Fusion (driver to TSS),
Probe Fusion Drivers, TSS Modifications
Heller
3:45 – 4:10
General activities:ATIS Coordination TasksDocumentationFAT Deployments
Heller
4:10 – 4:30 Schedule Heller
4:30 – 5:00 Open Discussion / Action Item Summary All
Oct 15, 2007Release 4.0 Kickoff Meeting 8
Project TeamProject Team
Oct 15, 2007Release 4.0 Kickoff Meeting 9
AgendaAgenda
Time Item Lead
1:00 – 1:10 Introductions and Opening Remarks Tillander
1:10 – 1:20 High Level Overview – meeting objectives Heller
1:20 – 1:30 Project Team Heller
1:30 – 2:45
Data FusionGUI / Map
Admin Editor
TSS
Reporting Subsystem
C2C Plugin
General Subsystem Tasks
Data Fusion Engine Tasks
Database
Heller
2:45 – 3:00 Break
3:00 – 3:45Travel Time Enhancements
General Subsystem Tasks, Probe Fusion (driver to TSS),
Probe Fusion Drivers, TSS Modifications
Heller
3:45 – 4:10
General activities:ATIS Coordination TasksDocumentationFAT Deployments
Heller
4:10 – 4:30 Schedule Heller
4:30 – 5:00 Open Discussion / Action Item Summary All
Oct 15, 2007Release 4.0 Kickoff Meeting 10
What is the Data Fusion EffortWhat is the Data Fusion Effort(From the FDOT FLATIS 511 DFS Specification)(From the FDOT FLATIS 511 DFS Specification)
Oct 15, 2007Release 4.0 Kickoff Meeting 11
Release 4.0 Development Release 4.0 Development ActivitiesActivities
Oct 15, 2007Release 4.0 Kickoff Meeting 12
SunGuide Modifications / Data SunGuide Modifications / Data Fusion: GUI / MapFusion: GUI / Map
Floodgate Message Editor
Reports Query & Display
Updated TSS Link Data & Editor
Event Management:
– SAE J2540: Local phrase to code mapping
– Duplicate/Conflicting event resolution
External Data Edits
Oct 15, 2007Release 4.0 Kickoff Meeting 13
Adding SAE J2540 to EMAdding SAE J2540 to EM
EM GUI will be modified so the operator can select SAE ITIS (International Traveler Information Systems) codes
ITIS codes provide efficient “coding” for transmission to wireless devices (e.g. automobile)
2047 “entries” (not all used)
Oct 15, 2007Release 4.0 Kickoff Meeting 14
J2540: Extended PhrasesJ2540: Extended Phrases
253 Phrases
Oct 15, 2007Release 4.0 Kickoff Meeting 15
SunGuide Modifications: SunGuide Modifications: Admin EditorAdmin Editor
Data Fusion Configuration
– Select data types to be archived
– Confidence Index Value editor
– TVT link configuration
– Wind Gust threshold editor
SAE J2540 Phrase Mapping Support
Updated TSS Link Editing
Oct 15, 2007Release 4.0 Kickoff Meeting 16
SunGuide Modifications: SunGuide Modifications: TSSTSS
Add support for geographical information about links
Geographical information will be in Data Bus and published via C2C
Oct 15, 2007Release 4.0 Kickoff Meeting 17
Reporting SubsystemReporting Subsystem
New Data Fusion reports
Oct 15, 2007Release 4.0 Kickoff Meeting 18
C2C Plugin TasksC2C Plugin Tasks
Updated C2C Link and Node data
New C2C Travel Time data type
New C2C Floodgate Message data type
New C2C Event data type using SAE J2540
New C2C Location Table data type using FDOT-provided data
Oct 15, 2007Release 4.0 Kickoff Meeting 19
Data Fusion Subsystem:Data Fusion Subsystem:General Subsystem TasksGeneral Subsystem Tasks
Create a new subsystem (schemas and objects) SunGuide event and travel time retrieval Weather information retrieval (NWS RSS feeds) District EOC data retrieval Strategic Intermodal System data retrieval convert to
Location table New handlers for new weather and event data sources (4
handlers) FDOT Location table format, parsing and storage Input data sanity checking Metadata and data source support Performance monitoring and status reporting
Oct 15, 2007Release 4.0 Kickoff Meeting 20
Data Fusion Subsystem:Data Fusion Subsystem:Data Fusion Engine TasksData Fusion Engine Tasks
External weather data
External TSS and TVT data
FHP CAD data
District EOC data
FDOT Location Table data
Fused event information
Data archiving
Oct 15, 2007Release 4.0 Kickoff Meeting 21
Data Fusion Subsystem:Data Fusion Subsystem:Database TasksDatabase Tasks
Fused event tables
Location data tables
New data archiving tables
Update tables for Data Fusion Support
Develop scripts for installation upgrades
Generate new DBDD
Oct 15, 2007Release 4.0 Kickoff Meeting 22
AgendaAgenda
Time Item Lead
1:00 – 1:10 Introductions and Opening Remarks Tillander
1:10 – 1:20 High Level Overview – meeting objectives Heller
1:20 – 1:30 Project Team Heller
1:30 – 2:45
