    Network Planning for Cyclists (draft)December 2014

  • Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    2 December 2014

    About SustransSustrans makes smarter travel choices possible, desirable and inevitable. We’re a leading UK charity enabling people to travel by foot, bike or public transport for more of the journeys we make every day. We work with families, communities, policy-makers and partner organisations so that people are able to choose healthier, cleaner and cheaper journeys, with better places and spaces to move through and live in.

    It’s time we all began making smarter travel choices. Make your move and support Sustrans today. www.sustrans.org.uk

    Head Office Sustrans 2 Cathedral Square College Green Bristol BS1 5DD

    © Sustrans December 2014

    Registered Charity No. 326550 (England and Wales) SC039263 (Scotland)

    Photography: Sustrans or CTC Benchmarking unless noted otherwise

    Issue level: 01

    Owned by: NCN Director

    Contact: [email protected]

    ContentsThis chapter of the Sustrans Design Manual should be read in conjunction with Chapter 1 “Principles and processes for cycle friendly design.” That chapter includes key guidance on core design principles, whether to integrate with or segregate from motor traffic, the space required by cyclists and other road users as well as geometrical considerations. Readers are also directed towards the “Handbook for cycle-friendly design” which contains a concise illustrated compendium of the technical guidance contained in the Design Manual. This chapter has initially been issued as a draft and it is intended that it be reviewed during 2015; feedback on the content is invited and should be made by 31 May 2015 to [email protected]

    1. Key principles

    2. Introduction

    Function of a cycle network plan

    Stages in cycle network planning and implementation

    3. Stage 1: estimate cycling demand and network function

    Journey attractors and trip patterns

    Route function and hierarchy in the network

    Cycle use targets

    4. Stage 2: define route alignment and concept design

    Identification of route options

    Selection of preferred route alignment

    Type of provision (concept design)

    5. Stage 3: implementation priorities, budget and programme

    Implementation approach and priorities

    Budget

    Programme

    6. Stage 4: detailed design, construction & publicity

    Detailed design and construction

    Public engagement programme

    7. Stage 5: monitor, evaluate, maintain and upgrade

    8. References

  • 3December 2014

    Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    1. Key principles

    • development of a cycling network plan will help to ensure routes and facilities are coherent and provide for the travel patterns in the area, including target growth in cycling and planned changes in land use

    • a network plan can provide the basis for budget and programme setting and prioritising implementation, and can ensure that opportunities arising from land-use development, transport projects and routine highway maintenance are captured to deliver and enhance parts of the network

    • the network plan also has a promotional role in demonstrating the authority’s commitment to encouraging and facilitating cycling, particularly where the cycling network offers accessibility and journey time advantages compared to driving

    • the network should connect all significant trip generators and attractors - schools and colleges, retail areas, primary healthcare and hospitals, businesses, public transport interchanges, leisure and visitor attractions and public open space – with residential areas

    • the cycle network in most existing urban areas will predominantly utilise existing roads, modified where necessary to reduce traffic volumes and speeds and with cycle-specific measures where these provide filtered permeability, improve safety and user comfort, and/or reduce delays for cyclists. Traffic free routes can valuably supplement the road network where these provide additional connectivity, journey time or safety benefits and/or a more pleasant user experience

    Fig 1.1 Examples of elements of a network• providing good access to and through

    town centres and other local centres - this commonly requires mixed priority streets

    • direct connections to public transport hubs and other trip generators

    • filtered permeability - traffic cells, access for cyclists through road closures and vehicle restricted areas, contraflow facilities, exemption from restricted turns, cycle bridges across rivers and railways, short-cuts through parks

    • area-wide 20mph limits and zones and other means to reduce traffic speed and volume

    • giving a high priority to cycle friendly junctions at the design stage

    • cycle lanes and advanced stop lines to enable cyclists to avoid queuing traffic

    • cycle tracks alongside rivers and canals and on disused railways

    • maximising route opportunities to and through new developments

    • secure and convenient cycle parking at both trip ends

    Major employer

    Major employer

    School

    Riverside route

    TOWN CENTRE

    YHA

    Museum

    Pedestrian area

    Bus Station

    Residential area

    Residential area

    Park

    National Cycle Route

    National Cycle Route

    Country park

    Main cycle routes

    Secondary cycle routes

    Traffic free

    bridge

    Traffic free bridge

    funded by new

    development

    New development

    Traffic-free link through development site connecting to station

    All roads subject to 20mph speed limit except those shown

    Major employer

  • Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    4 December 2014

    • network implementation should prioritise routes with high travel demand, including potential demand from mode switching to cycling and walking. Conversely, implementing route opportunities ‘because they are available’, but which do not serve an existing or potential cycling or walking demand is likely to represent poor value for money

    Filtered permeability, Bristol

    Secure cycle parking, Cambridge

    • implementation strategies commonly involve a combination of six approaches:

    • area-based phases (ideally accompanied by smarter choices programmes)

    • corridor-based (typically provision along and across main radial routes)

    • targeted investment around major attractors (rail stations, employers)

    • targeted investment at key priorities (e.g. bridges) to unlock barriers

    • network-wide default interventions (advanced stop lines, flush kerbs etc)

    • opportunistic delivery funded by land use development, transport schemes and routine maintenance

  • 5December 2014

    Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    Access through pedestrianised street, Cambridge

    • dialogue with existing cycle users and other stakeholders is very valuable throughout the network planning and implementation process; to identify route options, and post-implementation enhancements, and to help publicise the network to potential users

    • investment in infrastructure and Smarter Choices at levels of £10 to £20 per capita per annum is advocated by the All Party Parliamentary Cycling Group and in the Mayor of London’s 2013 Vision for Cycling in London. This level of investment delivered significant increases in cycling in the English Cycling Cities and Towns programme and is commonplace in leading cities in the Netherlands, Denmark and Germany

    2. IntroductionFunction of a cycle network plan2.1Development of a cycling network plan for an urban or rural area will help to ensure routes and facilities are coherent and provide for the travel patterns in the area, including target growth in cycling and planned changes in land use.

    2.2An agreed network plan can provide the basis for budget and programme setting and prioritising implementation. It can ensure that opportunities arising from land-use development, transport projects and routine highway maintenance are captured to deliver and enhance parts of the network.

