TK 1425 .58 F472 no.2565d

SUSITM 1I!J)1OILECDIC 'lOner

DRAINAGE STRUCTUU AND WATERWAY DESIGN GUIDELINES

Report by Rarza-Ebasco Suaitna Joint Venture

Prepared for Alaaka Pover Authority

Draft Report September 1984

Page 2: SUSITM 1I!J)1OILECDIC 'lOner

0r-

OoLOLOr-,MM

L

r

SUSITBA HYDROELEctRIC PROJECT

DRAINAGE STRUCTURE AND WATERWAY DESIGN GUIDELINES

Report byHarza-Ebasco Susitna Joint Venture

Prepared forAlaska Power Authority

Draft ReportSeptember 1984

AlaskaResources & InformationLibrary Suite 111

3211Providence DriveAnchorage, AK 99508-4614

Page 3: SUSITM 1I!J)1OILECDIC 'lOner

TABLE OF COIITEJiTS

SECTION/TITLE

1.0 INTRODUCTION

1.1 Setting1.2 Scope1.3 Project Description

PAGE

1-1

1-11-11-2

1.3.11. 3. 2

GeneralWatana Dam and Reservoir

1-21-3

1.3.2.11.3.2.21.3.2.31.3.2.4

Dam SiteTransmission FacilitiesAccess PlanSite Facilities

1-31-41-41-4

1.3.3 Devil Canyon Dam and Reservoir 1-4

1.3.3.11.3.3.21.3.3.31.3.3.4

Dam SiteTransmission FacilitiesAccess PlanSite Facilities

1-41-51-51-6

1.4 Stage 1 Pre-Project Field Investigations 1-6

1.4.11.4.2

Engineering ActivitiesEnvironmental Science Activities

1-61-7

1.5 Stage II Project Construction

2.0 FLOW DETERMINATION

2.1 General2.2 Gaged Watercourses2.3 Ungaged Watercourses

1-8-

2-1

2-12-12-3

2.3.12.3.22.3.32.3.4

GeneralRunoff CoefficientDraining AreaRainfall Intensity

2-32-42-52-i

2.4 Example Peak Discharge Determination 2-10

Page 4: SUSITM 1I!J)1OILECDIC 'lOner

TABLE OF CONTEBTS (cont'd)

SECTION/TITLE

3.0 HYDRAULIC DESIGN

3.1 Introduction3.2 Fish Passage Problems

PAGE

3-1

3-13-1

3.2.13.2.23.2.33.2.4

Excessive Water VelocityInadequate Water DepthExcessive Hydraulic JumpGuidelines for Structures

3-23-23-43-4

3.3 Drainage Structure Design Criteria3.4 Waterway Hydraulics

3-53-7

3.4.13.4.2

GeneralWaterways

3-73-7

3.4.2.1

3.4.2.2

Permissible Non-erodibleVelocity MethodTractive Force Method

3-123-15

3•4 • 3 Cu 1ve rt s 3-24

3.4.3.13.4.3.23.4.3.33.4.3.43.4.3.53.4.3.63.4.3.73.4.3.83.4.3.93.4.3.103.4.3.113.4.3.12

3.4.4 Bridges

3.4.4.13.4.4.2

3.4.4.33.4.4.4

Fish Passing RequirementsScope of GuidelinesCulvert HydraulicsCulverts Flowing with Inlet ControlCulverts Flowing with Outlet ControlComputing Depth of TailwaterVelocity of Culvert FlowInlets and Culvert CapacityProcedure for Selection of Culvert SizeInlet Control NanographsOutlet Control NanographsPerformance Curves

GeneralHydraulics of Constrictions inWatercoursesProcedure for Design of Bridge WaterwayExample

3-243-253-263-273-293-393-403-423-453-503-593-75

3-81

3-81

3-813-893-102

Page 5: SUSITM 1I!J)1OILECDIC 'lOner

30221/TOC840922

TABLE OF COJiTEliITS (conttd)

SECTION/TITLE

REFERENCES

APPENDIX A PROJECT DRAWINGS

APPENDIX B RAINFALL FREQUENCY DATA FOR ALASKA

-iii-

PAGE

4-1

A-I

B-2

Page 6: SUSITM 1I!J)1OILECDIC 'lOner

3022l!TOC840922

No.

2.3.1

2.3.2

3.2.1

3.4.1

3.4.2

3.4.3

3.4.4

3.4.5

TABLES

TITLE Page

Values of Relative Imperviousness 2-5

Runoff Coefficients "C" 2-6

Average Cross Sectional Velocities in Feet/SecondMeasured at the Outlet of the Culvert 3-3

Typical Channel Roughness Coefficients 3-10

Channel Roughness Determination 3-11

Recommended Permissible Velocities for Unlined Channels 3-13

Entrance Loss Coefficients 3-33

Key to Tables for Cland k Values for Each ConstrictionType 3-87

-~v-

Page 7: SUSITM 1I!J)1OILECDIC 'lOner

No.

2.3.1

2.3.2

2.3.3

2.3.4

3.4.1

3.4.2

3.4.3

3.4.4

3.4.5

3.4.6

3.4.7

3.4.8

3.4.9

3.4.10

3.4.11

3.4.12

3.4.13

3.4.14

3.4.15

3.4.16

3.4.17

302211TOC840922

FIGUUS

TITLE

Tc Nomograph for Small Watersheds

Tc Nomograph for Large Watersheds

Upland Method Velocity Determination

Time of Concentration vs Intensity

Waterway Cross Section Measurement

Recommend Permissible Unit Tractive Force for Canalsin Noncohesive Material

Permissible Tractive Force for Coarse NoncohesiveMaterial

Angles of Repose of Noncohesive Material

Tractive Force Ratio K vs Side Slope

The Maximum Tractive Force on a Bed and Sides

Inlet Control

Outlet Control

Culvert Hydraulics Diagram

Culvert Outlet Diagram

Culvert Outlet Submerged

Hydraulic Performance Curves for 48-Inch C.M. PipeCulvert with Projecting Inlet

Definition Sketch of Flow through Constriction

Constriction Types

Type I Opening, Vertical Embankment Vertical Abutment

Subrupts kW & k Curves for Vertical Embankmentand Abutment of Type I Opening

Type II Opening, Embankment Slope 1 to 1, VerticalAbutment

-v-

2-8

2-8

2-9

2-11

3-8

3-19

3-20

3-21

3-22

3-23

3-28

3-30

3-35

3-38

3-39

3-77

3-82

3-83

3-92

3-94

Page 8: SUSITM 1I!J)1OILECDIC 'lOner

30221/TOC840922

No.

3.4.18

3.4.19

3.4.20

3.4.21

3.4.22

3.4.23

3.4.24

3.4.25

FIGURES (cout'd)

TITLE

Type II Opening Embankment and Abutment Slope 2 to 1Vertical Abutment

Type III Opening, Embankment and Abutment Slope 1 to 1

Type III Opening, Embankment and Abutment Slope 2 to 1

Type IV Opening, Embankment Slope 1 to 1, VerticalAbutment with Wing Walls

Type IV Opening, Embankment Slope 2 to 1, VerticalAbutment with Wing Walls

Types I-IV Openings, ke, kt and k j cures

The Effect of Channel Roughness on the Backwater Ratiofor Basic - Type Constrictions

The Effect of Constriction on the Backwater Ratio

-V:L-

3-95

3-96

3-97

3-98

3-99

3-100

3-101

3-101

Page 9: SUSITM 1I!J)1OILECDIC 'lOner

DESIGN CHAR.TS

CHART NO. TITLE

1 Headwater Depth for Box Culverts with Inlet Control

2 Headwater Depth for Concrete Pipe Culverts with InletControl

3 Headwater Depth for Oval Concrete Pipe Culverts withLong Axis Horizontal with Inlet Control

4 Headwater Depth for Oval Concrete Pipe Culverts withLong Axis Vertical with Inlet Control

5 Headwater Depth for C.M. Pipe Culverts with InletControl

6 Headwater Depth for C.M. Pipe Arch Culverts withInlet Control

7 Headwater Depth for Circular Pipe Culverts withBevelled Ring Inlet Control

8 Head for Concrete Box Culverts Flowing Full n=.012

9 Head for Concrete Pipe Culverts Flowing Full n=.012

10 Head for Oval Concrete Pipe Culverts Long AxisHorizontal or Vertical Flowing Full n=.Ol2

11 Head for Standard C.M. Pipe Culverts FlowingFull n=.024

12 Head for Standard C.M. Pipe Arch Flowing Full n=.024

13 Head for Structural Plate C.M. Pipe Culverts FlowingFull n=0.03028 to 0.0302

3-52

3-53

3-54

3-55

3-56

3-57

3-58

3-62

3-63

3-64

3-65

3-66

3-67

14 Head for Structural Plate C.M. Pipe Arch Culverts 18 in.Corner Radius Flowing Full n=0.0327 to 0.0306 3-68

3022l!TOC840922

15

16

17

Q/B vs dc

Critical Depth Circular Pipe

Critical Depth Oval Concrete pipe Long Axis Horizontal

-vu.-

3-69

3-70

3-71

Page 10: SUSITM 1I!J)1OILECDIC 'lOner

3022l!TOC840922

DESIGN CHARTS (cont'd)

CHART NO. TITLE Page

18 Critical Depth Oval Concrete Pipe Long Axis Vertical 3-72

19 Critical Depth Standard C.M. Pipe-Arch 3-73

20 Critical Structural Plate C.M. Pipe-Arch 18 inch CornerRadius 3-74

-viii-

Page 11: SUSITM 1I!J)1OILECDIC 'lOner
Page 12: SUSITM 1I!J)1OILECDIC 'lOner

DRAINAGE ST1WCTU'iE AID WAIEi.WAY DESIGN GUIDELINES

1.0 INTRODUCTION

1.1 SETTING

This manual is intended to be used by design engineers during the

preparation of contract plans and specifications for Alaska Power Authority

projects. The guidelines ~n the manual incorporate State-of-the-Art

Engineering Practices and procedures, and also incorporate Alaska Department

of Fish and Game 1981 proposed habitat regulations where appropriate.

Although the manual is organized in such a way that it is applicable to any

Alas ka Power Authority project in ge ne r a L, nevertheless it contains much

detailed information which can be used directly ~n the preparation of

contract documents for any specific project.

1.2 SCOPE

The purpose of these best practices guidelines i s to establish the proper

procedures for drainage structures and waterways required tor implementation

of a major construction project using-the Susitna Project as an example.

Drainage structures considered in these guidelines will consist of culverts,

waterways, and the waterways beneath bridges which are required to implement

temporary or permanent access to project features. The drainage structures

and pertinent waterway work will be classi fied by the type of fish

utilization that occurs in the watercourse where the project feature is

proposed. These types are:

Type A: Watercourse that i s used by anadromous f ish during any period

of the year.

3022l/l840922

1-1

Page 13: SUSITM 1I!J)1OILECDIC 'lOner

Type B: Watercourse that is utilized by resident fish during any

period of the year.

Type C: Watercourse that has no history of being used by anadromous or

re s ident fi sh ,

Waterway work for Type A and B watercourses will be limited to the necessary

adjustments in the watercourse at the inlet and out let of the drainage

structure to assure efficient hydraulic condi tions, fish movement, and to

preclude deleterious sediment transport or deposition in or around the

drainage structure. Waterway work for Type C watercourses can in some cases

be more extensive in that a collector system may be required to channel

surface runoff to the watercourse in question. A typical example of this is

an interceptor ditch along a roadway or waterway work associated with

diverting the watercourse during the construction of the drainage

structure.

The watercourse work will be divided into two distinct stages. Stage I will

be the field investigations and design. During this stage, site specific

investigation results and design criteria will be presented to secure the

necessary permits from the Alaska Department of Fish and Game and any other

permits ie., CIRI, State of Federal. Stage II would be the construction of

the drainage structure of waterway.

1.3 PROJECT DESCRIPTION (Example)

1.3.1 General

The Susitna Hydroelectric Project, located on the Susitna River

approximately 60 miles northeast of Anchorage, will consist of two dams and

reservoirs and ancillary features necessary for field investigation, design,

site access, construction, operation and transmission of energy to the

30221/1840922

1-2

Page 14: SUSITM 1I!J)1OILECDIC 'lOner

l

centers of Anchorage and Fairbanks. The Federal Energy Regulatory

Ccmmission License Application Project No. 7114-000 as accepted July 29,

1983 included both Watana and Devil Canyon. Watana is located at river mile

184 on the Susitna River and 1S to be initiated first. Devil Canyon,

located at r1ver mile 152 is scheduled to begin seven years after

commencement of Watana Construction.

1 .3.2 Watana Dam and Reservoir

1.3.2.1 Dam Site The Watana Dam, Figure A-I Appendix A, will create a

reservoir approximately 48 miles long, with a surface area of 38,000 acres,

and a gross storage capacity of 9,500 acre-feet at Elevation 2185, the

normal maximum operating level.

The dam will contain a rolled embankment, earth and rock fill structure,

with a central impervious core. The design crest elevation of the dam will

be 2205, which results in a max unum height of 885 feet above the foundation

and a crest length of 4,100 feet. During construction, the river will be

diverted through two concrete-lined diversion tunnels, each 36 feet 1n

diameter and 4,100 feet long, on the north bank of the river.

The power intake will also be located on the north bank with a bi-level

approach channel excavated in rock, serving it and the spillway. Turbine

discharge will flow through six draft tube tunnels to surge chambers

downstream from the powerhouse. The surge chambers will discharge to the

river through two concrete-lined tailrace tunnels. The spillway located to

the north of the power intake will consist of an upstream ogee control

structure with three radial gates and an inclined concrete chute and flip

bucket.

Emergency release facilities will be located in one of the diversion tunnels

to allow lowering of the reservoir over a period of time to permit emergency

inspection or repair of impoundment structures.

30221/1840922

1-3

Page 15: SUSITM 1I!J)1OILECDIC 'lOner

1.3.2.2 Transmission Facilities. The project transmission facilities will

deliver power fran the Susi tna River basin generating plants to the major

load centers at Anchorage and Fairbnks in an economical and reliable manner.

The facilities will consist of overhead transmission lines, underwater

cables, switchyards, substations, a load dispatch center, and a

communications system.

1.3.2.3 Access Plan. Access to the project site (See Figure A-3, Appendix

A) will connect with the existing Alaska Railroad at Cantwell where a

railhead and storage facility occupying 40 acres will be constructed.

1.3.2.4 Site Facilities. Included among the site facilities will be a

combination camp and village that will be constructed and maintained at the

project site. The camp/village will be a largely self-sufficient community

housing 3300 people during construction of the project.

Permanent facilities required will include a permanent town or

community for approximately 130 staff members and their families.

permanent facilities will include a maintenance building for use

subsequent operation of the power plant.

small

Other

during

A plan showing the location of the campi vi llage and the permanent town 1.S

shown on Figure A-I, Appendix A.

1.3.3 Devil Canyon Dam and Reservoir

1.3.3.1 Dam Site. The Devil Canyon dam and surrounding area in relation

to main access facilities and camp facilities are shown on Figure A-4,

Appendix A.

The Devil Canyon Dam will form a reserV01.r approximately 26 miles long with

a surface area of 7,800 acres and a gross storage capacity of 1,000,000

acre-feet at Elevation 1455, the normal maximum operating level.

30221/1840922

1-4

Page 16: SUSITM 1I!J)1OILECDIC 'lOner

The dam will be a thin-arch concrete structure with a crest elevation of

1463 (not including a three-foot parapet) which results 1n a maximum height

of 646 feet. An earth-and rockfill saddle dam will provide closure to the

south bank. The saddle dam will be a central core type earth and over fill

similar in cross section to the Watana Dam. The dam will have a nominal

crest elevation of 1469. The maximum height above foundation level of the

dam is approximately 245 feet.

During construction, the river will be diverted by means of a single 30-foot

diameter concrete-lined diversion tunnel on the south bank of the river.

A power intake on the north bank will consist of an approach channel

excavated in rock leading to a reinforced concrete gate structure. The

turbines will discharge to the river by means of a single 38-foot diameter

trailrace tunnel leading from a surge chamber downstream from the powerhouse

cavern.

Outlet facilities consisting of seven individual outlet conduits will be

located in the lower part of the main dam. The spillway will also be

located on the north bank. As at Watana, this spillway will consist of an

upstream ogee control structure with three radial gates and an inclined

concrete chute and flip bucket.

1.3.3.2 Transmission Facilities.

Transmission lines will be built between the Devil Canyon switchyard and the

Gold Creek switching station.

1.3.3.3 Access Plan. Access to the Devil Canyon site (See Figure A-3,

Appendix) will consist primarily of a rai lroad ex tension from the ex isting

Alaska Railroad at Gold Creek to a railhead and storage facility adjacent to

the Devil Canyon camp area.

30221/1840922

1-5

Page 17: SUSITM 1I!J)1OILECDIC 'lOner

1.3.3.4 Site Facilities. The construction of the Devil Canyon Dam will

require various facilities to support the construction activities throughout

the entire construction period.

As described for Watana, a construction camp will be constructed and

maintained at the project site. The camp/village will provide housing and

living facilities for 1,800 people during construction. Electric power will

be provided from Watana. A plan showing the location of the camp/village is

shown on Figure A-4, Appendix A.

1.4 STAGE I PRE-PROJECT FIELD INVESTIGATIONS

During the feasibility and licensing phase of the Susitna Project

investigations in the areas described in section 1.3 "Project Description",

will be necessary to design and construct the Project. This time frame is

defined herein as Stage I and involves activities i n the engineering and

environmental sciences. All such activities would be conducted under the

applicable technical and regulatory permits required by Federal, State,

and/or local authorities.

1.4.1 Engineering Activities

The principal activity during this stage would be subsurface exploration for

the major project features at Watana including improvements to the present

camp site which could also include the development of a temporary airstrip.

The geotechnical explorations will include damsite subsurface drilling,

monitoring, dozer or backhoe excavation of inspection trenches, geophysical

surveys and investigation of quarry materials and borrow materials. The

above activities (except for quarry and borrow area development) can be

accomplished with light equipment, helicopter transport or with special

ground transport equipment. Whereas quarry and borrow_area development may

require heavier equipment and access crossing natural waterways or earthwork

which could impede drainage courses. In these instances drainage structures

30221/1840922

1-6

Page 18: SUSITM 1I!J)1OILECDIC 'lOner

will be designed and constructed using the criteria established Ln Section

2.0 and 3.0 of these guidelines.

The temporary ai.r field will require the design and construction of a

drainage collector system and perhaps drainage structures to insure that

surface runoff will reach the existing drainage features. Criteria for this

design is presented in sections 2.0 and 3.0.

The preceeding is an estimate of what will be the Stage I engineering work

requiring drainage and waterway design.

1.4.2 Environmental Study Activities

Environmental science activities will consist of aquatic, terrestrial, and

cultural resource field investigations.

Environmental science activities involve most areas of the Susitna Project.

The biological studies encompass both aquatic and terrestrial programs. The

aquatic studies are concentrated on the mainstem Susitna River from the

Oshetna River (the upstream boundary of the reservoir impoundment) to Cook

Inlet. In addition, tributaries within this reach, lakes within the

proposed impoundment areas and streams along the proposed access road are

being studied. The primary terrestrial study area includes that portion of

the Susitna Basin that lies within about 15 miles of the Susitna River from

Gold Creek to the Oshetna River mouth. In addition, studies are being

conducted within the Susitna River floodplain between Gold Creek and Cook

Inlet. Cultural resource studies would be conducted primarily in the

vicinity of the impoundment areas, along the access roads, railway and

transmission line routes.

These activities will not involve ground distrubance nor require culvert or

bridges; hence waterways and drainage courses will not-be affected.

30221/1840922

1-7

Page 19: SUSITM 1I!J)1OILECDIC 'lOner

1.5 STAGE II PROJECT CONSTRUCTION

The Alaska Power Authority and their engineering consultant will prepare

engineering design memoranda, construction drawings and specifications for

the features described in 1.3.2 Watana Dam and Reservoir. In project

features requiring drainage structures or waterways, the technical criteria

presented in these guidelines will be incorporated, and used in the design

memoranda, and construction contract documents.

3022111840922

1-8

Page 20: SUSITM 1I!J)1OILECDIC 'lOner
Page 21: SUSITM 1I!J)1OILECDIC 'lOner

2.0 FLOW DETEKKlHAIIOI

2.1 GENERAL

In this section. the methodologies for determining the flow i.n a waterway

for a specified recurrence frequency are discussed.

2.2 GAGED WATERCOURSES

The U.S. Geological Survey, in cooperation with the Alaska Department of

Transportation and Public Facilities and other State and Federal Agencies.

maintains a network of stream gaging stations and crest gages throughout the

State of Alaska. The data obtained from these programs is published in

Water Resources Data for Alaska. Part 1. Surface Water Records. The U.S.

Geological Survey has published computer print-outs of frequency-discharge

curves for all stations with satisfactory length of record. Data obtained

from the stream gaging program has been used to formulate· a report that

presents regional flood frequency curves for most sites in Alaska. The

publication contains Magni tude and Frequency of Floods in Alaska South of

the Yukon River, Geological Survey Circular 493.

In the case where a site 1.S being investigated on a waterway that has a gage

and historical records of flow. the drainage area above the site will be

compared with that above the gage to determine if there is compatibility 1.n

the factors that affect runoff for the two areas. Factors that affect

runoff can be grouped into two major categories; climatic. which for the

purposes of these guidelines may have little or no incidence. and physio­

graphic. Climatic factors mainly include the effects of rain. temperature.

and evapotranspiration. all of which exhibit seasonal changes in accordance

with the climatic environment. Physiographic factors may be further

classified into two kinds: basin characteristics and channel

characteristics. Basin characteristics include such factors as size, shape.

30221/2840922

2-1

Page 22: SUSITM 1I!J)1OILECDIC 'lOner

drainage area, permeability and capacity of groundwater reservoirs, presence

of lakes and swamps, land use, etc. Channel characteristics are related

30221/2840922

mostly to hydraulic properties of the channel which govern the movement and

configuration of flood waves and develop the storage capacity. It should be

noted that the above classification of factors are interdependent to a cer­

tain extent. For clarity, the following is a list of the major factors:

Meteorologic factors

1) Rainfall

a) Intensity

b) Duration

c) Time distribution

d) Areal distribution

e) Frequency

f) Geographic location

2) Snow

3) Temperature

4) Evapotranspiration

Physiographic factors

1) Basin Characteristics

a) Geometric factors

i , Drainage area

2. Shape

3. Slope

4. Stream density

5. Mean Elevation

b) Physical factors

1. Land use or cover

2. Surface infiltration condition

3. Soil type

4. Geological condition, such as the permeability and

capacity of groundwater reservoir

5. Topographical condition, such as the presence of lakes,

swamps, and glaciers.

2-2

Page 23: SUSITM 1I!J)1OILECDIC 'lOner

2) Channel characteristics

a) Carrying capacity, considering size and shape of cross sec­

tion, slope, and roughness

b) Storage capacity

If there is no significant difference i n these factors for both drainage

areas above the site or above the existing gage, the flow at the site can be

computed for the specified frequency by multiplying the gaged flow by the

ratio of the squares of drainage areas.

Qs = Qg(A )1/2

s

(A )1/2g

Qs = Site flow

Qg = Gage flow

As = Site drainage area

Ag = Gaged drainage area

In cases where compatibility in the factors cannot be readily ascertained,

the staff hydrologist should be consulted or the flow determination be made

using the methodology for ungaged watercourses outlined in the succeeding

paragraph.

2.3 UNGAGED WATERCOURSES

2.3.1 General

The relation between rainfall and peak runoff has been represented by many

empirical and semiempirical formulas. The rational formula which will be

30221/2840922

used in these guidelines can be taken as representative of these formulas.

The rational formula is:

2-3

Page 24: SUSITM 1I!J)1OILECDIC 'lOner

Q = CIA

where Q is the peak discharge in cubic feet per second (cf s ) , C a runoff

coefficient dependent on the physiographic conditions of the drainage area,

the average rainfall intensity (I) in inches per hour and A is the drainage

area in acres.

In using the rational formula it is assumed that the maximum rate of flow,

due to a rainfall intensity over the drainage area, is produced by that

rainfall intensity being maintained for a time equal to the period of con­

centration of flow at the point under consideration (Tc).

The elements involved in runoff are far more complicated than the rational

formula indicates. In larger drainage areas the temporary storage of storm

water in overland travel toward stream channels and in these channels them­

selves accounts for a considerable reduction in the peak discharge rate. It

is for this reason the Alaska Department of Highways recommends that use of

this method be restricted to drainage areas less than 200 acres unless no

other method is available to estimate discharges.

The remainder of this section will be dedicated to quantifying the para­

meters used in the rational formula.

2.3.2 Runoff Coefficient

The rational formula runoff coefficient (C) is the ratio of runoff to the

average rate of rainfall at an average intensity when all the drainage area

is contributing. Since this is the only manipulative parameter in the

rational formula, judgement in its selection should reflect the physiogra­

phic factors listed in paragraph 2.2.

30221/2840922

2-4

Page 25: SUSITM 1I!J)1OILECDIC 'lOner

Table 2.3.1 presents values of relative imperviousness for various surfaces.

In Table 2.3.2 the runoff coefficient C can be determined by weighting

physiographic factors (watershed characteristics) and summing them.