Data FusionGUI / Map
Admin Editor
TSS
Reporting Subsystem
C2C Plugin
General Subsystem Tasks
Data Fusion Engine Tasks
Database
Heller
2:45 – 3:00 Break
3:00 – 3:45Travel Time Enhancements
General Subsystem Tasks, Probe Fusion (driver to TSS),
Probe Fusion Drivers, TSS Modifications
Heller
3:45 – 4:10
General activities:ATIS Coordination TasksDocumentationFAT Deployments
Heller
4:10 – 4:30 Schedule Heller
4:30 – 5:00 Open Discussion / Action Item Summary All
Oct 15, 2007Release 4.0 Kickoff Meeting 23
AgendaAgenda
Time Item Lead
1:00 – 1:10 Introductions and Opening Remarks Tillander
1:10 – 1:20 High Level Overview – meeting objectives Heller
1:20 – 1:30 Project Team Heller
1:30 – 2:45
Data FusionGUI / Map
Admin Editor
TSS
Reporting Subsystem
C2C Plugin
General Subsystem Tasks
Data Fusion Engine Tasks
Database
Heller
2:45 – 3:00 Break
3:00 – 3:45Travel Time Enhancements
General Subsystem Tasks, Probe Fusion (driver to TSS),
Probe Fusion Drivers, TSS Modifications
Heller
3:45 – 4:10
General activities:ATIS Coordination TasksDocumentationFAT Deployments
Heller
4:10 – 4:30 Schedule Heller
4:30 – 5:00 Open Discussion / Action Item Summary All
Oct 15, 2007Release 4.0 Kickoff Meeting 24
Travel Time Modifications Travel Time Modifications OverviewOverview
The FDOT CO is planning to deploy an LPR system along Interstate 10 around the Tallahassee area in early 2008. The LPR system will collect probe data for the SunGuide Software System to calculate travel times and post on Dynamic Message Signs (DMS).
The enhancement of existing TvT subsystem to include the message template consists of two phases with different destinations. This requirement stems from the SunGuide Footprint issue #51 and 224, and SwRI will implement this as enhancement.
Travel time calculation will allow probe based and station based calculation for a single segment.
Add capability for SunGuide to acquire data from AVI and LPR devices.
Oct 15, 2007Release 4.0 Kickoff Meeting 25
Travel Time: Major ActivitiesTravel Time: Major Activities
Least squares trending analysis: involves changing the structure of TVT to now store past travel times and perform computations.
Allowing 5 alternate routes and doing comparisons of travel times on routes to determine the message: this involves storing alternate route messages (involved extensive database and schema changes). The upper/lower bounds also has alternate route messages.
Probe fusion:– AVI and LPR drivers– Dynamic link redefinition
Oct 15, 2007Release 4.0 Kickoff Meeting 26
Modifications to Travel Time Modifications to Travel Time SubsystemSubsystem
Functionality:– Allow grouped TvT tags – Alternate routes– Formatting message based on sign characteristics– Calculate delay time and allow use in messages– Display travel times on GUI – Least-squares trending– Support for either probe or station based computation
for a single segment– Limit Travel time to single source of data– Display Multiple times on GUI– GUI Alert for no data
Oct 15, 2007Release 4.0 Kickoff Meeting 27
Modifications to Travel Time Modifications to Travel Time Subsystem – con’tSubsystem – con’t
Specific changes:– Database Modifications– Existing schema Modifications– Add type of link to TSS (AVL, LPR, or other detector):
• Limit travel time links to one type of detection link• Allow multiple links to be defined for each travel time
segment (mark one as primary)• Modify database tables to store links differently• Change schema structure o Change admin editor for
setting up TvT links
Oct 15, 2007Release 4.0 Kickoff Meeting 28
Probe Fusion DriverProbe Fusion Driver
General capabilities:
– Configure system parameters
– Archive tag read data
– Tag Matching/Filtering
– Fusion aspect
– Dynamic link redefinition
Oct 15, 2007Release 4.0 Kickoff Meeting 29
Probe Fusion Driver – con’tProbe Fusion Driver – con’t
Probe Fusion Input Driver (a driver to TSS)– Driver will “pair up” reads to determine travel times
– Travel times will be published to Data Bus (which TvT can then access for generating messages)
– AVI Drivers:• TransCore Allegro IT2020• Sirit Identity Flex Title 21
– LPR Drivers:• PIPS P357 Video Processor• I-10 Tallahassee [TBD]
– Note: SunGuide will talk to the above devices using a TCP/IP socket (implies terminal server connection)
Oct 15, 2007Release 4.0 Kickoff Meeting 30
