37
NOTICE INVITING TENDER Tender No. OIL/62/7/ENQ-509 Date – 29.09.2010 Bid Closing Date & Time: 28.10.2010 (14:30 Hrs.) OIL INDIA LIMITED (OIL), a Govt. of India Enterprise, invites competitive bids from domestic bidders for Supply, installation, testing commissioning and maintenance of Solar Photo Voltaic power plant (30 Kwp DC as per STC) at OIL House, Plot No. 19, Sector 16A, Noida. Non-transferable bid documents can be obtained from the offices of Sr. Advisor(C&P), Oil India Limited, Plot No. 19, Sector-16A, NOIDA – 30 201 & Head (Kolkata Branch), Oil India Limited, 4, India Exchange Place, Kolkata- 700001, on application and payment of non-refundable tender fee (PSU and SSI Units are exempted) of Rs.1,000.00 through demand draft made in favour of Oil India Limited and payable at Noida/New Delhi. Tender documents will be on sale from 05.10.2010 till one day prior to the scheduled Bid Closing Date. For details, please visit www.oil-india.com.

Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

NOTICE INVITING TENDER

Tender No. OIL/62/7/ENQ-509 Date – 29.09.2010

Bid Closing Date & Time: 28.10.2010 (14:30 Hrs.)

OIL INDIA LIMITED (OIL), a Govt. of India Enterprise, invites competitive bids from domestic bidders for

Supply, installation, testing commissioning and maintenance of Solar Photo

Voltaic power plant (30 Kwp DC as per STC) at OIL House, Plot No. 19,

Sector 16A, Noida. Non-transferable bid documents can be obtained from the offices of Sr. Advisor(C&P),

Oil India Limited, Plot No. 19, Sector-16A, NOIDA – 30 201 & Head (Kolkata Branch), Oil India Limited, 4, India

Exchange Place, Kolkata- 700001, on application and payment of non-refundable tender fee (PSU and SSI Units are

exempted) of Rs.1,000.00 through demand draft made in favour of Oil India Limited and payable at Noida/New

Delhi. Tender documents will be on sale from 05.10.2010 till one day prior to the scheduled Bid Closing Date. For

details, please visit www.oil-india.com.

Page 2: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 2 of 37

OIL INDIA LIMITED PLOT NO. 19,SECTOR-16A

NOIDA-201 301

TELEPHONE-0120-2488333/2488347

Email: corp_c&[email protected] M/s.

Tender No. & Date : OIL/62/7/ENQ-509 dtd 29.09.2010 Bid Closing on : 28.10.2010 at 14.30 hrs. Bid Opening on : 28.10.2010 at 14.45 hrs. Completion Required : Within 10 months from LOI Cost of Bid Document : Rs. 1,000.00 Bid Security Amount : Rs. 20,000.00 Performance Security/Guarantee

: 10% of the order value

Sirs, With reference to your application we are pleased to issue this tender document and invite you to submit your firm quotation for the materials as listed & specified in the enclosed Annexure-I. Your quotation must be written in English, complete in all respect without keeping any ambiguity and conform to the “General Terms & Conditions” enclosed. It is also essential that your quotation must reach us before the bid closing date as indicated above. Your special attention is drawn to the following 1.a) Rates should be quoted in the format as per Annexure-III for the Scope of Supply/Work as detailed in Annexure-I . 1.b) Your offer must include: i) Tender No. viii) Excise Duty, if applicable. ii) Full description of the material offered. ix) Taxes. iii) Any deviation in specification. x) Firm road freight for door delivery at

above destination. iv) Best possible delivery for each item. xi) Brand name, whenever specific. v) Unit & total basic price for each item. xii) Conformity to monogram/Inspection

requirements & charges, if any. vi) Validity of minimum 120 days from the

date of bid opening. xi) Installation & Commissioning charges with

break-up of taxes. vii) Packing charges, if any. xii) Operation & Comprehensive Maintenance

charges with break-up of taxes 2. Incomplete quotations will be summarily rejected. The sealed quotation should be sent to the following address: Senior Adviser(C&P), Oil India Limited, Plot No. 19, Sector-16A, NOIDA-201 301, Uttar Pradesh. Issued By_________________ Issued On_________________

Yours faithfully, OIL INDIA LIMITED

(P. Das) Chief Manager (Materials) FOR SR. ADVISOR (C&P)

FOR CHAIRMAN & MANAGING DIRECTOR

Page 3: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 3 of 37

ANNEXURE-I OIL INDIA LIMITED

(A Government of India Enterprise)

TERMS OF REFERENCE / SCOPE OF WORK

Scope of work for supply & installation of SPV grid connected system 1.0 Scope of Work in General

The general character and the scope of work to be carried out under this contract is illustrated in the detail specification. The contractor as a Manufacturer of Solar PV modules for providing the end to end solution for the above, including but not limited to design, supply providing of the required Solar Photo Voltaic power plant with accessories, peripheral like power conditioning units, cables, junction boxes, earthing etc shall supply the SPV system in totality and ensure the installation, performance, testing, commissioning, warrantee, annual maintenance etc. The bidder has to ensure planning and smooth execution of the project as well. The contractor shall carry out and complete the said work under this contract in every respect in conformity with the contract documents and with the direction of and to the satisfaction of Project Coordinators. The contractor shall furnish all labour, materials and equipment as listed and specified otherwise, transportation and incidental necessary for supply, installation, testing and commissioning of the complete system through as described in the specifications as per MNRE guidelines.

2.0 Solar PV Panel / Grid Connected System

i) Supply, installation, testing and commissioning of Solar PV system (inclusive of

Electrical, Electronics and mechanical features).

ii) The installation shall include the electrical wiring, cabling, terminations, cable

trays, string inverters, metering and hooking up the system to the electrical grid.

iii) Supply and installation of Module mounting structure/ super structure for mounting

at roof top OIL BHAWAN, NOIDA.

iv) The PV modules shall be installed with necessary tilt with the most effective

orientation.

v) Supply and installation of power conditioning unit.

vi) Supply and installation of cables on prefabricated GI cable trays and / or within

suspended ceiling spaces including installation, cable trays, hangers, supports,

cable terminations all fixing accessories (terrace to plant room inclusive of PVC

sleeve/ other accessories etc wherever required)

vii) Supply and installation of earthing system with testing joint for every pit

(grounding) system including cutting of roads / paved areas and making as good

as in original shape. Design shall be submitted by contractor and approved by OIL.

viii) Solar Photo Voltaic (SPV) system capacity will be 30 Kwp DC output which shall be

verified by OIL.

Page 4: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 4 of 37

ix) Supply and installation and testing of entire system including synchronize with

plant main LT Panel grid / DG set.

x) Supply fixing, testing commissioning of lightening arrester.

xi) The system must be capable of logging all parameter like generated power in KW /

KVA, voltage, current etc. inclusive of Energy meter (Electronic / Multifunctional)

xii) The system must be capable of upgrading, extension at later stage as and when

required by purchaser.

xiii) Supply and laying of power/ control copper cables from PV power panel to plant

room Main LT panel including within terraces to main P V panels.

xiv) Supporting structure material shall be electrolytically compatible with the PV panel

mounting frame.

xv) Contractor shall design their SPV panel structure according to RCC roof. Design of

SPV structure and distribution of load on roof top beam shall be submitted for

approval by OIL.

xvi) Contractor shall check existing building management system, if any up gradation

required as per their own requirement or install new system (PC / Software etc)

complete as required to operate their own system.

xvii) Data networking cabling as per site requirement from PV solar system to existing

plant room.

xviii) Danger notice plates at some prominent locations as per IS: 2551

xix) Bidder shall visit the site and take necessary measurements to make himself

familiar with the site before submission of the bids.