    2.3The network plan also has a promotional role in demonstrating the authority’s commitment to encouraging and facilitating cycling, particularly where the cycling network offers accessibility and journey time advantages compared to driving.

  • Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    6 December 2014

    Figure 2.1 Cycle network planning and implementation process (Section numbers in parentheses reference sections of this chapter)

    Define implementation

    approach & priorities

    Map journey attractors

    Existing demand: cycle use & other modes

    Identify route alignment options

    Existing trip patterns & potential growth

    Define route function & hierarchy

    Stage 1

    Estimate cycling demand

    Define

    network function

    (Section 3)

    Planned land use developments

    Stage 2

    Define route alignment &

    concept design

    (Section 4)

    Select route alignment options

    Define cycle use targets*

    Review existing cycle network &

    other route options

    Identify physical barriers to cycling & possible solutions

    Stage 3

    Define implementation

    priorities, programme and

    budget

    (Section 5)

    Stage 4

    Detailed design

    Construct & publicise

    Support with smarter choices

    programme

    (Section 6)

    Stage 5

    Monitor & evaluate

    Maintain & upgrade

    (Section 7)

    Consult c

    ycle

    users

    and o

    ther s

    takehold

    ers

    Define type of provision (concept design)

    Define budget and

    programme

    Construct network Publicise &

    support with smarter choices programme

    Monitor use & condition Evaluate

    Maintain & upgrade

    * Stages marked ‘*’ are related elements of a cycling strategy which will directly influence network planning in urban areas where high cycle usage / capacity requirements are key determinants of the type of provision.

    Population & employment

    targets*

    Benchmarking*

    Policy objectives*

    Detailed design

    Stage Tasks

    Wayfinding strategy

    Fig 2.1 Cycle network planning and implementation process (section numbers in parentheses reference sections of this chapter)

  • 7December 2014

    Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    2.4The cycle network in most existing urban areas will predominantly utilise existing roads, modified where necessary to reduce traffic volumes and speeds and with cycle-specific measures where these improve safety and user comfort, reduce delays or provide filtered permeability for cycle users. Traffic free routes can valuably supplement the road network where these provide additional connectivity, journey time or safety benefits and/or a more pleasant user experience.

    Stages in cycle network planning and implementation2.5The cycle network planning and implementation process involves five key stages. These are defined in Table 2.1.

    Table 2.1 Cycle network planning and implementation stages

    Project phase Stage

    Network

    planning

    1. Estimate cycling demand (magnitude/ distribution

    and potential increases) and network function

    2. Define route alignment and concept design

    3. Define implementation priorities, programme and

    budget

    Implementation 4. Detailed design, construct and publicise

    Post-implementation 5. Monitor & evaluate, maintain and upgrade

    2.6Network planning comprises the first three of these stages. The network plan also needs to respond to the final stage - post implementation monitoring and evaluation - to adapt and enhance the cycle network.

    2.7Figure 2.1 illustrates the main tasks involved in each stage of the cycle network planning and implementation process. Each of these tasks is described in more detail in the following sections.

    2.8The complexity of the network planning process will depend on the character of the network area. For example, the tasks of defining trip patterns, network demand and capacity requirements, and the optimum route alignment and type of provision will tend to be more complex in large urban areas than for small towns or rural networks.

    2.9Dialogue with existing cycle users and other stakeholders is very valuable throughout the network planning and implementation process, particularly in identifying existing barriers to cycling, preferred route alignments and interventions needed to bring routes up to the requirements of the target users. Cycle users can have an important role in publicising the network and working with key target users, including employers and schools. Feedback from users is also very helpful in identifying refinements to networks post-implementation.

  • Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    8 December 2014

    Staff cycle parking, Nottinghamshire County Council

    School cycle parking, Leicester

    3. Stage 1: Estimate cycling demand and network function

    Journey attractors and trip patterns

    Journey attractors3.1The network should connect all significant trip generators and attractors - schools and colleges, retail areas, primary healthcare and hospitals, businesses, public transport interchanges, leisure and visitor attractions and public open space – with residential areas.

    3.2Planned land use developments should be included in planning the network. Engagement with local authority officers responsible for strategic planning and development control can identify:

    • future trip generators

    • key cycling infrastructure needed to unlock development sites

    • corridors that need to be safeguarded for future routes to and within development sites

    • cycle parking requirements

    • potential development funding opportunities that can deliver parts of the network

    Journeys to work3.3 The Census journey to work origin-destination matrices can provide valuable insights into commuting patterns, desegregated by main transport mode. The pattern of existing journey to work trips by all modes within regular cycling distance (generally up to five miles each way, with a smaller proportion over that) can indicate the potential ‘market’ for cycling trips which a cycling network should aim to capture. This can inform both cycle usage targets and the setting of geographical priorities for implementing the cycle network.

    3.4The 2011 Census data will reflect current car-dependent patterns of housing and jobs, which can be expected to change in the future to be more easily served by cycling, walking and public transport, in line with national and local transport policy. Because Census records main travel mode, it will underestimate cycle access trips made as part of longer mixed-mode journeys; and will not reveal the scale of access trips to rail or coach stations.

    Journeys to school3.5In England, prior to July 2011, the National School Census provided a national database of school travel data including ‘pupil usual mode of travel’, which could be combined with pupil home postcode and school location data to map travel patterns to all schools. This provided near comprehensive datasets, available to local authorities, on cycling and walking mode share and the spatial distribution of school trips by travel mode.

  • 9December 2014

    Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    3.6Since the withdrawal of the ‘pupil usual mode of travel’ data field from the national school census in July 2011, collection of these data relies on local authorities working with individual schools. Good information will exist in some areas to input to the cycle network design, but this is not comprehensive.

    3.7Established in 2008, the Hands Up Scotland Survey is the largest national dataset to look at travel to school across Scotland. The project is funded by Transport Scotland and is a joint survey between Scottish local authorities, who collate the data, and Sustrans, who undertake overall collation, analysis and reporting.

    Other trip purposes3.8Quantitative data on existing and potential cycle use for other journey purposes tend to be much less comprehensive. Some data may be available by interrogating local transport models, which will include data from historic surveys. Other information may be available from user surveys at specific destinations or on specific routes, but this will rarely be geographically representative of non-work trips in an area.