Table 2.3.1 Values of Relative Imperviousness

Type of Surface

For.all watertight roof surfacesFor asphalt runway pavementsFor concrete runway pavementsFor gravel or macadam pavements

*For impervious soils (heavy)*For impervious soils, with turf*For slightly pervious soils*For slightly pervious soils, with turf*For moderately pervious soils*For moderately pervious soils, with turf

*For slopes from 1% to 2%

Factor C

0.75 to 0.950.80 to 0.950.70 to 0.900.35 to 0.700.40 to 0.650.30 to 0.550.15 to 0.400.10 to 0.300.05 to 0.200.00 to 0.10

To account for antecedent precipitation conditions, as reflected by the fre­

quency of the selected rainfall intensity, a correction factor Ca should

be multiplied with the runoff coefficient C. Values of Ca for various re­

currence intervals are listed below:

RecurrenceInterval

(Years)

2 to 102550

100

.fa

1.01.11.21.25

30221/284U922

In no case should the product C x Ca exceed 1.

2.3.3 Drainage Area

The drainage area, in acres, which contributes to the site for which the

discharge is to be determined, can be calculated from~ topographic map or

2-5

Page 26: SUSITM 1I!J)1OILECDIC 'lOner

Thble 2.3.2 RUNOFF COEFFICIENTS "c"

Runoff Producing Characteristics of Watershed With ODrresponding Weights

Z,I

G",

Designation ofWatershed

Characteristics

Relief

Soil

Vegetal cover

Surface Storage

Extreme75 to 100%

(40)St e e p , rugged terrain,with average slopesgenerally above 30%.

(20)No effective soil cover;either rock or thin soilmantle of negligible in­filtration capacity.

(20)No effective plant cov­er; bare or very sparsecover.

(20)Negligible, surface de­pressions few and shal­low; drainageways steepand small; no ponds ormarshes.

High50 to 75%

(30)Hilly, with averageslopes of 10 to 30%.

(15)Slow to take up water;clay or other soil lowinfiltration capacity.

(15)Poor to fair; clean­cultivated crops orpoor natural cover;less than 10% ofdrainage area undergood cover.

(15)Low; well-defined sys­tem of small drainage­ways; no ponds ormarshes.

Normal30 to 50%

(20)Rolling, with averageslopes of 5 to 10%.

(10)Normal; deep permeablesoils.

(10)Fair to good; about50% of drainage areain good grassland,woodland, or equiva­lent cover; not morethan 50% of area inclean-cultivated crops.

(10)Normal; considerablesurface depressionstorage; drainage sys­tem similar to that oftypical prairie lands;lakes, ponds, andmarshes less than 2%of drainage area.

Low25 to 30%

(10)Relatively flat land, withaverage slopes of 0 to 5%.

(5 )Hlgh; sands, loamy sandsand other loose, opensoils.

(5)Good to excellent; about90% of drainage area ingood grassland, woodland,or equivalent cover.

(5)High; surface depressionstorage high; drainagesystem not sharply defined;large floodplain storageor a large number of lakes,ponds, or marshes.

Page 27: SUSITM 1I!J)1OILECDIC 'lOner

from measurements taken in the field. If the former is used, a site visit

should be programmed to gather information to be used in determining the

runoff coefficient C and the parameters that will affect the value of the

selected rainfall intensi ty , Also, the si te visi t , literature review and

discussions with fisheries resource managers should be used to ascertain the

type of water course. (see 1.2 Scope).

2.3.4 Rainfall Intensity

Rainfall intensity, for the drainage area in question can be estimated for

specific recurrence intervals (frequency) from the isohyetal maps 1n

Appendix B. The average rainfall I used t n the rational formula depends

upon size and shape of the drainage area, the land slope, type of surface,

whether flow is overland or channelized as'well as the rainfall intensity.

The former factors are instrumental in determining the time of concentration

(T c) for the drainage area.

The theory underlying the developnent of the rational formula 1S that the

maximum discharge at any point in a drainage system occurs when:

1. The entire area tributary to the point 1S contributing to the

flow.

2. The average rainf all intensi ty producing such flow is based upon

the rainfall which can be expected to fall in the time req uired

for water to flow from the most remote point of the area to the

point being investigated. The "most remote point II is the point

from which the time of flow is greatest. It may not be at the

greatest linear distance from the point under investigation.

Nanographs .for the determination of time of concentration Tc for small and

large drainage areas are presented in Figures 2.3.1 and 2.3.2 respectively.

These nomographs utilize the length of travel (L) in feet and the difference

in elevation (H) in feet between the beginning and end point.

30221/2840922

2-7

Page 28: SUSITM 1I!J)1OILECDIC 'lOner

150

Tc,min200

150

100

80L,ft

10,000 6050

405,000

30

c 25~O .2 20........ "§2,000 -... C 15

II1,500 v

e0

U 101,000 '0 8- II

Ei= 6

500 5

4300

3200

150 2

100

EXAMPLEHeiQht =100ftLenQth ~ 3,OOOftTime of concentration -14 Min

10

2

3

100................

................E~PlE-...

................ -­II>

Note: ~

Use nomograph Tc for natural ....basins with well defined chonnels, 0

for overlond flow on bar. ~.arth,ond for mowed ora.. road- ~

side channels ....For overland flow, orau.d sur- 5

foe.., multiply Tc by 2__ .55 For overland flow, cmrc'r.te or ~

.. - OiPhciit surfac.. , multiply Tc ~by 0.4

For concrete channels, multiplyTc by 0.2

'"o~

c'0CL.

II

'0EII

'"

,]:;oII>o

.I:J-c

Ba.ed an .tudy by P.Z. Kirpich,Civil £ngin-.ring, Vol. 10, No.6, Jun. 1940, p.~62

Fig. 2.3.1 Tc Nomograph for Small Watersheds

10

40,000 108

30,000 6

420

20,000 330

2 Ul.. 40;:,

10,0000s:

1.0 .s8,000 .8 o 60

I-- __ .6806,000

~- - - - - __f::~,"!,~e100 =4,000 3 --. '3£=..i 3,000 .2

200

2,000 0.1300

400

1,000

800 Example 600L = 7,250 It

800600 H=130ftthen Tc = 0.57 hr 1,000

Fig. 2.3.2 Tc Nomograph for Large Watersheds

2-8

Page 29: SUSITM 1I!J)1OILECDIC 'lOner

The time of concentration of the preceeding nomographs may be calculated by

the following equation:

T ~ .0078 (L )0.77c l' H/L"""'

where Tc is in minutes. The Tc calculated by the preceeding methods

assumes a natural drainage basin with well defined channels, for overland

flow on bare earth, and for mowed grass road side channels. If the overland

flow is on grassed surfaces multiply the Tc by 2. For overland flow on

concrete or asphalt surfaces multiply Tc by 0.4. For concrete channels,

multiply Tc by 0.2.

Alternatively travel times for overland flow in watersheds with a variety of

land covers can be calculated by the Uplands Method. (See Figure 2.3.3).

The individual times are calculated from the velocity for each ground cover

and the summation of the time giving the time of concentra-

40

30

20

i:•u..10•"" 9.s 8

• 7j 6en 5

4

3

2

1.0

0.5..Nc::i

tion Tc'

Figure 2.3.3 Upland Method Velocity Determination

2-9

Page 30: SUSITM 1I!J)1OILECDIC 'lOner

With the time of concentration calculated and the rainfall intensity for the

area selected (Appendix B) the average rainfall intensity for the drainage

area may be determined using Figure 2.3.4. The curve for the selected one

hour rainfall is followed to the right or left until reaching the calculated

time of concentration and the average rainfall intensity (I) can be

determined.

2.4 EXAMPLE PEAK DISCHARGE DETERMINATION

As an example of the use of the Rational Method, a hypothetical drainage

area and its characteristics are used.

A drainage area of 40 acres with a distance from its most remote point being

measured as 2500 feet of which 500 feet is overland flow in forests with

heavy ground litter having an average slope of 5%. The remaining 2000 feet

can be classified as in a natural basin with well defined channels with a

drop in elevation of 150 feet.

Watershed characteristics: Reference Table 2.3.2

Relief; Flat to rolling land averageslope approximately 7 percent 0.15

Soil; Medium soil permeabilities 0.18

Vegetal cover; 25% of the area undergood cover 0.13

Surface Storage; Well defined systemof drainage ways on50% of area, negligibleon remainder

Sum C =

0.17

0.63

30221/2840922

It is required to determine the runoff for recurrence periods of 2, 10 and

50 years for a location 100 miles north of Anchorage. Referring to Appendix

2-10

Page 31: SUSITM 1I!J)1OILECDIC 'lOner

,...•• 0

,

'1 !T,

1.41·11.2I .110090.80.70.6

0.5

041

2

Iii'

';.....I .s::. _;

-0-< -:a ~-itlitttttitttiJtt-

2oommm

f) 0-

19

b

~ll JillIf II

EWtt#llll

._-

.4£J:::i::i::HttH

.It I I I I II" '1'1"'"11

,-Fig. 2.3.4

Page 32: SUSITM 1I!J)1OILECDIC 'lOner

" l

B Figures B2, B4 and B6 we estimate 0.4, 0.6 and 0.7 inches per hour

respectively.

Time of concentration Tc)

Overland flow Figure 2.3.3 yields a velocity of 0.6 ft/sec.

The Remaining route of 2000 feet and 150 feet of drop from Figure 2.3.1 give

9 minutes.

Time of concentration

= 22.9 minutes500 ftT c = 9 + _

0.6 ft/sec 60 sec

Average Rainfall Intensity (I)

Referring to Figure 2.3.4 with the given rainfall intensities the average

rainfall intensities (I) can be derived as follows:

FrequencyOne hourRainfall

AverageRainfall

Intensity (1)

2 year10 year50 year

0.4 in.O. 6 m ,O. 7 m ,

0.72 i n ,1.25 in.1.48 i.n ,

Runoff Calculations

Two year frequency

Q = CIA = 0.63 x 0.72 x 40 = 18.14 ft 3jsec

30221/2840922

2-12

Page 33: SUSITM 1I!J)1OILECDIC 'lOner

Ten year freq uency

Q = CIA = 0.63 x 1.25 x 40 = 31.50 ft 3/sec

Fifty year frequency

Q = C Ca* I A = 0.63 x 1.2 x 1.48 x 40 = 44.76 ft 3/sec

*Antecedent precipitation correction factor see paragraph 2.3.2.

30221/2840922

2-13

Page 34: SUSITM 1I!J)1OILECDIC 'lOner
Page 35: SUSITM 1I!J)1OILECDIC 'lOner

3.0 HYDRAULIC DESIGN

3.1 INTRODUCTION

An effective drainage structure and waterway design process involves many

factors. principal of which are hydraulic performance. structural adeq uacy

and overall construction and maintenance costs. The design process will

incl ude an assessment by a fisheries biologist to determine whether the

water course is a fish stream. Type A or Type B. (see section 1.2-Scope).

A fish stream is defined as any water flow that is accessible to fish and

capable of supporting aquatic life. This would include. but is not limited

to. all Alaska Department of Fish and Game designated streams and all their

tributaries up to impassab l e natural barriers. Type A freshwater systems

above blockages may also support resident fish stocks. Evaluation and

recommendations will be made by a fisheries biologist during site location

to determine the presence of fish stocks.

If the waterway is classified as either Type A or Type B the following cri­

teria should be included in the design process.

3.2 FISH PASSAGE PROBLEMS

The efficient passage of fish through a drainage structure req U1 res close

attention to the resolution of three problems:

1. Excessive water velocity

2. Inadequate water depth

30221/3840922

3-1

Page 36: SUSITM 1I!J)1OILECDIC 'lOner

3. Excessive hydraulic jump

3.2.1 Excessive Water Velocity

Excessive water velocities can block fish movement simply by exceeding the

swimming ability of fish. Swimming ability varies with species, size and

age of fish, and length of drainage structure (culvert). Studies of fish

movement have provided the information presented on Table 3.2.1.

Slope is the most important factor determining velocity in culverts. Slopes

steeper than 0.5 percent (1/2 foot drop in 100 feet) generally create exces­

sive velocities for fish passage.

3.2.2 Inadequate Water Depth

Fish require sufficient water depth to attain maxunum swimming abilities.

The depth required is directly related to fish size with larger fish requir­

ing deeper water. When insufficient depths are encountered, fish are unable

to produce full propulsion.

Causes of inadequate depth. The two most frequently encountered reasons for

insufficient water depth are steep slope and a wide, flat channel bottom (no

low flow channel).

a. All other factors being constant, the steeper the slope of a structure

the shallower the water depth.

b. All other factors being constant, the wider the structure bottom the

shallower the water depth.

30221/3840922

3-2

Page 37: SUSITM 1I!J)1OILECDIC 'lOner

Table 3.2.1

AVERAGE CROSS SECTIONAL VELOCITIES IN FEET/SECOND MEASUREDl/AT THE OUTLET OF THE CULVERT

Length ofCulvertin Feet

Group I

Upstream mi­grant salmonfry and fin­gerlings whenups team mi­gration takesplace at meanannual flood

Group II

Adult and juvenileslow swimmers:grayling, longnosesuckers, whitefish,burbot, sheefish,Northern pike,Dolly Varden/ArcticChar, upstreammigrant salmon fryand fingerlings whenmigration not a~

mean annual flood

Group III

Adult mode­rate swim­mers: pinksalmon, chumsalmon, rain­bow trout,cutthroattrout

Group IV

Adult highperformanceswimmers:king salmon,coho salmon,sockeye sal­mon, steel­head

30221/2840922

1/

30 1.0 4.6 6.8 9.9

40 1.0 3.8 5.8 8.5

50 1.0 3.2 5.0 7.5

60 0.9 2.8 4.6 6.6

70 0.8 2.6 4.2 6.0

80 0.8 2.3 3.9 5.5

90 0.7 2.1 3.7 5.1

100 0.7 2.0 3.4 4.8

150 0.5 1.8 2.8 3.7

200 0.5 1.8 2.4 3.1

200 0.5 1.8 2.4 3.0

Title 5 Fish and Game Part 6 Protection of Fish and Game HabitatChapter 95 - Alaska Department of Fish and Game

3-3

Page 38: SUSITM 1I!J)1OILECDIC 'lOner

Minimum water depths required for instream movement of juveniles will vary

with species and size of fish present. Generally, 0.2 foot (2.4 inches) ~s

sufficient for passage. Minimum water depths for adult fish are: lJ

King Salmon-0.8 feet

Other salmon and trout over 20 inches-0.6 feet

Trout under 20 inches-0.4 foot

3.2.3 Excessive Hydraulic Jump

The two basic causes for a hydraulic jump at the downstream end of a

structure are bed scour and slope of structure placement.

a. Degradation of the streambed below the. structure can result in lowering

the water surface below the downstream end of the structure. This

occurs most frequently in steep gradient streams with erodible bottom

materials. Degradation of a receiving waterway can create a hydraulic

jump at a downstream end of the structure.

tributary.

b. Placement of a flat sloped structure on a steep sloped waterway builds

in a jump.

3.2.4 Guidelines for Structures

Location: The guidelines for locating structures for fish passage are also

coincidental with those for hydraulic design.

1. There should not be a sudden increase i.n velocity immediately above,

below, or at the crossing.

2. Structures should not be located on a sharp bend ~n the stream channel.

1/ Lauman, J.E. Salmonid Passage at Stream - Road Crossings: A Reportwith Department Standards for Passage of Salmonids. 1976 Department ofFish and Wildlife Portland Oregon.

30221/3840922

3-4

Page 39: SUSITM 1I!J)1OILECDIC 'lOner

3. Structures should be designed to fit the stream channel alignment.

They should not necessitate a channel change to fit a particular cross

ing design.

3.3 DRAINAGE STRUCTURE DESIGN CRITERIA

All drainage structures in waterways an which fish are known to freq uent

(Type A or B) shall be designed in accordance with the following criteria:

Water-

course Flood

Type Frequency

A

B

C

2 year

10 years

50 years*

Maximum velocity per Table 3.2.1 group and twice the

depth of flow per paragraph 3.2.2

No static head at culvert entrance

Allowable pondage at site

* In the case that the drainage structure is at a primary road or railway

the flood frequency is to be 100 years.

Drainage structures 1.n waterways where there are no anadromous fish will be

designed for criteria Band C above. Drainage structures that are

classified as temporary, meaning that they will be removed and the habitat

rehabi l i tated wi thin a 10 year period wi 11 be designed for the preceedi ng

criteria except that the flood frequency of criteria C will be 25 years.

Drainage structures in fishery streams shall be placed with the waterway

substrate in its invert. In the case of culverts, at least one fifth of the

diameter of each round culvert and at least 6 inches of the height of each

elliptical or arch type culvert is to be set below the stream bed at both

the inlet and outlet of the culvert. The above is not applicable to bottom

less arch type culverts. In the case of a rock substrate, a request for

30221/3840922

3-5

Page 40: SUSITM 1I!J)1OILECDIC 'lOner

variance should be submitted to the Alaska Department of Fish and Game

(ADF&G) for approval.

A drainage structure design data sheet, tabulating information for each

site, prepared by a fisheries biologist and a design engineer will be sub­

mitted to ADF&G for approval and approved prior to undertaking any construc­

tion. (See end of 3.4.3.8, Inlets and Culvert Capacity.)

The drainage structure design will require the following conditions to be

adhered to during its construction.

a. All bank cuts, slopes, fills and exposed earth work attributable to

installation in a waterway must be stabilized to prevent erosion during

and after construction.

b. The width and depth of the temporary diverison channel must equal or

exceed 7S percent of the width and the depth, respectively, of that

portion of the waterway which is covered by ordinary high water at the

diversion site, unless a lesser width or depth is specified by the

ADF&G on the permit for activities undertaken during periods of lower

flow;

c. During excavation or construction, the temporary diversion channel must

be isolated from water of the waterway, to be diverted, by natural

plugs left ~n place at the upstream and downstream ends of the

diversion channel.

d. The diversion channel must be constructed so that the bed and banks

will not significantly erode at expected flows.

e. Diversion of water f low into the temporary diversion channel mus t be

conducted by first removing the downstream plug then removing the up­

stream plug, then closing the upstream end and then the downstream end,

respectively, of the natural channel of the diverted waterway.

30221/3840922

3-6

Page 41: SUSITM 1I!J)1OILECDIC 'lOner

f. Rediversion of flow into the natural stream must be conducted by remov­

ing the downstream plug from the natural channel and then the upstream

plug, then closing the upstream end and then the downstream end, re­

spectively, of the diversion channel.

g. After use, the diversion channel and the natural waterway must be

stabilized and rehabilitated as may be specified by permit conditions.

3.4 WATERWAY HYDRAULICS

3.4.1 General

A field inspection is basic to the design of diversion channels, culverts,

and bridge encroachment into waterways, all of which encompass the drainage

structures to which these guidelines are addressed.

For the design of drainage structures, the hydraulic condi tion of the

prepared structure will be similar to the natural waterway upstream and

downstream of the proposed structure site must be known. The parameters for

a typical section will be measured in the field. During this inspection a

check should be made of downstream controls. At times the tailwater

is controlled by a downstream obstruction or by water stages in another

waterway.

3.4.2 Waterways

This section describes the techniques for investigation of the waterway on

which a drainage structure is to be constructed and the construction

activities for a new waterway such as a temporary diverison channel.

Hydraulic investigation and design of waterways will be based upon Manning's

formula for uniform flow unless existing site conditions indicate that flows

will be non uniform. A full treatment of this subject may be found i.n

30221/3840922

3-7

Page 42: SUSITM 1I!J)1OILECDIC 'lOner

treatment of this subject may be found in Open-Channel Hydraulics by Ven Te

Chow, Mc Graw Hill 1959.

The Manning formula:

v • 1.49 R2/3 Sl/2n

Where: V is the mean velocity in fps;

R is the hydraulic radius ft;

S is the slope of the waterway, and

n is the coefficient of roughness, specifically known as

Manning's n

The discharge in the waterway may be determined by multiplying by "A" the

area of the water prism in the formula.

a. Waterway Investigation

A hydraulic rating curve of the waterway should be determined by measuring

the waterway cross section between highwater marks on both sides of the

waterway. If these marks are not visible a high water level should be esti­

mated. Figure 3.4.1 is an example of a waterway cross section measurement.

8' /0' 6' 1" 6' /2' 5'

Figure 3.4.1 Waterway Cross Section Measurement

3-8

Page 43: SUSITM 1I!J)1OILECDIC 'lOner

30221/2840922

From the cross section the area and wetted perimeter should be calculated

for at least 3 levels, or more if the waterway is deep, including the maxi­

mum level.

From the measured slope of the waterway and a determination of waterway

roughness n, the discharges for the selected levels (depth of flows) can be

calculated using Manning's formula. The n values for typical channel condi­

tions are presented in Table 3.4.1 and a method used by the U.S. Soil Con­

servation Service for computing an n value taking into consideration factors

that affect n is presented in Table 3.4.2.

b. Waterway Design

The required capacity of the waterway should be determined by the method

indicated in Section 2.0-Flow Determination. If the waterway IS to be de­

signed for fish passage, the group (Table 3.2.1) and the minimum depth of

flow for instream movement (paragraph 3.2.2) snould be determined.

3-9

Page 44: SUSITM 1I!J)1OILECDIC 'lOner

Table 3.4.1 Typical Channel Roughness Coefficientsl/

Value of n Channel Condition

0.016-0.017

0.020

0.0225

Smoothest natural earth channels, free from growth, withstraigth alignment.

Smooth natural earth channel, free from growth, little curva­ture.

Small earth channels in good condition, or large earth chan­nels with some growth on banks or scattered cobbles in bed.

0.030 Earth channels with considerable growth.with good alignment, fairly constant section.channels, well maintained.

Natural streamsLarge floodway

0.035 Earth channels considerably covered with small growth.Cleared but not continuously maintained floodways.

0.040-0.050 Mountain streams in clean loose cobbles.able section and some vegetation growingchannels with thick aquatic growths.

Rivers within banks.

vari­Earth

0.060-0.075 Rivers with fairly straightbadly obstructed by smallaquatic growth.

alignment and cross section,trees, very little underbrush or

0.100

0.125

0.150-0.200

Rivers with irregular alignment and cross section, moderatelyobstructed by small trees and underbrush. Rivers with fairlyregular alignment and cross section, heavily obstructed bysmall trees and underbrush.

Rivers with irregular alignment and cross section, coveredwith growth of virgin timber and occasional dense patcnes ofbushes and small trees, some logs and dead fallen reese

Rivers with very irregular alignment and cross section, manyroots, trees, bushes, large logs, and other drift on bottom,trees continually falling into channel due to bank caving.

30221/2840922

1/ Design of Small Dams, U.S. Bureau of Reclamation, 1977.

3-10

Page 45: SUSITM 1I!J)1OILECDIC 'lOner

Table 3.4.2 Channel Roughness Determinationl1

Steps

1. Assume basin n2. Select modifying n for roughness or degree of irregularity3. Select modifying n for variation in size and shape of cross section4. Select modifying n for obstructions such as debris deposits, stumps, exposed

and fallen logs5. Select modifying n for vegetation6. Select modifying n for meandering7. Add items 1 through 6

Aids in Selecting Various n Values

1. Recommended basic in valuesChannels in earth------------O.OlOChannels in rock-------------0.015

Channels ln fine gravel------------0.014Channels ln coarse gravel----------0.028

2. Recommended modifying n value for degree of irregularitySmooth-----------------------O.OOO Moderate---------------------------O.OlOMinor------------------------0.005 Severe-----------------------------0.020

3. Recommended modifying n value for changes in size and shape of cross &ectionGradual----------------------O.OOO Frequent------------------O.OlO to 0.015Occasional-------------------0.005

4. Recommended modifying n value for obstruction such as debris, roots, etc.Negligible effect------------O.OOO Appreciable effect-----------------0.030Minor effect-----------------O.OlO Severe effect----------------------0.060

5. Recommended modifying n values for vegetationLow effect----------0.005 to 0.010 High effect---------------0.025 to 0.050Medium effect-------O.OlO to 0.025 Very high effect----------0.050 to 0.100

6. Recommended modifying n value for channel meander

Ls=Straight length of reach ~=Meander length of reach

Lm/Ls n

1.0-1.2 0.000

1.2-1.5 0.15 times n,s

>1.5 0.30 times ns

where ns=items 1+2+3+4+5

II Design of Small Dams, U.S. Bureau of Reclamation, 1977.

30221/3840922

3-11

Page 46: SUSITM 1I!J)1OILECDIC 'lOner

30221/2840922

The design of a stable channel 1S accomplished by trial and error. It is

reasonable to expect a channel to suffer some damage during a 50-year flood

event, but one would desire a stable channel for the la-year flood event.

Therefore as a trial starting point, the channel section will be des igned

for maximum discharge with a velocity approximately 20% higher than the

velocity that would be permissible in the channel during the la-year flood

event.

Two methods will be presented for channel design; the Permissible Velocity

Method and the Tractive Force Method. Examples of their use will also be

presented.

3.4.2.1. Permissible Non-erodible Velocity Method

The maximum permissible velocity, or non-erodible velocity is the greatest

mean velocity that will not cause erosion of the channel body. In general,

old and well-seasoned channels will stand much higher velocities than new

ones, because the old channel bed is usually better stabilized, particular­

ly with the deposition of colloidal matter. When other conditions are the

same, a deeper channel will convey water at a higher mean velocity without

erosion than a shallower one.