3.0 Salient Feature of Grid Connected Solar PV system

SPV Power Plant i. Array installed capacity : 30 Kwp DC as per STC

ii. PV Cells : Mono / Poly Crystalline

iii. Power rating of one SPV Module : 200 Wp and above

iv. Efficiency of SPV Module : 13.5% and above

Plant Area Detail i. Location : Plot No. 19, Sector 16 (A), Oil India Ltd, Noida-

201301, U P ii. Long / Lat : 28.3˚ N and 77.1˚ E

SPV Plant Site

i. Vendor must visit the location for assessment of roof area availability at

proposed site, prior to submitting the Tender document.

ii. Annual Generation Guarantee : 48, 000 Kwh

Page 5: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 5 of 37

TECHNICAL SPECIFICATION

1.0 Solar Photo Voltaic Modules

Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline Silicon Solar Photovoltaic cells. Solar photovoltaic module shall be 200 Wp and above Crystalline high power cells are used in the Solar Photovoltaic module. Solar module shall be laminated using lamination technology using established polymer (EVA) and Tedlar / Polyester laminate. Anti-reflection coating on to cells improve light absorption and to increase cell performance. Each Solar module should consist of 72/60 Photovoltaic cells. Solar Photovoltaic module efficiency shall be greater than 13.5% and power tolerance less than 2%. Module shall be made of high transmissivity glass front surface giving high encapsulation gain and hot butyl rubber edge sealant for module protection and mechanical support. All materials used must have a proven history of reliable and stable operation in external outdoor applications. Solar modules are designed to operate and perform in relative humidity up to 85% with temperatures between -40 Deg C and +85 Deg C and with stand gust up to 200km/h from back side of the panel. Sample modules and production processes employed in the manufacture of the offered module are in accordance with the requirements of IEC 61215, IEC61730 & CE. Certifications must be provided by under writers laboratory. The module frame must be made of corrosion resistant materials, which is electrolytically compatible with the structural material used for mounting the module. Module Junction box (weather resistant) shall be designed for long life out door operation in harsh environment. Degradation of power generated should not exceeding 20% of the min. rated power over the 25 year period. Efficiency of solar PV system shall be guranted to 90% for up to 12 years & 80% for up to 25 years. The PV module shall be equipped with bypass diode to minimize power drop caused by shades. The solar modules shall have suitable encapsulation and sealing arrangements to protect the silicon cells from the environment. The arrangement and the material of encapsulation is compatible with the thermal expansion properties of the Silicon cells and the module framing arrangement/material. The encapsulation arrangement ensures complete moisture proofing during life of the solar modules.

Page 6: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 6 of 37

Each module must have low iron tempered glass front for strength and superior light transmission. It also must have back sheet for environment protection against moisture and high voltage electrical insulation. The fill factor of modules is not less than 0.70 or above. Note: I-V curve of each PV module with Sl Nos. should be submitted along with Modules.

1.1 Mechanical Features Solar Photovoltaic Module shall be made of toughened, low iron content, high transmissivity front glass. Anodized Aluminum Frame shall be provide around the module. The module shall be encapsulated with Ethyl Vinyl Acetate (EVA). Silicon edge sealant shall be provided around laminate. The back surface shall be Tedlar /Polyester trilaminate. ABS plastic terminal box shall be provided for the module output termination with gasket to prevent water moisture. the module shall be Resistant to water, abrasion, hail impact, humidity & other environment factor for the worst situation at site. Bypass diode arrangement shall be provided.

1.2 Marking Each module shall carry the following clear indelible markings:

• Name, monogram of manufacturer • Type or module number • Module serial number • Polarity of terminals • Maximum system voltage for which module is design • Date and place of manufacture

2.0 Module Mounting Structure

Structure shall support SPV modules at a given orientation, absorb and transfer the mechanical loads to the roof uniformly. There shall be no requirement of welding or complex machinery at site. The array structure shall be so designed that it will occupy minimum space without sacrificing the output from SPV panels & shall withstand heavy winds. The supplier / manufacturer shall specify installation details of the PV modules and the support structures with appropriate diagrams and drawings, its load and distribution on roof top. Module mounting structure shall be made up of hot dipped MS galvanized material. Structures to be coated with hot dip (Galvanized) minimum 70 microns size. Super structure shall be designed & fabricated according to site condition. The array structure shall be grounded properly with earthing system Support structure design and foundation or fixation mounting arrangements should withstand minimum horizontal wind speed of 200kms / hr (Designed value shall be greater than 200kms / hr). All fasteners shall be of Stainless steel.

3.0 Junction Boxes The junction boxes shall be dust free, vermin and waterproof and made of FRP / Thermo Plastic with IP65 protection. The terminals shall be connected to copper bus bar arrangement of proper sizes. The junction boxes shall have suitable cable entry points fitted with cable glands of appropriate sizes for both incoming and out going cables.

Page 7: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 7 of 37

Suitable markings shall be provided on the bus bar for easy identification and cable ferrules shall be fitted at the cable termination points for identification. The junction boxes shall have suitable arrangement for the following: • Combine groups of modules into independent charging sub-arrays that shall be wired to the controller.

• Provide arrangement for disconnection for each of the groups. • Provide a test point for each sub-group for quick fault location. • To provide group array isolation. • The rating of the JB’s shall be suitable with adequate safety factor to inter connect the Solar PV array.

• Metal oxide arrestors shall be provided inside the Array Junction Boxes.

4.0 Power Conditioning Unit (PCU) Solar array shall produce DC energy output and supplied to the DC bus for inverting to AC voltage. Maximum Peak Power Tracking (MPPT) to extract maximum energy from solar array. The efficiency of PCU shall not be less than 97% & shall be designed to meet the Solar PV Array capacity control) will extract maximum energy from solar array and provides 400V AC +/-10%, 50HZ, to synchronize with local utility grid. Output shall be sine wave with < 3% total harmonic distortion (THD). Additionally, it will provide protection features such as, over current, short circuit, over temperature as a minimum. PCU shall be of very high quality having high efficiency 97% and above. The PCU should be completely compatible with the SPV array voltage and grid supply voltage. The PCU shall be string type inverters to reduce the DC power losses & can have the flexibility to increase the capacity of the plant. The PCU shall be designed for continuous, reliable power supply as per specifications. The PCU shall be capable of complete automatic operation and shall be capable to synchronize independently & automatically with the grid supply. The PCU shall built-in with data logging to remotely monitor plant performance through external PC. The PCU shall have internal protection arrangement against any sustained fault. The dimension, weight, foundation details etc. of the PCU shall be clearly indicated in the detailed technical specification provided by the bidder. It has user friendly LED / LCD display for programming and view on line parameters. Unit shall be IP-65/67

Page 8: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 8 of 37

4.1 Indications:

• Inverter on • Grid on • Inverter under voltage / over voltage • Inverter over load • Inverter over temperature

4.2 Protections:

• Over voltage both at input & output • Over current both at input & output • Over / under grid frequency • Over temperature • Short circuit • Protection against lightening • Surge voltage protection

4.3 Remote Monitoring:

• DC power input • DC input voltage • DC current • AC power output • AC voltage • AC current • Power factor

In addition to above energy values to be displayed

Recommended Make: SMA / KACO / XENTRAX

5.0 Data Monitoring of Power Plant

The performance and generation data is recorded using a data logger. The Monitoring system shall comprise of the following main components:

• PCU logs the inverter performance data and transmits the same to the Data logger.

• Data monitoring system logs irradiance (solar insulation) and temperature.

• Data logger gathers information and monitors the performance of the inverter. It also supports measurements from the external sensors. The data can be acquired remotely through Ethernet port (RJ45) should be available to connect to OIL network.

• PC Data logging software enables automatic long-term storage of measured data from SPV Plant. It allows visualization, monitoring, commissioning and service of the installation

• Communication interface the entire system can be operated and monitored via interfaces (RJ45 / Telephone modem/Ethernet), in addition to the information indicated on the operator panel. Further information can also be acquired remotely through the interfaces mentioned above.

• One PC should be provided with necessary software for SPV system monitoring by Electrical Supervisor at Control room of Power Plant.

Processor – Intel Core 2 Duo Hard Disc – 160 GB (Min), Ram - 1 GB (Min) DDR2, Make – HP / Dell

Page 9: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 9 of 37

6.0 Cables and Accessories

a) Cables should be PVC insulated XLPE Copper Conductor armour MV Cables up to 1100 v grad as per IS: 694

b) Cable should be Bright Annealed 99% pure Copper Conductor that offer conductor resistance. Conductor shall be of electrolytic Copper confirming to IS: 8130

c) Sizes of the cables as following – i. Array to junction box / PCU : 1 core x 4/6 sqmm strained copper cable

ii. PCU to LT ACDB & metering panel : 2 core x 16 sqmm strained copper, XLPE

Armoured cable iii. LTACDB & Metering Panel to Main Grid DB : 3.5 / 4 corex XLPE 25 sqmm

strained Armoured cable iv. Cables shall be layed on prefabricated GI cable trays and through suitable HDP

pipes.

7.0 Earthing and Protection

i. The PV array structure shall be grounded properly using adequate (min 3 nos) number of connecting system. All metal casing / shielding of the plant shall be thoroughly grounded to ensure safety of the power plant. Earthing resistance shall be less than 5.0 ohms in line watt IE rules as per IS: 3043 code of practice for earthing.

ii. GI strip of minimum size 3mmx30mm shall be used for carrying earthing

connection. iii. Proper earthing pit shall be made for connecting as per OIL approval.

8.0 Lightening Arrester To protect the system from heavy surge of lighting a suitable arrester to be provided with separate earthing system.