    3.9Monitoring of existing cycle use will tend to underestimate potential demand, particularly by children and older people, who could switch to cycling if cycling conditions improve.

    Design implications3.10In the absence of robust data on trip patterns and journey purpose, the approach to planning the cycling network should be to provide a comprehensive network of cycle routes connecting all journeys attractors to at least the minimum design standards (widths, lighting) identified in Chapters 4 and 5. Greater cycling widths, a higher cycling design speed (20mph) and lighting should be provided on all routes likely to be used for commuting. Greater widths should also be used on routes designed to cater for school journeys, and near public transport hubs and major visitor attractions, in town centres, and in other locations where high cycle and/or pedestrian flows are expected.

    Cycle parking at station, Edinburgh

    Cycle parking at other attractors, Cambridge

  • Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    10 December 2014

    Main route: cycle priority crossing, Bristol

    Route function and hierarchy in the networkDefine schematic network and hierarchy of routes3.11In urban areas, the aim will be to develop a cycle network around a mesh width of no more than 250m, so that an alternative route is never more than 250m away, as used in The Netherlands. In London, a mesh width of up to 400m is recommended. The network may be organised around a hierarchy of routes as follows:

    • main routes – key utility cycling routes connecting the town centre, public transport hubs and other main journey attractors with a design speed of 20mph. In many urban areas these will provide for each of the main radial corridors with orbital linkages

    • secondary routes – other utility routes serving smaller destinations and forming a finer grid of routes between the main routes to deliver a 250m mesh spacing

    • access routes – quiet roads and tracks serving individual properties/destinations

    Example images of each type of route are shown on this page and the next.

    3.12Within this network more strategic main routes would be identified for prioritisation of investment and promotion. Different interventions to encourage cycling will be appropriate in different places and on different categories of route. Main routes will be characterised by:

    • high capacity for cyclists; greater widths, more storage capacity at advanced stop lines and signalised crossings

    • priority over other traffic

    • design speed of 20mph

    • lighting

    • potential route branding to assist wayfinding

    3.14A schematic route network can be drawn up initially, comprising straight line connections between journey attractors, to help define the density of routes required and function of each route in the hierarchy. An example schematic network for Greater Bristol is shown in Figure 3.1. Figure 3.2 illustrates a further stage of developing this into a ‘tube map’ of routes.

    Main route: 20mph, Central Oxford

    Main route: mandatory cycle lane within bus lane, Cambridge

    Main route: fully segregated route, London

    Main route: stepped cycle track, Brighton

    Main route: provision alongside guided bus way, Cambridge

    Pho

    to: S

    arah

    Toy

    Pho

    to: J

    on

    Toy

    Pho

    to: J

    on

    Toy

  • 11December 2014

    Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    Secondary route: cycle contraflow, Penny Street, Lancashire

    Secondary route: removal of centre line, Cambridge

    Access route: – residential street with 20mph limit, Bristol

    Access route: Part time permissive access route through car park, Lancaster Royal Infirmary

