A Contractor’s perspective Sustainable futures
We have a can do attitude.
We exceed expectations.
1. The Approach
2022By 2022 McLaren
will be an industry leader
Minimise.Promote.Educate.
Our approach
• Minimise resource use
• Reduce C02
• Reduce landfill
• Water efficiency
• Promote environmentally responsible design
• Promote environmental culture
CR Five Year - Strategy Timeline 25.07.2017
Year 1 Year 2 Year 3 Year 4 Year 5
People Attract / Develop Talent 5Equitable Working Environment 5Create Local Employment 2
Planet Base line (C02 / Waste) 4Record 4Reduce 3Environmental Awareness 3Build Techniques 3Cost Savings 3
Key : Community 1 Target Project CCS Standards 6 2 Define Strategy Community Engagement 5 3 Agree Strategy Charity 5 4 Implement Strategy McLaren Training Links 3 5 Delivery Phase 1Training / Apprenticeships 3 6 Delivery Phase 2Culture Change 2 7 Deliver Results
Five year plan
Reset the base line
Sustainability leadership
NAOMI WARRSHEQ Enviro Lead
SALLY FRASERPlatform Manager
LIZZIE SPARROWPR & Comms
STRATEGY
ADAM NICHOLSONPre-con Director
NIKKI TREWEEKLearning & Development
DELIVERY
TECHNICAL
• Forward guidance
• Long term strategy
• Marketplace analysis
• Networking
• Training
• Statistical analysis
• Training
• Process analysis
• Tender support
• Compliance
• Audits
• ISO
• SmartWaste
• Reporting
• Site support
• Narrative
• Internal Comms
• External PR
• EOI
• PQQ
• Tenders
• Design / Innovation
• Training curriculum
development
• Training delivery
STEVE BUTTONSupply Chain Lead
• Supply Chain Approvals
• Materials & Labour
Assessment
Our ambition
Source: LFS annual average 2001/01 - 2017/18
SUSTAINABILITY TO BE AS INTEGRATED WITH SELF-OWNERSHIP AND HEALTH & SAFETY
Our strategy
RICS WHOLE LIFE ASSESSMENTS
Our strategy
CARBON EMISSIONS BY BUILDING TYPE
Forecast Tracker
CORE METRICS
• Sector
• Turnover
• Programme
• Waste to landfill
• Carbon content
• Overall waste
• Water
FORECAST
Metrics from 2016-18
Central Government Local Government
Building Control
Part L
BREEAM / LEED
25% Reductions
Employer & Designers
Client / contractor led Central Government
Embodied Carbon
Reductions
ESOS
Reporting
Contractors
Sub-Contractors
Site Contractors
Manufacturers
Carbon management
OPERATIONAL CARBON CONSTRUCTION CARBON
Challenges
• BREEAM / Well / LEED
• Forecasting
• Track & Reduce Carbon & Landfill
• Biodiversity
• Part L 35% reductions
• Waste Management
• Embodied Single Use Plastics
• Carbon reduction (in use)
• Increased Recycled Content
• Responsibly Sourced Materials
• Take Back Schemes
• Material Efficiency
• Water Consumption
• Circular economy
ALREADY ACHEIVING SUCCESS IN PROGRESS
Waste minimisation
• 90% Diversion from landfill
• Single Use Plastics / packaging – examples such as tiles, sanitaryware and smaller MEP materials
Embodied Carbon
• Use of Materials with Recycled Content
• Responsible Sourcing of Materials
Big ticket items
• Concrete – GGBS or Fly Ash
• Steel – Increased use of recycled content
• MEP – Traceability of Manufactured plant materials + non UK supply chain packaging
Smaller Packages
• Fire Stopping
• Roof Lights
• Removal of plastic before delivery to site
• Auditing of materials pre delivery to site
• Supply Chain Education
Areas of focus
Supply Chain
• Supply Chain Education
• Check plastics are not artificially removed before delivery to site
• Change to Electric Vehicles & Plant delivery to site
• Traceability of Manufactured plant materials + non UK supply chain packaging
Procurement strategy - 150 Holborn example
Contractor and Supply chain collaboration
Quantity Surveyor
Design Manager
Site Manager
Site Sustainability Champion
Subcontractor Management
Subcontractor installers / labour
Manufacturers
What will we do differently?
• Supply Chain Sustainability Training
• Include project Sustainability strategy in site induction
• Sustainability Focus Package workshops Pre / Post Contract
• Empowered and Educated Sustainability Champion
• Empowered and Educated Package Manager
• Empowered and Educated Logistics Team
• Empowered and Educated Site Administration
2. The Process
Process Map
Employer & Project Requirements Materials Supply Chain support and engagement
• Customer policy
• McLaren policy
• Project risk/opps review
• Materials/package schedules
• Policy strategy for plastics/circular economy and sustainability
• Detailed review - plastics
• Detailed review - circular economy
• Detailed review - sustainability
• Enquiries
• Returns
• Orders
• Pre-start sustainability training
• Package Specific strategy
• Materials Passporting
Supply chain training, auditing and reportingCross check policies with training and auditing procedures
Audits & Reporting
• Delivery Audit
• Reporting
• Materials Passporting
3. The Output
Sustainable outcomes
DRIVING CULTURE ON SITE
• A site sustainability person – being visible on site and during procurement
• Site power reductions and reduction of emissions using Fire Fly Hybrid
Generator
• Targeting further use of electric vehicles for work along side Camden
Strategy
REDUCING C02 AND EMISSIONS
• Use of GBBS within concrete frame
• Team re-evaluated the programme to ensure extra curing time did not impact
programme
ENHANCING RECYCLED CONTENT
Sustainable outcomes
REDUCING SINGLE USE PLASTICS
• Small on site husbandry strategies – use of plastics cups
• Delivery to site of materials – working with subcontractor to remove delivery
plastic
• Key partner – Skanska
• Rainwater Harvesting On Site Cabins
WATER USE REDUCTION
• Focusing upon delivering Excellent and Outstanding accreditations through
enhanced materials procurement strategy
BREEAM EXCELLENT TARGETING
Embodied Carbon
BIG TICKET ACHIEVEMENTS NEXT AREAS OF FOCUS
• Steel - Working with Severfield to increased recycled content
• Façade - Product Origination & Removal of Single Use Plastics
• MEP - Product Origination & Removal of Single Use Plastics
• Dry Lining - Take back schemes / removal of Single Use Plastics
FINISHES PACKAGES
• Removal of single use plastics
• Removal of single use delivery plastics
UNITS OF MEASURE
• Developing knowledge of Whole Life Carbon Assessments kgCO2
SITE TRAINING
• Including the subcontractors within the training
50%GGBS
PILING, GROUNDWORKS
AND CONCRETE
Industry Opportunities
• Clients Demanding Change
• The Next Generation
• Subcontractors
• Materials Manufacturers
• AIM / O&Ms
• Materials Passporting
• Aligned embodied carbon reporting
World Green Building Week campaign