9.0 Spare Parts i. Bidder shall quote and supply one additional string type PCU of similar capacity

used in the system.

ii. Bidder shall recommend and furnish details for essential spare parts required for at least 10 years after completion of guarantee period of five years and provide the details of nearest source of availability.

iii. Hard-ware such as clamps. Pipes, fittings, cable tags, screws, nuts and bolts any

other items required along necessary tools for 5 years power plant maintenance need to be provided.

Page 10: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 10 of 37

10.0 Installation and Commissioning

i. Detailed project execution programme shall be submitted along with the offer. The bidder shall be responsible for arranging all tools / tackles and manpower for installation and commissioning the complete system.

ii. The bidder shall quote the charges of installation, testing & commissioning of the system by the technical experts and manpower involved should be inclusive of to and fro air/rail fares, boarding / lodging & daily expenses amongst others. The bidder will also submit the errection & commissioning procedure for approval by OIL.

iii. The bidder shall provide all necessary hoists, ladders, scaffoldings, transportation of labour and materials necessary for the proper execution and completion of the work to the satisfaction of OIL.

iv. The bidder, during the execution of the work shall coordinate with other agencies / existing associated work with the project and shall work in harmony with them without causing any hindrance or obstruction to the other works.

11.0 Approval & Clearances

Bidder shall take necessary approval & clearances from Govt. / Statutory bodies like electrical authorities wherever applicable in the scope of this work.

11.1 Inspection and Testing

All materials to be supplied shall be subject to inspection and test by OIL at its discretion at any stage of manufacture and before dispatch. The bidder shall provide all necessary facilities, labs, instruments and labour for testing. Bidder shall bring out the proper testing procedure; demonstrate testing to OIL representatives and present adequate records of tests carried out as per the written procedure. Test certificates duly signed by an authorized person shall be submitted for scrutiny. OIL may go for sampling to cross check the test results.

No equipment shall be delivered without prior written clearance from OIL.

12.0 Annual Generation Guarantee

Bidder shall give minimum annual power generation guarantee for 48,000 Kwh for first year and for subsequent years as per following –

2nd Year : 99% of 1st Year Generation (48,000 Kwh)

3nd Year : 98.5% of 1st Year Generation (48,000 Kwh)

4th Year : 98% of 1st Year Generation (48,000 Kwh)

5th Year : 97.5% of 1st Year Generation (48,000 Kwh)

In case of short fall, bidder will compensate the less power generated as per prevailing rate of UP State electricity board (present power rate is Rs. 5.50 per Kwh) for first five years.

After first 5 years, power generation trend must be mentioned.

Bidder may monitor the performance of system installed. In case bidder finds that installed system will not meet assigned minimum annual guarantee, it is up to bidder to add up in the system to meet the minimum requirement.

Page 11: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 11 of 37

13.0 Operation and Annual Maintenance Contract (Operation & Comprehensive

AMC)

i. Bidder shall provide 5 years operation and comprehensive maintenance contract as per Ministry of New and Renewable Energy(MNRE) guidelines to qualify for MNRE subsidy. The bidder shall provide all necessary manpower for regular cleaning and washing of the panels, checking of different components/assemblies/sub-assemblies etc. as part of the operation for better performance of the system.

ii. During the 5 years operation and comprehensive maintenance contract,any

defect found in the SPV module,PCU or any other accessories will be replaced by the bidder on free of cost basis.

iii. Operation & Maintenance contract will be extendable for another 5 years (after

completion of first 5 years) on mutually agreed terms at the discretion of OIL. iv. The bidder should maintain daily log sheet containing tables for power

generation and provide monthly log sheet in CD form in addition to certified hard copy.

14.0 Completion Drawings

• Contractor shall submit complete drawings set before start of the job and after completion of the work with changes incorporated. These drawings shall be submitted in the form of four sets of CD’s and four portfolios (300 x 450 mm) each containing complete set of drawings on approved scale indicating the work as - installed. These drawings shall clearly indicate following:

• Location and rating of PV arrays.

• Location and details of panels, and other particulars including approved fabrication

drawings of panel.

• Complete wiring diagram, as installed and scheduled showing all connections in the complete electrical system.

• Routing and particulars of all cables and trays.

• Single line diagram, power schematic, control schematic with detailed bill of materials,

showing makes, types and description of all components and accessories.

15.0 SPV Panels Cleaning Facilities

Bidder shall provide daily dusting & water washing facilities, all necessary accessories for dusting shall be provided. Bidder shall also extend water line with suitable pressure pump for the roof top of five story building and shall provide necessary rubber hose etc for washing the panels.

Page 12: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 12 of 37

16.0 LT Panel & AC Distribution Board

Power conditioning unit converts DC energy produced by solar array to AC energy. The AC power output of the inverter shall be fed to the AC Distribution Board (metering panel & isolation panel) which also houses energy meter. The 400V AC +-10% output of the isolation panel is fed to the grid. AC energy is then synchronized with the grid and power is exported to the grid.

17.0 Transportation

Materials are to be dispatched on door delivery basis. Transit insurance and loading and unloading will be in bidder scope.

18.0 Material Storage at Site

Suitable storage space for material will be provided by OIL. Custody of material its transportation up to storage space, security and issue of material will be in bidder scope.

19.0 Time of commencement after LOA is issued: Within 15 days;

Expected time for completion of activities: Particulars Time Schedule

• Site visit With in 15 days from date of LOA

• Supply of Materials after inspection by OIL

Six month after submission of design

• Installation of SPV system as per approved design

Two months after supply of material

• Commission, Testing and Hand over to OIL

One month after installation

20.0 Time of completion of the job : 10 months from LOA

The contractor is required to submit the flow chart of activities and give presentation to explain the same to coordinating authority within a month from LOA. The related activities shall be routed through coordinators, Sh P Jamal, CE (PBD) and Sh H H Sharma, Dy CE (PEP). The contractor shall furnish the progress report every month to coordinators.

21.0 Experience / Qualification Criterion :

(i) The bidder should be manufacturer of SPV Modules with annual production capacity of minimum 5 MWp.

(ii) Bidder must have completed at least one solar PV system of minimum 30 KWp which is presently operating successfully for more than a year in India.

(iii) Bidder should have average annual financial turnover as per Audited Annual Reports

for the last three accounting years should be at least Rs. 5.00 Crores. The documentary evidences against above must be submitted alongwith the ‘Techno-commercial’ Bid failing which the offer will be summarily rejected.

Page 13: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 13 of 37

22.0 Price Format: The bidders must quote prices in the format given in Annexure-III.

23.0 Payment:

23.1 70% payment will be made against supply of materials and balance 30% after satisfactory commissioning at site along with the installation & commissioning charges after adjusting liquidated damages, if any. Payment towards training will be released after successful completion of training.

23.2 Payment towards Operation & Comprehensive Maintenance charges will be paid quarterly after completion of the quarter. The ‘Compensation’ as per para 12.0 above, if any will be adjusted as below:

(i) For the initial four years – from the first quarterly bill of next year.

(ii)For the fifth year- from the last quarterly bill and balance, if any from performance security.

(END OF SECTION-1)

Page 14: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 14 of 37

Annexure-II GENERAL TERMS AND CONDITIONS

FOR INDIGENOUS TENDER

1.0 TRANSFERABILITY OF BID DOCUMENTS :

1.1 The Bid documents are non-transferable. The bid can only be submitted in the name of the bidder in whose name the bid document has been issued.

1.2 Unsolicited offers will not be considered and will be straightway rejected. 1.3 Employees of Oil India Limited are prohibited from quoting and also from getting others

to quote on their behalf.

2.0 COST OF BIDDING :

2.1 The Bidder shall bear all costs associated with the preparation and submission of its bid

and OIL will in no case be responsible or liable for those costs, regardless of the conduct or outcome of the bidding process.

3.0 AMENDMENT TO BIDDING DOCUMENTS :

At any time prior to the bid closing date, OIL may for any reason, whether at its own

initiative or in response to clarifications requested by the prospective bidder(s), modify the bidding document by amendment(s). All prospective bidders who have received the bidding documents will be notified of the amendments in writing.

4.0 CONTENTS OF OFFERS :

4.1 Offer should be in English and the bidders are required to indicate both Ex-works as well as FOR Destination price by road. The Price Schedule shall be furnished by the bidder as per proforma vide Annexure -III. The prescribed proforma duly filled in and signed should be returned intact whether quoting for any item or not. When any item is not being quoted by the Bidder, the corresponding space should be filled up by the words “Not Quoting”. The Price Schedule shall be complete and free from ambiguity, change or interlineations.

4.2 OIL reserves the right to place order on FOR (despatching station) or FOR (destination) terms. Offered rates should be kept firm through delivery/despatch.