    Secondary route: no entry except cyclists, Bristol

    Main route: trees as traffic calming, Bristol

    Pho

    to: J

    on

    Toy

    Pho

    to: J

    on

    Toy

    Pho

    to: J

    on

    Toy

    Pho

    to: J

    on

    Toy

  • Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    12 December 2014

    Fig 3.1 Schematic network map for Greater Bristol showing journey attractors

    Credit: Bristol City Council, South Gloucestershire Council, Arup

  • 13December 2014

    Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    Q1

    0

    Azt

    ecW

    est

    Brad

    ley

    Stok

    e

    Filto

    n

    UW

    ECa

    mpu

    s

    St G

    eorg

    esPa

    rkN

    etha

    mLo

    ck

    Arn

    osVa

    le

    Bart

    onH

    ill

    Law

    renc

    eH

    ill

    Ash

    ton

    Hot

    wel

    ls

    St Wer

    burg

    hs

    Crib

    bsCa

    usew

    ayPa

    rkw

    ay

    Stat

    ion

    Old

    land

    Com

    mon

    Dur

    ley

    Hill

    Sout

    h Br

    isto

    lSk

    ills

    Acad

    emy

    Hen

    grov

    ePa

    rk

    Vict

    oria

    Park

    Cate

    rPa

    rk

    Ash

    ton

    Park

    Leig

    hW

    oods

    Clift

    onSu

    spen

    sion

    Brid

    ge

    Pars

    onSt

    reet

    Stat

    ion

    Wel

    lsRo

    ad

    Har

    ecliv

    e Ro

    ad

    Har

    tcliff

    e

    Tott

    erdo

    wn

    Bish

    opsw

    orth

    Nai

    lsea

    Emer

    son

    Gre

    en

    Avon

    Val

    ley

    Han

    ham

    Keyn

    sham

    Bris

    lingt

    on

    Whi

    tchu

    rch

    Bath

    Bris

    tol

    Scie

    nce

    Park

    Ham

    broo

    k

    Yate

    Sout

    hmea

    dH

    ospi

    tal

    Wes

    tbur

    yon

    -Try

    mBl

    aise

    Esta

    teSy

    lvan

    Way

    Bren

    try

    Hen

    bury

    Lock

    leaz

    e

    East

    ville

    St P

    auls

    Gre

    enba

    nk

    Chel

    tenh

    amRo

    ad

    Bris

    tol

    City

    Cen

    tre

    Clift

    onD

    own

    Sea

    Mill

    s

    Hor

    field

    Shire

    ham

    pton

    Avon

    mou

    th

    Port

    ishe

    adPi

    ll

    Dow

    nend

    Stap

    le H

    ill

    King

    swoo

    d

    Man

    gots

    field

    War

    mle

    y

    Bedm

    inst

    er

    NO

    RTH

    SO

    MER

    SET

    Fifteen minute cycle

    SOU

    TH G

    LOU

    CEST

    ERSH

    IRE

    F1 F2 F3 F4 F5 F6 F7 F8 F9 F10

    F11

    F12

    F13

    F14

    Q1

    Q2

    Q3

    Q4

    Q5

    Q6

    Q7

    Q8

    Q9

    Q1

    0

    Q11

    Q12

    Q1

    3

    Q1

    4

    Q1

    5

    Q1

    6

    F1

    F1

    F1

    F2 F2

    F2

    F3 F3 F3

    F4

    F4

    F4

    F14

    F14

    F14

    F14

    F14

    F14

    F14

    F14

    F14

    Q1Q1

    Q1

    Q2

    Q3

    Q3

    Q2

    F5F5

    F5F6

    F6

    F7

    F8

    F8

    F8

    F9

    F9

    F1

    F4 F5 F6

    F7

    F2

    F3

    Q1

    Q3

    Q4

    Q7

    F9

    Q8

    Q13

    Q4

    Q10

    Q7

    Q7

    Q6

    Q6

    F12

    Q13

    F11

    F11

    F11

    F11

    F12

    F12

    Q5

    Q8

    Q9

    F13

    F13

    F13 F13

    Q14

    Q16

    Q16Q1

    5

    Q11

    Q11

    Q11

    Q12

    Q2

    Q3

    Q4

    Q4

    F10

    F10

    The

    Port

    way

    Wh

    itel

    adie

    s/W

    estb

    ury

    Ro

    ad A

    4018

    Glo

    uce

    ster

    Ro

    ad A

    38

    Fish

    po

    nd

    s/St

    aple

    ton

    Ro

    ad A

    432

    F5 T

    wo

    Mile

    Hill

    A42

    0

    F6 B

    ath

    Ro

    ad A

    4

    F7 W

    ells

    Ro

    ad A

    37

    F8 B

    ish

    op

    wo

    rth

    /Har

    tclif

    fe A

    38

    F9 C

    oro

    nat

    ion

    Ro

    ad A

    370

    F10

    Inn

    er L

    oo

    p O

    rbit

    al

    F11

    Inn

    er M

    idd

    le O

    rbit

    al

    F12

    Ou

    ter M

    idd

    le O

    rbit

    al

    F13

    No

    rth

    ern

    Lo

    op

    Orb

    ital

    F14

    Ou

    ter R

    ing

    Orb

    ital

    Do

    wn

    s W

    ay

    Co

    nco

    rde

    Way

    Fro

    me

    Gre

    enw

    ay

    Bri

    sto

    l Bat

    h R

    ailw

    ay P

    ath

    Wes

    ley

    Qu

    ietw

    ay

    Wh

    itch

    urc

    h R

    ailw

    ay P

    ath

    Mal

    ago

    Gre

    enw

    ay

    Fest

    ival

    Way

    Pill

    Path

    – R

    iver

    Avo

    n T

    rail

    Riv

    er A

    von

    Tra

    il

    No

    rth

    Fri

    ng

    e Q

    uie

    tway

    Yate

    Qu

    ietw

    ay

    Kn

    owle

    Qu

    ietw

    ay

    St A

    nn

    e’s

    Qu

    ietw

    ay

    Purd

    ow

    n Q

    uie

    tway

    Trym

    Qu

    ietw

    ay

    F1 F2 F3 F4 Q1

    Q2

    Q3

    Q4

    Q5

    Q6

    Q7

    Q8

    Q9

    Q1

    0

    Q1

    1

    Q1

    2

    Q1

    3

    Q1

    4

    Q1

    5

    Q1

    6

    F5 F6 F7 F8 F9 F14

    F13

    F12

    F11

    F10

    F7

    F8

    Cabo

    tCi

    rcus

    Cent

    reO

    ldM

    arke

    t

    Tem

    ple

    Mea

    ds

    City

    of B

    risto

    lCo

    llege

    Ash

    ton

    Sout

    hvill

    e

    Uni

    vers

    ity

    Hot

    wel

    ls

    Jam

    esBa

    rton

    Q1

    0

    Bris

    tol C

    yclin

    g Net

    wor

    kA

    com

    preh

    ensi

    ve n

    etw

    ork

    of h

    igh

    qual

    ity, co

    ntin

    uous

    an

    d di

    rect

    rou

    tes

    is e

    ssen

    tial to

    mak

    e cy

    clin

    g fo

    r ev

    eryo

    ne fee

    l ea

    sy, sa

    fe a

    nd c

    onve

    nien

    t.

    The

    Bris

    tol Cy

    clin

    g M

    anife

    sto

    map

    s ou

    t 20

    0 m

    iles

    of

    Cycl

    ing

    Free

    way

    s an

    d Qui

    etw

    ays

    conn

    ectin

    g ev

    ery

    area

    , en

    hanc

    ed b

    y lo

    cal lin

    ks.