Table 3.4.3. lists the maX1mum permissible velocity for cnannels with erod­

ible linings based on uniform flow in continuously wet, aged channels.

3-12

Page 47: SUSITM 1I!J)1OILECDIC 'lOner

30221/2840922

Table 3.4.3*

RECOMMENDED PERMISSIBLE VELOCITIES (ft./sec.) FOR UNLINEDCHANNELS

Type of Material for Excavated Section Clear Water Silt - Carrying Water

Fine Sand (non colloidal) 1.5 2.5Sandy Loam (non colloidal) 1.7 2.5Silt Loam (non colloidal) 2.0 3.0Ordinary Firm Loam 2.5 3.5Volcanic Ash 2.5 3.5Fine Gravel 2.5 4.0Stiff Clay (colloidal) 3.7 5.0

Graded Material:Loam to Gravel 3.7 5.0Silt to Gravel 4.0 5.5Gravel 5.0 6.0Coarse Gravel 5.5 6.5Gravel to Cobbles «6") 6.0 7.0Gravel to Cobbles ()6") 7.0 8.0Shales and Hardpans 7.0 8.0

* State of California, Dept. of Public Works, Division of Highways,"Planning Manual of Instructions, Part 7, Design," 1963.

Using permissible velocity as a criterion, the design procedure for an un­

lined cnannel section, assumed to be trapezoidal, is as follows:

1. For the given kind of material forming the channel body, estimate

the roughness coefficient n, side slope z, and the maximum per­

missible velocity, V (Table 3.4.3).

2. Compute the hydraulic radius R by use of the Manning formula.

3. Compute the water area required by the given discharge and per­

missible velocity, i.e.: A = Q/(1.2V).

4. Compute the wetted perimeter, P = A/R.

3-13

Page 48: SUSITM 1I!J)1OILECDIC 'lOner

5. Solve simultaneously for band y (base and depth of flow).

6. With the given section, by iteration, calculate with varying

depths of flow, the depth and velocity for the 10-year flood dis­

charge. Check if velocity is equal or less than the permissible.

If not, change slope if possible or lower velocity and repeat 1.

7. For fish streams, repeat 6 for the 2-year flood discharge to

check if velocity is equal to or less than permissible fish pass­

age velocity for the designated group (Table 3.2.1) and the depth

of flow is at least 50% greater than that indicated in paragraph.

3.2.2 for the fish type. If the above are not met, a further

channel revision may be required necessitating recalculation be­

ginning with 1 or the incorporation of a low flow section in the

invert of the channel.

A calculation example follows in steps 1 through 6

Compute the bottom width and depth of flow of a trapezoid channel laid

on a slope of .0016 and carrying a design discharge of 400 c f s , The

channel a s to be excavated in earth containing non-colloidal gravelly

silt.

Solution:

For the given conditions, the following are estimated: n = 0.025, side

slope z = 2:1, and maximum permissible velocity = 3.75 x 1.2 = 4.5 fps.

1. Using the Manning Formula, solve for R

4.5 = 1.49 R2/3 (.0016)1/20.025

R = 2.60 ftThen A = 400/4.5 = 88.8 ft 2, and P = AIR = 88.8/2.60 = 34.2

30221/3840922

3-14

Page 49: SUSITM 1I!J)1OILECDIC 'lOner

2. A ~ (b + zy)y = (b + 2y)y = 88.8 ft 2and P = b + 2 (1 + z2)1/2y = [b + 2(5)1/2y ] = 34.2 ft.

3. Solving the two equations simultaneously:(b + 2y) y = 88.8(b + 4.47y) = 34.288.8 - 2y2 = 34.2y - 4.47 y22.47y2 - 34.2y + 88.8 = 0

y = 3.46 ftb = 18.7 ft

3.4.2.2 Tractive Force Method

The tractive force method takes into account physical factors of bed ma­

terial, channel section, depth of flow and velocity. This method will be

confined to non cohesive materials for which the permissible tractive force

is related to particle size and shape, and sediment load in the water. The

tractive force is the unit force tending to cause erosion of the material

forming the channel. Figure 3.4.2 shows curves for recommended values of

permissible unit tractive force for particles up to about 4 inches in diame­

ter. For coarser material, the permissible tractive force in psf is eq ual

to 0.4 times the diameter in inches as shown in Figure 3.4.3. The diameter

is that of a particle of equivalent spherical volume. The curves in Figures

3.4.2 and 3.4.3 are based on particle sizes of which 25% by weight are larg-

er.

The limiting condi tion for permissible tractive force i s governed by the

particles on the sides rather than those on the bottom of the channel. The

resistance of the material on the sides is reduced by the sliding force down

the sides due to gravity. The effect of side sLopes is expressed as factor

K, which is the ratio of the tractive force required to initiate motion of a

particle on the sloping sides to that on a level bottom. The equation is:

( 1 - sin2 0 1/2K = sin2 0 )

30221/3840922

3-15

Page 50: SUSITM 1I!J)1OILECDIC 'lOner

30221/2840922

o = side slope angle

e = angle of repose of the material which varies with particle sizeand shape as shown in Figure 3.4.4.

The solution of this equation is given in Figure 3.4.5.

The formula for maximum tractive force is:

TO = 62.4 R8

8 = energy gradient ~n ft/ft (channel slope for uniform flow)

R = hydraulic radius

In a wide open channel, the hydraulic radius ~s approximately equal to the

depth of flow y; hence, TO = 62.4 y8.

Channels in fine material less than 5 mm ~n diameter are designed by using

the recommended values of tractive force ploted in Figure 3.4.2. In this

case, "d " is the mean diameter for which 50% by weight are larger. The

sliding effect of the particles down the channel sides due to their own

weight is neglected.

An example using values for; a 10-year flood design, a trapezoidal channel

laid on a slope of .0016, and carrying a discharge of 400 cfs. The channel

is to be excavated in earth containing noncolloidal coarse gravels and peb­

bles, 25% of which is 1.25 in or over in diameter. Manning's n = 0.025.

For trapezoidal channels, the maxamum unit tractive force on the sloping

sides is usually less than that on the bottom (Figure 3.46); hence, the side

force ~s the controlling value ~n the analysis. The design of the channel

should therefore include: (a) the proportioning of the section dimensions

for the maximum unit tractive force on the sides and (b) checking the

proportioned dimensions for the maximum unit tractive force on the bottom.

3-16

Page 51: SUSITM 1I!J)1OILECDIC 'lOner

a. Proportioning the Section Dimensions:

1. Assuming side slopes of 2: 1 and a b/y ratio =5, the maximum

unit tractive force on the sloping sides (Figures 3.4.6) is

.775 x 62.4 yS = .775 x 62.4 x .0016y = 0.078y psf.

2. Considering a very rounded material 1.25 in. in diameter, the

angle of repose (Figure 3.4.4) is 9 = 33.5. With 9 = 33.5

and SS = 2.1, the permissible tractive force ratio on the

sloping sides (Figure 3.4.5) is K = 0.6. For a size of 1.25

in., the permissible tractive force on a level bottom is T =

0.4 x 1.25 = 0.5 psf (this can also be obtained from Figure

3.4.2) and the permissible tractive force on the sides is

equal to 0.6 x 0.5 = 0.3 psf.

3. For a state of impending motion of the particles on side

slopes, .078y = 0.3 or y = 3.88 ft. Accordingly, the bottom

width b = 5 x 3.85 = 19.3 ft. For this trapezoidal section,

A = 104 sq ft and R = 2.85.

4. By the Manning equation Q = 1.486 AR2/3S1/2n

= 1.486 (104) (2.85)2/3 (.0016)1/2 = 491 cfs.025

Further computation will show that for a side slope of 2: 1

and b/y ratio of 4.1, b = 15.8 ft., Q = 425 cfs, which is

close to the design discharge.

30221/2840922

b. Checking the proportioned dimensions:

With S8 = 2:1 and b/y = 4.1, the maximum unit tractive force on

the channel bottom (Figure 3.4.6) is 0.97 x 62.4 x 3.85 x .0016

0.374 psf < 0.5 psf (permissible tractive force on the bottom).

3-17

Page 52: SUSITM 1I!J)1OILECDIC 'lOner

30221/2840922

5.

6.

Determining maximum flow conditions: with base width and

side slopes determined, the depth of flow required for the

maximum flow conditions can be determined using the Manning

formula.

For fish streams, repeat paragraph 5 for the 2-year flood

discharge to check if velocity i s equal to or less than

permissible fish passage velocity for the designated group

(Table 3.2.1) and the depth of flow is at least 50% greater

than that indicated in paragraph 3.2.2 for the fish type. If

the above are not met, a further channel revision may be

required, necessitating recalculation beginning with 1 or the

incorporation of a low flow section in the invert of the

channel.

3-18

Page 53: SUSITM 1I!J)1OILECDIC 'lOner

2.0

4.0

OA

0002

..... t,.

'7

7/

/

/Hi9f\ content of

V ~ I.lI.i~Coarse noncahesivefine sed iment '" V material

I '" ~ ~ ,II.~ ~ 7

~ '":--"" ,/

-- /, ./\ .....10-- ..-1\\ - ........

"-- Cleor water\L Low content of

fine .edlment

I

lj.4 0.6 081.0 2 4 6810 20 40 60 80 IOJ

O.~

002

0.10.08

0.06

0.Q04

0.003

0.010.008

0.006

1.0

0.8

0.6

•o..:I.

e..l.

-oo.....

N..:...':•..e 0.2

Mean Diameter - mm.

Figure 3.4.2

RECOMMEND PERMISSIBLE UNIT TRACTIVE FORCE

FOR CANALS IN NONCOHESIVE MATERIAL

3-19

Page 54: SUSITM 1I!J)1OILECDIC 'lOner

••4

2

N.:-~•..a0.8

.s8 O.i

!QI 0.4>.--c.J0'"~~..a~

0.2.-e'"4'

11.

0.1

0.08

0.06

0.04

' .

VV

//

/V

/V

V/

/

/V

//

V

0.1 0.2 0.4 0.' 0.8 I 2 4. e 10Diameter In IneMI t 2!5'*a larger

Figure 3.4.3

PERMISSIBLE TRACTIVE FORCE FOR COARSE NONCOHESIVE MATERIAL

3-20

Page 55: SUSITM 1I!J)1OILECDIC 'lOner

42

"i 40-c:0...

38-'"0J::

J:: 36-.-,lit 34Qc»"" 32CI'c»'0. 30~0Q, 28~-0 26•e;. 24.i

22

20

Particle size in inches0.2 0.4 o.sO.8 LO 2.0 3.0 4.0

1 I 't'« I I I

112 11'1'2.

.,- ,..-~

//~./~

~ //V~~//V/

~l/ 1///V

~~~If ///

o~ _c~ IJ //~ V VIe If If'1/~. if' 1/

0" oy 1/ II~ sbq;·~ V II

o o~ ~/ II..,0; bI~~ ~b~11.~ c0 oJi I

~" ~ ~ II~ ..~~ ...~~/

" ..0 ~I A§j~ Vt.s:I~I

Figure 3.4.4

ANGLES OF REPOSE OF

NONCOHESlVE MATERIAL

3-21

Page 56: SUSITM 1I!J)1OILECDIC 'lOner

Repose

Side Slopes

j SIII. z ,Based on 8qu~tlon K- 1- SIII.~ ...

40-11,44:1-

I

35- •>-3

1112:1- -I:;0>

tt(")>-3

-....H

ti3 1314:'-~0

I"Ij

--- :'300

0

"'i:

:;0~

(") I"Ij- 2:1- Itx:I .... - I ....:;0 ~

0u ~-

w > 11 i 2 IM :. - I II

>-3 CD25-

MN 0 W >N

~ ~ 021/2:'-. ..<1 Ln00 000

..H 8 3:1-t:1tJ.:l

N

00 jr-'0 -~ ••As

~

.,"0

CI)

5'

U.I 0.2 0.3 0.4· 0..5 Q.6 0.7 o.a 0.9 .0K = Permissible Tractive Farce on Side. in fraction of Volue for level Bottom for Nancaheslve Mote,••'

0' J_ I

Page 57: SUSITM 1I!J)1OILECDIC 'lOner

LLIUa:eLLI>-....U<

la::....~:::>~-Xex:E

<D0lJJCD (f)LLI

....0-(f)ozex

..•~-.

~~

--.!•II

,If:0

-;:

~'i-,

0e

,If:0-- Q

,,

i- 0

•.G

."

I'0

IIII

N.a

--Q

t

I0'

I.1\~

t--",

t'lI-

I0-- 0r{

.

\\

\\

\\

J\

~\\

""~:\

/.~~\~

.2::t

'0IS'l'C

I

to\e

IS'0- u

~\ua:

C/J\' Y1

C/J\

~~~\

.,~

\;.:.

~~

r--.,'\'"co,

I\CO»~~

"'"",\~

<,

".,

~1

'-,

,If:u-

-rt)~

~~

0................... ..

Z.....N

II"'~--

N.....

~i\.

I-t-~~

1--

-..,

q.

0)0'II)

f'o:c&l

"1'If.

ttl-O~

0-:0

-0

00

00

0S~

.'Z9

.0IW

..8.

U!

(Hn

IOA

'XO

W)

"De'4S

.AUDI.~

Fig

ure

3.4

.6

THEM

AXIMUM

TRACTIV

EFORCE

ONBED

ANDSID

ES

3-2

3

Page 58: SUSITM 1I!J)1OILECDIC 'lOner

30221/2840922

3.4.3 Culverts

3.4.3.1 Fish Passing Requirements. The following presentation on culvert

design is essentially a repitition of the Hydraulic Engineering Circular

No.5 pepared by the Bureau of Public Roads, U.S. Department of Commerce.

As such the design criteria established are for the design of highway

culverts and includes no provisions of fish passage criteria. Therefore,

this paragraph will ammend the following in the instances that the culvert

is to be placed on a waterway that has been established to have resident

fish or used by anadromous fish.

In Sections 3.2, Fish Passage Problems and 3.3 Drainage Structure Design

Criteria, the basic requirements were presented for the successful design of

a culvert for passing fish. They were:

1. Velocity requirement per fish group (Specified in Table 3.2.1)

2. Place invert below waterway bed by at least 0.2 diameter

3. Maintain depth of flow requirement for fish type per paragraph 3.2.2

Inadequate Water Depth.

It can be shown that concrete culvert characteristics with full flow, when

the lower 20% of the diameter is filled with the streambed substrate, are

modified as follows:

Area reduced by 14.5%

Hydraulic radius reduced by 11%

Average roughness coefficient n

increased by 30%

3-24

Page 59: SUSITM 1I!J)1OILECDIC 'lOner

These changes in parameters will reduce the culvert capacity by about 39%.

Therefore the selection of the culvert s i ze as presented in the following

text will require a correction. This correction is achieved by increasing

the design discharge (full pipe flow only) by 63% before starting the design

procedure indicated in 3.4.3.11 Outlet Control Nomographs.

For low flow design, as in the case of the 2 year flood, the culvert will

flow partially full and the discharge depth for runoff discharge can be

computed taking into consideration the culvert section with fill material

using Manning's formula. The hydraulic radius is accounted for by weighting

the perimeter with the n's of the culvert and the substrate material as per

the following equation.

P n 1.5)2/3s s

n =

"Important"

Per the preceeding, culverts meeting the requirements prescribed herein

should be designed for a maximum capacity equivalent to: 1.63 x the cal­

culated design discharge.

3.4.3.2 Scope of Guidelines. The following text contains a brief discus­

sion of the hydraulics of conventional culverts and charts for selecting a

culvert size for a given set of conditions. Instructions for using the

charts are provided. Sane approx imations are made in the hydraulic design

procedure for simplicity. These approximations are discussed at appropriate

points throughout the text.

30221/3840922

3-25

Page 60: SUSITM 1I!J)1OILECDIC 'lOner

30221/2840922

For this discussion, conventional culverts include those commonly installed,

such as circular, arch and oval pipes, both metal and concrete box culverts.

All such conventional culverts have a uniform barrel cross section through­

out. The culvert inlet may consist of the culvert barrel projected from

the roadway fill or mitered to the embankment slope. Sometimes inlets have

headwalls, wingwalls and apron slabs, or standard end sections of concrete

or metal. The more common types of conventional culverts are considered in

these guidelines.

3.4.3.3 Culvert Hydraulics. Laboratory tes ts and field observations show

two major types of culvert flow: (1) flow with nlet control and (2) flow

with outlet control. For each type of control, different factors and formu­

las are used to compute the hydraulic capacity of a culvert. Under inlet

control, the cross-sectional area of the culvert barrel, the inlet geometry

and the amount of headwater or ponding at the entrance are of primary impor­

tance. Outlet control involves the additional consideration of the eleva­

tion of the tailwater in the outlet channel and the slope, roughness and

length of the culvert barrel.

It is possible by involved hydraulic computations to determine the probable

type of flow under wni.cn a culvert will operate for a given set of condi­

tions. The need for making these computations may be avoided, however, by

computing headwater depths from the charts in this circular for both inlet

control and outlet control and then using the higher value to indicate the

type of control and to determine the headwater depth. This method of de­

termining the type of control is accurate except for a few cases where the

headwater is approximately the same for both types of control.

Both inlet control and outlet control types of flow are discussed briefly in

the following paragraphs and procedures for the use of the charts are given.

3-26

Page 61: SUSITM 1I!J)1OILECDIC 'lOner

30221/2840922

3.4.3.4 Culverts Flowing With Inlet Control. Inlet control means that the

discharge capacity of a culvert is controlled at the culvert entrance by

the depth of headwater (HW) and the entrance geometry, including the barrel

shape and cross-sectional area, and the type of inlet edge. Sketches of

inlet-control flow for both unsubmerged and submerged projecting entrances

are shown in sections A and B of Figure 3.4.7. Section C shows a mitered

entrance flowing under a submerged condition witn inlet control.

In inlet control the roughness and length of the culvert barrel and outlet

conditions (including depth of tai Iwa t e r ) are not factors in determining

culvert capacity. An increase in barrel slope reduces headwater to a small

degree and any correction for slope can be neglected for conventional or

commonly used culverts flowing with inlet control.

In all culvert design, headwater or depth of ponding at the entrance to a

culvert is an important factor in culvert capacity. The headwater depth

(or headwater HW) is the vertical distance from the culvert invert at the

entrance to the energy line of the headwater pool (depth + velocity head).

Because of the low velocities in most entrance pools and the difficulty in

determining the velocity head for all flows, the water surface and the ener­

gy line at the entrance are assumed to be coincident, thus the headwater

depths given by the inlet control charts in this circular can be higher than

will occur in some installations. For the purposes of measuring headwater,

the culvert invert at the entrance is the low point in the culvert opening

at the beginning of the net cross-section of the culvert barrel. (Refer to

para gr a ph 3. 4 • 3 • 1 ) •

Headwater-discharge relationships for the various types of circular and

pipe-arch culverts flowing with inlet control are based on laboratory re­

search with models and verified in some instances by prototype tests. This

3-27

Page 62: SUSITM 1I!J)1OILECDIC 'lOner

A

HW____ ...£ !!![~,,~OC(---

PROJECTING EHO - UNSUe""ERGEO

8

-it' .••:--- -- -- -

""'~lR#

tHW

\

PROJECTING END - SUetoolERGEO

c

-- ----1'---- ..... -~~-­HW

JAITERED END - suetoolERGED

--..,-./----~'io!.,~iZ;,~v!~'</B--

Figure 3.4.7

INLET CONTROL

3-28

Page 63: SUSITM 1I!J)1OILECDIC 'lOner

research is reported in National Bureau of Standards Report No. 44441/ en­

titled "Hydraulic Characteristics of Commonly Used Pipe Entrances", by John

L. French and "Hydraulics of Conventional Highway Culverts", by H. G.

BOssyZ/, Experimental data for box culverts with headwalls and wing­

walls were obtained from an unpublished report of the U.S. Geological

Survey.

These research data were analyzed and nomographs for determining culvert

capacity for inlet control were developed by the Division of Hydraulic Re-

search, Bureau of Pub lic Roads. These nomographs, Charts 1 through 6,

give headwater-discharge relationships for most conventional culverts flow­

ing wi th inlet control through a range of headwater depths and discharges.

Chart No. 7 is included to stress the importance of improving the inlets of

culverts flowing with inlet control.

3.4.3.5 Culverts Flowing With Outlet Control. Culverts flowing with outlet

control can flow with the culvert barrel full or part full for part of the

barrel length or for all of it, (see Figure 3.4.8). If the entire cross

section of the barrel ~s filled with water for the total length of the bar­

rel, the culvert is said to be in full flow or flowing full, Sections A and

B. Two other common types of outlet-control flow are shown in Sections C

and D. The procedures given in this text provide methods for the accurate

determination of headwater depth for the flow condi tions shown in Sections

1/ Available from Division of Hydraulic Research, Bureau of Public Roads.

2/ Presented at the Tenth National Conference, Hydraulics Division, ASCE.,August 1961. Available on loan from Division of Hydraulic Research,Bureau of Public Roads.

30221/2 3-29840922

Page 64: SUSITM 1I!J)1OILECDIC 'lOner

..

1 -HW

WATERSURFACE

A

_ ~ w.s.

8

1HW

IH

<, w.s.' ..... - ---

c

fH

-L.. w.s....... ------.

o

-----------~~--~~----....

OUTLET CONTROL

Figure 3.4.8

3-30

Page 65: SUSITM 1I!J)1OILECDIC 'lOner

A, Band C. The method given for the part full flow condition, Section D,

gives a solution for headwater depth that decreases in accuracy as the

headwater decreases.

The head H (Section A) or energy required to pass a given quantity of water

through a culvert flowing in outlet control with the barrel flowing full

throughout its length is made up of three major. parts. These three parts

are usually expressed in feet of water and include a velocity head ~, an

entrance loss He' and a friction loss Hf• Tnis energy is obtained from

ponding of water at the entrance and expressed in equation from

(1)

30221/2840922

The velocity head Hv equals V2/2g, where V is the mean or average velocity

in the culvert barrel. (The mean velocity is the discharge Q, in cfs, di­

vided by the cross-sectional area A, in square feet, of the barrel.).

The entrance loss He depends upon the geometry of the inlet edge. This

loss is expressed as a coeffcient k e times the barrel velocity head or

He = k e V2/2g. The entrance loss coefficients k e for various types of

entrances when the flow is in outlet control are given in Table 3.4.4.

The friction loss Hf is the energy required to overcome the roughness of

the culvert barrel. Hf can be expressed in several ways. Since most

engineers are familiar with Manning's n the following expression is used:

H =Rl. 33 2g

3-31

Page 66: SUSITM 1I!J)1OILECDIC 'lOner

Where:

Where:

n a Manning's roughness coefficient

L = length of culvert barrel (ft)

V = mean velocity of flow in culvert barrel (ft/sec)

g = acceleration of gravity, 32.2 (ft/sec 2)

R = hydraulic radius or A/P (ft)

A = area of flow for full cross-section (sq ft)

P = wetted perimeter (ft)

30221/2840922

Substituting in equation 1 and simplifying, we get for full flow

29n2L v2H = (1 + k e + ------)

RI.33 2g

3-32

Page 67: SUSITM 1I!J)1OILECDIC 'lOner

Table 3.4.4 Entrance Loss Coefficients

Coefficient ke to apply to velocity head V2/2g for determination of headloss at entrance to a structure, such as a culvert or conduit, operting fullor partly full with control at the outlet.

Entrance head loss He = ke V22g

Coeffi-Type of Structure and Design of Entrance cient ke

Pipe, ConcreteProjecting from fill, socket end (groove-end) •••••••••••••• 0.2Projecting from fill, sq cut end ••.•••••••••••••••••••••••• 0.5Headwall or headwall and wingwalls

Socket end of pipe (groove-end)........................ 0.2Square-edge 0.5Rounded (radius - 1/12D) •••••••••••••••••••••••••••••• 0.2

Mitered to conform to fill slope ••••••••••••••••••••••••••• 0.7*End-section conforming to fill slope •••.•••••••••••••••••• 0.5

Pipe, or Pipe-Arch, Corrugated MetalProjecting from fill (no headwall)Headwall or headwall and wingwalls

0.9

Square-edge' 0.5Mitered to conform to fill slope. ••••••••• ••• ••••. •••••.••• 0.7*End-section conforming to fill slope...................... 0.5

Box, Reinforced ConcreteHeadwall parallel to embankment (no wingwalls)

Square-edged on 3 edges 0.5Rounded on 3 edges to radius of 1/12 barrel dimension. 0.2

Wingwalls at 30° to 75° to barrelSquare-edged at crown................................. 0.4Crown edge rounded to radius of 1/12 barrel dimension. 0.2

Wingwalls at 10° to 25° to barrelSquare-edged at crown................................. 0.5

Wingwalls parallel (extension of sides)Square-ed ged a t crown O. 7

30221/2840922

*Note: "End-section conforming to fill slope", made of either metal orconcrete, are the sections commonly available from manufacturers.From limited hydraulic tests, they are equivalent in operation toa headwall in both inlet and outlet control. Some end sections,incorporating a clo~aper in their design have a superior hy­draulic performance. These later sections can be designed usingthe information given in 3.4.3.8 Inlets and Culvert Capacity.