4.3 EXCISE DUTY:

4.3.1 Excise Duty, if any, should be quoted either as “extra” or as inclusive as the case may be. The Seller, if happens to be a Supply House, should not quote “Excise Duty” as extra.

Page 15: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 15 of 37

4.3.2 SSI Unit availing slabs rate of turnover for duty structure should specify the maximum Excise Duty levies against the order at the time of delivery, if order is placed on them.

4.3.3 Bidders, who are manufacturers, should indicate the rate of Excise Duty, if any, separately for all quoted items.

4.3.4 Any benefit/concession/exemption involved should be spelt out clearly by the bidders. In case such information is not furnished in the Bid, the offer will be loaded with the maximum amount of Excise duty applicable for the item for evaluation purpose. However, OIL reserves the right to place the order based on the excise duty indicated in the Bid which will be binding on the Bidder.

4.3.5 Bidder should indicate the following in their offer:

a) Address of the factory from where the goods will be despatched.

b) Chapter, Heading and Sub-heading of the Excise tariff for the material offered.

4.4 SALES TAX :

4.4.1 Sales Tax as applicable should be quoted/specified by the bidder. 4.4.2 Any other benefit/concession/exemption available at the time of delivery should be spelt

out clearly by the bidders. In case such information is not furnished in the Bid, the offer will be loaded with the normal amount of tax applicable for the item for evaluation purpose. However, OIL reserves the right to place the order based on the tax indicated in the Bid which will be binding on the Bidder.

4.5 Taxes, Excise duty, if any, should be shown separately as indicated in the Annexure-III.

IF TAXES ETC. ARE NOT SHOWN SEPARATELY THE OFFER WILL BE CONSIDERED TO BE INCLUSIVE OF ALL TAXES, DUTIES ETC. AND WILL BE BINDING ON THE BIDDER.

4.6 OTHER TAXES & LEVIES :

(i) All taxes, stamp duties and other levies for the services including installation/commissioning, Training etc. shall be to the Bidder/Seller’s account.

(iii) Income Tax shall be deducted at source from the invoices at the appropriate rate under the I.T. Act & Rules from time to time. Service Tax ,as applicable will be on OIL’s account.

4.7 STATUTORY VARIATION :

Any statutory variation (increase/decrease) in the rate of excise duty/sales tax/Customs Duty or any statutory levy after the closing date of tenders/revised priced bid, as the case may be, but within the contractual delivery/completion period will be to the account of OIL subject to documentary evidence. However, any increase in excise duty/sales tax/Customs Duty or any statutory levy after the expiry of the scheduled date of delivery shall be to the supplier’s account.

Page 16: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 16 of 37

4.8 THIRD PARTY INSPECTION (When specifically called for in the tender):

4.8.1 All inclusive charges for Third Party Inspection must be indicated separately as shown in the Price schedule vide Annexure – III.

4.8.2 Offers without any mention about Third Party Inspection charges as specified above will be considered as inclusive of Third Party Inspection charges. When a bidder mentions Third Party Inspection charges as extra without specifying the amount, the offer will be loaded with maximum value towards Third Party Inspection charges received against the tender for comparison purposes. If the bidder emerges as lowest bidder after such loading, in the event of order on that bidder, Third Party Inspection charges mentioned by OIL on the Purchase Order will be binding on the bidder.

4.9 SAMPLES (When specifically called for in the tender):

4.9.1 Bidder shall submit Samples of requisite quantity whenever called for. Each sample

shall be sealed and have a card affixed indicating

a) Bidder’s name, address, contact Telephone No. & Email address

b) Tender No. and Bid Closing Date

c) Product Name

d) Item No. of the tender

4.9.2 Sample must be received on or before the Bid Closing Date failing which the offer will be rejected.

4.9.3 Bidders who have been exempted from submission of tender sample through specific communication from OIL, need not submit any sample. However, they will be required to enclose a photocopy of the exemption letter along with their bid failing which their offers will be liable to be rejected.

4.10 TRAINING (When specifically called for in the tender):

4.10.1 Bidders shall indicate cost for training OIL’s personnel separately whenever called for.

4.10.2 For training at Bidder’s premises, only the training fee should be indicated by the Bidder. All charges towards to & fro fare, boarding/lodging and daily expenses etc. for OIL’s personnel shall be borne by OIL.

4.10.3 For training at OIL’s premises, the Bidder should quote training charges which should be inclusive of all charges of their personnel viz. to and fro air fares, boarding/lodging expenses and daily expenses etc. for the entire period. Local transport for commuting to the site at the place of training will be provided by OIL.

Page 17: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 17 of 37

4.11 INSTALLATION AND COMMISSIONING (When specifically called for in the tender):

4.11.1 In the event installation and commissioning of the item by the technical experts of the bidders is involved, the charges thereof should be quoted separately which should be inclusive of to and fro air fares, boarding/lodging & daily expenses of the bidder’s technical personnel amongst others. OIL will provide local transport for commuting to the installation site. Bidders shall also indicate in their offer the total expected time required for installation/commissioning of the items.

4.11.2 Offers without any mention about installation/commissioning and Training charges will be loaded with maximum value towards installation/commissioning and Training charges received against the tender for comparison purposes.

4.12 DISCOUNT

Prices should be quoted net of discount and no discount should be shown separately. Discount, if any should be merged with the quoted prices. Discount of any type, indicated separately as well as conditional discount, will not be taken into account for evaluation purpose. However, if an offer is found to be the lowest even without considering discount, OIL shall avail such discount at the time of placement of order.

4.13 Any interlineations, erasures or overwriting shall be valid only if they are initialed by the person or persons signing the bid.

4.14 Bidders should offer firm prices. Offered prices shall be both in figures and words and in case of any discrepancy between these two, the prices indicated in words will only be considered.

4.15 CHANGE IN QUANTITY : OIL reserves the right to increase / decrease the quantity. It will be obligatory on the part of the Bidder to supply ordered quantity at the offered rates.

4.16 TECHNICAL LITERATURE: Relevant technical literature must be submitted along with the offer whenever called for without which the offer would be liable to be rejected.

4.17 DELIVERY : Offers should be for delivery at site as indicated, with firm delivery date. If delivery is not specifically indicated by the bidders, it will be construed that the delivery quoted is as per delivery indicated in our enquiry and will be binding on the bidder. The delivery will be counted from the date of receipt of the letter of intent/order by the successful bidder.

4.18 VALIDITY : Offers must be valid for acceptance for the minimum period of 120 days, unless otherwise specified, counted from the Bid Closing Date as indicated in the covering page. Offers without the minimum validity period will be liable for rejection. In the absence of any categoric mention regarding validity of the offer, it will be construed that the offer is valid as called for in the covering page and it will be incumbent on the bidders to accept order, if any, when placed within such validity.

Page 18: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 18 of 37

4.18 VAGUE AND INDEFINITE EXPRESSIONS:Any vague and indefinite expressions such as “Subject to prior sale”, “Prices ruling at the time of dispatch”, “Subject to availability of materials” etc. will not be considered.

5.0 CLARIFICATION IN RESPECT OF INCOMPLETE OFFERS:

Prospective bidders are advised to ensure that their bids are complete in all respects and conform to OIL’s terms, conditions and bid evaluation criteria of the tender. Bids not complying with OIL’s requirement may be rejected without seeking any clarification.

6.0 BID SECURITY :

(NOTE : This clause is applicable only in case of tenders wherever specifically mentioned.)

6.1 All the Bids must be accompanied by Bid Security for the amount as mentioned in the NIT and shall be in the prescribed format (Annexure IV) in one of the following forms:

i) A Bank Guarantee from any nationalised scheduled Indian Bank. The Bank

Guarantee shall be valid for six months from the bid closing date and shall be enforceable at Duliajan/Delhi/Kolkata/Guwahati.

ii) Bank draft in favour of OIL INDIA LIMITED and payable at Delhi. 6.2.1 The bidders will have to submit the Bank Guarantee from any of the scheduled Indian

banks and on non - judicial stamp paper of requisite value, as per the Indian Stamp Act, purchased in the name of the issuing banker.

6.2.2 The Bank Guarantee issued by a Bank amongst others must contain the following particulars of such Bank :

(a) Full Address

(b) Branch Code

(c) Code Nos. of the authorized signatory with full name and designation

(d) Phone Nos./Fax Nos./E-mail address

6.2.3 In case, any such Bid Security in the form of a Bank Guarantee is found to be not genuine or issued by a fake banker or issued under the signatures of fake official of the Bank, the bid submitted by the concerned bidder shall be rejected forthwith and the bidder shall be debarred from participating in future tenders.

