Sunset Substation
Community DesignMeeting #3
Agenda
•Welcome and Introduction
•Final Vision Statement •Solar Study Analysis•Alternate Design Schemes•Preliminary Cost Comparison
•Questions and Comments
www.sunsetsubstation.org
Vision Statement
Abstract Statement toGuide Future Decision Making
Vision Statement
1. This public parcel should be repurposed for community use.
2. Incorporate renewable energy technologies that allow power generation and public use to coexist.
3. Empower and inspire community involvement in the maintenance and stewardship of the site.
Solar Study Analysis
Solar Access - Middle of Site
Solar Access - NE Corner of Site
Sample 23 kW Installation
Parameters
Parameters
Precedents
Precedents
Precedents
Precedents
Precedents
Design Schemes
The Big Roof Scheme
The Big Roof Scheme
Alle
y
W.
65
th S
t.
CoveredPlaza
CommunityBuilding
Storage &Solar Equipment
32nd Ave. NW
The Big Roof Scheme
The Big Roof Scheme
The Pair Scheme
The Pair Scheme
Alle
y
W.
65
th S
t.
Plaza
CommunityBuilding
Storage &Solar Equipment
32nd Ave. NW
The Pair Scheme
The Pair Scheme
The Wedge Scheme
The Wedge Scheme
Alle
y W.
65
th S
t.
CoveredOutdoor
PlazaCommunity
Building
Sto
rage &
Sola
r Equip
ment
32nd Ave. NW
The Wedge Scheme
The Wedge Scheme
The Wedge Scheme
Conceptual Cost Comparison
Total Project
$660,000
Solar Component (160 panels)
$390,000
Total Project
$775,000
Solar Component (131 panels)
$450,000
THE BIG ROOF SCHEME
Total Project
$730,000
Solar Component (114 panels)
$285,000
THE WEDGE SCHEME
THE PAIR SCHEME
THE PAIR SCHEME THE BIG ROOF SCHEME THE WEDGE SCHEME