3-33

Page 68: SUSITM 1I!J)1OILECDIC 'lOner

Figure 3".4.9 shows the terms of equation 2, the energy line, the hydraulic

grade line and the headwater depth, HW. The energy line represents the to­

tal energy at any point along the culvert barrel. The hydraulic grade line,

sometimes called the pressure line, is defined by the elevations to which

water would rise in small vertical pipes attached to the culvert wall along

its length. The energy line and the pressure line are parallel over the

length of the barrel except in the immediate vicinity of the inlet where the

flow contracts and re-expands. The difference in elevation between these

two lines is the velocity head, V2/2g.

The expression for H 1S derived by equating the total energy upstream from

the culvert entrance to the energy just inside the culvert outlet with con-

sideration of all the major losses in energy. By referring to Figure 3.4.9

and using the culvert invert at the outlet as a datum, we get:

2g

Where: dl and d2 = depths of flow as shown in Fig. 3.4.9

= velocity hed in entrance poolVI2gLSO = length of culvert times barrel slope

Then:

And:

Vl2

dl + + LSO - d2 = Hv + He + Hf2g

vl2H = dl + + LSO - d2 = Hv + He + Hf

2g

From the development of this energy equation and Figure 3.4.9, head H 1S

the difference between the elevations of the hydraulic grade line at he

outlet and the energy line at the inlet. Since the velocity head in the

30221/2840922

entrance pool is usually small under ponded condi tions, the water surface

or headwater pool elevation can be assumed to equal the elevation of the

3-34

Page 69: SUSITM 1I!J)1OILECDIC 'lOner

energy line. Thus headwater elevations and headwater depths, as computed

by the methods given in this text, for outlet control, can be higher than

might occur in some installations. Headwater depth is the vertical distance

from the culvert invert at the entrance to the wate surface, assuming the

water surface (hydraulic grade line) and the energy line to be coincident,

d l + Y.l2 in Figure 3.4.9.

2g

yl2

f 29 ~=".h-,'ll!..·s.r --.,....------/-----:--... -- f'~:;..;;_-=-_--:;;;::--=-==.:7--~~-'-;------=--:P H

HW dl =--', Hd2..!Ls.

~ ~2 DATUM

+LSo

Figure. 3.4.9

CULVERT HYDRAULICS DIAGRAM

Equation 2 can be solved for H readily by the use of the full-flow nomo­

graphs, Charts 8 through 14. Each nomograph is drawn for a particular bar­

rel shape and material and a single value of n as noted on the respective

charts. these nomographs can be used for other values of n by modifying

the culvert length for the use of the full-flow monographs as directed in

3.4.3.11 Outlet Control Nomographs.

In culvert design, the depth of headwater HW or the elevation of the ponded

water surface is usually desired. Finding the value of H from the nomo­

graphs or by equation 2 is only part of the solution for this headwater

depth or elevation. In this case of Figure 3.4.8 Section A or Figure 3.4.9

where the outlet is totally submerged, the headwat~ pool elevation (assumed

3-35

Page 70: SUSITM 1I!J)1OILECDIC 'lOner

30221/2840922

to be the same elevation as the energy line) is found by adding H to the

elevation of the tailwater. The headwater depth is the difference ~n eleva­

tions of the pool surface and the culvert invert at the entrance.

When the tailwater is below the crown of the culvert, the submerged condi­

tion discussed above no longer exists and the determination of headwater is

somewhat more difficult. In discussing outlet-control flow for this condi­

tion, tailwater will be assumed to be so low that it has no effect on the

culvert flow. (The effect of tailwater will be discussed later.) The com­

mon types of flow for the low tailwater condition are shown in Sections B, C

and D of Figure 3.4.8. Each of these flow conditions are dependent on the

amount of discharge and the shape of the culvert cross-section. Each condi­

tion will be discussed separately.

Full flow at the outlet, Section B of Figure 3.4.8 will occur only with the

higher rates of discharge. Charts 15 through 20 are provided to aid in de­

termining this full flow condition. The curves shown on these charts give

the depth of flow at the outlet control. This depth is called critical

depth dc' When the discharge is sufficient to give a critical depth equal

to the crown of the culvert barrel, full flow exists at the outlet as in

Section B of Figure 3.4.8. The hydraulic grade line will pass through the

crown of the culvert at the outlet for all discharges greater than the dis-

charge causing critical depth to reach the crown of the culvert. Head H can

be measured from the crown of the culvert in computing the water surface

elevation of the headwater pool.

When cri tical depth falls below the crown of the culvert at the outle t ,

the water surface drops as shown in either Sections C or D, depending again

on the discharge. To accurately determine headwater for these conditions,

computations for locating a backwater curve are usually required. These

backwater computations are tedious and time consuming an they should be

avoided if possible. Fortunately, headwater for the flow condition shown

in Section C can be solved by using the nomographs and the instructions

given in this text.

3-36

Page 71: SUSITM 1I!J)1OILECDIC 'lOner

30221/2840922

For the condition shown in Section C, the culvert must flow full for part of

its length. The hydraul~c grade line for the portion of the length in full

flow will pass through a point where the water breaks with the top of the

culvert as represented by point A in Section C. Backwater computations show

that the hydraulic grade line if extended as a straight line will cut the

plane of the outle t cross section at a point above cri tical depth (water

surface). This depth is at a height approximately equal to one haif the

distance between critical depth and the crown of the culvert. The elevaton

of this point can be used as an equivalent hydraulic grade line and H, as

determined by equation 2 or the nomographs, can be added to this elevation

to find the water surface elevation of the headwater pool.

The full flow condition for part of the barrel length, Section C, will exist

when the headwater depth HW, as computed from the above headwater pool ele­

vation, is equal to or greater than the quantity:

D + (l + k ) y2e _

2g

Where Y is the mean velocity for the net cross section of the barrel; Ke,the entrance loss coefficient; and D, the inside height of the culvert. If

the headwater is less than the above value, a free water surface, Figure 2D

will extend through the culvert barrel.

The part full flow condition of Section D must be solved by a backwwater

computation if accurate headwater depths are desired. Detai Is for making

this computation are not given in this text. Ins tead the solution used is

the same as that given for the flow condition of Section C, with the reserv­

ation that headwater depths become less accurate as the discharge for a par­

ticular culvert decreases. Generally, for design purposes, this method is

satisfactory for headwater depths above 0.75D, where D is the heignt of the

culvert barrel. Culvert capacity charts found in Hydraulic Enginering Cir­

cular No. 10 give a more accurate and easy solution .for this free surface

flow condition.

3-37

Page 72: SUSITM 1I!J)1OILECDIC 'lOner

Headwater depth HW can be expressed by a common equation for all outlet­

control conditions, including all depths of tailwater. This is accomplished

by designating the vertical dimension from the culvert invert at the outlet

to the elevation from which II is measured as ho' The headwater dep t h HW

elevation is:

HW = H + h - LSo 0

All the terms in the equation are in feet. II is comptued by equation 2 or

found from the full-flow nomographs. L is the length of culvert in feet and

So the barrel slope in feet per feet. The distance ho is discussed in

the following paragraphs for the various conditions of outlet-control flow.

Headwater HW is the distance in feet from the invert of the culvert at the

inlet to the water surface of the headwater pool.

When the elevation of the water surfce in the outlet channel is equal to or

above the elevation of the top of the culvert opening at the outlet, Section

A, ho is equal to the tailwater depth. Tailwater depth 1W is the distance

in feet from the culvert invert at the outlet to the water surface in the

outlet channel. The relationship of HW to the other terms in equation 3 is

illustrated in Figure 3.4.10.

f-------=--------HW

JL -----------

Figure 3.4.10

CULVERT OUTLET SUBMERGED

3-38

Page 73: SUSITM 1I!J)1OILECDIC 'lOner

If the tailwater elevation is below the top of the culvert opening at the

outlet, Sections B, C and D of Figure 3.4.8, ho is more difficult to de­

termine. The discharge, size and shape of culvert, and the TW must be con­

sidered. In these cases, h is the greater of two values (1) TW depth asadefined above or (2) (de + D) e- 2. The latter dimension is the distance

to the equivalent hydraulic grade line discussed previously. In this frac­

tion dc is the critical depth, as read from Charts 15 through 20 and D is

the culvert height. The value of d can never exceed D, making the upperclimit of this fraction equal to D. Where TW is the greater of these two

values, critical depth is submerged sufficiently to make TW effective in

increasing the headwater. The sketch in Figure 3.4.11 shows the terms of

equation 3 for this low tailwater condition. Figure 3.4.11 is drawn similar

to Section C of Figure 3.4.8, but a change in discharge can change the water

surface profile to that of Section B or D.

LSoL--------

de +0--or2

Figure 3.4.11

CULVERT OUTLET LOW TAILWATER

3.4.3.6 Computing Depth of Tailwater. In culverts flowing with outlet con­

trol, tailwater can be an important factor in computing both the headwater

depth and the hydraulic capacity of a culvert. Thus, in many culvert de­

signs, it becomes necessary to determine tailwater depth in the outlet chan­

nel.

3-39

Page 74: SUSITM 1I!J)1OILECDIC 'lOner

30221/2840922

Much enginering judgment and experience is needed to evaluate possible tail­

water conditions during floods. As has been mentioned previously, a field

inspection should be made to check on downstream controls and to determine

water stages. Often times tailwater is controlled by a downstream obstruc­

tion or by water stages in another stream. Fortunately, most natural chan­

nels are wide compared to the culvert and the depth of water in the natural

channel is considerably less than critical depth, thus the tailwater ~s ~n­

effective and channel depth computations are not always warranted.

An approximation of the depth of flow in a natural stream (outlet channel)

can be made by using Manning's formula if the channel is reasonably uniform

in cross section, slope and roughness. Values of n for natural streams for

use in Manning's have been presented in Tables 3.4.1 and 3.4.2. If the

water surface in the outlet channel is established by downstream controls,

other means must be found to determine the tailwater elevation. Sometimes

this necessitates a study of the stage-discharge relationship of another

stream into which the stream in question flows or the utilization of data on

reservoir elevations if one of the dams is involved.

3.4.3.7 Velocity of Culvert Flow. A culvert, because of its hydraulic cha­

racteristics, increases the velocity of flow over that in the natural chan­

nel. High velocities are most damaging just downstream from the culvert ­

outlet and the erosion potential at this point is a feature to be considered

in culvert design.

Energy dissipators for channel flow have been investigated in the laboratory

and many have been constructed, especially in irrigation channels. Designs

for highway use have been developed and constructed at culvert outlets. All

energy dissipators add to the cost of a culvert, therefore, they should be

used only to prevent or to correct a serious erosion problem (see Reference

5).

3-40

Page 75: SUSITM 1I!J)1OILECDIC 'lOner

The judgment of engineers working in the particular area 1S required to

determine the need for energy dissipators at culvert outlets. As an aid 1n

evaluating this need, culvert outlet velocities should be computed. These

computed velocities can be compared with outlet velocities of alternate

culvert designs, existing culverts in the area, or the natural stream

velocities. In many streams the maximum velocity t n the main channel is

considerably higher than the mean velocity for the whole channel cross­

section. Culvert outlet velocities should be compared with maximum stream

velocities in determining the need for channel protection. A change in will

of culvert does not change outlet velocities appreciably 1n most cases.

Outlet velocities for culverts flowing with inlet control may be approxi­

mated by computing the mean velocity for the culvert cross section using

Manning's formula:

v = 1.49 R2/3 So1/2

n

Since the depth of flow 1S not known, the use of tables or charts is recom­

mended in solving this equation.ll . The outlet velocity as computed by

this method will usually be high because the normal depth, assumed in using

Manning's formula is seldom reached in the relatively short length of the

average cu I vert. Also, the shape of the outle t channel, including aprons

and wingwalls, have mucn to do with changing the velocity occuring at the

end of the culvert barrel. Tailwater 1S not considered effective 1n

reducing outlet velocities for most inlet control conditions.

In outlet control, the average outlet velocity will be the discharge divided

by the cros-sectional area of flow at the outlet. This flow area can be

either that corresponding to critical depth, tailwater depth (if below the

crown of the culvert) or the net cross section of the culvert barrel.

31 See References.

30221/2 3-41840922

Page 76: SUSITM 1I!J)1OILECDIC 'lOner

30221/2840922

3.4.3.8 Inlets and Culvert Capacity. Inlet shape, edge geometry and skew

of the entrance affects culvert capacity. Both the shape and edge geometry

have been investigated by recent research but the effect of skew for various

flow conditions has not been examined. Results show that the inlet edge

geometry is particularly important to culvet performance in inlet-control

flow. A comparison of several types of commonly used inlets can be made by

referring to Charts 2 and 5. The type of inlet has some effect on capacity

in outlet control but generally the edge geometry is less important than in

inlet control.

As shown by the inlet control nomograph on Chart 5, the capacity of a thin

edge projecting metal pipe can be increased by incorporating the thin edge

in a headwall. The capacity of the same thin edged pipe can be further in­

creased if the entrance is rounded, bevelled or tapered by the addition of

an attachment or the building of these shapes into a headwall. A sketch

on the nomograph, Chart 7 shows the dimensions of two possible bevels. Al­

though nomographs have not been prepared for other barrel shapes, the capa­

city of box culverts can be increased at little cost by incorporating a

bevel into the headwall. In computing headwater depths for outlet control,

when the above bevel is used, ke equals 0.25 for corrugated me tal barrels

and 0.2 for concrete barrels.

3-42

Page 77: SUSITM 1I!J)1OILECDIC 'lOner

DRAINAGE STRUCTURE DESIGN DATA SHEET 1

Location: Township --------Section

Range

Meridian --------

Project Feature: (Project access road, material site access road, etc.)

Station:

Type of Water Course

User Fish Group (A & B Type Watercourse only)

A

I

B

II

C

III IV

Drainage Area: acres

years

Gradient

Q2: cfs

Frequency of Qdesign:

Watercourse Area for Q2:

Watercourse depth of flow for Q2:

Qdesign: cfs----------

ft/ft

ft

Classify channel substate:

Channel configuration: Braided

Other: (describe)

Meandering Straigh t

Culvert Type: Other

Size:

Slope:

V, Q2:

HW/D, Q2:

ft/ ft

ft/sec

%-----------

Length:

V, Qdesign:

HW/D Qdesign:

ft

ft/sec

%

30221/2840922

Attested to by:

Fisheries Biologist

A849/DATA-SH.l

3-43

D~sign Engineer

Page 78: SUSITM 1I!J)1OILECDIC 'lOner

PROJECT: _

HVDRJLOGIC AKJ CHANNEL INFORMATIOO

DESIGNER: _

DATE:

SKETCHSTATION: _

QI ----~=----

TWI =----TW2 =---

EL.

.r _L-----:--__"'- 1--L ~~

'

so· tEL.__ L .-- I- ELo_7

ALLOWABLE OUTLET VEl.OCITY =

TW_

HEADWATER COMPUTATIONCULVERT

DESCRIPTION

(ENTRANCE TYPE

aINLET CONf.

.!:!.!et. HWD

OUTLET CONTROL

H dd .0

Ke c +HW-H ... "0 - LSo

TW ho Llu HW

1->",I­.J-I-

u;:)00';:

>

COST COMMENTS

7{1-------I---4--+---1---4--4-4--1f---+---+---1--I--+--+-__I---+-------Ic

l ~ ...

SUMMARY a. RECOMMENDATIONS:

Drainage Structure Design Data Sheet 2

3-44

Page 79: SUSITM 1I!J)1OILECDIC 'lOner

3.4.3.9 Procedure for Selectin of Culvert Size

Step 1: List design data. Drainage Structure Design Data Sheets 1 and 2

are provided for this.

a. Design discharge Q, 1n cfs., for required periods (i.e. Q2S

or QSO etc).

b. Approximate length L of culvert, 1n feet.

c. Slope of culvert. (If grade 1S given 1n percent, convert to

slope 1n ft. per ft.).

d. Allowable headwater depth, in feet, which is the vertical

distance from the culvert invert (flow line) at the entrance

to the water surface elevation permissible in the headwater

pool or approach channel upstream from the culvert.

e. Mean and maX1mum flood velocities 1n natural stream.

f. Type of culvert for first trial selection, including barrel

material, barrel cross-sectional shape and entrance type.

Step 2: Determine the first trial S1ze culvert.

Since the procedure given 1S one of trial and error, the intitial

trial size can be determined in several ways:

30221/2840922

a. By arbitrary selection.

3-4S

Page 80: SUSITM 1I!J)1OILECDIC 'lOner

b. By using an approximating equation such as to = A from

which the trial culvert dimensions are determined.

c. By using inlet control nomographs (Charts 1-7) for the

HWculvert type selected. If this method ~s used, an D

Z~must be assumed, say D : 1.5, and the given Q, a trial

size ~s determined.

If any trial s~ze ~s too large in dimension of limited height of

embankment or availability of size, multiple culverts may be sued

by dividing the discharge equally between the number of barrels

used. Raising the embankment height or the use of pipe arch and

box culverts with width greater than height should be considered.

Final selection should be based on an economic analysis.

Step 3: Find headwater depth for trial size culvert.

a. Assuming INLET CONTROL

(1) Using the trial size from step 2, find the headwater

depth HW by use of the appropriate inlet control

nomograph (Charts 1-7). Tailwater TW conditions are to

be neglected in this determination. HW in this case ~s

found by multiplying ~obtained from the nomographs

by the height of culvert D.

30221/2840922

(2) If HW ~s greater of less than allowable, try another

trial size until HW is acceptable for inlet control

before computing HW for outlet control.

3-46

Page 81: SUSITM 1I!J)1OILECDIC 'lOner

b. ASSUMING OUTLET CONTROL

(1) Approximate the depth of tailwater TW, in feet, above

the invert at the outlet for the design flood condition

in the outlet channel. (See general discussion on

tailwater, 3.4.3.6).

(2) For tailwater TW elevation equal to or greater than the

top of the culvert at the outlet set ho equal to TW

and find HW by the following equation (equation 3).

where

HW = vertical distance ~n feet from culvert invert (flow

line) at entrance to the pool surface.

R = head loss in feet as determined from the

appropriate nomograph (Charts 8-14).

h = vertical distance in feet from culvert invert at

outlet to the hydraulic grade line (In this case

ho equals TW, measured in feet above the culbert

invert).

So = slope of barrel in ft./ft.

L = culvert length in ft.

(3) For tailwater TW elevations less than the top of the

culvert at the outlet, find headwater RW by equation 3

as in b (2) above except that

h =o

2

or TW, whichever 1S the greater.

30221/2840922

3-47

Page 82: SUSITM 1I!J)1OILECDIC 'lOner

30221/2840922

where

dc = critical depth in ft. (Charts 15 through 20 Note:

dc cannot exceed D

D = height of culvert opening in ft.

Note: Headwater depth determined in b (3) becomes increasingly

less accurate as the headwater computed by this method

2v-falls below the value D + (1 + Ke)2g- . (See

discussions under 3.4.3.5 Culvert Flowing Full with

Outlet Control.

c. Compare the headwaters found in Step 3a and Step 3b (Inlet

Control and Outlet Control). The higher headwater governs and

indicates the flow control existing under the given conditions

for the trial si~e selected.

d. If outlet control governs and the HW is higher than is

acceptable, select a larger trial size and find HW as

instructed under Step 3b. (Inlet control need not be checked,

since the smaller size was satisfactory for this control as

described under Step 3a).

Step 4: Try a culvert of another type or shape and determine s~ze and HW by

the above procedure.

Step 5: Compute outlet velocities for s~ze and types to be considered ~n

selection and determine need for channel protection.

a. If outlet control governs in Step 3c above, outlet velocity

equals to' where A=/Zo ~s the cross-sectional area of

3-48

Page 83: SUSITM 1I!J)1OILECDIC 'lOner

30221/2840922

flow 1n the culvert barrel at the outlet. If dc or TW 1S

less than the height of the culvert barrel use Aocorresponding to dc or TW depth, whichever gives the greater

area of flow. Ao should not exceed the total cross­

sectional area A of the culvert barrel.

b. If inlet control governs 1n step 3c, outlet velocity can be

assumed to equal mean velocity in open-channel flow in the

barrel as computed by Manning's equation for the rate of flow,

barrel size, roughness and slope of culvert selected.

Note: Charts and tables are helpful in computing outlet

velocities. (See References)

Step 6: Record final selection of culvert with size, type, required head­

water, outlet velocity, and economic justification.

3-49

Page 84: SUSITM 1I!J)1OILECDIC 'lOner

3.4.3.10 Inlet-Control Nomographs

Charts 1 through 7

Instructions for Use

1. To determine Headwater (HW), given Q, and size and type of culvert.

a. Connect with a straightedge the given culvert diameter or height

(D) and the discharge Q, or ~ for box culverts; mark

ZWintersection of straightedge on ~ scale marked (1).

H~b. If D scale marked (1) represents entrance type used, read Dn gz~

o scale (1). If another of the three entrance types listed on the

nomograph is used, extend the point of intersection in (a)

horizontally to scale (2) or (3) and read D. Compute HW by

ZHZWmultiplying D by D.

2. To determine discharge (Q) per barrel given HW, and s~ze and type of

culvert.

HWa. Compute o-for given conditions

b.HW

Locate n-0n scale for appropriate entrance type, If scale (2)

30221/2840922

HW. .(2) or (3) is used, extend o-po~nt hor~zontally to scale (1).

HWc. Connect point on n-scale (1) as found ~n (b) above and the size

of culvert on the left scale. Read Q or %on the discharge

scale.

HWd. If a-is read ~n (c) multiply by B (span of culvert) to find Q.

3-50

Page 85: SUSITM 1I!J)1OILECDIC 'lOner

3. To determine culvert size, given Q, allowable HW and type of culvert.

a. !£ii.Using a trial size, compute

HWb. Locate n-0n scale for appropriate entrance type. If scale (2)

or (3) is used, extend ~int horizontally to scale (1).

c. Connect point on ~ale (1) as found in (b) above to given

discharge and read diameter,height or size of culvert required for

HWD value.

d. If D is not originally assumed, repeat procedure with a new D.

30221/2 3-51840922

Page 86: SUSITM 1I!J)1OILECDIC 'lOner

FORWITH

CHART r12

600 ( I ) (2) (3)II500 EXAMPLE 8 9 10

10 400 5'12' eoa 0.75 ct. 7 80/8 • 15 ctt/fI. 7 8

679 300 ,/ll.t - MW 60- ' ••t 5 6

(t) 1.7' 3.5 58

200 (2) 1.90 3.8 4 5(3) 2.05 4.1 4

47 3

33

I- 1006 0

0 QIl. 80 2--......a:: ~ 2IIJ =.Q. 60 2S <II /1-Il. 50

/' ~ 1.5oI-

~ 40 / IIJ 1.5IIJ :x: 1.5IIJ

"'/Il. CD Il.

~ 4<, 30 p- O2- -.*",1- (/'I

§ :x: ,,7 ~l-

X 0 20/a::

0 IIJ 1.0CD ~ I-

0 ZIl.1.0 100 I- .9

3 /IIJ .."...~ :x:l- I-:x: /' "" .IRq_.O Q.

"" a:: 10 F'lar. --... IIJ .8 .9 9IIJ -: ct 0:x: :x:-: o 8 a::

<II IIJ8 ..J'-: Q .... .7 -4

-: Il. 6 ~

0 0-: 5.!:!.!. scs L E WINGWALL 4 .7 10 IIJ

~ I- 4 0 FLARE :x: .64a:: (I) 30· '0 1'-

3(2) 90· on4 15· .6 "6(Jl O· (1II,nllon, - .5

2ot l,di.l)

.5r. "•• Ical, (2) or (3) O',oj.e,"0'1'0".1'" fa leI', (I). ,1\,,,10111 ,'rolCaf'l' InClln.ct 1:1", rhrOUQn .4o anCi Q Icot••. Ot "W,tI, QSill".t'OU4.

.8 .4 4

.6

.5 .3035 35

HEADWATER DEPTH80X- CULVERTSI NLET CONTROL

3-52

Page 87: SUSITM 1I!J)1OILECDIC 'lOner

1M 10,000CHART 2

I" 1,000 EXAMPLE (I) (3)

15. ',0000-41 I...... (3.S , ....

144 5,000Q-120 aft L

1324,000 y.- HW 5.,...3,000 (II 1.5 I.'

1204.

2,000(II t.1 1.4

loe(31 t.1 1.1 4.

'0 I_ ,... 3.

9& 1,0003.

80084

600 ,/'/·2. 2:-

500//

72 400 2.enl.&.I 300 9"V% ~~(,)

1.5 1.5

! en / en

&0 II. 200 /a::

z o l.&.I 1.5

! /....- l.&.I

e 54~

/ 2<

.... sa:: /~ 100l.&.I 48 !> ./' a:: 80...I ./" <::)

%

(,) ~2 ~ 60I-a. ~J \.0

II. en 50~

0 0HW ENTRANCE 0

a:: 40 o SCALE TYPE a:: 1.0

l.&.I 3&uJ

I- 30.... .9 .9

lIJIII Sq"art -.19' .lth C

2 33h,a4.all 3t .9

<0

a 20 (2' G,oo•• '''0 .,t" <

30 hea4••11lIJJ: .E! a

(3' G,oo...n4 .8

21 ptOl'Cli".

10

24 8.7

.7.7-

6 To u" Icol' (2' 0' (3) pto,IC!

21 5 hot llOnl ally to scol' (I). tI....

