19
1 Supervision and Quality Control Consultancy For Construction of Different Building in Different of Parts of State Minutes of the Meeting A Pre bid meeting, under the Chairmanship of the Director (Training & Administration), EPCO held at EPCO Conference hall at 3.00 PM on dated 26/12/2011. Following members were present in the meeting:- 1. Shri A.K. Pandey, Chief Engineer, PWD & Project Director (PIU), Bhopal 2. Shri T.L. Sharma, Vice President, IPAI (M.P. Chapter), Bhopal 3. Shri J.P. Namdev, EPCO, Bhopal The meeting was attended by representatives of following Firms:- 1. Mr. Abhishek Modi, M/s WAPCOS Ltd., New Delhi 2. Mr. Prashant Singh, M/s Enarch, Noida 3. Mr. Abhinav Shrivastava, M/s Enarch, Noida 4. Mr. Nishant Khaira, M/s Khaira & Associates, Bhopal 5. Mr. Dharmesh Sarkango, M/s Mehta & Associates, Indore 6. Mr. Abu Asit, M/s Semac, New Delhi 7. Mr Dilip Verulkar, M/s SPCL, Mumbai 8. Mr. J.L. Wani, M/s SPCL, Mumbai Following decisions were taken in the meeting:- 1. List of the works being executed by PIUs should be uploaded on EPCOs website. The list is attached herewith. 2. It was decided that rates will be quoted in clusive of all taxes except Service Tax. Service Tax will be paid as per prevailing rates at the time of payment. 3. Bidders were suggested to ensure the availability of key staff members at the time of bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms will be awarded zero marks for that position. 4. With reference to clause 16.1, it was agreed that only one set of apparatus may be procured which will remain with Material Engineer. Core cutter machine should be made available by SQC consultant as and when required by PIU. Apart from above, following clarification was made by EPCO during the discussion:- a. Joint Venture: - Status of the firm at a time of empanelment will only be considered. b. Provision of personnel: - As per clause 4.1.2 of RFP document (Note-ii) Number of personnel given in the table is only for technical evaluation of the technical bid. Consultants may deploy staff as per requirement of the project. If they feel so but no extra payment for additional personnel be payable to consultant till additional staff is demanded by PIU & approved by EPCO.

Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

1

Supervision and Quality Control Consultancy For

Construction of Different Building in Different of Parts of State

Minutes of the Meeting

A Pre bid meeting, under the Chairmanship of the Director (Training & Administration), EPCO held at EPCO Conference hall at 3.00 PM on dated 26/12/2011. Following members were present in the meeting:-

1. Shri A.K. Pandey, Chief Engineer, PWD & Project Director (PIU), Bhopal 2. Shri T.L. Sharma, Vice President, IPAI (M.P. Chapter), Bhopal 3. Shri J.P. Namdev, EPCO, Bhopal

The meeting was attended by representatives of following Firms:-

1. Mr. Abhishek Modi, M/s WAPCOS Ltd., New Delhi 2. Mr. Prashant Singh, M/s Enarch, Noida 3. Mr. Abhinav Shrivastava, M/s Enarch, Noida 4. Mr. Nishant Khaira, M/s Khaira & Associates, Bhopal 5. Mr. Dharmesh Sarkango, M/s Mehta & Associates, Indore 6. Mr. Abu Asit, M/s Semac, New Delhi 7. Mr Dilip Verulkar, M/s SPCL, Mumbai 8. Mr. J.L. Wani, M/s SPCL, Mumbai

Following decisions were taken in the meeting:-

1. List of the works being executed by PIUs should be uploaded on EPCOs website. The list is attached herewith.

2. It was decided that rates will be quoted inclusive of all taxes except Service Tax. Service Tax will be paid as per prevailing rates at the time of payment.

3. Bidders were suggested to ensure the availability of key staff members at the time of bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms will be awarded zero marks for that position.

4. With reference to clause 16.1, it was agreed that only one set of apparatus may be procured which will remain with Material Engineer. Core cutter machine should be made available by SQC consultant as and when required by PIU.

Apart from above, following clarification was made by EPCO during the discussion:-

a. Joint Venture: - Status of the firm at a time of empanelment will only be considered.

b. Provision of personnel: - As per clause 4.1.2 of RFP document (Note-ii) Number of personnel given in the table is only for technical evaluation of the technical bid. Consultants may deploy staff as per requirement of the project. If they feel so but no extra payment for additional personnel be payable to consultant till additional staff is demanded by PIU & approved by EPCO.

Page 2: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

2

c. Turnover:- The bidder should have minimum annual turnover of Supervision and Quality Control / Project Management C onsultancy fee amounting to Rs. 2.00 Crore (Rs. Two Crore) or more during each of the last three financial years.

d. Experience: - Experience of key personnel as self employed professional may be considered if the principle client is a Government Body.

Apart from above clarification some frequently asked questions were also discussed which are as follows:-

Q.1 For different packages separate Technical bid is to be submitted?

Ans. Yes

Q.2 Bid document also needs to be enclosed in Technical bid?

Ans. Yes

Q.3 Can same Project Team of experts be mentioned in the bid documents of other clusters?

Ans. No as replied above in clarification at S.No.3. In case the bidder is awarded with work of more than one cluster, he shall have to deploy different team of experts for different package.

Q.4 What percentage will be considered for Technical & Financial evaluation?

Ans. As mentioned at clause-13 of RFP document 80% weightage will be given to Technical score & 20% to Financial score.

Q.5 How a bidder can visit the site?

Ans. Bidder may contact Shri A.K. Pandey, Project Director, Project Monitoring Unit, Public Works Department, Satpura Bhawan, Bhopal for getting site information for visiting different Project Implementation Unit (PIU). His phone no. is 0755-2551570 and mobile no. is 09425330222.

Q.6 Can maximum age of the Field Engineers be relaxed so as to have the services of Retired Engineers?

Ans. No.

Q.7 Is it mandatory for the key professional to sign the CV?

Ans. Yes. The CVs should be signed both by the employee and the employer. The meeting ended with a vote of thanks by Director (Training & Administration), EPCO.

Page 3: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

3

List of the works being executed by PIUs as given by PWD:-

Page 4: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

4

Page 5: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

5

Page 6: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

6

Page 7: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

7

Page 8: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

8

Page 9: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

9

Page 10: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

10

Page 11: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

11

Page 12: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

12

Page 13: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

13

Page 14: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

14

Page 15: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

15

Page 16: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

16

Page 17: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

17

Page 18: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

18

Page 19: Supervision and Quality Control Consultancy For ... · bidding. If it is found that CV(s) of any key staff member is included in the documents of any other bidder firm, both firms

19