Al-Najah National University Engineering Faculty building Engineering Department Graduation Project: Complex of Ministries Supervied by : Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Supervied by : Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

  • Upload
    arav

  • View
    40

  • Download
    0

Embed Size (px)

DESCRIPTION

Al-Najah National University Engineering Faculty building Engineering Department Graduation Project: Complex of Ministries. Supervied by : Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris. Chapter One : Introduction. Complex of Ministries. Site Description. - PowerPoint PPT Presentation

Citation preview

Page 1: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Al-Najah National University Engineering Faculty

building Engineering DepartmentGraduation Project:

Complex of Ministries

Supervied by : Dr. Monther DwaikatPrepared by: Haneen Ghanem

Lama DroobiRana Faris

Page 2: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Chapter One : Introduction

Complex of Ministries

Page 3: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Site Description

Page 4: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Site Description

Page 5: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Comparing Due to Solar Exposure

Page 6: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Project A Solar Exposure Project B Solar Exposure

1 321830 1 288965

2 178638 2 295384

3 665375 3 299986

4 238771 4 338305

5 325649

6 291600

7 221080

8 300814

9 292773

Comparing Solar Exposure Value`s

Page 7: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

PROJECT A

Page 8: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

PROJECT B

Page 9: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

PROJECT B

Page 10: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Environmental

analysis

Page 11: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Sun path in winter for project A

Page 12: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Sun path in summer for project A

Page 13: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Sun path in winter for project B

Page 14: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Sun path in summer for project B

Page 15: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Project A Solar Exposure Project B Solar Exposure

1 321830 1 288965

2 178638 2 295384

3 665375 3 299986

4 238771 4 338305

5 325649

6 291600

7 221080

8 300814

9 292773

Comparing Solar Exposure Value`s

Page 16: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Daylight :

Page 17: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Ground Hole Section

Page 18: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Architectural design

Page 19: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Parking Design

Page 20: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Ramp Length 24Slope of the Ramp 1:10

Floor height 3Ramp Radius 7

straight ramp length 10Circular Ramp Length 20

Total Ramp Length 30Road Width 5.5

Road Width in Circular Ramp 7.5

Parking Design

Page 21: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Floor Height 3.5m

Levels Number 11 floorelevator interval time 25-29 sec

Waiting Time 15-17 secPercent of Population to be carried in 5 min 14-16%

Net Area ( Normal ) 10-12m2/person

Round Trip (RT) 118handling Capacity (h) 38.6

Interval (I) 23.6 secPercent of Population (PHC) 21%

Number of cars needed 4

Elevators Design

Page 22: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Architectural DesignPlans :

Ground Floor

Page 23: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Architectural DesignPlans :5th and 6th Floor

Page 24: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Architectural DesignPlans :

7th Floor

Page 25: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Architectural DesignPlans :

2nd basement Floor

Page 26: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

East Elevation

Page 27: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Nouth Elevation

Page 28: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

West Elevation

Page 29: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

South Elevation

Page 30: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Section A-A

Page 31: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Section B-B

Page 32: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Structural

design

Page 33: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

structural design

The structural design was made by SAP program

3D modeling

Page 34: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Ministry of Trade and Economy

Typical Plan

Building 3D Model

Page 35: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Codes: The structures are designed using practice code

and specifications that control the design process and variables.

The following codes and standards are used in this study:

*ACI 318-08: American concrete institute provisions for reinforced concrete structure design.

*UBC-97: code which is used here for seismic load parameters determination .

Page 36: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Structural element:

•Design will include the following elements :1) slab ( one way rib slab).2) beam ( main beam & secondary beam) .3) column .4) footing

Page 37: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Design data: 1- Compressive strength of concrete (f\c) beams shear walls columns Footing slabs

2- Yielding strength of steel (fy),

3- Bearing capacity of soil=

f\c =400 kg/cm2

fy =4200 kg/cm2

4 kg/cm2

Page 38: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Material :Unit weight of used materials

Unit weight of materials

ton/m³

Unit weight of materials

Kg/m³

Material

2.5 2500 Reinforced concrete

2.3 2300 Plain concrete2.6 2600 stone1.2 1200 Blocks

Page 39: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Preliminary Design:

Slab thickness

Beam thickness

Main beam→ (60*50) cmHidden beam→ (30*50) cmExternal beam→ (60*30) cmColumn dimension

G1 → d= 90 cmG2→ (40*40) cmG3→ (50*50) cmG4 → (55*55) cmG5 → (60*60) cmG6 → (70*70) cmG7 → (80*80) cm

Page 40: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Loads :

Superimposed dead load=4.5 kN/m² Superimposed dead load for carrage=2.5 kN/m²

Live load =5 kN/m²

Page 41: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Check for sap model :•Compatibility check

Page 42: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Check for sap model :Check equilibrium

dead load127700KN From

sap128500 manual

.6% %of error

live load33614 From sap

34200 manual

1.75% %of error

Page 43: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Check for sap model : local equilibrium (internal force )

#of beam

Sap value Manual value %of error

B1 475 420 11%B2 649 612 5.5%

#of slab

Floor Mu from sap

Mu manual

%of error

1 F6 79.5 75.6 5%2 F4 45 37 17%

#OF COLUMN MANUAL Pu Sap Pu %of error C1 4963.5 5178 4.3%C2 2061 2538 23%

Page 44: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Dynamic Design :Soil type Sc

Z = 0.2 C v=0.32 Ca =0.24

T- calculation T- Sap 0.6 S 0.35 S

Page 45: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Design :Design slab

Page 46: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Beams design

Design :

Page 47: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Design:Column design

Page 48: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Design:Column design

Page 49: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Design:footing design

Page 50: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Desing :

Page 51: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Mechanical

design

HVAC , water supply

drainage system, fire system.

Page 52: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

U The element0.72 Outside wall0.87 ceiling0.61 floor3.5 window7 Aluminum door

HVAC system

- Heating design.

Page 53: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris
Page 54: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris
Page 55: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris
Page 56: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

The selection diffuser is a square supply air diffusers of four way flow pattern with size of 46*46 cm

cooling design.

Page 57: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris
Page 58: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Water supply

Page 59: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris
Page 60: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris
Page 61: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Drainage system

Page 62: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris
Page 63: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris
Page 64: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris
Page 65: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Fire system

Page 66: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris
Page 67: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris
Page 68: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris
Page 69: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Electrical design

Page 70: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Artificial lightingFlorescent lamp (4*T8 18 watt) BEGA 5524 3

TC-D 26W Luminaire Luminous Flux =5400 lm

Luminaire Luminous Flux =5400

lm

Page 71: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Number of luminaries for each space have been calculated

Page 72: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

the seventh floor was design by dialux program lamps that were used are of a type SECOLUX-E PL-L 136EVG. with 36 watt.

Page 73: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris
Page 74: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Cost estimation

Page 75: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Total cost=45300000 NIS Total area=14885.92m² cost/m²=3043.14 NIS

Project A

Page 76: Supervied by :  Dr. Monther Dwaikat Prepared by: Haneen Ghanem Lama Droobi Rana Faris

Total cost =25900000 NIS.Total area= 8957.69 m² Total cost /m²=2891.3 NIS

cost Work

25586010 NIS

Structural & architectural cost

216930 NIS Mechanical cost

97060 NIS Electrical cost

Project B