    Azt

    ecW

    est

    Brad

    ley

    Stok

    e

    Filto

    n

    UW

    ECa

    mpu

    s

    St G

    eorg

    esPa

    rkN

    etha

    mLo

    ck

    Arn

    osVa

    le

    Bart

    onH

    ill

    Law

    renc

    eH

    ill

    Ash

    ton

    Hot

    wel

    ls

    St Wer

    burg

    hs

    Crib

    sCa

    usew

    ayPa

    rkw

    ay

    Stat

    ion

    Old

    land

    Com

    mon

    Dur

    ley

    Hill

    Sout

    h Br

    isto

    lSk

    ills

    Acad

    emy

    Hen

    grov

    ePa

    rk

    Vict

    oria

    Park

    Cate

    rPa

    rk

    Ash

    ton

    Park

    Leig

    hW

    oods

    Clift

    onSu

    spen

    sion

    Brid

    ge

    Pars

    onSt

    reet

    Stat

    ion

    Wel

    lsRo

    ad

    Har

    ecliv

    e Av

    e

    Har

    tcliff

    e

    Tott

    erdo

    wn

    Bish

    opsw

    orth

    Nai

    lsea

    Emer

    son

    Gre

    en

    Avon

    Val

    ley

    Han

    ham

    Keyn

    sham

    Bris

    lingt

    on

    Whi

    tchu

    rch

    Bath

    Bris

    tol

    Scie

    nce

    Park

    Ham

    broo

    k

    Yate

    Sout

    hmea

    dH

    ospi

    tal

    Wes

    tbur

    yon

    -Try

    mBl

    aise

    Esta

    teSy

    lvia

    nW

    ay

    Bren

    try

    Hen

    bury

    Lock

    leaz

    e

    East

    ville

    St P

    auls

    Gre

    enba

    nk

    Chel

    tenh

    amRo

    ad

    Bris

    tol

    City

    Cen

    tre

    Clift

    onD

    own

    Sea

    Mill

    s

    Hor

    field

    Shire

    ham

    pton

    Avon

    mou

    th

    Port

    ishe

    adPi

    ll

    Dow

    nend

    Stap

    le H

    ill

    King

    swoo

    d

    Man

    gots

    field

    War

    mle

    y

    Bedm

    inst

    er

    Fifteen minute cycle

    Q11

    Q8

    Q16

    Q16

    Q13

    Q6

    Q5

    Q12

    Q15

    Q14

    Q4

    Q10

    Q1

    Q1 Q7

    Q9

    F14

    F14

    F13

    F14

    F14

    F14

    F12

    F14

    F14

    F1

    F1

    F2

    F3 F3

    F11

    F11

    F5

    F4

    F4

    F9

    F8

    F9

    F8

    F12

    F6

    Q2

    Q3

    Q2 F7

    Q4

    F13F1

    Th

    e Po

    rtw

    ay

    F2 W

    hit

    elad

    ies/

    Wes

    tbu

    ry R

    oad

    A40

    18

    F3 G

    lou

    cest

    er R

    oad

    A38

    F4 F

    ish

    po

    nd

    s/St

    aple

    ton

    Ro

    ad A

    432

    F5 T

    wo

    Mile

    Hill

    A42

    0

    F6 B

    ath

    Ro

    ad A

    4

    F7 W

    ells

    Ro

    ad A

    37

    F8 B

    ish

    op

    wo

    rth

    /Har

    tclif

    fe A

    38

    F9 C

    oro

    nat

    ion

    Ro

    ad A

    370

    F10

    Inn

    er L

    oo

    p O

    rbit

    al

    F11

    Inn

    er M

    idd

    le O

    rbit

    al

    F12

    Ou

    ter M

    idd

    le O

    rbit

    al

    F13

    No

    rth

    ern

    Lo

    op

    Orb

    ital

    F14

    Ou

    ter R

    ing

    Orb

    ital

    Q1

    Wes

    tbu

    ry Q

    uie

    tway

    Q2

    Co

    nco

    rde

    Qu

    ietw

    ay

    Q3

    Fro

    me

    Qu

    ietw

    ay

    Q4

    Bri

    sto

    l Bat

    h R

    ailw

    ay P

    ath

    Q5

    Wes

    ley

    Qu

    ietw

    ay

    Q6

    Wh

    itch

    urc

    h Q

    uie

    tway

    Q7

    Mal

    ago

    Qu

    ietw

    ay

    Q8

    Fest

    ival

    Qu

    ietw

    ay

    Q9

    Pill

    Qu

    ietw

    ay

    Q10

    Pro

    men

    ade

    Qu

    ietw

    ay

    Q11

    No

    th F

    rin

    ge

    Qu

    ietw

    ay

    Q12

    Yat

    e Q

    uie

    tway

    Q13

    Kn

    ow

    le Q

    uie

    tway

    Q14

    St

    An

    ne’

    s Q

    uie

    tway

    Q15

    Pu

    rdo

    wn

    Qu

    ietw

    ay

    Q16

    Try

    m Q

    uie

    tway

    F10

    Cabo

    tCi

    rcus

    Cent

    reO

    ldM

    arke

    t

    Tem

    ple

    Mea

    ds

    City

    of B

    risto

    lCo

    llege

    Ash

    ton

    Sout

    hvill

    e

    Uni

    vers

    ity

    Hot

    wel

    ls

    Jam

    esBa

    rton

    Fr5

    Q4

    F6

    F8 Q7

    Q13

    F7 Q10

    F4

    F3

    Q3

    F2

    F1

    Q1

    F9

    Q8

    How

    will

    thi

    s be

    del

    iver

    ed

    • Se

    ekin

    g an

    d pr

    ioritisi

    ng inv

    estm

    ent

    • En

    suring

    pro

    tect

    ion

    and

    enha

    ncem

    ent th

    roug

    h th

    e sp

    atia

    l pl

    anni

    ng p

    roce

    ss

    • Us

    ing

    fund

    ing

    from

    dev

    elop

    men

    t

    (Sec

    tion

    106

    agr

    eem

    ents

    )