6.3 Any bid not accompanied by a proper Bid Security (in Original) in conformity with Clauses 6.1 and 6.2.1 will be rejected outright without any further reference.

6.3.1 Normally offers received along with either a copy of Bid Security or Fax Bid Security shall not be considered. However, OIL will consider the offer, provided Original Bid Security executed in prescribed proforma and legally operative on or before the Bid Closing Date (technical Bid Closing Date in case of Two Bid & Two Stage Bidding System) is received by tender inviting authority within 15 days of Bid Closing date (technical Bid Closing Date in case of Two Bid & Two Stage Bidding System).

Page 19: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 19 of 37

6.3.2 If Bidder fails to submit original Bid Security with the same content as in Copy/Fax Bid Security and in accordance with bidding document within the time as specified in para 6.3.1 above, the bid will be rejected outright as invalid bid.

6.4 The Bid Security of the unsuccessful bidders will be returned after finalization of tender whereas the Bid Security of the successful bidder will be discharged on such bidder’s furnishing the Performance Security to OIL in the prescribed format (Annexure V) against the Purchase Order secured by the bidder within the stipulated time frame. The successful bidder will however, ensure that the validity of the Bid Security till such time the Performance Security in conformity with Clauses 7.0 below as the case may be, is furnished.

6.5 The bidders will extend the validity of the Bid Security, if and whenever specifically advised by OIL, at the bidder’s cost.

6.6 Bid Security will not accrue any interest during its period of validity or extended validity.

6.7 The Bid Security will be forfeited:

a) If a bidder withdraws his bid during the period of validity of bid or any extension thereof duly agreed by the bidder,

OR

b) If the successful Bidder do not accept the order or fails to furnish the Performance Security within 30 days of placement of order or before the expiry of Bid Security (unless extended), whichever is earlier.

6.8 Exemption of Bid Security: 6.8.1 Small Scale Units registered with NSIC/Directorate of Industries and parties registered

with DGS&D are exempted from submitting bid security provided they submit an attested copy of their valid registration with Corporation/Directorate of Industries/DGS&D which indicates the category of items being tendered for and if the total tender value is less than the monetary limit for which the unit is registered. Documentary evidence of the monetary limits should be enclosed without which the bidder will not be entitled for exemption.

6.8.2 Public Sector undertakings are exempted from submitting Bid Security.

7.0 PERFORMANCE SECURITY :

(NOTE : This clause is applicable only in case of tenders wherever specifically mentioned.)

7.1 The successful bidder shall furnish the Performance Security in the form enclosed (Annexure V) herewith within 30 days of the receipt of Letter of Intent / order failing which OIL reserves the right to cancel the order and forfeit the Bid Security. Bidders should undertake in their bid to submit Performance Security as stated above.

Page 20: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 20 of 37

7.2 In the event of Seller’s/Bidder’s failure to discharge their obligations under the Contract, the Performance Security shall be encashed and the proceeds thereof shall be forfeited without any further reference to the Seller/Bidder.

7.3 The Performance Security shall be denominated in the currency of the contract and shall be in the form of a Bank Guarantee.

7.4 The Bank Guarantee will have to be given from the nationalised scheduled banks on non judicial stamp paper of requisite value, as per the Indian Stamp Act, and stamp paper should be in the name of the issuing bank.

7.5 The Bank Guarantee issued by the Bank amongst others must contain the following particulars of the Bank :

(a) Full Address

(b) Branch Code

(c) Code Nos. of the authorized signatory with full name and designation

(d) Phone Nos./Fax Nos./E-mail address

7.6 In case, the Performance Security in the form of a Bank Guarantee is found to be not genuine or issued by a fake banker or issued under the signatures of fake official of the Bank, the LOI/Purchase Order issued/placed on the Supplier shall be treated as cancelled forthwith and the bidder shall be debarred from participating in future tenders. Further, the Bid Security submitted by such Supplier shall be invoked without any further reference.

7.7 The Bank Guarantee shall be enforceable at Noida / Delhi or as specified in the order.

7.8 Performance Security for capital nature items like plant and machinery etc. shall be valid for 12 months from the date of commissioning or 18 months from the date of despatch whichever concludes earlier. However, for consumables like chemicals, cement, tubular etc. the Performance Security shall be valid for 12 months from the date of despatch. The validity requirement of Performance Security specified in the main order is assuming despatch within stipulated delivery period. In case of any delay in despatch, validity of the Performance Security is to be extended suitably as aforesaid.

7.9 Performance Security will be discharged by the Purchaser and returned to the Seller, within 30 days of its expiry of validity including any extension sought thereof in case of no claim on seller by the purchaser.

7.10 Performance Security amount will not accrue any interest.

Page 21: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 21 of 37

7.11 Exemption of Performance Security :

7.11.1 Small Scale units registered with NSIC/Directorate of Industries are exempted from

submitting Performance Security if the order/contract value is less than the monetary limits for which the firm is registered. In absence of monetary/quantity limit in the NSIC/Directorate of Industries certificate, bidders should submit Capacity Assessment Certificate issued by concerned NSIC/District Industries Centres. Otherwise the unit will not be eligible to avail exemption for Performance Security.

7.11.2 The bidders will extend the validity of the Performance Security, if and whenever

specifically advised by OIL, at the Bidder/Seller’s cost.

8.0 DOCUMENTS COMPRISING THE BID

8.1 The bid prepared by the bidder shall comprise the following components, duly completed:

a) Price schedule (Refer Annexure-III)

b) Bid must accompany necessary literature/catalogue of the equipment as well as of the spare parts catalogue thereof, wherever required.

c) Exceptions/Deviations Statement, if any

d) Authorisation letter for attending Tender Opening (Refer Annexure VI)

e) Bid Security, wherever required.

f) Confirmation about the Performance Security, wherever required

8.2 In case of Press Tenders, Bidders should enclose the proof of purchase of tender

document. 9.0 SUBMISSION OF OFFER :

9.1 SEALING AND MARKING OF BIDS :

9.1.1 Offers should be sent in triplicate in double sealed envelope.

9.1.2 The original offer in bidders own original letterhead duly signed by authorised signatory and stamped should be marked as ORIGINAL and the two copies as DUPLICATE & TRIPLICATE. All the three copies of offer should be put in a sealed envelope bearing the following details on the left hand top corner:

i) Oil India Ltd.’s Enquiry No.

ii) Bid closing date

iii) Brief Description of materials

iv) Bidder’s Name, official address with Phone Nos. & Email address.

NOTE : Bidder’s Name, Address, Phone Nos., Email address as described above should be indicated on the inner envelope to enable OIL INDIA LTD to return the late bid to the bidder, if necessary.

Page 22: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 22 of 37

9.1.3 The sealed inner envelope containing the offers should then be put in another envelope

bearing the following address:

Sr. Adviser(C&P) Oil India Limited Plot No. 19,Sector 16A NOIDA-201301 Uttar Pradesh

9.2 Special methods of marking & sealing where tender is called under “TWO BID

SYSTEM” & “TWO STAGE BIDDING SYSTEM” :

9.2.1 In case of TWO BID SYSTEM, bidders shall prepare the technical and commercial bids in triplicate separately and shall put these in two separate envelopes marked as “Techno-commercial “Unpriced Bid” and “Priced Bid”. Both the envelopes containing the “Unpriced Bid” and “Priced Bid” should be supersribed with Bid Closing Date., enquiry no, bidder`s name and brief description of materials, and sealed and then put inside another envelope superscribing the enquiry no., Bid Closing Date, bidder`s name and brief description of materials. The “Unpriced Bid” shall contain all techno-commercial details except the prices which shall be kept blank. The “Priced Bid” must contain the price schedule and the bidder’s commercial terms and conditions.

9.2.2 Under TWO STAGE BIDDING SYSTEM, bidders are required to submit only the Techno-commercial “Unpriced Bids” in the first stage. The “Priced Bids” will be submitted at a later date when called for by OIL.

9.3 Any offer not complying with the above submission procedure will be rejected.

9.4 Bidders, in their own interest, are advised to drop their offers personally in “ TENDER BOX”.Alternatively they may send the same through Registered Post/courier. Oil India Limited will not be responsible for any delay, wrong delivery or non-delivery of the offers. No offer will be accepted after the bid closing date and time.

9.5 Bids must be submitted in original. No offer should be sent by Telex / Cable / Fax / E-mail/telephone unless specifically asked for in writing. Bids not complying with above

will be rejected.

10.0 DEADLINE FOR SUBMISSION OF BIDS :

10.1 Offers must be received at the office of the Sr. Adviser( C & P),Oil India Limited,Plot No.

19,Sector 16A,NOIDA-201301 by the Bid Closing Date & time mentioned in the Notice Inviting Tender (NIT).