4uti It,ol9h! i"clt",4 Ii", tMou9h

o 0"4 Q Ical ... O' ''''t It ~. .63

II,,,.'tOU4. .6

18.6

2

1.0 .5.5 .5

12

HEAQWATER SCALES 2 t13

REVISED MAY 1964

HEADWATER DEPTH FORCONCRETE PIPE CULVERTS

WITH INLET CONTROL

3-53

Page 88: SUSITM 1I!J)1OILECDIC 'lOner

CHART 3

151 I If3000 EXAMPLE

SiI,; re"...1"Q. 500 ctt (2)

13el I., 2000 (3)..t:\1*' HW

0 (f ...) ( I ) 40

121 a 71 (II Z.I 11.11.(2) Z.2 1.1 4.0 3.0

113 a12 (~) Z.~ t.Z3.0

"'0 i" f.,t3~loeael

...--- 2.091 a 83 -- 2.0

fo...---

91a 51400 .->1.~"" 2.0-- 1.500 Q 1.5

83a 53 -- )--- 1.5...- 200 :z:

Z ....To u...eol. (Zl "'(~I tJ)

.... _ • ""it/t' 11ft, ac:4- eni: I&. 100

tlltevtft .,,_ '0"''' I&.0 of .... 011" 'itc""9' 0..I ! 80 •• iftf.,••ct Icof. (I ) .

1.0 1.0

• tJ)

> - F,_ poi,,, 011 ••'"" (II :I0 eo a38 2- 60 ....j .., " ....0111111' It ac: .9 .9I&. .... .....".... 011 •••"., ICO" .... .90 " 50 (21 or (~l.

t-

- ac: z• 40 ,.... 53134 .8 ~

II) :z: :z:ac: 0 30 t-Il)

JC 49 a32 Q4-....

Z 0 .1 .7

• 20 .74- 45129 ac:II)

HW/O.....- ENTRANCE ~....

N 42127 SCALE TYPE • .8 Cu; 0 6

10 (I) Squo,. "9' ."" •....38124 8

n•••waU :z:(21 Groo.... _ ..,"

8 ...0...11 55 (3) (jto.....ncs 5

4OtO,ICltll4

30119 3

.4 .4 42

8 1S 0

1.0_1

23114

HEADWATER DEPTH FOROVAL CONCRETE PIPE CULVERTS

LONG AXIS H'ORIZONTALWITH INLET CONTROL

IUll(AU OJ' IOIJIC.IC ~I JAN. 1M3

3-54

Page 89: SUSITM 1I!J)1OILECDIC 'lOner

\.014a23

CHART 4

'711 IS''000

4000 EXAMPLE (2)1711136 (3)3000 s"•. s.· I 10· 6

Q. 200 eft (I) 65

11lL12\ 2000 ? HW 5('''') 6 ..

12 lL 113 5 ..III 21 IS 0(I) 20 '00 368 lL 106 ..

1000 (3) 21 10 S 3_

63 1'8 800 it 0 ito ' ••t3

600 ./' - ...... 2--258 a 91

/" -500 ./" QI/) 400 ./" ... 2w 53 a 83 ~...,~ J: 1.5-J: ~ 1.5C,) 300 ./"!.

---w

48a16 -ZOO !! i.5! .--- II:

W --- I/) To w.. ac.l. (21 0' lSI ~

ea. 43lL 68 ./" ~ 4'... tttal9ftt "". 0i: ./" C,)

.",........ft • .,. veh,•• I/)... ./" Z .f "10 .'u, d'ieft.',• 2..-/ 10O II: 1.0 1.0• »> (; to ,,,,,,,,c, Ic.l. (I) .>~8.60 ,,_ ",to' Oft ,eel. II) W

0 - 80 l-~ W .",.C, hOIl"""'" to !

9 90 <:) 60 .O.... hOft Oft ., ."., Ie aM

a:: t2l 01(3)• 50 8 pw 34 a 53 J:!! C,) 40a:: I/)

JC32.49 a 30 .1 1

Z HW!O ENTRANCE II:w• 29a 45 SCAL.E TYPE l-ea.

20 ceI/)~- 6 .6_

I.I,j(I) SCI"." let,. w. ,ft Q

N27 I 42 h......u •

\I) I.W121 Grone .". w"" J:

10 ".Od.....24.38

8(S) Gtoove .".. 5 .5

'f"II''''''65..

19.30 4 43

2

HEADWATER DEPTH FOROVAL CONCRETE PIPE CULVERTS

LONG AXIS VERTICALWITH INLET CONTROL

3-55

Page 90: SUSITM 1I!J)1OILECDIC 'lOner

CHART 5

<lOT'0,000 ( I )

'SI8,000 EXAMPLE

6,000 0.36 i.chel (3.0 I.et) 6.(2)

1~65,000 Q. I' eft (3)

\44 4,000 5. 6.

Ittw' ttW

132 3,000 T (I.." 6.2 ~..:_- -

(I) 1.1 5.4 4.-- -<,)

120 2,000 (21 2. I 1.3 5...... 4 .c (31 2.2 6.6

108 ...Ia. 3. 4.

...I'011'1 hit

C

96a: \,000 3.:l... 3-o 800:la:...

84 '" 600 2.

I500

400 /' --..,.I 2. '2

72 /'/(/'I

I 300 <3I.IJ j::: I (/'I /'

1.5o :::~ --l \0.

~ ....<r../(,)60 (/'I 1.5 1.5

~ ~ <r..;."y a:

,,/I.IJ

§ 54 ~to-w

to- W~

a: \:le:t

I.IJ 48 a: 0> e:t...l ::: Z::l

/~1.0o ::: I';

~42

./" 0,..c,

0/ w . 10 .

a:: a .9 .§I.IJ

36 HW ENTRANCEto- SCA .. EI.IJ 0 TYPE ....

to- .~~ 33

e:te:t :1) "tad_(UI ~ .8 .80

a30 121 -..it."c2 to c~nforrn

e:t

$UJ ato IIQIU :r

<.>

Q 27 10 (3) P'OI'~" I'IQ

a: .7 .7c 8Q;Z - 24 .7:: 6<II

5 To uti Ical, (2) or (31 CHOI'C:

2\ 4 hOllzon'aUy to leol, (I), thin 61&" ,'rait'" .ncllnld lin, fhrQuqft

.6

3 o .1nd Q ICOl.l, or r,.",.. 01 6

18illus,rat.d.

2

l~

_. -' .'3- ....5

1.0 5

12 HEADWATER DEPTH FORC. M. PIPE CULVERTSWITH INLET CONTROL

9URE Au OF Pvlll.IC ROAO' JAN 1963

3-56

Page 91: SUSITM 1I!J)1OILECDIC 'lOner

CHART 6

.35

(I).-4 (2)-jr------4'--' l3l

r-s

r4

3

-F-t

2 I- 2

1.5

1.5 ~ 1.5

.AI ------a 1.0

1.0~ 1.0:. i- .t .,1MCIt .s.,ar:

I- .•~ ••lit ••2ar: I- .11M .1t-Z .7-

%:t-a- •• .11MQ

••ar:

iQ« .51M .5 .52:

I- ••.4

.4

.35 .35

1-1-1rnHEADWATER DEPTH FOR

C. M. PIPE-ARCH CULVERTSWIT H INLET CONTROL

1.0

••I." , II·

s.eee

J' ..·.,..10'·'· 4,000

la'·4·. "-S· 5,000 EX.....PLE

SI••: 31'. u·Z,OOO O. to .f.

• '1'-!d.I'-.·!U U' N_

I) '....,15 ...II'·S", 1'·5·a~ (II 1.10 1.0

I;' 1.000(II 1.1t 1.1

100 131 1.11 •• 2

.~, ••••• "-S"

100 wI) I. f ...,~ SOO~... S"Z" , S'·," 400en

1. 3001"0", S'-I"

200

1'-,· , 4'-1·~ar: "~ ./,

,/1M72",4."

C/) 100 ,/a- li.a: ~10 ,/

! ",/II. .5",40" +''70 - 10 "io~g

50 /'1M1M ,/C/) 5.",3.·

i: '" 40 ,/ar: ,/.. ~ ./2: 50 ,/z ~

~ 50"' 31" C/) ,/a- a io~1M ./' -? SCALE ENTR"'NCEN 43"' 21" TV'I;; ,/

/" III .......H./ 10a ./' III .. It...... _f...

I,) ,/ • te Me,.

Q/3.", 2a·

I. """'1"a: •cQ 5zc.. 4<It

T.... _I. Itl .. (SI "'1...2,""r s ....' .....11' ,••••,. (II, ,...........,11' I..UaM II...tlt.....

I)'" 0 •••,••, .. r........

Z5" ,I'· I III...,.,...

••.S..AOOfTIOMA1. !lUI NOT OIMDISlONm &filE

L.IITID I" 'A.AlCATQft'. CA1*.~

3-57

Page 92: SUSITM 1I!J)1OILECDIC 'lOner

CHART 7

.6

.1

.6

.1

A •3.6 3.0

3.0

Q• 2.0:

Z.O ;;/I:1M...w 1.5:I

1,5 caz:~Q"

""0II:

""~.. 1.01.0 !

cw: .9

~--

• .8

•• t t • I.'••••n ...

0...1 o.4MJ 0.'" 00" •.... 0. III 0. 041 0. Itt •IIVILU.............u. JOO·

--­l1."~'- --~----o

2000

1000

100

600500

400

300

'10I.15.

I."131

120

101

9.

8.

11InW:uz 60!S 54~

II:4'w

~;:)U... 410II:W~ 36w:Ic 332i~-21

24

II

II

15

ItHEADWATER DEPTH FOR

CIRCULAR PIPE CULVERTSWITH BEVELLED RING

INLET CONTROL

3-58

Page 93: SUSITM 1I!J)1OILECDIC 'lOner

3.4.3.11 Outlet - Control Nomographs

Charts 8 through 14

Instruction for Use

Outlet control nomographs solve equation 2, paragraph 3.4.3.5, for head H

when the culvert barrel flows full for its entire length. They are also

used to determine head H for some part-full flow conditions with outlet

control. These nomographs do not give a complete solution for finding

headwater HW, since they only give H in equation 3, HW = H+h o - LSo•(See discussion for 3.4.3.5 Culverts Flowing with Outlet Control).

1. To determine head H for a given culvert and discharge Q.

a. Locate appropriate nomograph for type of culvert selected. Find

ke for entrance type in Table 3.4.4.

b. Begin nomograph solution by locating starting point on length

scale. To locate the proper starting point on the length scales

follow instructions below:

(1) If the n value of the nomograph corresponds to that of the

culvert being used, select the length curve for the proper

ke and locate the starting point at the given culvert

length. If a ke curve is not shown for the selected ke,see (2) below. If the n value for the culvert selected

differs from that of the nomograph, see (3) below.

(2) For the n of the nomograph and a ke intermediate between the

scales given, connect the given length on adjacent scales by a

straight line and select a point on this line spaced between

the two charts in proportion to the ke values.

30221/2 3-59840922

Page 94: SUSITM 1I!J)1OILECDIC 'lOner

(3) For a di fferent roughness coefficient nl than that of the

chart n, use the length scales shown with an adjusted length

Ll• calculated by the formula

See instruction 2 for n values.

c. Using a straightedge, connect point on length scale to size of

culvert barrel and mark the point of cr os s i ng on the "turning

line." See instruction 3 below for size considerations for

rectangular box culvert.

d. pivot the straightedgeon this point on the turning line and connect

given discharge rate. Read head in feet on the head (H) scale.

For values beyond the limit of the chart scales, find H by solving

eq uation 2.

2. Values of n for commonly used culvert materials.

Concrete

30221/3840922

Pipe

0.012

Boxes

0.012

3-60

Page 95: SUSITM 1I!J)1OILECDIC 'lOner

30221/2840922

Corrugated Metal

Small Medium large

Corrugations Corrugations Corrugations

(2 2/3" x 1/2") (311 xI") (6" X 2")

Unpaved 0.024 0.027 Varies*

25% paved 0.021 0.023 0.026

Fully paved 0.012 0.012 0.012

*Variation in n with diameter shown on charts. The various n values

have been incorporated into the nomographs and no adjustment for

culvert length is required as instructed in Ib (3).

3. To use the box culvert nomograph, chart 8, for full-flow for other than

square boxes.

a. Compute cross-sectional area of the rectanglar box.

b. Connect proper point (see instruction 1) on length scale to barrel

area ~/ and mark point on turning line.

c. pivot the straightedge on this point on the turning line and

connect given discharge rate. Read head in feet on the head (H)

scale.

~/ The area scale on the nomograph is calculated for barrel cross-sections

with span B twice the height D; its close correspondence with area of

squart boxes assures it may be used for all sections intermediate between

square and B = 2D or B = 1/2D. For other box proportions use equation 2

for more accurate results.

3-61

Page 96: SUSITM 1I!J)1OILECDIC 'lOner

I ! ~ ~ i\ ,. o .. o .. .... .. ".. t

DIS

CH

AR

GE

tQ)

INC

FS

Ivr

II

II"

"1

1'1

'1'1

"1

IIiii

I','1

'1"

iiii

l""1

i'

11

1""

1iii

1'1

'1'1

"i'

"Ii

llil

ii"1

""1

'I

ulG

l.

ON

U'

4Io

UO

GO

GO

oN

C>

I4

Io

UO

GO

.-

N"'

.1o

00

\0

00

0g

gg

gg

sg

sg

so

00

0It

DIM

EN

SIO

NO

FS

QU

AR

E8

0X

INF

EE

To

~t:

0N

N1

)(U

')(.

uoGO

"".o

Q)(

)()(

N)(

11

')(

)()(

)()()C

__

N\U

.C>

IU

O.

UOGO

...,.o

QO

..I

II

1I

II

II

1I

If\'

1'1

II

IIIi,

IIV

ii"

'I,'I

IIii

II

II

•U

O\

cJl

•0

NC

>I.

UOGO

•0

~0

00

00

00

~"\"~REA

Of

RE

CT

AN

GU

LAR

80X

INS

QU

AR

EF

EE

TT

UIU

....

,L

.IIl

----

----

--

Iii

I,I'

iii

Jiii

I'Ii

II

II

I'"

II

,,'T

'-'"

T"

•,

II"

II

I'

I•

I~

0.

GO

UO

.U

'N

bG

tiJ

lUO

:"

F ,.-o % J> :u -I c»

x~

••

"' •~ r:

~'Ii I o

I

IL~ :a:

s:1

;1 ~~~I~

~nJ

IF...

•<

•r'

"1

r~

Ii' h i: ::1 :i il ie tJ t, II Ix • ~

."".....

_""•

••

.0.0

_0

'"~

'" So"-

+"t

~

~...,

~'t

.'-

'b+

'~~

'p~

:.\ "" \•

HE

AD

(H)

INF

EE

T

\\ \\

\\ \

\,..\

\i~V.

..•

'f-.

\~o~

\\

<"0

\

.t\

0

w'b

\

00

"0 o

\

o o z o ::0"1

"1...

.-t:

J:0

1"1

1"1

::J~

II-

ZC

DO

°G

lOo

X"

-"

0l\

leO

::O

....e

rr < 1"

1::0 -t (J

)

w I '"N

Page 97: SUSITM 1I!J)1OILECDIC 'lOner

CHART 9

'0' Qu"a. eroWft 'tot Il.Ibm."e4, com,,,t....w by""'fMOI dnCtlM. 1ft ' ... d"I9ft ptoc.4ute

20

6

6

8

4

10

6

.5

- :i

··10

/g-+ =1:

SlOp. 50- ~OuTL£T CUl.v£IIT FLOWII<G FVI.L

·MW. tot. "0-\..50

"" -.-, 0

o ~

~

5ue.,£/lG£O

.,0, \.._110_

---~~ 00. "

2000

1000

800 120

600 106

500 96

400 64

JOO72

66

200 60U')

U. 54o

~U')

uJ::J:

0 '"- 100 ZuJ ~;

42I.:la: 8 -~ .;:)::J: J6

'" - 60U') a: J3uJQ 50 l-

..... JO40

:!<l0 21

3024

2021

18

10 15

8

6 ,2

5

4

aUlllAU 01 _I.IC ~.os ,.1< .963

HEAD FORCONCRETE -PIPE CULVERTS

FLOWING FULLn : 0.0 12

3-63

Page 98: SUSITM 1I!J)1OILECDIC 'lOner

...

CHART 10

2000

'01' ClYlfe' era... "0' w."'.,...._COM,v'e H. by........ dHCltM4f ... ' .... ".'9" ","OC••..,.

---4

8

910

to.•

0.5

06

0.7

0.8

0.91.0

-%:-QC

"'"%:

. '0

7

~• •Q~ .,0

~• ·0.~

510'. 50­SUIM(ItGlO OuTLET CULV( liT FLOWING FVLL

Jo4W. "'.1\0-\.$0

~3.

0"1""8'0'" Of'! .. ,. Icole 0"ot_.nd for IOft9 al.e l'lo'I,Oftfol

.,,"oUO"O" Th" tfto",ld b.

r~.".4 fot lon, :1111 ..."hcol

----------

1000

800

151.97

800138.87

500121.71

400 113.72

10••••300 98.83

91.58

200 (I) 83.53lU

(I) %: 78.4.II. (,)(,)

~Z

~sa. 43.

- -..i'!.l.9.0 -- _lU &0-38lU 100 !:!? --I:l Ill: --Ill:

80 53134C •

~;;%: Z(,) C(I)

&0 CI.Q (I) 45129-SO lU 42127N

U;40 38124

30

30 I \~

20

23.14

10 20

8

HEAD FOROVAL CONCRETE PIPE CULVERTS

LONG AXIS HORIZONTAL OR VERTICALFLOWING FULL

IVII£AU OF "VILle "0.605 .4".19413 n • 0.012

3-64

Page 99: SUSITM 1I!J)1OILECDIC 'lOner

CHART II

2000

'0' 0",11" ero.., "" ........, •••, c:oift ...', 11'11 ty"",trloda ~"Cfl". IIfII 1M ca••,t" ~OC'dwe

SIO". 50-SU."EI'GlD OUTl.ET CU\.VE I'T FLOWING FUl.l.

HW. H+ 1\0-\,.5.

20

8

6

4

10

2

LO

.4

i "0

!HW

1000

800

600 120

500 108

400 96

300 84

20012

U

60III\I,. 54o~

100 III\0.1 48:z:

0 80 <.,)- ~\0.1

42<.:) 60 ~cz:

50 0~ 36:z: -o 40 cz:III 33Q Q.35 \0.1----~

30 \0.1 304 'l.1:I~ ..-f1Q

20 24

21

10 18

8

6 15

5

412

3

2

HEAD FORSTANDARD

C. M. PIPE CULVERTSFLOWING FULL

n·0.024

3-65

Page 100: SUSITM 1I!J)1OILECDIC 'lOner

L

CHART 12

6

Fo, oull,t crow" ItOt ",tlm,rqlct, comout. HW 'by1'M'~d. dnCtlMd Ii1 1"4 4.I.q" 1)(0c.du,1

- .5

6I-u.I 1u.II&. 8~ 9

:r.: - 10.-

7

1

8

-9

10

Slap. so ....SUIIII("GlO oun.er CUI.V£llr f\'ow.NG FUll

w..-,. M~ 1\0-1-50

300

200

'"! ...:It :ItIE oJ:l..

10090

80

1012"X••"

60 6~"X 40"

~O J:o ~X36"a:c(

In 40 •S,~~

I&. Q";7Q~(.,) --a:: ~0":'(31"

~30 I&.

(5 0..... 43"X21"u.I u.I

Cl Ina: a:c( 20J: )(

o ZIn0 ~ 36"X 22"

In

u.IN

In

10 29"XIe"

9

825"XI6"

1

6

5

4

IlUll(AU Of ~u8llC llOAO!l JAN 1963

HEAD FORSTANDARD C. M. Pt-PE-ARCH CULVERTS

FLOWING FULLn =0.024

3-66

Page 101: SUSITM 1I!J)1OILECDIC 'lOner

CHART 13

F.....'let cro_ ...t c.... ,.". w.., Ily""ft.~. _1_ '" tftO ~ proc_to

2

4

6

15

1

8

9

10

20

I

::I

Q4....

o+.'~",.p

o.",

q,g~o

~ f::'--;::OY ,0

...J...

5000

4000

3000

180

1682000

154

144I;f)....:: 132Q~

1000 ~ 120

I 114800 Q

108I;f)

700 II:.. .... 102Q I-600 ....

~ :I 96..0 !l00 Q 90

I.... .oJ<:)

400.. 84

a:: Z --..:I:: 78

Q 0 »>I;f) zQ 300

2

66

200 leo

10030

Di.",. ft

" 0.03217' 0.0320

10' 0.0311I" 0.0302

40

50

HEAD FORSTRUCTURAL PLATE

CORR. METAL PIPE CULVERTSFLOWiNG FULL

n· 0.0328 TO 0,0302

3-67

Page 102: SUSITM 1I!J)1OILECDIC 'lOner

f'000

2000

CHART 14

.IT ~ :-1=:Slope 50-

SU8Mt:"G(O OUTLET CULYE"T FLOWI~G FULLHW_ H""o"L.So

'01 outl,t era .. " "ot ,ubm"9Id, compute HW bymeU'OCiI <t"CtlHd 1ft ,,,_ cS"14ft procldu,.

<16.6 I 10.1

-to (C'1-:O~; ,,0 G'-\

1000 ->. '<ZI-

1~.3 I 9.2LoJ

( 00 '"LoJ 2

I-

o'~1.1.

800 lW =lW '9" ~,\ I

1.1. 12.9 I 8.3

,0~ , ,00

J:

=I

0

600 J:~ :3lW

(Il o ::I:1.1. a:

.< /\~' \o !l00 ~ I 1.4 I 1. 2

•= lWI CL \,..\1'Z.V ,,-00 \ \.~ 4

0 400 a:I y/ \'lW 1.1. 9.5 I 6.4 .... 0. , \

<:J 0 sa: - .y c \ ' \-~ lW f). ., r-, .l" '\

J: 300 ~10' ,}' I r 't 1\00

o a:8.~ I

Ex .... "LE ~ \- \ 6(Il 5.8 ' .0 -'" Q. 280 C~

Io4t 6 I J:'T<loOO -\ \\z / ,

'r t.~ • \..f/l '!l00 j

8

200 .....1.0 I 5 IlW 9

~(Il 10

6 I I 46 Sir.6.1 .4.6 0,032 '... •. 1 I '.8 0.0321

z 11417.2 0.031 , 15::i 16.6110.1 0.0308

100

20

HEAD FORSTRUCTURAL PLATECORRUGATED METAL

50 PIPE ARCH CULVERTS18 IN. CORNER RADIUS

FLOW-ING FULLn=0.0327 TO 0.0306

3-68

Page 103: SUSITM 1I!J)1OILECDIC 'lOner

CHART 15

.~

-----~

:..---, I......../""

.-.-V I ; -I ~ ....

CRITICAL DEPTH -I ./ _-l---!__ ! :I

i/ RECT~N6\JLAR StC7~ON

/! I I I I

I ..-t--l. ._+-_.-i i I '

4

....u. 3z-

u 2'"0

oo 10 20 40 50

r--.-'." '---~---1

,--- ------

: q! N C.F.S. ! I

! I I I 1 i i I1 1

I !

\ I i ; ;I I /

I Ii ,/ !' .

I : I ! V II I

I I

~'I I - -!~.!

: ; I

........ I..........._-I

I ! I! I I i 1

!I

I I I I! I II1 I

!

i I i i ~ iI

: I

I I I1 ! I

i ! I I

I I :I

i ! i

I : !

I ! i

I

iI

i ;i! !

I I

i II Ii

I

i I

II Ii i

i : iI

:i

) I I

)

16

15i ! I

i i

14 1

l- I Iu. ,Z 10

u"0 9

e

7

6

e

3002150-

I i I I ,: '; !150100

de C~NNOT EXCEED 0

4 --..""O-"""-~-.l. -.l. "'--I--'---_ -....__

50

-NOTE·

8UA[AU OF PUBLIC qoAOS ...... 1963

3-69

Page 104: SUSITM 1I!J)1OILECDIC 'lOner

CHART 16

2

~ Ii-~"

......:~3,~EXCEED TOP OF PI PE iA ~ de CANNOT

~~2,O II.~

61,0'01••

I10 20 30 40 50 60

DISCHARGE - Q- CFS70 80 90 100

i II ~ ! I i I !

,I I II i

, i ---I Ii

~~ :, i i

~! I I,

~~l/~~ I !~r Ii I

~~V ~~I-+ I,~~

-.g, y- 7'1 i i ! Ii ,

:/~i8' i I I I I I/h I de CANNOT EXCEED ToP OF PIPE

id:Y~7' I II I I I I I i-6' I i : ! i I

~~,

i, , ! i ! I !

I "rI : , I i'OIA. I I ! I

6

I­LIJLIJl.I.'u 4~,1:I-Q. 3LIJQ

...Jq:u 2I- 0

a:o

100 200 300 400 ~~0 600DISCHhRGE' Q -CFS

700 800 900

8

7

I­I.IJ

6~,

1:~ ....• Q.