Probe Fusion Driver – con’tProbe Fusion Driver – con’t
TSS Modifications:
– Add ability to store number of vehicles
– Add new device types
– Add notification of no data
Oct 15, 2007Release 4.0 Kickoff Meeting 31
AgendaAgenda
Time Item Lead
1:00 – 1:10 Introductions and Opening Remarks Tillander
1:10 – 1:20 High Level Overview – meeting objectives Heller
1:20 – 1:30 Project Team Heller
1:30 – 2:45
Data FusionGUI / Map
Admin Editor
TSS
Reporting Subsystem
C2C Plugin
General Subsystem Tasks
Data Fusion Engine Tasks
Database
Heller
2:45 – 3:00 Break
3:00 – 3:45Travel Time Enhancements
General Subsystem Tasks, Probe Fusion (driver to TSS),
Probe Fusion Drivers, TSS Modifications
Heller
3:45 – 4:10
General activities:ATIS Coordination TasksDocumentationFAT Deployments
Heller
4:10 – 4:30 Schedule Heller
4:30 – 5:00 Open Discussion / Action Item Summary All
Oct 15, 2007Release 4.0 Kickoff Meeting 32
ATIS Coordination TasksATIS Coordination Tasks
Coordination with Districts– 12 meetings (teleconference)– Action item follow-up
ATIS Contractor Coordination meetings:– C2C Interface management:
• 6 one hour teleconferences• 6 one day meetings in Florida• Action item follow-up
– Additional “general” teleconferences:• 12 two hour teleconference• Action item follow-up
– 6 one day meetings in Florida
Oct 15, 2007Release 4.0 Kickoff Meeting 33
DocumentationDocumentation
Documents to be updated:– Software Requirements Specification (SRS)– Software Design Document (SDD)– Interface Control Documents (ICDs)– Version Description Document (VDD):
• Release 4.0 specific implementation notes as appropriate
– Software User’s Manual (SUM)– Database Design Document (DBDD)– Software Integration Plan (SIP)– Software Integration Case Procedures (SICP)– Administrator training material
Other:– Rational RequisitePro (requirements) Database
Oct 15, 2007Release 4.0 Kickoff Meeting 34
Factory Acceptance Testing (FAT)Factory Acceptance Testing (FAT)
Steps:
– Functional Configuration Audit (FCA)
– Test Readiness Review (TRR)
– FAT Execution:
• April 7-11, 2008 in San Antonio (dates will be solidified by January 15, 2008
Software will be installed at TERL for IV&V and deployed to existing RTMCs after the IV&V
Oct 15, 2007Release 4.0 Kickoff Meeting 35
Deployments Planned Deployments Planned
Deployment to existing installations (dates can be adjusted):
– D1
– D2
– D3
– D4
– D5
– D6
– D7
– TERL Considerations
– TVT usable on installation
– DFS coordinated with Statewide ATIS
Oct 15, 2007Release 4.0 Kickoff Meeting 36
AgendaAgenda
Time Item Lead
1:00 – 1:10 Introductions and Opening Remarks Tillander
1:10 – 1:20 High Level Overview – meeting objectives Heller
1:20 – 1:30 Project Team Heller
1:30 – 2:45
Data FusionGUI / Map
Admin Editor
TSS
Reporting Subsystem
C2C Plugin
General Subsystem Tasks
Data Fusion Engine Tasks
Database
Heller
2:45 – 3:00 Break
3:00 – 3:45Travel Time Enhancements
General Subsystem Tasks, Probe Fusion (driver to TSS),
Probe Fusion Drivers, TSS Modifications
Heller
3:45 – 4:10
General activities:ATIS Coordination TasksDocumentationFAT Deployments
Heller
4:10 – 4:30 Schedule Heller
4:30 – 5:00 Open Discussion / Action Item Summary All
Oct 15, 2007Release 4.0 Kickoff Meeting 37
ScheduleSchedule
Important dates:– Design Reviews:– Design Reviews:
• In person design reviews (Orlando):– Travel Time Nov 6-7– Data Fusion Nov 7-8
• Follow-up (teleconference):– Travel Time Dec 11– Data Fusion Dec 13
– FAT: April 7-11, 2008 – SwRI, San Antonio– IV&V: May 5-9, 2008 – TERL, Tallahassee
Post-development dates:– Deployment:
• Districts (order TBD): May 2008• Coordinated with Statewide ATIS deployment
Oct 15, 2007Release 4.0 Kickoff Meeting 38
AgendaAgenda
Time Item Lead
1:00 – 1:10 Introductions and Opening Remarks Tillander
1:10 – 1:20 High Level Overview – meeting objectives Heller
1:20 – 1:30 Project Team Heller
1:30 – 2:45
Data FusionGUI / Map
Admin Editor
TSS
Reporting Subsystem
C2C Plugin
General Subsystem Tasks
Data Fusion Engine Tasks
Database
Heller
2:45 – 3:00 Break
3:00 – 3:45Travel Time Enhancements
General Subsystem Tasks, Probe Fusion (driver to TSS),
Probe Fusion Drivers, TSS Modifications
Heller
3:45 – 4:10
General activities:ATIS Coordination TasksDocumentationFAT Deployments
Heller
4:10 – 4:30 Schedule Heller
4:30 – 5:00 Open Discussion / Action Item Summary All
Oct 15, 2007Release 4.0 Kickoff Meeting 39
Discussion ?