10.2 Timely delivery of the offer at the above address is the responsibility of the bidder.

Page 23: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 23 of 37

11.0 MODIFICATIONS AND CLARIFICATIONS OF BIDS :

11.1 Offers or modifications to offers received after the Bid Closing Date and time will not be

considered. No unsolicited correspondence after submission of the offer will be taken cognizance of or responded to.

11.2 After the opening of the bid, OIL may at its discretion ask the bidder for clarification of

its bids. The request for clarification and response shall be in writing and no change in the price or substance of the Bid shall be accepted. The reply of the bidder should be restricted to the clarifications sought.

12.0 EXTENSION OF BID SUBMISSION DATE :

Normally no request for extension of Bid Closing Date will be entertained. However, in

case of any changes in the specifications, inadequate response or for any other reasons, OIL may at its discretion, extend the bid closing date and/or time.

13.0 RETURN OF LATE BIDS :

13.1 Bids received after Bid Closing Date & time will be treated as “Late Bids”. In case of

tenders where Bid Security has been called for, the late bids shall be returned to the bidders immediately. In all other cases, the late bids will be destroyed by OIL.

14.0 OPENING OF TENDERS :

14.1 Bidder or their authorised representative (only one person per bidder) will be allowed to be present at the time of opening of the Bids. However, a letter (in the form as per Annexure VI enclosed) must be produced to the Tender Opening Officer at the time of opening of tenders. Unless this letter is presented, the representative will not be allowed to attend the tender opening.

14.2 In case of any unscheduled holiday/Bandh on the bid opening date, the Bids will be

opened on the next working day. Accordingly, Bid Closing Date / time will get extended up to the next working day.

15.0 COMPLIANCE WITH TENDER :

15.1 Bidder’s offer must conform in all respects with the applicable specifications, drawings

and terms and conditions of the tender. Any deviation from the tender specifications or terms and conditions must be clearly and explicitly stated. In order to be considered responsive, bidder’s offer must specifically include the following statement :

We certify that our offer complies with all NIT requirements and Specifications

except for the following :

List exception

If none, state “None”

Page 24: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 24 of 37

15.2 OIL reserves the right to accept / reject any deviation in bidder's offer pertaining to the materials specifications or to the terms and conditions stipulated in this tender without assigning any reason other than Bid Rejection Criteria specified in the Bid document.

16.0 PURCHASER’S RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS.

16.1 OIL reserves the right to accept / reject or prefer any offer either in full or in part or

annul the bidding process and reject all bids at any time prior to award of contract without thereby incurring any liability to the affected bidder (s) or any obligation to inform the affected bidder (s) of the ground for OIL`s action. OIL also reserves the right to split the order between two or more parties.

17.0 INSPECTION AND TEST :

17.1 All materials to be supplied shall be subject to inspection and test by OIL at its discretion

at any stage of manufacture and before despatch by mutual arrangement. Inspection and tests shall be carried out either by OIL’s personnel or through a third party nominated by OIL. Seller has to arrange for the inspection through the nominated third party (whenever applicable) and obtain the necessary inspection certificates.

17.2 OIL reserves the right to inspect the material through any of the Third Party Inspection

Agencies. While appointing the Third party Inspection Agency (from OIL’s approved agencies), the bidder shall pass instruction to the appointed Third Party Inspection Agency to comply and respond to the advice/queries made by OIL directly with the inspection agency in connection with the inspection.

17.3 Bidder must extend the required facility for inspection by Third Party Inspection Agency. The bidder will be responsible for arranging the third party inspection and must submit the inspection certificate in Original to OIL alongwith the despatch documents. The certificate issued by the Third Party Inspection Agency must specify that the inspection has been carried out for the material to be supplied to OIL INDIA LIMITED and inspection has been carried out as per the scope of inspection stipulated in OIL’s Purchase Order. The certificate should also specify OIL’s Purchase Order Number.

18.0 PACKING :

18.1 Packing of goods must be sufficiently robust to withstand multiple handling during transit for delivery to their final destination so that contents do not get damaged. Protection of the plant and equipment against corrosion or deterioration must be given special attention.

18.2 Machined steel and iron parts are to be heavily greased / varnished as a prevention against rust.

18.3 In the case of internal combustion engines, compressors and similar equipment, internal parts are to be sprayed with an inhibitor or water splitting preservative and all openings covered with tape to prevent ingress of water.

Page 25: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 25 of 37

18.4 Boxes / Packing cases containing electrical / electronic equipment are to be waterproof lined.

18.5 All items must have their respective identification marks painted / embossed on them.

18.6 Crates or boxes should have a list of items contained therein secured to the exterior by means of an enveloping piece of tin sheet nailed to the wood. A duplicate list should also be included inside the crate with the contents.

18.7 The Seller shall be responsible for damage of goods either in full or in part and for corrosion and/or deterioration of the plant and equipment during transit due to inadequate/insufficient packing or due to non-compliance with the above Para Nos. 18.1 to 18.4 depending upon the nature of items and as such shall be obligated to repair or replace the damaged goods or plant or equipment in full or in parts thereof, at free of cost to OIL within a reasonable period of time.

18.8 WEIGHT AND SIZE LIMITATION OF PACKAGES :

Normal limiting dimensions and weights are as under :

Category Length Width Height Capacity

Truck 5.185 Mtrs 1.98 Mtrs 1.98 Mtrs 9 MT

Normal Trailer 10.98 Mtrs. 2.44 Mtrs. 2.44 Mtrs. 18 MT

Semi Low Bed Trailer

10.98 Mtrs 3.05 Mtrs. 3.05 Mtrs. 20 MT

Low Bed Trailer 6.71 Mtrs. 3.05 Mtrs. 3.81 Mtrs 18 MT

This dimensional restriction must not be violated without prior approval from OIL. The finished packing should be in the form of a Box under the limited dimensions.

19.0 DESPATCH :

19.1 Road Despatch : 19.1.1 In the event of an order other than FOR Destination terms, the material will be required

to despatch through OIL’s approved transporter (which will be specified in the order) on “Door Delivery” basis.

19.1.2 For orders placed on FOR Destination basis, the material will be required to despatch

through reputed Bank approved transporters only on Door Delivery basis. In case OIL is required to collect the material from transporters godown, extra expenditure incurred thereof will be recovered from the Bidder/seller.

19.2 Rail Despatch : In case of Rail despatch, the Bidder will be fully responsible for arranging required

railway wagons/rake. Tubular consignment will be despatched on open type wagons only. Height of the wagons should not exceed 4.6 metres.

Page 26: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 26 of 37

20.0 INSURANCE :

20.1 Transit insurance will be arranged and paid for by OIL for all orders other than FOR

Destination orders. The Bidder/seller will be required to intimate the insurance agency (which will be specified in the Purchase Order) regarding the despatch details immediately after despatch. The Sellers have to arrange the transit insurance at their cost in case of orders placed on FOR Destination basis.

21.0 PAYMENT TERMS :

21.1 Payment terms where installation / commissioning and Training are not involved :

21.1.1 Payment will generally be made against completed supply. Where phased delivery is indicated in the order, payment will be made against each lot as per phasing.

21.1.2 In certain cases, payment to the extent of 90% maximum of the value of the supply will be made against proof of despatch presented through Bank or to OIL directly. Balance 10% of the value will be released not later than 30 days of receipt of goods at OIL’s site. Adjustments, if any, towards liquidated damage shall be made from the balance 10% payment. OIL may consider releasing 100% payment against despatch documents for suppliers having good track record with OIL and where 10% Performance Security is submitted in time and no installation/commissioning is involved.

21.2 Payment terms where installation /commissioning and Training are involved :

Wherever installation / commissioning and Training are involved, 70% payment will be made against supply of materials and balance 30% after satisfactory commissioning at site along with the installation & commissioning charges after adjusting liquidated damages, if any. Payment towards training will be released after successful completion of training.

21.3 Payment against Trial Orders : In the event of placement of trial orders, payment will be made only on acceptance of

goods after successful field trial of the materials. 21.4 PAYMENT TO THIRD PARTY :

Request for payment/part payment to third party (i.e., other than the party on whom the order has been placed) will not be entertained by OIL under any circumstances. The offers stipulating payment/part payment to such third party will be considered as non-responsive and such offers will be rejected.

21.5 OIL implemented e-payments to its vendors and therefore, the forms enclosed as Annexure-VII may be filled by the successful bidder enabling us to remit the amount directly to the bank.

Page 27: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 27 of 37

21.0 BANKING CHARGES :

All banking charges will be to the bidder's account.

21.0 ADVANCE PAYMENT :

21.1 Request for advance payment shall not be normally considered. Depending on merit and at the discretion of OIL, advance payment may be agreed at an interest rate of 1% above the prevailing Bank rate (CC rate) of State Bank of India compounding on quarterly basis from the date of payment of the advance till recovery /refund.