I.IJo...Jq:

1000 :::I-

er'.J

14,..----.....--------..,-----.,..-....--....------,--,---....---.,....-....----,

400030002000DISCH ARGE· Q. CFS

+--+-"""7""'~ .--r-----"----l-~. -~---I--_-;i

'OCO

8 r--+---~-+--r-_t"7?"'b-'''::>_'"'--------+---

I

6 t---t--+-~>4'_-F--'-"l--.........--+--_+_-r--_+-..,.._-dc CANNOT EXCEE0 TOP OF P.:..;IP~E'-i'--lI I

I

I 2 r---r-----_+-+---+-.........--!--!------+----

r--------- --+-1-..,..---+..-------

BUREAU OF PI.;8LIC ROADS

JAN. i964 CRITICAL DE PTHCIRCULAR PIPE

3-70

Page 105: SUSITM 1I!J)1OILECDIC 'lOner

CHART 17

18016014080 100 120

DISCHARGE- Q-CFS

604020

~~~ I

~P"

..".

.-'~.,..., ,

",V ! ,.A ,

# ./", i I.

~/" I

~I

~~ / I 1!

A ~v ,-+-

~~V de CANNOT EXCEED TOP OF P1PE !I

'---+--/-~~V I I I

i ;

.i//A~68"143" : II-

I ~'i "I :0.4"I IIIf! .....9' I ! !

38"129"iI !

" 14' I ! I_III !

: ! , I ! I

3.0

3.4

1.0

2.0

...L.IJL.IJ"­I<,)

"CII

%

~ °0L.IJ

'0

,i

!!

400 500 600

OISCHARGE-Q - CFS

4

I ~~: ..........VII r 'l"--

5 1--l--+_.........-+_ol--+-+--+--+---:~~:;.~r-=~~::7""'~=t'-+_! ~--"-~~~: I; I

l--l----+-~_+-r__1___+___".6"""""""'--1r""_ ___i~-+--_+-+1,- - '--:---1' ----

'

I I ~~:::"''''--L/! ! I ,

I, ~V---:I./ ~ ,-- I I .I .#"~V-",V ' I I: i [ i .

.--,: _~~i I : dCICAN~(CE~D TrO~"'''1---

3 ~V:' ! 1---: I:: I

! j'j10'1'" 15;i97i ' --;-- I ~r-+--· /AV· I I I ! 1 I . ; I

2~ '2"x77I, ,. ,IOS"xq8' i ! i ! I I

91' 1 5 01 I ,I I --l'-"---~-··76"1148"60"138' i I;·

Bu REAU OF Pl.i3Li C ROAD S

JAN 1964CRITICAL DE PTH

OVAL CONCRETE PI PELONG AXlS HORrZONTAL

3-71

Page 106: SUSITM 1I!J)1OILECDIC 'lOner

CHART 18

I I ~-- I i II

i~-rI i i I

i~! -b::::===

! I ! - '-:;;.- r-rr III --I ~~~- I iT I

~ ; i

.J~~ ::/:~..--L.

I i ::.,....--~-:'I-~~V "-i I

-+--i I II I iI

~~-97'.151' I +-f _CAM"'~_ ~'C:~ TO', 0, Pi77'.12" t !

~--68·.106· I53'. 9" I

-t.'-4S0.76·

I I 1 .38'.60" II I 1 1_- _+_~ __I I i i i

i J.-~

::::::: ::::-- i-~~~r::::~ ..... I

~~V"V ..... ! -i--'---:%V V 1

I

~1

I I I

~Y ""-,-

~ i I II

i I

~~~43·.68" I I 1 I iIde CANNOT EXCEED TOP OF PIPE.-Ae'i; ,....,. I I)

29'.45' !24'.38"

I H+-,4".23'

;

4

2

.... 0t:: 0u..Iu~,X....Q.LLlo..J<.to~~ 10o

8

6

4

2

20

100

40

200

60

300

SO 100 120

OISCHARGE-Q-CFS

400 500 600

OISCHARGE- 0- CFS

140

700

160

800

\80

900

200

iooc

BUREAU OF PUBLIC ROADS

JAN 1964

3-72

CRITICAL DEPTHOVAL CONCRETE PIPELONG AXIS VERTICAL

Page 107: SUSITM 1I!J)1OILECDIC 'lOner

CHART 19

240220

50

200

.~--+--~

180

----4--------._---_-_de CANNOT EXCEED TOPOFPIPE

-,.-----,.--~

-----'------r--~~. --,-'-~---l

i . i i . ._..--------------------...~..

"'t'" "--'--- -.---- •• - - --------.- ------.

80 100 120 140 160DISCHARGE-a -CFS

20 30 40DISCHARGE-a- CFS

'/;~-...;.....--..;.---- ------ ---

. ,- -- ----....... _- -------..--~---+---~

---';"-.-+--- ---_. -

--- .....- -+0----, I

--=----+-----,-_.-.-- -- ---.-

604020

_.. _- ----------- --'-'-..-,---

t-.L..-l.--+-l-+-->--+--+-f-+-+-+-1r-+-+-+-1""7~I!f--h""':;:---+---r-,-~.,.

2.0

1.8

l- 1.6loWloWU.

I 1.4"'til"I

1:l-

1.2a-w0

..Jc( 1.0o....a::'~ 0.8

0.6

040

34

32

3.0

... 2.8ww 26u,

,;,,, 2 4

1: 22I-a. 20w0

18..Jc( 16oI- 14a::o 1.2

1.0

0.8

0.60

BUREAU OF PUBl.IC ROADS

JAN. 1964 CRITICAL DEPTHSTANDARD c. M. PI PE- ARCH

3-73

Page 108: SUSITM 1I!J)1OILECDIC 'lOner

CHART 20

.......-;:;:" lA'"""",."..

,......~~ ~ ..... I

.JJ'~ ~V V !

~~ V l../, ,

/ ~ '/ ./V I

~V '/ ./fI" ~ I

/" ./ V V i I

V /,

~V

/ V /'v: ,/' I ,

V / ./ /,/

/ V V -/ I I i

i/V! / V I I ,,

/ V!/ / de CANNOT EXCEED TOP OF PI PE ! ! !//'./.....r I I I

,V/ / fr'!~o. S'-5" I I

I/~~g-rl~':9:

I I I....... -O"l}-I"

,....-~61_f·141- .!II

f

I I ,:

... 4LIJLIJ........"a•:z::...~ 3Q

..Jc(Q...a::Q 2

Io 100 200 300 400

OISCHARG:::· Q·CFS500

--r t---+.----'-+--4,

f .

t---+--+--jJ¥--#.....,.--+-+--t--t--~---I I de CA'INOT EXCEED TOP OF PIPE, : 1

r--~~-------~--t-"""7"!--7"If-7+-~'--- -- ---- --

f--+----1---+---!--------...-,...-----+-~··-----~I-+,

9

aII

-!

7

6

16'·7".10'-1'3 1---+---..,..:6JLi~JIf- 15'· 4', 9' 'J="~i--"""'-'--r---+-~-----....--+--i.--i.---'--i---+--l

12"10",8'· 4'11',5',7'· 3'

~+-,-g.:rE:9'-6"'6'- 5" !-+--+---l--+--+--t---t-----r-...-----'---r--+---+-......--t---+--i

2'-..u..'-I---l._1o--_--'----"__"""--.:...__~-'-.......---l_.:-.-.:...._J.,--l_~...J__J.,___:.___lo 200 400 600 800

...LIJLIJ....' ...

"CI,J:...Q.

LIJ

Q 5 I-........-...-------::'""~""""lr_~'-J------+----~ ---~--.o..-_-___i..J-<(,J

t:41-........_-_-h'-,~.,..,...~----- ......-+----.-....a::(,J

BUREAU 01: ;:>U8,.C ROADS

JAN. '964CRITICAL DE PTHSTRUCTURAL PLATE

C, M. PIPE-ARCHIS INCH CORN!R RAOIUS

3-74

Page 109: SUSITM 1I!J)1OILECDIC 'lOner

3.4.3.12 Performance Curves. The principal disadvantage in using

nomographs for the selection of culvert sizes is that it requires the trial

and err or., method described in the text. Some engineers who limi t their

selection to a relatively small number of types of culverts would find it

advantageous to prepare performance curves such as shown in Figure 3.4.12.

These curves are applicable through a range of headwaters and discharges for

a length and type of culvert. Usually charts with length intervals of 25 to

50 feet are satisfactory for design purposes.

Figure 3.4.12 is plotted from the data shown in the following tabulations.

These data were obtained from the nomographs contained in the text.

(Computer programs are available from Public Roads for making these

computatios). The first tabulation is for the inlet-control curve on Figure

3.4.12, and the second tabulation is for the outlet-control curves.

Data for Inlet-Control Curve

HW

HW* ~ HWX 4

D (Read) D

.5 21 c.f.s. 2.0 ft.

.6 29 2.4

.7 37 2.8

.8 46 3.2

.9 56 3.61.0 65 4.01.1 74 4.41.3 90 5.21.5 102 6.01.7 112 6.82.0 126 8.02.5 145 10.03.0 165 12.0

* From Chart 5 Projecting Inlet (3)

30221/3840922

3-75

Page 110: SUSITM 1I!J)1OILECDIC 'lOner

DATA FOR OUTLET-CONTROL CURVES

Q dc d c+D H HW for Various So

2

(Assume) Chart 16 (Compute) Chart 11 % .5% 1% 1.5% 2.0%

*20 cfs 1.3 ft. 2.6 ft. .2 ft. 2.8 ft. -40 1.9 3.0 .8 3.8 2.8 1.8 .8

60 2.3 3.2 1.9 5.1 4.1 3.1 2.1 1.1

80 2.7 3.4 3.3 6.7 5.7 4.7 3.7 2.7

100 3.1 3.6 5.2 8.8 7.8 6.8 5.8 4.8

120 3.3 3.6 7.5 11.1 10.1 9.1 8.1 7.1

140 3.5 3.8 10.2 14.0 13.0 12.0 11.0 10.0

160 3.7 3.8 13.6 17 .4 16.4 15.4 14.4 13.4

30221/2840922

2

* From Chart II - or by Equation 2.

The curves plotted apply only to the type and length of culvert shown.

Culverts placed on grades steeper than about 2.5 percent will operate on the

inlet control curve for the headwater-discharge range of this plot. If a

free outfall condition does not exist a correction for tailwater should be

made an instructed in Step 3b, 3.4.3.9 Procedure for Selection of Culvert

Size.

3-76

Page 111: SUSITM 1I!J)1OILECDIC 'lOner

HYDRAULIC PERFORMANCE CURVESFOR

48-INCH C.M. PIPE CULVERTWITH

PROJECTING INLET

~.VIJI// If

s « ' I /'/3 O' il? 0 J I/ 0" ~ol

I/VIL~'/'1/VI

/1'I/;v I

I '/i,/ I1,

,I;Iii ! !

I l, ,,-

LIMITV '/,

.750:3' :.... ~ ke =0.9I"" / r I

/ n =.024 IJ LENGTH -:. 200 ft.

/ --;NLET CONTROLI -OUTLET CONTROL

I NO TAILWATER I,I 2i<) HW=O+(I+Ke}-L,

29

9

2

oo 20 40 60 80 100 120 140 160 180 200

DISCHARGE (Q) CFS

12

10

"

-~7J:-

Figure 3.4.l2

3-77

Page 112: SUSITM 1I!J)1OILECDIC 'lOner

PROJECT: /42 £3 ._- DESIGNER: ..I..o.~

DATE: 2-/8-64-

HYDROLOGIC AND CHANNEL INFORMATION SKETCH

STATION : 32./ + 14-

EL.~

A:vt~L ~ -la, = /60 c.f.s ~ Q ti O TW, = .$.0. .l- ------

EL./ool

TWL.Q2 = TWz = So· .o//.

EL.;]tL :: -;;;0 ,

( a I : DESluH DISCHARGE. SAT QZ!I ) MEAN STREAM VELOCITY = B!~

°z = CHECIl DISCHARGE. SAT o~ OR 0'00 MAX. STREAM VELOCITY= /O'/SIC.

HEADWATER COM PuTA TlON<:t

CULvERTz ....J

INLET CONT. OUTLET CONTROL HW=H + ho -LSooJ 'l ... !:

DE S,.HIPTION Q SIZE ~ x .J,", COST CO",,"ENTS.. 0

.!::!..!. ~.. :;).J

IlHTRM'~E TYPE! HW :<e H de TW ho LSo HW s 0'"0 2 u >

1---'---' ._-Ic..,.,p (..', r) -- N_ ........ ,.....

~-(( /60 .$4" lSI. 71:1 e s '. "r-ry .... ~. - ..

:5 &.:./,.,..,./ ,w.,..

" 1..0 48 225 90 .S 85 3.7 3.8 38 /..0 //./ /11 (~~

- '" - rrr -S4"

.. ..3.6 .II .3 4./ /.0 7.B /1,( ~

",.I.,.,.y .,. til,'60 SJ / 5" 70 . .5 4. 7 7.8 ,5 •'s••.•.

(0 ,~ "'-- - -!

--- -- I--Co-:rtr-re C ..... / .. H .... it.y"

~. 4'd'f~ -#"'~/ / "- ;. .48 z 35" 94 S 47 3. 7 38 .3 3.8 /.0 7S' 94 /4; ic:. r.,.., S~ ..~--- -'~-- - -

t...h'...v 0.<

" /60 .:> ( leO 7.Z ,...29 36 4/ 3 .1../ /0 60 Jz. /47 ~....~~";;D_.......

--;:;",. c r" Ie--z;::-: r~). -_. - i -

~N""" ...:

<ireQ"e ~"d ·1.0...160

48t q

<78 ·z 10 3.7 3.8 3 ".8 /.0 '-B 78 /40.

",~I -t . .,;,r'-----.----- ----- - - ---

I"

-- - .. --~-

SUMMARY a RECOMMENDATIONS:

-'----- --_._.. -- - _..._----------- - J

3-78

Page 113: SUSITM 1I!J)1OILECDIC 'lOner

PROJECT: E /4- -.2 (.5) DESIGNER: ~P.e

DATE: 2-20· 64

HYDROLOGIC AND CHANNEL INFORMATION SKETCH

STATION: 8+.,

EL.~

/

~f /AHW=JLJ

/

~Q, - 400 c../~ Qso TW1 = 6 S' -L_ ----.....-......-- TW .". ..s-O2

- TW2 =El./OI/ SO" "':'!:y;I.

EL..u1 T-

L;:~'

( ° I = Ot !>IGN DISCHARGE. SAY °2~ ) MEAN STREAM VELOCITY = S '(..s.c.°2 = CHEc.l( DISCHARGE: • SAY 0!l0 DR °100 MAX. STREAM VELOCITY= /J! '/.s.c

H(ADWA TER COMPUTATION~

CULI/ERT ! ........J ",'::

INLET CONI OUTLET CONTROL HW=:H ... ho -LSo...J ~DESCRIPTION 0 Silf ~ z

... u COST CO...... ENTS... 0..dC+D ... :;,...J

ttNIRAN(f IYPl) ~ HW t<~ H de TW ho LSo HW ~ 0'">0 2 0

c....... "" .. (c, .... )-

N-./ = 9./As.s",.,.4', S"d P,. •.., 400 /s j#;- Dc 78" r... J,.·.44;"" ac'~--- . ..-- --- ~--- ----~- r--- - ,--

Hvv N,.,,,..400 84' 118 83

r;.."" 90".--I ---1---- _._-1------ .- .- - .

.111;' rf ~... I."C.fc'c. x.«... ..;.:",,"'a 90..

/c:JS: 79 ·2 /9 sz ~3 6.s 6.S 6.0 Z4- 79 rry Z P'IPIJI ".. iG .. o.e~- .~ .. --1--.•_----1-----1·- ,-_.. _~

s .....c 1"y,...c 1'i:oo ~./I'Z jO';o<!:-S Z-oo 54 /US' 8.3

- 1--" - - .-- -1----- ---_.z.:s i lice. r c:; Void

" Z. G>O in- " .Jd fo 9 z: ;'54 4.0 4,S 6S 6,S 60 .59 '9 "0' ~c.. O.C:; .$••<::__,,.6

'--- . f-.- ... - -,.' f--- _._- '\.~ ., .. -- ..c,., C~P 14',(. e<- r c (..t.se (J~v,1 A

&".., a (I:-,r7) Zoo 60 " 54 67 zs . Z 4.0 4S D·S 6.S' 60 6.7 67/0/

C..,. b, ,,_• .4'''1:10:<- 0.<:

~-- ..- - --- - 1--.- -- _._.."4 'I it'" 1".,. bo' s''''J /~ c .. ' ~ c: rc v .. I .., ... • r,,1 Q,,,J <:~

SUMMARY a RECOMMENDA 110NS'

..

l -"- ----- .._------- - . . .-

3-79

Page 114: SUSITM 1I!J)1OILECDIC 'lOner

PROJECT: r,s·z. DESIGNER: .I.. ",. H.

DATE: z· Jl' .•~HYDROLOGIC AND CHANNEL INFORMATION SKETCH

STATION : :I'~ "0

EL~

•..J=~".L ~ l-°1 /z D et··· Q,zs TWI = $.0, --L- ___

=Oz= TWz =

EL901 So· ~y. EL:J ,-TW~

L=~'

( 0 I • DtSIGN DISCH..RGE • S..Y Ou ) MEAN STREAM VELOCITY: ,~ '!SIIe.0 1 = CHECK DISCH....GE. S..Y 0 50 0fII 0

100 MAX. STREAM VELOCITY: /s Y.sec.

CULVERT HEADWATER COM PUTATION ~~~:::l

INLET CONT. OUTLET CONTROL HW=H + ho -LSo ..J 31 .... !:DESCRIPTION 0 SIZE iz ..JU COST CO....ENTS~o

g dC+D ...~;:IENTlIl ..NCE TYP!) HW Ke H dC TW hO LSO HW ~

,D > ,

2 u :eM'" (Ci...,) ~ "- N_ ",.~.. i,"""lwrwJ 1%0 :r." /.2$ s. '- ~ : "-"y Nil

,

II ~

~JN • ." ___

t, ,1..0 .0 .91 4.9 .7 .l.s 3.0 4..0 3.0 .... 0 leUJJI

4.9 c:._.~.~

C_P Arc" 1a .... ~ ~ .::4...... .-.,.~.,I'r""; ',"0 ~.H /'Z4 4." .7 '.4 2.4- 3.0 3.0 $.0 "'.0 4.6 , C.,/...... .,.

C.AC,..... lie" 4' ~ l/ZO..

1.:13 4.9 .4 Z.e 3./ 3-S ".0 s.s 1•. 0 ".9.50· 'tN. \N. ~' '\: ;;:

C.A~-"" 0<1.' 6u *. ~~ ~<fr. 1.-1 P,*v'. /20 "8" /.S/ 4.8 .2 2.9 %·7 2.9 .5.0 .3.0 / •. 0

"4.8

c_... h c,·..~~

\I

, Z'".

/. // S.O /7 3./ 3.8 3.0 3.8 '0." So~_~,.t:I S10qj $'-1- .%~

\0..~ i~

SUMMAID' a BECO-MM€NDATIONS:IN-PLACE COST, AYIILABllITY, LOCATION, COVER REQUIREMENTS, ETC., SHOULD BE tONSIDERED BY

THE DESIGNER IN SELECTING CUl HRT. CM PIPE 'RCH CULVERTS OR ';ONCRETE OYAl PIPES MIGHT BE A SOLUTION WHEU COYER IS LIMITED.

3-80

Page 115: SUSITM 1I!J)1OILECDIC 'lOner

30221/2840922

3.4.4 Bridges

3.4.4.1 General. This paragraph will present the design criteria appli­

cable to the locating of the bridge abutments and substructure, wnich

constrict the waterway, to insure hydraulic conditions for safe a structure

and the efficient passage of fish in watercourses that have been classified

Type A or B. The criteria for fish presented in Table 3.2.1 and a depth of

flow 50% greater than that specified in 3.2.2 Inadequate Water Depth shall

be required during the two year flood.

The criteria for design discharge determination shall be in accordance with

the applicable portions of 3.3 Drainage Structure Design Criteria. The

watercourse bed stability at the critical section should be investigated by

either of the methods indicated in 3.4.2.1 Permissible Velocity Method or

3.4.2.2 Tractive Force Method.

3.4.4.2 Hydraulics of Constrictions 1n Watercourses. When an area con­

striction is introduced to an otherwise uniform, friction-controlled flow in

prismatic channel of mild slope a backwater profile is first developed

upstream from the constriction. Please refer to Figure 3.4.13.

3-81

Page 116: SUSITM 1I!J)1OILECDIC 'lOner

Section(0)- B

«": .., Eddy zone'0..- '

T <-1-"(1) b ~ (3) Ccb (4)

1__---1-

......-:::;:- Live streom bO\lndary

",-

t ~ddY zone... I-

(u)

Note:horizontal scale distorted

Datum

(0)

~

Backwater profile

Normal profile ~i'lh

I'h;...J,..---

...."-

he=hl .o( Y.=Y3hon=htn r h4=h 3n

Channel bottom (zero slope /.

Datum-

(e)

n

Figure 3.4.13. Definition of flow through constriction. (a) Plan;

(b) elevation; (c) elevation, adapted to assunption of zero

friction loss.

3-82

Page 117: SUSITM 1I!J)1OILECDIC 'lOner

_lzF_TYPE I

Type I opening, vertical embankment, vertical abutment

TYPE D

Type II opening, embankment and abutment slope.

~@\______J--- TYPE m ~--------

Type III opening, embankment and abutment slope/

Type IV opening, embankment slope and vertical abutment with wing

walls.

Figure 3.4.14 Constriction Types

3-83

Page 118: SUSITM 1I!J)1OILECDIC 'lOner

The upstream end point of the backwater curve is assumed to be at section O.

Near the constriction at section 1 the central body of water begins to

accelerate. An adequate approximation for the location of Section 1 may be

taken at a point one opening width b from the center of the opening.

At the constriction, the flow as rapidly varied, characterized by marked

acceleration in directions both normal and parallel to the streamlines. The

longitudinal water surface drops rapidly in this region. Within the con­

striction, the live stream contracts to a width somewhat less than the

nominal width of the opening, and the spaces between the live stream and the

constriction boundaries are separation zones occupied by eddying water. As

the water passes through the contraction, the contracted stream reaches a

minimum width at Section 2, which corresponds to the vena contracta in an

orifice flow. After the vena contracta, the live stream begins to expand

until it reaches downstream Section 4, where the uniform-flow regime is

reestablished in the full-width channel. Between Sections 3 and 4, the flow

is gradually varied. Over the whole reach from Sections 0 to 4 encompassed

by the backwater effect of the constriction, the total energy loss is the

same as that for uniform flow.

The equation for the discharge through the constricted Section 3 ~s

1 Eq. 1:

Q = CA3 [2g ( h - h +f

1/2

30221/3840922

A3 = area water prism at Section 3

VI = average water velocity at Section 1

hf = hydraulic friction loss between Sections 1 and 3

C = is an overall coefficient of discharge

3-84

Page 119: SUSITM 1I!J)1OILECDIC 'lOner

Eq. 2:

The overall coefficient of discharge C is calculated by first determining

the Ct, the coefficient of discharge standard value whicn is a function of

the physical type of abutment configuration along the flow lines of the

constriction. The types are shown in Figure 3.4.14. The coefficient C' are

dependent upon two factors; m the precent of channel contraction and L/b the

ratio of the width of the abutment parallel to flow and the width of the

constricted opening.

The value of M may be calculated by:

K

m = [1 - Kl

+ KC

+ K ] 100%r c

where K refers to the conveyance capacity

Eq. 3:K = 1.486 r 2/ 3

nA

30221/2840922

and subscripts L, rand c refer to the Sections at 1 to the right of, left

of, and the constricted section.

The overall coefficient of discharge C is now determined by adjusting C' for

the effects of secondary variable by multiplying C' by the appropriate cor­

rection factors k.

A listing of these corrections follows:

kF = a coefficient that adjusts C' for the influence of a nonstandard

value of F

k = a coefficient that adjusts C' for the influence of angularity of

flow

3-85

Page 120: SUSITM 1I!J)1OILECDIC 'lOner

ke = a coefficient that adjusts C' for the influence of angle of wing

walls

ke = a coefficient that adjusts C' for the influence of eccentricity

of constriction

kj = a coefficient that adjusts C' for the influence of piers and

piles

kr = a coefficient that adjusts C' for the influence caused by round­

ing entrance corner of abutment for vertical-faced constrictions

k t a coefficient that adjusts C' for the influence of submergence

of bridge members

kw = a coefficient that adjusts C' for the influence of length of

wing walls

kx a coefficient that adjusts C' for the influence of the ratio of

distances x/b (See Fig. 3.4.19c and Fig. 3.4.20c)

k y = a coefficient that adjusts for the influence of ratio of depth

of water width to opening,

y ya + b

2b

The C' values and the correction factors can be obtained from the Figures

3.4.15 to 3.4.23 at the end of this Section.

It is possible that certain combinations of the empirical coefficients

applied to C' may appear to yield a value of C greater than 1.0.

cases, however, a value of C = 1.0 should be used.

