1
Superintendent’s
Proposed
Capital
Improvement
Plan
2018-2028
Chesapeake Public Schools
School Board Meeting
November 13, 2017
Addition at Oscar Smith High School
2
CIP Projects – Year 1 (2018-19)
$79,083,800
Roofs
BMW
BRI
CAM
GBI
GRI
TES
HVAC
BRP
BRI*
CAM*
GTP*
GBI*
GRI*
GRM*
HMS*
HOMS*
JMS*
PORT*
Track
Repaving
DCM
GBM
WBH
School
Repaving
CWM
DCH*
GBH
Mod&Add
CHT (D)
IRM (D)
Mod
CWM (D)
CWI (D)
Field
Houses
DCM
GBM
Tech
Upgrades
DCH (D)
GBH (D)
HHS (D)
OSH (D)
Track
Imprv.
CWM
Bus
Storage/
Maint.
Facility
*PARTIAL (D) DESIGN (C) CONSTRUCTION
Add
HMS (C)
3
Anticipated Funded CIP Projects (Through June 30, 2019)
CASH
(NON-ROUTINE
RENEWAL/
MAINTENANCE)
• Repaving DCH (part)
• Track WBH
PROFFER FUNDS/
RE-DIRECTS/LOCKBOX
(CASH/DEBT)
• Addition HMS (C)*
• Field houses DCM &
GBM
• Mod./Addition CHT (D)
10-YR DEBT
(NON-ROUTINE
RENEWAL/
MAINTENANCE)
• Roof BRI
• Roof TES
• HVAC BRP *$4.7 MILLION APPROPRIATED; ADDITIONAL
FUNDING MAY BE NEEDED AFTER BID
$19,171,900
ESTIMATED
TOTAL COST
• Summer 2018
– OSH construction
– GBP construction
– BMW construction
– HMS construction
– HOMS & HMS HVAC partials
– CAM roof
– BMW roof
– PORT HVAC partial
– DCHS repaving partial
+1 Clerk of Works needed
2-4 HVAC, roofing, or repaving projects
+1 Project Manager +1 Clerk of the Works (if funds are available)
New Construction & Planning Department Projects and Staffing
5
2018-2023 Five-Year Grand Total
Yr 1 (2018-19) $79,083,800
Yr 2 (2019-20) $81,177,100
Yr 3 (2020-21) $131,784,500
Yr 4 (2021-22) $126,651,500
Yr 5 (2022-23) $47,337,900 Addition at Oscar Smith High School
6
2018-2023 Five-Year
Grand Total
Addition at Oscar Smith High School