21.2 Advance payment if agreed to by the Company shall be paid only against submission of

an acceptable Bank Guarantee whose value should be equivalent to the amount of advance plus the amount of interest estimated by OIL on the basis of contractual delivery period.

21.3 “Bank Guarantee shall be valid for 03 months beyond the date of commissioning

incorporated in the Order and same shall be invoked in the event of Seller’s failure to execute the Order within the stipulated delivery period.”

21.4 In the event of any extension to the delivery date, seller shall enhance the value of the

bank guarantee to cover the interest for the extended period and also shall extend the validity of bank guarantee accordingly.

22.0 CONFIDENTIAL INFORMATION :

22.1 The Bidder / Seller shall treat as confidential all designs, drawings, data or information

written or verbal, supplied by OIL and shall use its best endeavors to ensure that such design, drawings, data or information is not divulged to any third party except with the consent of OIL where necessary for the purpose of performance of its obligation hereunder and subject to similar undertakings being obtained from such third parties to treat such design, drawings, data or information in like confidence other than designs, drawings, data or information which at the time of proposed disclosure are within the public knowledge or in the Bidder’s/Seller's possession.

23.0 PATENT AND OTHER RIGHTS : 23.1 The Bidder/Seller shall fully indemnify OIL against any action, claim or demand, costs

and expenses arising from or incurred by reason of any infringement or alleged infringement of any letter, patent, design, trademark or name, copy right or other legally protected rights in respect of any plant, work, materials to be supplied or any arrangement, system or method of using, fixing or working to be employed by the Bidder/Seller.

23.2 In the event of any claim or demand being made or action brought against OIL in

respect of any of the aforesaid matters, OIL shall notify the Bidder/Seller thereof as soon as possible and Bidder/Seller shall conduct with the assistance of OIL if necessary, but at his own expense, all negotiation for the settlement of such matter and any legal proceeding, litigation/ arbitration involved or which may arise therefrom.

Page 28: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 28 of 37

24.0 INDEMNITY AND INSURANCE :

24.1 The Bidder/Seller shall defend or hold OIL harmless from all actions, claims, suits and demands made, against either or both of them in respect of injuries to or death of any person including employees of the Bidder/Seller or non-compliance of any statutory/safety requirement.

24.2 The Bidder/Seller shall also defend and hold OIL harmless for loss of and damage to property arising from the supply of any goods or materials or the erection, installation repair or operation for a period, of any plant hereunder.

25.0 ASSIGNMENT :

25.1 The Bidder/Seller shall not transfer, assign or sublet the consequent Contract or any part thereof without the prior consent in writing from OIL. Any permitted transfer/assignment or subletting shall not relieve the Bidder/Seller of any of his obligations which might have arisen before such permission was given.

26.0 WARRANTY / GUARANTEE :

26.1 Goods, materials or plant (s) to be supplied hereunder shall be new, of recent make, of the best quality & workmanship and shall be guaranteed by the Seller for a period of 18 (eighteen) months from the date of despatch or 12 (twelve) months from the date of commissioning/receipt (where commissioning is not involved) whichever is earlier against defects arising from faulty materials, workmanship or design. Defective goods / materials or parts notified by OIL to the Seller shall be replaced immediately by the Seller on F.O.R destination basis including payment of all taxes and duties at Seller's expense. This guarantee shall survive and hold good not-withstanding inspection, payment for and acceptance of the goods. However, for consumables like chemicals, cement, tubular etc. the guarantee shall be valid for 12 months from the date of despatch

27.0 DEFAULT IN DELIVERY / LIQUIDATED DAMAGES :

27.1 Time will be of the essence of the contract.

27.2 In the event of the Seller’s default in maintaining the agreed delivery schedule set out in the order, OIL shall have the right to cancel the order at any time after expiry of scheduled delivery date without any reference to the Seller and make alternative arrangement at the discretion of OIL in which case extra expenditure involved, will be recoverable from the Seller and OIL shall not be responsible towards such cancellation or any damage that may be incurred by the Seller. The decision of OIL shall be final and binding on the Seller.

27.3 As an alternative to Clause No. 27.2 above, OIL reserve the right to accept the materials but, the Seller shall be liable to pay liquidated damages @ 0.5% per week or part thereof of the value of the goods in respect of which default in delivery takes place subject to a maximum of 7.5 %. Should there be default on the part of the Seller for more than 15 Weeks from the scheduled date to complete the delivery or to complete the installation/commissioning & Training (wherever applicable) successfully, OIL shall have the right, in addition to the provisions under Clause 27.2 to invoke the Performance Security without causing any notice to the Seller to this effect. The amount of liquidated damage as stipulated above is a pre-estimated genuine loss as agreed by both the parties and shall be payable without any demur and shall not be open for any dispute whatsoever.

Page 29: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 29 of 37

27.4 The liquidated damage as agreed by both the parties as a genuine pre-estimated loss shall be payable on Landed Cost of the materials at NOIDA inclusive of all cost to the extent of default (undelivered portion only in cases where part delivery is acceptable) and commissioning at site is not involved.

28.0 FORCE MAJEURE :

28.1 In the event of either of the parties being rendered unable, wholly or in part by force majeure to carry out its obligations under the agreement when entered into, it is agreed that on such party giving notice and full particulars of such force majeure in writing or by telegram / telex / fax to other party as soon as possible (within maximum one week), after the occurrence of the cause relied on then the obligations of the party giving such notice with proper documentary evidence so far as they are affected by such force majeure, shall be suspended during the continuance of any inability so caused but for no longer period, and such cause as far as possible be remedied with all reasonable effort.

28.2 The term “Force Majeure" as used herein shall mean ‘Acts of God’ including Landslides, Lightning, Earthquake, Fires, Storms, Floods, declared Wars, Blockades, insurrection, riots, Government regulations etc., which are not within the control of the party claiming suspension of its obligations within the meaning of the above Clause 29.1 and which renders performance of the contract by the said party completely impossible.

29.0 DEFAULT :

29.1 In the event of an Contract with the Bidder, if the Bidder/Seller contravenes any of the provisions of the Contract or neglects to carry out his obligations of the Contract, OIL may give notice in writing thereof requiring the Bidder/Seller to remedy the breach within seven days, or within such period as OIL may agree to be reasonable and in the event of Bidder’s/Seller's failing to do so, OIL will be at liberty to purchase the goods elsewhere or have the work which the Bidder/Seller has neglected to do, carried out by some other person at the Bidder’s/Seller's expense. In such an event OIL shall have the right to terminate the Contract.

30.0 TERMINATION : 30.1 In the event of an Contract with the Bidder, OIL shall have the right to terminate the

Contract giving 7 days notice or such reasonable time and in this event shall pay to the Bidder/Seller such sum as shall fully compensate the Bidder/Seller for work carried out by him in performance of the Contract prior to such termination.

31.0 APPLICABLE LAW :

The contract arising out of this tender shall be interpreted in accordance with and governed by the laws of India.

32.0 ARBITRATION :

32.1 All disputes and differences whatsoever arising between the parties out of or relating to

the construction, meaning and operation or effect of this Tender and consequent Contract or the breach thereof shall be mutually settled. However, in case no such mutual settlement is arrived at, the matter shall be settled by arbitration in accordance with the provision of arbitration of the Indian Arbitration & Conciliation Act, 1996 and

Page 30: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 30 of 37

any statutory modification or re-enactment thereof and the Rules made there under and for the time being in force. The venue of arbitration shall be at Duliajan/NOIDA/Delhi unless otherwise agreed by OIL

32.2 In case of dispute with the Seller who happens to be a Public Sector Undertaking, the same shall be resolved as per Department of Public Enterprises (DPE) guidelines.

33.0 BID REJECTION CRITERIA :

The bids must conform to the specifications, terms, and conditions given in the NIT.

Bids shall be rejected in case the items offered do not conform to the required minimum / maximum parameters stipulated in the technical specifications and to the respective international /national standards wherever stipulated. Notwithstanding the general conformity of the bids to the stipulated specifications and terms and conditions, the following requirements shall have to be particularly met by the bidders, without which the offer will be considered as non-responsive and rejected:

33.1 Bidders shall offer firm price through delivery and not subject to variation on any

account. Bids with adjustable price shall be treated as non responsive and rejected.

33.2 Offers with inadequate validity will be rejected.

33.3 Bids received after Bid Closing Date and time shall be rejected. Also, modification of Bids

received after Bid Closing Date/time shall not be considered.