In such

30221/2840922

Referring to Figure 3.4.13 in designing bridge opening for the maXimum dis­

charge we are concerned with backwater profile or the surcharge above the

normal profile and the depression in the normal profile at Section 3. The

interest in the former is to see whether overtopping of the banks occurs and

3-86

Page 121: SUSITM 1I!J)1OILECDIC 'lOner

TABLE 3.4.5

Key to Tables for C' and k Values for Each Constriction Type

k k k~ k k k k k k kType C' F P e j r t w x y

Type I 3.4.15 3.4.15B 3.4.16 3.4.23 3.4.23 3.4.15 3.4.23 3.4.15A B D A C,D C B A,B&C

Type II 3.4.17 3.4.17 3.4.23 3.4.23 3.4.23 3.4.188S=1: 1 A C A C,D B B

Type II 3.4.18 3.4.18 3.4.23 3.4.23 3.4.23 3.4.18wI 8S=2: 1 A C A C,D B B

ex>--.J

Type III 3.4.19 3.4.19 3.4.23 3.4.23 3.4.23 3.4.1988=1:1 A B A C,D B C

Typed III 3.4.20 3.4.20 3.4.23 3.4.23 3.4.23 3.4.2088=2: 1 A B A C,D B C

Type IV 3.4.21 3.4.21 3.4.21 3.4.23 3.4.23 3.4.238S=1: 1 A B C A C,D B

Type IV 3.4.22 3.4.22 3.4.22 3.4.22 3.4.23 3.4.23 3.4.238S=2: 1 A C B 0 A C,D B

SS = Sides lope

Page 122: SUSITM 1I!J)1OILECDIC 'lOner

the latter to determine water velocity at Section 3.

obtain a relationship for h.

By adjusting Eq. 1 we

Eq. 4

h F = b ( Q) 2j'kl K3 + L

the distance section 1 is upstream of the constriction, generally

where hF is the friction loss between Sections land 3 and may be calcu­

lated by:

Eq. 5

where; b

equal to the breadth of the constriction

L = the length of the constriction

Kl & K3 = are the total conveyances of Sections 1 and 3 respectively

In Figure 3.4.13 the increase hl* in water surface from the normal stage to

the backwater stage at Section 1 is known as the backwater of the constric­

tion. The distance h is the difference in water-surface elevation between

Sections land 3. The ratio hl*/ h is called the backwater ratio, which is

known to be a function of the channel roughness, percentage of channel con­

traction, and constriction geometry. A laboratory investigation (Reference

7) was made on the backwater effect due to vertical-faced constrictions with

square-edged abutments. Data plotted in Figure 3.4.24 indicates the rela-

tionship among backwater ratio, Manning's n , and contraction ratio m, It

can be seen that the channel roughness is relatively unimportant as a factor

in determining the backwater ratio. In fact, the limit or change in the

backwater ratio due to roughness is practically reached at an n of about

0.050. The previously cited laboratory investigation also reveals that the

influence of cross-sectional shape on backwater ratio is included in the

contraction ratio.

30221/2840922

3-88

Page 123: SUSITM 1I!J)1OILECDIC 'lOner

The backwater ratio in Figure 3.4.24 is for constriction of basic type, that

is, for a vertical-faced constriction with square abutments. The backwater

ratio for other types of constriction may be obtained by multiplying the

backwater ratio by an adjustment factor ka• This factor has been found to

be a function of the contraction ratio m and the ratio ct c .bas~c

Cbasic and C are, respectively, the discharge coefficients for thebasic type and for other types of constriction that can be determined by the

method described in the preceding text.

obtained directly from Figure 3.4.15 a and b.

The value of Cbas i c can be

Based on experimental data,

3.4.25.

the relationship among ka, m, and clc .bas~c ~s shown Figure

3.4.4.3 Procedure for Design of Bridge Waterway. The first step is to list

design data. Drainage Structure Design Data Sheet 1 is provided for this.

a. Design discharge Q i n cfs, for required periods (i.e. Q50 or QIOO

etc. )

b. Establish constriction type, (I, II III or IV) breadth of constriction,

length of constriction and the constriction centerline relative p r i.n-­

cipal channel water prism. In watercourses with fish, Type A or B see

1.2 Scope, it is preferable that the abutments or piers fall outside of

the two year flood channel. This will avoid the need to undertake an

analysis for the two year flood.

During the field investigation the watercourse should be surveyed at Section

1 (a distance upstream of the proposed constriction equal to the breadth of

the constriction) and Section 3 (at the downstream end of the constriction),

refer to 3.4.2 Waterways. The field investigation should also determine

30221/2840922

Manning's n, the slope between Section 1 and 3, and the substrate classifi­

cation for permissible velocities or tractive force calculations.

3-89

Page 124: SUSITM 1I!J)1OILECDIC 'lOner

c. Determine a rating curve for the reach between Sections 1 and 3 using

the average of the areas and hydraulic radii for several depths includ­

ing the design flood depth.

d. Calculate the conveyances K for Section 1 and the constricted channel

at Section 3 and the ratio Lib (embankment and constriction breadths).

e. Calculate m (channel cons t r ac t i.on ) from conveyances K (Eq. 2) with m

and Lib go to figure for constriction type (Figures 3.4.14 to 3.4.22)

to determine C' the coefficient of discharge (standard value).

f. Determine if the constriction type or location require any modification

to C' i v e , c' x k , kF etc. = C.

tion for modification factors.

See Table 3.4.5 for figure loca-

3u221/2840922

g. With nand m given enter Figure 3.4.24 to determine h1*1 h. (If the

constriction under investigation is not Type I a C' and kF are deter­

mined for the m, Lib and the Froude number in Figure 3.4. IS' a and b.

The C' x kF C is used with C de termined f. In Figurebasic in3.4.25 to obtain ka· k a times h1*1 h will give the corrected

hl*1 h).

h. Witn the value hl*1 n estimate h (Trial starts 0.9 x (VI ~)2~g

A3and calculate hl*

1. Calculate trial A3 using depth of flow calculated in c less ( h - hl*)

which is Y3.

J. Using Eq , 5 and 4 and correcting C value in Eq , 4 for Froude number

kF calculate h, if value agrees with that assumed in h, the solution

is reached. If not repeat h , i and j with a new estimate of h.

3-90

Page 125: SUSITM 1I!J)1OILECDIC 'lOner

30221/2840922

k , When solution is reached check V3 velocity per tractive force or per­

missible velocity criteria, if satisfactory or close to satisfactory a

analysis at the 10 year flood may not be necessary.

1. For fish watercourses where the two year flood water prism is con­

stricted, perform analysis a thru j to determine that velocity V3 does

not exceed requirements stipulated in Table 3.2.1.

3-91

Page 126: SUSITM 1I!J)1OILECDIC 'lOner

COMPUTATION OF PEAK DISCHARGE AT CONTRACTIONS

--.-------,[Iz If---r-TYPE I

008030 "0 50 SO 0.Pltc'" of ~ c,",,,oct ..

A. Baa_ curve (or ~oefflci_nt o:C diacharC_

20

-"

... "I I I Ir- _ , "I... - l- I"'- lo- I

..... "'- I

t- - -~T-~--,

. 1-- -1- -

" r--I-- - 1-.....l-- l-- l0- t:-"",r-:-l.: I-tJ +t' I-'~~... I-- l-- 1"- q= -LCiiiI±"I-- ~ -:-, ' n"",

lo- - - -s_ co.... itt....

+0 f·o ; I ;-.::Il !ll ........1.J)zp'

F·O.S •• I I --r- .. 0 j'O , :

: ,;., ;

7 90 I

1.00

1i~!t 0.70ic!-U

1.I , , , , i....-i"'I .....-r I

i , I ......-f" ; I II ! : I ! ~ ,

I

I i 1 I I ! ~r-r I , II. , l-f+±.. .l.-l- , I I

I : : I

, I , .---J-o+- , ! I I I iI J...-j...- I , i I I I ; : , ;

I I I, ,I I I I I , I ,

o oJO 02CI 0.30 0."0 0.50 0.60F. Fr..... .......or •.,.9-A.llih

8. VariatiOD ol diacbarl(e coefficient wi.th Froude number

0.70 0.80

.20

=tc/'I' '!lO....

I I '---+-" I<r:..-1 .-'- I I

IS f- ._ L __ ~~ I

, : I :....1- : I I !'",=- ,

i I i I i~ I :

".i

I- '_f-o: ! I i I : :-Q , I I _I ,

I

I I.10 : ,I ; I !

r/ I II I I

I I , : :~ I I I I ,.os i I I I ,

~, , I

, I

I7f I , ,

1\,1

o 0.0& 0.04 0.Q6 0.01 0.10 0.12i' Aet" of cor"" ,0000clilll' 1o widt' of 0"*"''''

C. Variatioo at diac:ha.rae coefficient With entrance round1nc

0.14

Figure 3.4.15.--Type 1 opening t vertical embankment t vertical abutment.

3-92

Page 127: SUSITM 1I!J)1OILECDIC 'lOner

DlSCHAIlGE·COEFFIClENT CURVES

oo..o

o...ci

,,

1

I~l-

l-f\ - ... i;

I' ~l;V~/ ~.

f'-

E.\ l-

I ! r-.1

! I I I,

I , ,I

!

~9,

'....•. .-T -

1 !o9: .

.J-

Ia

I- ,!!, ..

,. ,, 0a

-- :: ,, I

8I

,-+- d

, , ,-- , ,

I I

I , I ..

~, , :;

, ; , ; ,

"', , I ,

1, , ,

~ ri .v , ,~i, ~ I i\

~~~1

" I

, Ii- I <, "\! ,i-

,i- ;...;.- - ~ +. 1-- "'-'\

: N ,Si- t .~e

+-- I

I'-.J+--~,

I"

0

Figure 3.4.16.--kw and kep curves for vertical

ment of Type I opening see figure 3.4.23.

and abut-

...~..

o 5a ~

g

~¥:

embankment

,,

I

II0 .. , I..i : I

:~H, ..... 1 , :_+ I

,1 I I

i !I "I,

I I :1 I

I i I

I i\ ,

: :

~~I

\\1 I

\i

-h~ ~ \ II '\t ~/I I

I 1

I i r, Io

II

1

1, 1

,1

! I1

H I1 I

~L~,,

! I

-Il- ,

1i l

I"1 I "- i

I '\.\ ,,!I

1"\ 1\

!-:\

!! 3 -

3-93

Page 128: SUSITM 1I!J)1OILECDIC 'lOner

COMPUTATION OF PEAK DISCHARG£ AT CONTRACTIONS

5, :

I , ~-- ...- If, I

I r-H-, I

I

:

90 '00so

i ! ! I~-L +tI : t

I ,

, (

;.t !

I . t-'I ;-1.. ....'i i

~ ~ ~ 80 roItt. ",rc••t· If eftGft"" COftt,octl ••

A. Baa. cut:ve (or coeCCiclent of discharge

20'a

1.00~iiifii:;;:r:r:'T'"""'~""'-'-"""irr--""""'~"""-:-""""'n-:-nITrrTrTTnTnTnlnrrl

:.t O'80I---l--..,...++.........--1---+_-:==r-r--==:::::::::-f::::::::.l~o::::l::::~rr=H-++~~~~'il..

~- 0.20 0'" ol>o>o_.

-... I I 0.1 I

~ i-..i.. r- ...... ~ -i-+-; It ; I i

~OTt -.. r-~ I I : - 0.'- I

;~~ -~r--lL....,........

-TO.01-r ,-f-.- : ! ! :

I :! I ~ -l. ~ -;--+-~

I .05 :..- --i t .. -.-I 0.03 I

,i j I [ ,

i I I ~ .... -+1 i . ----:-:-- ':--n-I , , I i I rt !I I I I I-. f I I ! ! I I I ! I I I : . I I I' ., I

1.00

l<.y O.9 0

0.80a 10 20 ~ ~ ~ 80 ro

m-Perc.nt of eM""" contractionB. Varlatlon of discharge coetttctera with Ya")b r at io

--zo-

eo 90 100

0.9C H-t---r++-H-+-++-':"'"1.......-+-::?"""''-t-'--:--''--'!-::;:.-''f-+--t-----f--'----I

o.so~-++++-+-!-+++-.;....:,.....l.--+O,.....=;-......-+-+..;....-f-

30 ~ so 60m. Pt!rctnt ot ,,,onntl controctioft

C. 'IIlriation ot discharge ccerftc ient wah antularity

Figure 3.4.17. --Type II opening, embankment slope 1 to 1, ve rt ieal

abutment. See figure 3.4.23.

3-94

Page 129: SUSITM 1I!J)1OILECDIC 'lOner

DISCHARGE-COEFFICIENT CURVES

TYPE II

.....~- ... ,..1- I, , , ,

i \- ... 0_' -r-I- l'"o!'-.... I \ \ I I iI I I ... "- ;... I i ! I i :

I I I !-- ;... "- 't.: I.O~ I I I : I I Ii I

, ! """' .... ;-. N--o.:.. I I , ,i I i l' I ~""'" 0.50 ............. II

~I·Ston_.._ ......ltl... I , i :-.... -""'" I i ! ~ ..... I I !

I : , ~

~I I -

Ef~.0.20 • '1.00 I , I I i"'o!-- !""I.-.l.....[ I I

•-0· I I I Ii"".... , , r - .-o0li--....._-,... o.Z ,. 0.7 ! , I ,

~ I

I,.

r-L ~.O I ·0I I !+! H-<-

~ 's • I t i !-f-

~·tI I i I I I i

,I

, , I I I i I

~ 1.00

i"_I.-

0.'0

I PC I

;;;

'; 0.10

i!...oo'y 070

o 10 20 ~ ~ ~ ~ ro1ft. Pilre"t fJf eMMet COfttroctl..

A. Bu. curve for coefficient of discharie

eo 90 '00

'0080

~ 020 .... -.

30 40 30 ~ 70III' ,..,_ of _ ...." '1.

B. VariatiOl1 of d1acharie coefficient ith Ya'Yb ratio2i)

2010

- • .......1

I C""~ ---..:~ I i - i ! i I i I i I I I I I I I I i I I I I i --;-I

I :--.... ""':"4- I

I ; I ........ ' ; ~ , i ! I I i : ; , I ,.O~ I

I i I i -.... II I I , I : I I r I ~ .... I ! , ! , '1 0.03, : I ,, : I : , I I I

I I I i ,-

, I, ! , I I I i I i I I i I I, I I I, i ~....L.-...-

j I i I : I I I I ,I I I I I r f I ,

I , I! , I ,TI i I i ,

I , I i I I , i

kyO.sO

0.10o

1.00

eo7020 ~ 40 30 so".-Pete" '" eM_"" coettecU_

C. Variation of discharge coefficient .... ,th ancularity

.. .0-," 0- I , I ~ ! /"'f

~t t....- /.I ! I I I I I I , I I ! I A !AI I ! : 2(/ I I I ! .:.....-' -- -1 :7! ! , ,

I I , I i -:A I 1./1 , ,!

I ! I , : ! V I Y1 I I

I I I I I , I : I ~, A , I I

.... I - i I A I I I I I ! : I: I I I i I ! I I Y I

~~I t- i~-l- ;; -:-

I I vr I-- -t-, .LI ! 'A-'"- I ------!

.-~, I I

1-M [\ -'-I .L--- ,I I

! - ! ! I I -......- , I I ,

... ;. - , ! I , I I ,0 10

1.00

0.10

0.70

030

Figure 3.4.18.--Type II opening, embankment and abutment slope 2 to 1,

vertical abutment. See figure 3.4.23.

3-95

Page 130: SUSITM 1I!J)1OILECDIC 'lOner

c.~ ~i.-...L.----------- TYPE m

~1"'---

I

I I II I I

!,

1 1 I i

i , I

I . l I

R

, 1

...--~.---,- , , ,

i ;~- t· ~~+H70 so 90 100

---! I i I--. --,.......

40 50 60",.Perc ... of eftc",", 'GfI~octi ...

A. aue curve for coefticient of diecharae

i.... I I"N. : .............. ! I

20

I i I I iI • I.... ,

i... ..... II , I I

I " I 1"'-,..... I I I I

... ! I I -....:. Ii I

,

10

I

so

f..­

f­I­i-

".-ri­~+-

i

2l) 30 40 50 60

~.PI~t of ~".. COfttrlctio.B. Variation of diacharge coefficient WLth angularity

, I~-

'-0'-

II 1

o 10

o.'0~~~~~~~~tdRt1;1L.-l""'1++' ·1·+·' I Vf iLL l-L.LLL I t., i-

k. F rL i! f 1H1 IR++- r r*flilH _~._oao8f J..1' iii I I+1- r 1\

1-H--I-+:~+:;:-t.t...?_i"9-.t f I [I l' ,(..~ ~ t,' r-t -I r t r r"', 'H-- b-\..~ .~ l. f-tr I I t-r' rT;! 1 r

0.- .-:- I 70

..-

r- f ~ -1t:·-IIi :

0.12 0.14

I iI I ,_! T--

0.100.04 o.~ o.~

t.II- of I '0 ....111 of ''''''''C. Variation of diecharge coelticient With .!..ratio

b

0.01

1.10 1~!li,

....~~ -f t l rtf 11 II i I I i I I Hf-T-+++-H'++-~

I-+- -

100 ~o

1.20

Figure 3.4.19.--Type III opening, embankment and abutment slope 1 to 1.

See figure 3.4.23.

3-96

Page 131: SUSITM 1I!J)1OILECDIC 'lOner

DISCHARGE-COEFFICIENT CUR V ES

o30 40 50m.~c."t 01 channel CQftfroclion

A. Baa. curve Cor coefficient of discharge

2010

-,. ....- , , , I ll+r-::k=c -II! Iix-I'o.. ';". 1-1-l r~ t1 I I

I ! Ii

I~'l-, ~, I : i I I I ! I~" ,~..[ !"-. , I I :

,L'I ;~~-~- ~-:- - ,

~+--I- , ... ,~

, :-- ......... , , , I

", ".J. j .... ,...",,1 I~ .~ ,-... , --~- it- -- ..-+-I , I I

, .... -.... i-;"" , r-<.. ' l"-..... : ~ I t---..L.-

~H '" ....... ' ....... ., --. --- .0<1

I ........ ;-;....;.. -- ,....... ' ....... -....... --- i ------I i t

-H-t , ,'"""

......... -- - - osc"l , L' I ~~~- - - --L-o.4~ ...;.;' ~.;.....-::;::I , I ,eOftdltiOftI I .

i+--- ! --cl2J I i-S' .....d ttl ; I : ; r--' -,,. 0.2 '0 0.7 '-0· t r r : I ! ' I ; In,; ! f

0 I , , , 1 I,-lOO i' O ~- .. "---r-

"-; ,it- t. • I I I ! , , , ---1-.0 j'O I i i ; I

! I : i -I, ,"..~ I I ! i f I ! --, .-rTT r-tt I

, I I, ,0

60 70 80 90 10

1.00

o.so

I·0.90"!..j,:

c 10 80

;;;1;

1~ 0.7

~

7020 30 40 50 eo1ft. PwCllftt of d'IOI'tMt eontractl<ll

B. Variation or discharge coefficient wtth angula.rlty

10

<t. n--

1=60-';,1.'1;."" - .....-- I , ./, /' ,/,! I > i , , I I , , .... I ! /" V, ?rll

, ...- ; , .i., : .A-: I !...-r , ./,

, y, 1 , ! . ..:-~ , L/(i t- ----;--;---L......__.F... !

I, , , ! L

I , ; - I ; »« iiI

: I , ! ...- I, I ..r --:-:- - -1---- ----1-.; ~ ~ i i- ~ i Hiit

./ : \I ,.. , f ;

i

! ~- iI , , ' ! I ~, I f _.f ' i-r- i-H.....r I I

! i r-I... ..._t~ 1 ,I ,I I I , ;

80

1,00

0.90

0.80

0.700

0.30O.O~ 010 0.15 020 0.2~

1-- Ratle 01 1 to WId'. (ff 0ttt'Ifti""C.. Variation ot di.charge coeffici.nt with .!-ratio

b

~ "llI I I I , , , ! I

-F!-1.1 I i : I , , : ,i , i I ! :

I -" -+ ...L..i.l '- f-+ f-l-! t l. ~-~---~ . I I-\~ I !

, i! !.~ .±J:~ +- , Loa .;...l ! I !

to 1'0..~

I

II ,-.+-1._I

I ~o ~,' ............... i ! I i ,

-;.t- t-- --- I j-- fI....

.!--;- ! 1 !

....r- +t-+- I f I -:.- , ,II

115

1.'0

I.O~

1.00o

Figure 3.4.20.--Type III opening, embankment and abutment slope 2 to 1.

See figure 3.4.23.

3-97

Page 132: SUSITM 1I!J)1OILECDIC 'lOner

_~..~~ r'-- _

1001IO~ ~ ~ ~ roI'll- Plre ...t 01~ COI'trOC'f'tcM

A. Baa. curve for coefficient of diacharae

2010

IF -, -I ...- j;;;:

....- ..L I- ..... i I II I ... ..... .,.. I I

.......... , :---. I : -~ I I I

l.~"'"I

" I , ......... I -+ ~-'---'- • ' I :

~F".....

! I Ii"..... r-..l- ~I i ~ I lao' -H-r-;- "i . ! ~..

tTl i-..J.. ~";;"'!--

, -;.... I ! i .... i I : o.ao±kI , I ,~ ... ~ I I I i !

,....." I r-- i , -·F I 0.iu.1 I51_.., e.....lt_

I .......... ,~

I - - --t·O.!I. ,.cr ! ~-

~ .'- ~+-t, ~1,,~'" ,

0.5 .. rr ...-- -I i .

;;;h' 0 '-30- I , I I I , I I i '"I i , , , , ----"""'1--..

1 ! , , ! i ! ,, .0.2 I. 0.1 j to· I i i I I I I I I I

I I I I I

•• 1.00i i : I I

,J

1.00

0.60o

.~ 0.10.'"~

..a;;.... o.to

!:.;0.110

:;;

It.. •.~

I II '2

- ._-. ­---

w ~ ~ ~ 00",.Ptn:.-t of c..... cORtfoc::ti.,.

B. Variation of discharge coefficient .... uh angul.ar1.ty

I ,

i ! 4 . ..J-

10

I :

'-"""'i !

1'1; I

"

, y,, ./, ./ I I

./ I I

I I

I I

, 1 I,I I ! I

:\

I.I~"",,,,,,,,,,,,,,,,,""""'.,...-r----"""--""'....,.----r----.,

!40' 4!t ~cr ~~. 61!

9 ......qle 01 .i"" -01C. Variation of dbch.arge coefficient with win&~ .... all angle

See figure 3.4.23.

Figure 3.4.21. --Type IV

abutment with wing walls.

opening, embankment slope 1 to 1, vertical

3-98

Page 133: SUSITM 1I!J)1OILECDIC 'lOner

DISCHARCiE·COEri'ICU;hT CURva

;.2Dd'~C--------

100~ ~ ~ ~ ~

....... ., c:...-~..A. 8&ae curve (or coefficient ot cit.ac.h&rp

zo,0

O~~...... 1

~. to...,........ 1 , i ,

......... ...... --..

, I -- I, I. ,

I i ,-- , a! I , ~ , -0. : ! : ,

,...... , ....... : I -.i. , - : -St_. .-...- , ," , : , ,t. 0.1 ,. 0.5 '-0· l"'- , , , -- -

~I

, , I

F·O.!lO •-so- I ~' I 'ala!, , !

·~.o I '0, -,..--

1,-tOO

I I ,, ,, I ! I I I I i , ,

1.0

··j 0,10

i

O.flO a

I10..

0

!

··~ 0.10

l.''"

1.00

O.SO

ala

.. '- I YI I , y L.-"I I

I 2 ,~ , I ,

I ! I -'-,

I: I I, I I I '~, I I

- I,I : I : , 1 ...,

J-: , 1I , I , , 1-, , , i v ! I I - ...----- -

r-l-r' I I I ! 1\ r-! y I I

~,t-

±-±~ .. : I I'-r I I , I

10 zo ~ ~ ~ c•• "'ruM fII~ ~tr"'"

B. Variaticm 01. d.1.Icharle coeltlcicnt witb ancular:l.ty

10 ee

0,81)

, I : ,i : : I :

i : .-.--! I --- I

, : ---, I i.-H"'T! ! I ,

..... : I

I ,: ,

I i , i I

1.10

~~ ~ ~ ~ ~ ~

,. 'ro,," """"'1.~C. Vu1&t1clll 01 d.1acharp coefficient with 1"roude rw.m.ber

k,. 1.00

I I , ! I

~, ! I ~! I , I I ••01 ......

-r-- : ;..........-:~~

I

--LlJ:L I , , J.-- I! , .....,

..... i......I ,

100XI'

1.10

c...... •, .l1li' __D. Varw&!"" 01 dUcharCe coetflcleac ...1<.11 ... lD(• ....u""Cia:

Figure 3.4.22.--Type IV opening, embankment slope 2 to 1, vertical

abutment with wing walls. See figure 3.4.23.

3-99

Page 134: SUSITM 1I!J)1OILECDIC 'lOner

COMPUTATION OF PE<AK DISCHARGE AT CONTRACTIONS

L ~.P'"-.- .. --to, • 1,

losAwOf.... I>tt_ -.n... 131

II ,

I Il' i I I I :

-t- 'i, N I ! I

I :-..... , iI I i

.......... : I iI I , 1 I I

I I l' I I

+r- .1 : ,:-..... I

. I I ! i I I N- I I I, I I I I i

i I i :

1.00

0.80o O.O!! 0.10 0.15 0.20 0.25 0.30

~- arid" ."lIfft"OlnCe ratio

B. Variation of discharge coefficient with degree of submer-gence ot bndC.

L~••~! 1.0-

V~·..

,V

!

I

1.00

0.900 0.1 0.2 0.3 0.4•• Eceenttlclty rGflo

A. Vanation of discharge coefficient with eccentricity

PILES

• • •o • •

A'j'i;_____.....i~"'- _

W 30 ~ ~ ~ rom- PerCI"t of d'lo"nef COfttroctiofi

C. Variation of discharge coefficient Wlth area of brldge pile.

100

i '

80

---I I !

I '

l " -+---t-'H-i-~t--"-j !

l- ~ ~!... i

--r-- ,t f·

f-'\

I '

Ir

I I II I ,

-I-H-I100 'II

'n''-, I-t+~

100-.+--, 0" ~

0,~. A' ./// 1-;-.a »« /// s

2 ./" -"'i/' 0 ,.k· o 03 0

./ ,'r - 0.90J.: ./ ./ .-:.... 2/' /', • ...L-

a £,.- ,.- I , ,s-

f LU++,1-:'1- .- n""0.80

~PIERS

- = J'~=:z:z::a A,

~.0

I i I I I I i ,! f ! ! ! I I ! nti. I I I ! : I : :A"""!

, i I , I I I i i I ..--r-~'O

I I ..;......-,...-ri i , i ! i I

: i

100

0.9520 30 ~ ~ ~ ro ~ ~

"uPtrc_ 011 cfto''''11 contraC1IO'tD. Variation oflldischarge co.fficie~t with area. at bridge plera

100

Figure 3.4.23.--Types I-IV openings, ke, k t > and kj curves.

3-100

Page 135: SUSITM 1I!J)1OILECDIC 'lOner

1.00

0.80

~l~~ 0.60..i• 0.40gm

0.20

-- -- m-80- 160-- ---I--- ~140- - --~- I

..-- I- - 20-I--r--

..-- - - -'" JOI

i----0.00

o 0.010 0.020 0.030 0.040 0.050 0.060 0.070MonninQls "nil

Figure 3.4.24. The effect of channel roughness on the backwater ratio

for basic-type constrictions.

1.21.1

C/Cbosic

~973

'"I": :::::-- 973--_973

\ <, "'-,-~m:80

v

'"~ I-- ~ ~x

\ ,. I :tt--'"r-\<, 952-948-

"",,-947 Iv52_I-v52

!\952 r-, II

\ 952<,

"'m:4~_N6 I ILegend _

~o m:80x m:60

~• m:40-v m:209 m: as_

.1. '1m: 2~ I indicatedV27 v

I0·51.0

0.6

0.7

1.0

0.8

0.9

Figure 3.4.25. The effect of constriction on the backwater ratio.

3-101

Page 136: SUSITM 1I!J)1OILECDIC 'lOner

SUBJECT /1

IIAIlZAIIEWCO /2eo /(/4.Lvnc tid,., RIve r YSUS/TNA JO/NT VENTURE

COMPUTED »5IR CHECKED C C.

FilE NO./bS3-/03

DATE ~/2s:18'4

PAGE I-- OF .2 PAGES

-*/8/1

IIII•

J7 -;;; 0.0 3S .5 = c:J,OO/::{

ch?/7/7€/ CCJ~//o:s€c/t),eYr:2//e / s f"coJ;61es /cs..sr-/7a~ C /J //7 d/;?/n€r€,1'"

tt/Bler~O(/r'se ch SS/ h~d;;-S 77/2~ &rovj'?..IT'~fI /'SC.p/e

Oe-~/7n q /OOy,,- //00 dQoo = ~ ~20 ch CliO z: /200 Q-z =~50

o ; 3h2.CJQ-=-/20DQZZS-O

Page 137: SUSITM 1I!J)1OILECDIC 'lOner

Susitna Hydroelectric Project

Culvert Design Data Sheet

Location: Township ~;t;?;)1

Secti on _.lw::3:........=O::...- _

Range gee _-: /} 0 ~o (2/\ If A /

Meri di an (:) A..../ U (V

Project Feature: (project access road, material site access road, etc.)

Station: /200 ~:sh.J-P7. o~j{;v€r Y J(.//2chor;

Type Water Course 0 B C

User Fish Group (8 &Conly)

Drainage Area: &050I ® III IV

0, ()012

cfs--------Q2: 2 ~Q cfs Qdesign:

Frequency of Qdesign: ~~ years

Watercourse Area for Q2: /08',0 . ft2 Gradi ent ft/ft

Watercourse depth of flow for Q2: 2, IS ft

Classify channel substate: ~5/c?/J/hc2/l;/CJm 0 Ul1fo/IC;;e5,;- :;;>

7rdt/fE/s h co,6,g,ks /~.55 /;4~/7 C'//7cAcs

============--- 01-

_ ;0%--------

________ ft/sec

Size:

Channel configuration: Braided Meandering Gaig~

Other (describe) ~~~~~~~=)7~t?------------Other g/ld9~ GUt'/); ce>'J,./c'/ p/G!'"

2 ¥

t..1d/h .:);-c/;~nntP13& 15 5 :1-{ : /

Length: 50 / ft.

734

Culvert Type:

Slope:

Attested to by:;??-~

Fisheries Biologist Design Engineer

Page 138: SUSITM 1I!J)1OILECDIC 'lOner

lfAIZA.f&UC8 SUBJECT~~::cr"sS~20£) , FI.... roo/~53.-/tJ3 ~ __~tt: 11t:)#"'_1I( ,. Y DATe C'lzs/K4

SUSITNA JOINT VENTURE "'"' COMPUTeD 5"If CHeCKED C C PAGE .:3.- OF 7 PAGES

£)~~/,?~ / ~ ,b~S"~d' C)'7 /7r'~ 2ZJ C~A.f";"It::.f/an (.,c.n-l~ 5.5 -::: 15".'/ wIll, 38' .6~~w~lffh ~O~ o;/$h~~.$ ~r/~?G GV~// A;;JV"~ ~ C~/?/r;1/.coJ'?crl/E~~ ~/€;­$vj?,Pcrr /8;'/rh/4Ck 5EI d.:7S'h oCJ///J'J~ on 5Lc?1~.3 atJr//n~ p:7j1tE /.

I

I

I

I

I I I

I

I 71

/. '" i'i '1/i~ Z$f-!.Qf. S"}) 10] ((17. Z$""'!!~$J)c7·~ 0. 0 '32 ~ . ;1 Li01'/7. ZS" f/,9t10)J

- 7t 27 & ..

L -::: :3 &. 7 S (S'~~ h~"",..~ 3. e,; /9 c..) ~ ;:: ~ 7S I

b ~ 3B L-~ ~ /. 0

m := 1/ - ~-) /~o .1. -:: [i - 7 /2 7~ ]/()O~ {I J<; / /()3 2Q~ •

-=- 30.3%

C / PI' //7~~~/;7nO/J h...-- S.5¥.S".'! frc-? h9vr~.5 J~~/9 ;:J'7d3~~.20

- 0.032

Page 139: SUSITM 1I!J)1OILECDIC 'lOner

-

UID-fMlCO SlJSlTNA JOINT VENTURE

SUBJECT ~:r- C'135~~':2aO' U/05 u ,.u;:h~ ~ At::It!' yo Y

COMPUTED S;:? CHECKED C~

FILE NO. /~5J-/03

DATE tg/Zs/9# PAGE £ OF J... PAGES

s S := /:/ c ~ -:: {}.9Z$" '"

" ~I/s~ CJ.!J23 /0,.5.$ r/.S:/ 55::2:/ C -::::: 0. 92 /

,RtrJ/t"~W />,?oq;;he:;J ~ot" ~c::/a"'s ro c"(SI£~I/ TiJ~h :3,~ s

~ N~. -4 N./-(. ~9 /VA'.

-A~ N. 4. ~. ytf'S 0 ~~ 2J ~r /\( A

-It Ax ,y~s ri,•. 3.iI.19 c ~ /)/~./J( A. 3.~.20c. J

:= /() /(/.s)J:: ~.l.. /..ly (3 8 ~/()')( /. 5)/0"

=C/,03

~ I',..o~ h,. 3· ~ 23 /cr /1'7::: 3CJ.9 ,).j.:: 0.03

~ :: ..:3~9

,A1f /n/t?/;Po/;:;/€d' /'rOI'Y? 05.:;. f'. /.5?C d"c/ 3.l/. ZOe.

,t;;,,... L~ ::. I f'" Y -.:.':3- 7 S- 0 .. I 0 rb .. 7ii" -=39­

55:./.'/ '·$it S.5&2:1

;'X /./7~ /.03 ~x 1./0

C C <:1./ A/I x' ~2:J (99!3}(;' ID)Ie

-;;~CJ~4 >.1.0 t/s~t-:tJ

c=~o

Page 140: SUSITM 1I!J)1OILECDIC 'lOner

MJAm~EIAS:C,OSUSITNA JOINT VENTURE

SUBJECT S!r€:Ji"YJ c;.t:;ss/n? /2t%f FILE No.!.~S"3-/03 -t//S JvnCnt:>¥'} ;f)1/~r Y DATE &/2.s-/f14- A

COMPUTED' S ,/f) CHECKED C C PAGE 5 OF 2.. PAGES

S/nc~ LO~$~/C'ht;#7 /5 /J~/ 7f.P~ Td6?~~rn?/;?~ C'" :2.nd~ /rd i'Yl h~ 3,<1; / S 4 el8

h r: .I'Y1 ~ :3 o. 9 I % =/. C)

A C"'~ 4 93<;-

hd(.)eI~ /1/0.-:: q .. _....;.3_C--:-:z-:-(J-=-~==.4:; r;i -(('3 9Jtl.~(;o))/o) 112.? (/0;'

»o- 3 ¥

43 ~ = 0.:77S

C C~ / - 0.93<;- (0.:;;75)b.:J SIc:. -::: ~r-

~ 0.9/5"

~o

c:J.915-

=/.09

~ x: 0.77

h~iY) h? '3. L-/. 24 wt'~A /') z; a0'32 f 1Y7::. 30. 99'f

hIM h =0'~3

h* )h~ h CQ"r~c~d = 44 (A.;; =: (J. L/9!d, 77)

:: Cl. 377

<..

TrI .2 / L1 l] ~ . 3 (}i~):2 5 '3

- ,9 ( S,S<;(ff!)!2 ('32, 2­

_ 0. &53

<....

r.

~I

Page 141: SUSITM 1I!J)1OILECDIC 'lOner

WZAJlEWiC;1)SUS/TNA JO/NT VENTURE

SUBJECTSk£;l.n-? Cn!)$$/,,? 1200 I

Vb Jt../;?~"?d~ A';VIIG r YCOMPUTED 5& CHECKED cc

FILE No.d53-/03DATE '8/2s:/~'¢

PAGE~ OF -2 PAGES

k~ = C1.377 LJh~ 0.377 (,c'S3)

- CJ.2¥~

h ~ 7~ - LJ J; ,J- h/~ -=- I t2 - CJ. 65"3 1(/. 2{JC

~ -:: 9,5.:93

Q )'Z- 2-hr -z: b~/i: . I ,t- L ( 9.)l/~K3 J.4

2. t,2. 0 )'2-:: :3 ~ ~ 3~ 2..0 ...,).; 3 &,(__3 __

f~32d~(7127f6) 7/ z 7<6

a.o 6 g I- 0.038

/;/::: 0,/ 6 ~

£J ;, z: _V~'" -.!i '2- -r h/:2JC -:2J

"Z..( 3~20 J

_ ~3 ~, 5"+ 9. 593(1. $")" 'f.593) _

~ 7", <:.f (;, 0)

~h ~ a. S-~3 ~ 0. s s 3

/?Q~RJ/ .5/:e-~5 h/L' f"J' hr /'lt2/JIr/;;;/ LJ ~

-;;"121 I-J h :: ,S2S

(>hp~) r J;.;c:;,. 377 (:S25/ -.:a /3 8

f5"1-€"Pi) ~ 1-:/0 / - ~S290.138.: 9· b73

Jj.J., J 7(2 0 )~i{3 <::. <;,-,.. .7~73(1. .s))~&73 _ '5 .s»~ 4. / h~'r::-4.4 ~Y'.~

IJA -= C).52:S= <9K

Page 142: SUSITM 1I!J)1OILECDIC 'lOner

HAma ;COSUSITNA JOINT VENTURE

SUBJECT d~~~ L/'"CSSI1? /200/

V/:::1 JVJ17cho" ,,!va-r YCOMPUTED 5 if CHECKED C C.

FILE No/~53 -/0.3DATE B/2SL~¢'

PAGE L OF 7 PAGES