    • Da

    y to

    day

    mai

    nten

    ance

    and

    im

    prov

    emen

    t of

    hig

    hway

    s

    Fre

    eway

    s: d

    irec

    t an

    d c

    on

    tin

    uo

    us

    rou

    tes

    on

    mai

    n r

    oad

    s w

    ith

    ext

    ensi

    ve s

    egre

    gat

    ion

    Q1

    0

    Azt

    ecW

    est

    Brad

    ley

    Stok

    e

    Filto

    n

    UW

    ECa

    mpu

    s

    St G

    eorg

    esPa

    rkN

    etha

    mLo

    ck

    Arn

    osVa

    le

    Bart

    onH

    ill

    Law

    renc

    eH

    ill

    Ash

    ton

    Hot

    wel

    ls

    St Wer

    burg

    hs

    Crib

    bsCa

    usew

    ayPa

    rkw

    ay

    Stat

    ion

    Old

    land

    Com

    mon

    Dur

    ley

    Hill

    Sout

    h Br

    isto

    lSk

    ills

    Acad

    emy

    Hen

    grov

    ePa

    rk

    Vict

    oria

    Park

    Cate

    rPa

    rk

    Ash

    ton

    Park

    Leig

    hW

    oods

    Clift

    onSu

    spen

    sion

    Brid

    ge

    Pars

    onSt

    reet

    Stat

    ion

    Wel

    lsRo

    ad

    Har

    ecliv

    e Ro

    ad

    Har

    tcliff

    e

    Tott

    erdo

    wn

    Bish

    opsw

    orth

    Nai

    lsea

    Emer

    son

    Gre

    en

    Avon

    Val

    ley

    Han

    ham

    Keyn

    sham

    Bris

    lingt

    on

    Whi

    tchu

    rch

    Bath

    Bris

    tol

    Scie

    nce

    Park

    Ham

    broo

    k

    Yate

    Sout

    hmea

    dH

    ospi

    tal

    Wes

    tbur

    yon

    -Try

    mBl

    aise

    Esta

    teSy

    lvan

    Way

    Bren

    try

    Hen

    bury

    Lock

    leaz

    e

    East

    ville

    St P

    auls

    Gre

    enba

    nk

    Chel

    tenh

    amRo

    ad

    Bris

    tol

    City

    Cen

    tre

    Clift

    onD

    own

    Sea

    Mill

    s

    Hor

    field

    Shire

    ham

    pton

    Avon

    mou

    th

    Port

    ishe

    adPi

    ll

    Dow

    nend

    Stap

    le H

    ill

    King

    swoo

    d

    Man

    gots

    field

    War

    mle

    y

    Bedm

    inst

    er

    NO

    RTH

    SO

    MER

    SET

    Fifteen minute cycle

    SOU

    TH G

    LOU

    CEST

    ERSH

    IRE

    F1 F2 F3 F4 F5 F6 F7 F8 F9 F10

    F11

    F12

    F13

    F14

    Q1

    Q2

    Q3

    Q4

    Q5

    Q6

    Q7

    Q8

    Q9

    Q1

    0

    Q11

    Q12

    Q1

    3

    Q1

    4

    Q1

    5

    Q1

    6

    F1

    F1

    F1

    F2 F2

    F2

    F3 F3 F3

    F4

    F4

    F4

    F14

    F14

    F14

    F14

    F14

    F14

    F14

    F14

    F14

    Q1Q1

    Q1

    Q2

    Q3

    Q3

    Q2

    F5F5

    F5

    F6

    F6

    F7

    F8

    F8

    F8

    F9

    F9

    F1

    F4 F5 F6

    F7

    F2

    F3

    Q1

    Q3

    Q4

    Q7

    F9

    Q8

    Q13

    Q4

    Q10

    Q7

    Q7

    Q6

    Q6

    F12

    Q13

    F11

    F11

    F11

    F11

    F12

    F12

    Q5

    Q8

    Q9

    F13

    F13

    F13 F13

    Q14

    Q16

    Q16

    Q15

    Q11

    Q11

    Q11

    Q12

    Q2

    Q3

    Q4

    Q4

    F10

    F10

    The

    Port

    way

    Wh

    itel

    adie

    s/W

    estb

    ury

    Ro

    ad A

    4018

    Glo

    uce

    ster

    Ro

    ad A

    38

    Fish

    po

    nd

    s/St

    aple

    ton

    Ro

    ad A

    432

    F5 T

    wo

    Mile

    Hill

    A42

    0

    F6 B

    ath

    Ro

    ad A

    4

    F7 W

    ells

    Ro

    ad A

    37

    F8 B

    ish

    op

    wo

    rth

    /Har

    tclif

    fe A

    38

    F9 C

    oro

    nat

    ion

    Ro

    ad A

    370

    F10

    Inn

    er L

    oo

    p O

    rbit

    al

    F11

    Inn

    er M

    idd

    le O

    rbit

    al

    F12

    Ou

    ter M

    idd

    le O

    rbit

    al

    F13

    No

    rth

    ern

    Lo

    op

    Orb

    ital

    F14

    Ou

    ter R

    ing

    Orb

    ital

    Do

    wn

    s W

    ay

    Co

    nco

    rde

    Way

    Fro

    me

    Gre

    enw

    ay

    Bri

    sto

    l Bat

    h R

    ailw

    ay P

    ath

    Wes

    ley

    Qu

    ietw

    ay

    Wh

    itch

    urc

    h R

    ailw

    ay P

    ath

    Mal

    ago

    Gre

    enw

    ay

    Fest

    ival

    Way

    Pill

    Path

    – R

    iver

    Avo

    n T

    rail

    Riv

    er A

    von

    Tra

    il

    No

    rth

    Fri

    ng

    e Q

    uie

    tway

    Yate

    Qu

    ietw

    ay

    Kn

    owle

    Qu

    ietw

    ay

    St A

    nn

    e’s

    Qu

    ietw

    ay

    Purd

    ow

    n Q

    uie

    tway

    Trym

    Qu

    ietw

    ay

    F1 F2 F3 F4 Q1

    Q2

    Q3

    Q4

    Q5

    Q6

    Q7

    Q8

    Q9

    Q1

    0

    Q1

    1

    Q1

    2

    Q1

    3

    Q1

    4

    Q1

    5

    Q1

    6

    F5 F6 F7 F8 F9 F14

    F13

    F12

    F11

    F10

    F7

    F8

    Cabo

    tCi

    rcus

    Cent

    reO

    ldM

    arke

    t

    Tem

    ple

    Mea

    ds

    City

    of B

    risto

    lCo

    llege

    Ash

    ton

    Sout

    hvill

    e

    Uni

    vers

    ity

    Hot

    wel

    ls

    Jam

    esBa

    rton

    Q1

    0

    Qu

    ietw

    ays:

    ple

    asan

    t an

    d w

    ell

    sig

    ned

    tr

    affi

    c fr

    ee o

    r lo

    w t

    raff

    ic r

    ou

    tes

    Fig

    3.2

    ‘Tu

    be

    map

    ’ of

    net

    wo

    rk in

    Gre

    ater

    Bri

    sto

    l

    Cre

    dit:

    Bri

    sto

    l Cyc

    ling

    Cam

    pai

    gn

  • Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    14 December 2014

    Consider target users and trip purpose3.15The experience and journey purpose of different cycle users influences their ability (and willingness) to ride in different traffic conditions, to tolerate trade-offs of directness for attractiveness, and to deal with junctions and gradients. This can help with identifying the type of provision required on each route, including:

    • acceptable traffic volumes and speeds

    • route capacity and widths

    • cycling design speed

    • segregation or integration with pedestrians on traffic free routes

    • lighting requirements

    • cycle parking requirements

    3.16The network plan should define, as far as possible, the target users and main trip purposes for each main and secondary route. This will be evident from the journey attractors served. The aim should be to provide routes that are attractive to both the less experienced cycle user and the more confident cyclist.

    3.17Access routes should be appropriate for all target users and trip purposes.

    Cycle use targets3.17While not an essential stage in cycle network development, developing cycle usage targets early in the network planning process is useful to define the role of the cycle network in the transport system, influence route design and cycle parking standards for new developments, and to help justify appropriate levels of investment.