33.4 Offers received from unsolicited parties shall not be considered and rejected.

33.5 Bids shall be typed or written in indelible ink and Original bid shall be signed by the

bidder or his authorised representative on all pages failing which the bid shall be liable for rejection.

33.6 Offers received through Telex / Cable / Fax / E-mail/telephone shall be rejected unless specifically asked for in writing. Similarly offers received as xerox/ photocopy which is not on original letterhead of the Bidder & not duly signed & stamped will be rejected.

33.7 Bids shall contain no interlineation, erasures or overwriting except as necessary to correct errors made by bidder, in which case such corrections shall be initialed by the person (s) signing the bid. Any bid not meeting this requirement shall be liable for rejection.

33.8 Any offer containing incorrect statement will be rejected

33.9 Bids without original Bid Security as per Para 6.0 (wherever called for) and confirmation regarding submission of requisite Performance Security as per Para 7.0 (wherever called for) shall be rejected.

33.10 Bids not submitted in compliance with Special methods of marking & sealing under Two Bid / Two Stage Bidding system mentioned in Para 9.2 (whenever applicable) will be rejected.

Page 31: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 31 of 37

33.11 Bids submitted without all the cost details required vide Annexure III will be rejected.

33.12 Bids not submitted in compliance with Para 4.9.2 regarding submission of samples (whenever applicable) will be rejected.

34.0 BID EVALUATION CRITERIA :

34.1 Bids which are found to be responsive and meeting the requirement both specification wise and terms and conditions in the enquiry will be considered for final evaluation.

34.2 Each item shall be normally evaluated independently unless otherwise stated.

34.3 In the event of computational error between unit price and total price, unit price shall

prevail and adopted for evaluation.

33.4 Similarly, in the event of discrepancy between words and quoted figure, words will

prevail.

33.5 Preference to Public Sector Undertaking and Small Scale Industries etc. will be given as

per prevailing Government Guidelines as applicable on bid closing date. 33.6 At the time of evaluation of the offers, past performance of similar equipment supplied

by the bidder as well as after-sales service, supply of spares, etc. in respect of such equipment by the concerned bidder will be considered / evaluated. If the same are not found to be satisfactory as already communicated to the bidder, the offer may be considered as unacceptable offer and rejected.

33.7 Considering the nature of the item, if the product offered by the lowest acceptable

bidder is not field proven in OIL, purchaser at its discretion may place a trial order to the extent of 25% (maximum) only and balance quantity will be procured from other competitive bidders whose product has been field proven in OIL.

34.0 COMPARISON OF OFFERS :

34.1 Comparison of the bids will be done on ‘total Contract cost’ basis to ascertain the

lowest bid. 34.2 In case of any conflict between the Rejection/Evaluation criteria stipulated here with

that given in the Invitation for Bid, those mentioned in the Invitation for Bid will prevail.

********

Page 32: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 32 of 37

ANNEXURE-III PRICE FORMAT/SCHEDULE To Sr. Adviser(C&P) Oil India Limited Plot No. 19,Sector 16A NOIDA-201301 Tender No. ........................................................................... With reference to your above enquiry we quote our best prices as under :

Item

No. Description of work Qty Unit

Rate

(INR)

Total Amount

(INR)

1 (A+B)

Total lump sum price inclusive of all taxes & duties for design, manufacturing, packing for transportation, inland transportation upto site, complete services of erection, testing & commissioning at site, Operation and Comprehensive maintenance for 05 years including all civil & electrical works

1 Lump sum

Break up of total lump sum price as indicated above.

A.

Supply of Equipments/Materials

A1. Supply of SPV Module (30 KWp) 1 System A2. String type Power Conditioning Units (includes

01 No. spare) 4 No

A3. Super Structure for mounting of SPV Module 30KWp

1 System

A4. Data Logger (Web Connected) 1 Lump sum

A5. Any other item required for completing the above system

1 Lump sum

Total Ex-works price Packing & Forwarding Charges Excise Duty @ Sales Tax @ Other charges (Please specify) Total FOR despatching station Firm freight upto Destination by Road Total F.O.R. Destination Price (A)

B

Erection, Testing, Commissioning, Operation & AMC

B1. Erection, Testing & Commissioning of SPV system 30KWp

1 System

B2. Operation & Comprehensive AMC for 5 years 1 Lump Sum

Applicable Taxes Total Charges for Erection, Testing, Commissioning, Operation & AMC (B)

Grand Total (A+B)

(Rupees ____________________________________________________________________ ___________________________________________ only )

Page 33: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 33 of 37

ANNEXURE-III (Contd.) Excise Tariff No. : Delivery period : Name of manufacturer : Signature & Seal of Bidder Full Name ............................................... Address ............................................. ………………………………. Date : ........................................

Page 34: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 34 of 37

ANNEXURE-IV BID SECURITY FORM Whereas ........................................................................................................... (hereinafter called ‘the Bidder’) has submitted their Bid No. ...................... dated........................ against OIL INDIA LIMITED, NOIDA, INDIA (hereinafter called the Purchaser)’s Enquiry No............................... for the supply of .......................................................................................... (hereinafter called ‘the bid’ ............................................................................ KNOW ALL MEN by these presents that we ............................................ Of ................................................................................................... having registered office at .......................................................................................... (hereinafter called ‘the bank’) are bound unto the Purchaser, in the sum of ........ for which payment will and truly be made to the said Purchaser, the Bank binds itself, its successors and assigns by these presents. THE CONDITIONS of this obligations are : 1. If the Bidder, withdraws their bid during the period of bid validity specified by the

Bidder or 2. If the Bidder, having been notified of the acceptance of their bid by the purchaser during the period of bid validity :

a) fails or refuses to accept the order, or

b) fails or refuses to furnish the performance security. We undertake to pay to the purchaser up to the above amount upon receipt of their first written demand (by way of letter/fax/cable) without the purchaser having to substantiate their demand, provided that in their demand the purchaser will note that the amount claimed by it is due to it owing to the occurrence of one or both of the two conditions, specifying the occurred conditions or conditions. This Guarantee will remain in force upto and including sixty (60) days after the period of bid validity, and any demand in respect thereof should reach the Bank not later than the above date. Sealed with the ............................... Said Bank this .................... day of ... Signature of the Bank.

Page 35: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 35 of 37

ANNEXURE-V PERFORMANCE SECURITY FORM To Oil India Limited Plot No. 19,Sector 16A NOIDA-201301 Uttar Pradesh WHEREAS ..................................................................................... (name of the Seller) hereinafter called ‘the Seller’ has undertaken, in pursuance of order No............ dated .................. to supply ......................................................................... (description of Goods and Services) hereinafter called ‘the Contract’. AND WHEREAS it has been stipulated by you in the said Contract that the Seller shall furnish you with a Bank Guarantee by a recognised Bank for the sum specified therein as security for compliance with the Seller’s performance obligations in accordance with the Contract. AND WHEREAS we have agreed to give the Seller a Guarantee : THEREFORE we hereby affirm that we are Guarantors and responsible to you, on behalf of the Seller, upto a total of ...................................................(amount of the Guarantee in words and figures) and we undertake to pay you, upon first written demand declaring the Seller to be in default under the contract and without cavil or argument sum or sums within the limits of ..................... (amount of Guarantee) as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein. This Guarantee is valid until the .................... day of .......................... Signature of the Bank -----------------------------------------

Page 36: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 36 of 37

ANNEXURE-VI To Sr. Adviser(C&P) Oil India Limited Plot No. 19,Sector 16A NOIDA-201301

Dear Sir, Sub : Your Tender No......................................................... For .................................................. Mr. /Mrs. ........................................................ has been authorised to be present at the time of opening of the above Enquiry due on ................................ at NOIDA on my/our behalf. Yours faithfully,

Page 37: Supply, installation, testing commissioning and ... · 1.0 Solar Photo Voltaic Modules Solar photo voltaic module array shall consist of high efficiency Solar Modules utilizing Crystalline

Page 37 of 37

Annexure-VII

[TO BE FILLED-UP / SUBMITTED BY THE BIDDER ON ITS LETTER HEAD FOR E-REMITTANCE]

Name : Address : Phone No. (Land Line) : Mobile No. : E-mail address : Bank Account No. (in which you want the remittance against your bills)

:

Bank Name : Branch : Address of the Bank : Bank Code : IFSC / RTGS Code of your Bank : NEFT CODE of your Bank : PAN No. : VAT Registration No. : Sales Tax Registration No. : Service Tax Registration No. : We confirm and agree that all payments due to me/us from Oil India Limited can be remitted to our above mentioned Bank Account directly and we shall not hold Oil India Limited if the amount due from Oil India Limited is remitted to wrong account due to incorrect details furnished by us here.

_______________________________ Signature of Bidder with Official Seal

*****************