~~~r/n7 ;to n;,~~:1.7',/3

/At;. ~.7c~t.e/#!'h r ~/hc /: h f.=- CJ. 3 n(tY. 52~ z: tJ.13S/

Y4/t,C/ >~ {2Vl11":l?~) .;Jr .s;.C;?C'~ J

:J~2 0z:

(3~, /f57.t?3/(;' sJ)~ &73/

- 7: 3L1 /J/s~L

C::1/t:"~/:;J*O~f .c : a ~

Page 143: SUSITM 1I!J)1OILECDIC 'lOner
Page 144: SUSITM 1I!J)1OILECDIC 'lOner

REFERENCES

1. "Hydraulic Tables", Corps of Engineers, U.S. Army. For sale bySuperintendent of Documents, Government Printing Office, Washington,D.C.

2. "Hydraulic and Excavation Tables", U.S. Bureau of Reclamation. Forsale by Superintendent of Documents, Government Printing Office,Washington, D.C.

3. "Handbook of Hydraulics", by H.W. King, McGraw-dill Book Company, NewYork City.

4. "Design Charts for Open-Channel Flow", U.S. Department of Commerce,Bureau of Public Roads. For sale by Superintendent of Documents,Government Printing Office, Washington, D.C.

30221/ REF840922

5.

6.

7.

"Open-Channel Hydraulics", by Ven Te Chow, McGraw-rlill Book Company,New York City.

U.S. Geological Survey, Circular No. 284, 1953 Computation of PeakDischarge at Contractions C.E. Kindwater, R.W. Carter, H.J. Tracy.

Backwater Effects of Open Channel Constrictions, Transactions, ASCE,Vol. 120, pp . 993-1006, 1955.

4-1

Page 145: SUSITM 1I!J)1OILECDIC 'lOner

APPENDIX A

PROJECT DRAWINGS

A-l

Page 146: SUSITM 1I!J)1OILECDIC 'lOner

II

i;

~.

~i\~~

/)~(/

/

~~~l~~cxx:rO

+L]

I!II

ooaKi

l)(

~--,

-----

\\

I..

...

II!ii

I..

I

~li~

,ii:Ii

•z

I;iI!~

c~!

cIt

..c

~~

Ir

sf

iU0

(a::

0\,'I!Ii

:J""

Z.

Iz

II*

Ii

""~

!~l.ll

~i

I

!\

I'!I(~~~

~~>~

xi~

~~o

Uo

~.

"~~e

Page 147: SUSITM 1I!J)1OILECDIC 'lOner

'7i'o'UR. All

(I ItCH .. 101IItt..I:1)

PROPOSED

TRANSMISSIONCORRIDOR

00

ALASKA POWER AUTHOflffY

SU6lTNA HYIJIIOELECTRtC PROJECT

oSCALf

LEGEND

--<!>-- ""tMM"t MV£O UNOMOl.D HI.,....--- KCONCWft .....VED UNOIVKJIj) Hiett_V

.----. KCOHCWn' eMYfL H........--- ....~_·-ltrVI:ft

- TRAH5Mt$SIOH COftRIDOO

~

•~

+."!c~€!.'!Iol

/~ ~.'

----~

-,

.~./IIj ._._~_._""'_..@

Page 148: SUSITM 1I!J)1OILECDIC 'lOner

)

"

/

/ /1,./z .

('<01........ 000 FIGURe A3

l,./-)

( -,

, J'....r

.....#' ")

~ 0

l('::tf ... ',J I

/) .pf",'(,J"

J,

\ '

I," ),

ALASKA POWER AUTHORITY

~~~~~!NA ~~OR~?f·I.~:~T'.!~~j~~lfCT-==·WAf"N" O"M AND AEaEflYOfRi

PROJECT PLANWATANA a DEVIL CANYON

DEVELOPMENTS

1\I

./

.j

\

rP°• I')'" ,II <'

') \

" \)/ 5\ ')1, ,

\) ~///J

(/

. '7

().~~v~l)(!J< ~['.: (' ",1.,/ "~V'~.'" (I' ,J ..-.ft/\).u .._ ,r- ,

<. Il)\ \ '~"'., 7-~'" (", ' )"J' / ": U--t'1

~ " ,.F'!"" (/ ~;.<J~IL,i-~~"'" JJ '

f/'

,.~, .." /.1(' SCAl.E 0 Z\\/ . It·, . __ .." <OOd 1 ,,"""' ........,

~, I\ I

(I

\,

l )

\

.00 0

j

" )'.'\

I'

t. ,f

(:)(i" Jii'

-, ,tIi

\~\ ~.

'I'\ ...

It."

\'

\'

tJ

c <. J(

1\ J (, ) ':\ 'ttl II

1\(,\

,000

I \, ) (J V'.1 .' II! " r I (, / )

1 ~ . /

~ ' 1\, -.fi:',,' '/"(1,)./ \' . . ". ,) , " I ,I \ j;' ('"- '0 ,

, J ) " 1LEGEND' ~~£"4"4 'P, " ( " ' _'.__ I'ttOPOSfO ftIOlO

- '"'"'--'- . ''< . --

I, ,~ '1,/' '~~~ ••••• ::.:: .:'~",,'D' '~,. ' l' " , _ ",,,'". _. __> ., '" In',,, = ;;.

(d , .00 ,'! 1\ ,') Ilf"': . __, =S'U$SK)ft UN(

,( ,", I I , ',I '000" ' " \ '\ ,( \ ,)" i 1\ I ! l (\' ,\ ' I I D£N_

t

( II ! " '" I., I n,GH...._

' '," ,~_Ij) 1/ I, I ..", '>,f :' 'fl' I, ,I , t) '," ,; ~ ~ ,:r.': ' '\ "r' , "', , I,/ 'II ''''', I' ,,00 0i..,

\ l j ,

, ' ( 0

' It':, 400

,'\ I \ I J I '.'

\ i'I"" I" I"" \ I' !' 'I· 'I' 'l ,I I" I , ," " '. i

I ", t . /'" 'lit("I', ,',',; V' jll/>~/'I,,'0

00

J \' , '\ 'I.! I.\\ ~" .' 'I I . I" I \', \ ( 'I ''j' ,!J "I.), 'L ,", I 1\ ,. , f ')') , '(

, I', / i',,, .•~ " I'!- , < ," ' "'I, , /) /[ ') "-\ 'I.., I::,1,\\.::,;)::/(~''I )!1f ( , A\' ,J '--J II

! 'I If <... ,? ", ~"'~.-'1' I ' "\ II,L.')L .. ,)-t·- }, > ~ '. (."-":7 ~..-_ '\/'\ ,?

I '/ / (-f5!1<:;,I, .: '\,\v., <l-'' I 1\ f I ''l',', )'-'\.} \. ' J V (/'1 \ VI~ I

'000 (\ "~ \ '"

' I '~ '2 v,I f '/ ,) I •• ",,000 '-) '., I' " "'. )'1 L ',-., -, \ L '<,''>?/ (,'1',1 t, . >,\fle? \f."lJI,I \ I;l I, t) ,,(J"S;'\\~'\.

I '/ ,I. ~! I YI",I, , '\ '\l\l('~,.\, "I{to'~"" '\ 'cj ,II' <l'." i , .' -. 1\ ' , \ t\I , I 0

v., ( I J", , ' 't;

(I, '1" \ / "II., '\1 '. ) \ '') '( '" ) ", , ( ') ,., " " '. (<l:, .Jc ~'i ' i I \..s I,. ' . ~, '-;, ;'<'~['\ ••~

(,) /, i'{' ~, ,j, , I' ,,: (,'" '~;> )!"1

1

1 ' / ( ,?"'" rJ'I"~"', \' . ,,.--'- 'I " I, , " ,','/ " " ,1\)/1 ,I 'Et:J( L_~., ~

\ '

)},':' ') I

,I

}ooo

, ,'(

(" ,,.0;'1, I 'I J

I" ( '" ,',II. ',1"1 ) II, ' ) (

'I'I,,! .' ""0%1 ! /!J' ,I' 'I \

, i'

II

I\'

1"1\' ,':\( \

, ,

n/ I,,

; \

\ i'l "0II' 00\

\ 't ,\ '-',

1\

/I \/ ;1// \ J \1 \' , IIf ' ' / \I ,'\ ' (

,I S .l.. I / (', I' Jl \'. (. \ ' J A, ,t

\' \ I. \ ,,\ l, (1 (I

(

f 1.J, ,

)r"

(

i\,1., ,

,/ 'V'

I'r: 300 0

\ I I 'J \J 1\\ ''(/, l D ' i,',ii' uI ' .~ ','" ,

\ j \) , I

, \ ,l ' \ J )\ \, () " (}""

,l~nl .:1) )" ' j' (;VI'; '-'))\ {' {J

\ \ J f (

\~, \ ( ('I' 1\ ,),

" ''/1 \\\\,/ ) J\ \ .' I\ . ",cPO

\ ' '

')

@ . 'I"" ,( , < ,) 1'1

' II'~ l ,I, ,'ItI'\',"J' 'Ir ,

Page 149: SUSITM 1I!J)1OILECDIC 'lOner

FI_EA4

ACct.•• IIIOM(K_......nACCC" M»J)"IMfOAAJIYJ

CC*lTMlCllOIf JIIM:IAO

"IIMANEM' 1111 IIt040UTlllOCMl

RAILftOot,O

HtOJ£CT lOUt«May

WAYANA O...M AHD flE,EnYOI"

DEVIL CANYON

GENERAL PLAN

SlJIillW. HYDROELECTRIC PROJECT

ALA8KA POWER AUTHORITY

o 1000 1000 fin, (11tCtt· 1000 run

// ~

.>

J

1000

,..,0-,

I

\ \••UNA }~~ ~

~tIr~

)

' VlJr) l.' ') ~ .'~ - '\

~(', '\ J~>-~'r,j ', ' ,'" \' <, ~ ) ~='I"f - -/.,

/1J~ .r~, ....i »> s

\. ~,~.

,,' fY, """" ....',j ~ ICALIO 4.l ,,_.._..l~

/\----....

~ ~I

§I§I~: ~.

1 WI WI

i \ ' I

\ \I

\ 2100 \

-: ) ~I\

\ "'\

\

TO WATAMA~

~

Q

~

.. ),,1N,.000

!UIUJlQQ.

"~

Jl..~__

.lL1.ZlAJJIlQ

..lL~

Page 150: SUSITM 1I!J)1OILECDIC 'lOner

APPENDIX B

RAINFALL FREQUENCY DATA. FOR ALASKA

B-1

Page 151: SUSITM 1I!J)1OILECDIC 'lOner

-'

/t ...-~

;

+TttI

01su::-+-~-f~"""""t.,.-r:::.:""'.....--Ifr'-f~~:H--------:3-----".

0(...z:(0:a::l

-----

~-----;

~0:0(~

<~~-----'----~...l

<

.;

""I'--"

"'--'>

,,---"---,--

.--------+--=---.::::---:.~-_+__77_--''';''M~~-----!'

~-,

"iII

\Tf

Page 152: SUSITM 1I!J)1OILECDIC 'lOner

I~II;I~i:

I

~i-i--"::'~-r-

I~~---j-----

]I--------i--

i!T"I

Page 153: SUSITM 1I!J)1OILECDIC 'lOner

Y i~-----

..\

:I

\•

!\

~It L-

--+

--

--

-<::.::V'l

L--+

---<

...l

<

!

T

Page 154: SUSITM 1I!J)1OILECDIC 'lOner

...CD .~

i~---,-IIIIi~

.-----,;

-

II

I~IZ

I::

i~

------1

1~

iz

I:IJ•---~i

~1

,II:

IOC

I~

1

0

,1

~.---j~--------t--------1--~

i::~'.I

~

_':..--

<:.::Vl

L_

-i-_

_<....<

~L_+-_

_

EL

--+-----

Page 155: SUSITM 1I!J)1OILECDIC 'lOner

II)

co

IIIIw

I.cr

--I"

;:,I

IS:?

iI~

,,

-----,'-i~iI

~

""I.I!

-----,

l~,~

---

--,:

~=.~

~

TI

~

"

T,Ti

..

I

I~

t..:",

.~

I~

..,

!';

.....,

~,

~.~-

!l

I~.·f

~-

-

"3..~-

0-:

!..

~:y

-:

Iv

..

~-

Ir-

~;"'i--"

!

-e::.::'"L

---+

----<....<

I\

=f..-,-----r',.-

--I

:,

,

I ii

I/

II

I~;

!1

ItI:IIi

Page 156: SUSITM 1I!J)1OILECDIC 'lOner

::....,I

cc:~~-----

/)

I;

/•

I!I

/I:'

J\::;.I~.

I

'1

<~""~---:----<....<

,Iit

II,I

~\

Page 157: SUSITM 1I!J)1OILECDIC 'lOner

/II.~

;I

/J"

./

r:!

/~,.J

iI

.;I

./

'\;

I,

:'\:.

i././\

.\\

I......,

t.....I

..

•,;"

I;_

':1

iI

aI

~!lI

v•

t\

"'I...c