    3.18Targets are mainly relevant to designs in urban areas and urban fringe where, to deliver adequate capacity, designs may need to include widths, signal green times and cycle parking standards that exceed typical minimum levels.

    3.19The methodology for selecting cycle usage targets can include:

    • policy objectives: cycling mode share needed to address policy drivers such as congestion, air quality, physical activity targets and quality of life objectives

    • benchmarking against existing and target cycling levels in similar settlements in countries with established cycling cultures

    • benchmarking against existing cycling levels and cycling usage trends in different parts of the network plan area. UK cities can have significantly different cycling levels in different neighbourhoods due to urban density, availability of alternative transport options and parking, the character of the road network and existing cycling provision, the presence of a transport hub or major employer(s), topography, and demographic factors

    Designs should include the full range of cyclists and cycles

  • 15December 2014

    Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    • census data which can reveal the distribution of existing cycling levels (for journeys to work) and the potential market for cycling in an area if a network were to capture short trips that are currently being made by car (see preceding section)

    • cycle user and non-user surveys

    3.20Modelling of cycle usage has been used for more than 20 years in some northern European situations to help define cycle network budgets and route capacity. There have been recent calls in the UK to more accurately define the conditions which influence mode choice and assignment in UK situations.

    4. Stage 2: Define route alignment and concept design

    Identification of route optionsReview existing cycle network and other available route options4.1Once the schematic network has been defined, all potential route alignments that could serve each link should be identified, including:

    • the existing cycle network (on-road and off-road links)

    • other existing roads

    • potential new traffic free routes through vehicle restricted areas, along green corridors or public open space. This should include locations where cycling has historically been prohibited

    • new routes through proposed land use developments

    • cycling provision within new transport corridors

    4.2Many existing cycle networks have been implemented over many years against a background of changing land use, design best practice and a growth in cycling. The review of the existing cycling network should include assessment of:

    • whether each existing route adequately provides its required function in the network (as defined in the previous section), taking into account projected land use developments, network hierarchy and capacity considerations

    • assessment of work needed to bring a route up to current design best practice and to cater for projected growth in cycle usage

    4.3Assessment of existing routes and new/alternative alignments can draw on assessment tools, such as those in the draft London Cycling Design Standards 20141 and Active Travel (Wales) Act 2013 draft Design Guidance2

    1 London Cycling Design Standards draft for consultation, Transport for London, June 2014

    2 Active Travel (Wales) Act 2013 draft Design Guidance, Welsh Government, May 2014

  • Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    16 December 2014

    4.4Input from existing cycle users is very useful in identifying deficiencies with existing cycling provision, alternative route options, and problems that, with treatment, can significantly improve a route. It is also important for designers to cycle existing and potential routes under different conditions to experience the level of service and to identify design details.

    Identify barriers to cycling within the network4.5In parallel to identification of route options, the network plan should identify existing barriers and deterrents (physical and perceived) to cycling. Such barriers to cycling can include:

    • river, canals, railways and some major roads that physically separate parts of the network. Crossings of these features commonly funnel traffic onto a limited number of locations that can be intimidating for cycle users

    • other busy or fast roads and junctions that deter users

    • pedestrianised areas, parks and footpaths where cycling is prohibited

    • one-way roads

    • casualty sites or perceived high risk sites

    • sites associated with personal security concerns

    • steep topography

    4.6Early identification of these constraints will help define issues that need to be resolved (or at worst avoided) by the network design. Identification of potential solutions to overcome the barrier effect will inform the next stage: selection of preferred route alignment.

    Selection of preferred route alignment 4.5The suitability of each link, modified if required, to cater for the needs of the identified target users should be considered against the five criteria: coherence, directness, safety, comfort and attractiveness. The adaptability of the link to accommodate significant increases in cycle use should also be reviewed. Table 4.1 describes key requirements under each criterion.

    4.6Input from existing cyclists is very valuable in identifying the existing route option(s) that conveniently provide(s) access to destinations and balances directness, topography, traffic conditions, personal security and comfort. The local knowledge of existing cycle users, including less confident cyclists and those with children who cycle, which has been built up over many hundreds of trips can identify how different routes meet the needs of different target cycle users and at different times of day.

  • 17December 2014

    Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    Table 4.1 Core criteria for routes used by cyclists

    Coherence• link all potential origins and destinations

    • be continuous and recognisable

    • offer consistent standard of protection throughout

    • be properly signed

    • include well located cycle parking

    Directness• be based on desire lines

    • result in minimal detours or delays

    • provide a positive advantage in terms of directness and priority over

    motor traffic

    Safety• be safe and perceived as safe

    • provide personal security

    • limit conflict between cyclists and pedestrians and other vehicles

    Comfort• be smooth, non-slip, well maintained, drained and free of debris

    • have sufficient width for the level of use

    • have easy gradients

    • be designed to avoid complicated manoeuvres

    • enable cyclists to maintain momentum

    • minimise impacts of noise, spray and headlight dazzle from other traffic

    Attractiveness• be attractive and be interesting

    • integrate with and complement their surroundings

    • contribute to good urban design

    • enhance personal security

    • be well maintained

    Adaptability• where substantial increases in cycling are expected, consideration should be

    given to the adaptability of infrastructure to accommodate large increases

    in use

  • Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    18 December 2014

    4.7Existing cycle users will also be able to identify problem locations which, if resolved, could unlock parts of the network that currently deter or pose hazards for cyclists.

    4.8The selection of a preferred route will need to take into account the following considerations:

    • for utility journeys, the optimum route, all other considerations being equal, will be the most direct option (shortest distance and minimum delay). Any other alignment would need to offer significant benefits in terms of safety, comfort or attractiveness to be successful

    • for routes primarily intended for leisure use, attractiveness and comfort will be of higher importance

    • the feasibility and cost of addressing any existing route deficiencies to cater for the needs of the identified target users, compared to alternative route options

    • impact of any engineering measures required, or high levels of cycle use, on other sustainable modes (public transport and pedestrians) and essential vehicles (emergency services)

    • casualty data should be used carefully in selecting a route alignment. Cycling casualties tend to be widely dispersed and casualty clusters commonly indicate routes that are heavily used by cyclists – because they are convenient. A low casualty record can indicate a location that cyclists avoid due to perceived danger. Casualty data may be helpful in identifying routes that need priority treatment to assist cyclists

    • perceived safety of different options, because this can strongly influence route choice, and ultimately mode choice

    • personal security, particularly for commuter routes that are likely to be used after dark

    • adaptability to accommodate significant increases in cycling use

    4.9Parallel provision: whilst the aim should be for a network that provides safe and convenient routes for the full range of cycling abilities, there may be some instances where, in the short term, no single route option provides the optimum balance of safety, directness, comfort and attractiveness for the needs of different users (e.g. experienced commuters and new or child cyclists). In such situations alternative routes with different characteristics may be provided in parallel for the different user groups as an interim arrangement. However, the longer term aim should be to design all routes as suitable for the full range of target users. Cycling networks can have a role in providing for the transition from inexperienced to more confident and skilled cycle users; this will be the case particularly in towns and cities where cycling levels have historically fallen to a low level.

  • 19December 2014

    Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    Type of provision (concept design)4.10Once the preferred alignment has been chosen for a link, the appropriate type of provision for cycle users will need to be selected. Guidance on this is provided in the chapters on:

    • principles and processes for cycle-friendly design (chapter 1)

    • streets and roads (chapter 4)

    • junctions and crossings (chapter 7)

    • traffic free routes: conceptual design (chapter 5)

    • traffic free routes: detailed design (chapter 6)

    4.11Key considerations in selecting the appropriate provision will be:

    • effectiveness of the solution to deliver the five criteria at a standard required for the target cycle user

    • effects on other traffic (note that, on many routes, reducing traffic speeds or traffic volumes to assist cyclists should not be viewed as disbenefits; but instead a contribution to wider safety, health and environmental objectives)

    • effects on pedestrians

    • suitability at night and in adverse weather

    • adaptability to cater for cycling growth

    • cost (capital cost and maintenance liability)

    4.12In practice, selection of route alignment and type of provision is an iterative process; the preferred alignment may need to be revised at this stage if a design solution cannot be found that provides adequate capacity or level of service for cycle users or cannot be delivered without unacceptable cost or impact on other traffic.

    4.13Initial construction cost estimates should be prepared to enable comparison of the concept design options and to feed into and inform the overall network budget and programme (covered in the next section).

    4.14Cost estimates can be built up quickly using standard unit costings per linear metre / per square metre / per item. Cost estimates should include appropriate contingencies to account for utilities diversions, land purchase and any other unknown requirements.

  • Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    20 December 2014

    5. Stage 3: Implementation priorities, budget and programme

    Implementation approach and priorities

    Introduction5.1Implementation of a comprehensive city-wide cycle network may take many years. Cycle networks in London and Copenhagen have been implemented over more than 30 years, and upgrading the networks is an ongoing process.

    5.2Investment will therefore need to be prioritised where it can have greatest effect in encouraging cycling and reducing casualties. Implementation strategies commonly involve a combination of six approaches, each of which is described in the following sections:

    • area-based phased implementation (ideally accompanied by targeted smarter choices interventions)

    • corridor-based (typically to address provision along and across main radial routes)

    • targeted investment around major attractors (rail stations, employers)

    • targeted investment at key priorities to unlock barriers

    • network-wide default interventions

    • opportunistic delivery funded by land use development, transport schemes and routine maintenance

    5.3The balance of these approaches will depend on the size of the settlement, the distribution of journey attractors (concentrated in the centre or dispersed in local centres and/or urban fringe development); the highway layout; existing cycling levels, topography and in some cases demographics and / or public health priorities.

    5.4Smarter choices programmes with major employers, schools and visitor attractions may most effectively be targeted at areas receiving infrastructure investment.

    Area-based phased implementation5.5Intensive area-based implementation of infrastructure measures may be used to avoid spreading limited resources too thinly across a network area. Smarter choices programmes may also be focused on the same areas to promote use of the new infrastructure. The aim will be to implement the entire network eventually (likely to be over 15 to 20 years, given current funding levels), by implementing a new area comprehensively every 3 to 5 years.

    5.6This approach may be appropriate where there is very different propensity to cycle in different areas due to topography, land use patterns or demographics. The early phases will target areas where investment is likely to yield the greatest increases in cycling and/or the greatest health benefits. The priority areas are likely to be those with:

  • 21December 2014

    Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    • high trip density (all modes) – town centre and main railway, plus dominant trip attractors (provided these are not geographic outliers)

    • existing cycling levels and culture - it is easier to build on high existing usage in locations with a culture of cycling, and then to work out to neighbouring areas

    • health indicators – areas with low activity and high obesity rates are likely to benefit most from increased physical activity. However, people living in these areas may have lowest propensity to cycle more

    • areas with particular demographics, e.g. young mobile people without access to a car

    5.7The main disadvantage of the area-based prioritisation of funding is that it does not equitably spread resources across the population geographically.

    Corridor-based approach5.8A corridor-based approach is typically used to develop the main ‘spine’ routes on a network; commonly serving the radial corridors and town centre. This approach works well where there are predominantly residential areas between the main ‘spine’ corridors and these areas are already cycle-friendly and require minimal intervention.

    Targeted on major attractors5.9Local cycling networks serving one or more specific large journey attractors may be a priority where there are particular car parking pressures or a culture of cycling – commonly hospitals, universities and railway stations. These networks are aimed at commuting journeys and accompanying smarter choices programmes will be important to maximise cycling uptake. The disadvantage of this approach is that it may create relatively isolated sections of network.

    Network-wide default interventions5.10The following low-cost interventions, can be applied as a default measure across the highway network and will provide accessibility and advantage to cycle users with negligible impact on other vehicles.

    • advanced stop lines

    • cycle access at road closures

    • exemption from banned turns

    • contraflow cycling on one-way streets

    • flush kerbs

    • cycle parking

    Advanced Stop Line, London

    Contaflow cycling, London

    Cycle parking, Brighton

    Road crossing, Cramlington

    River crossing, Newport

  • Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    22 December 2014

    Addenbrookes Access Road, Cambridge

    Pho

    to: J

    on

    Toy

    5.11Advanced stop lines, flush kerbs and cycle parking can be introduced without the need for a Traffic Regulation Order (TRO). The need for TROs for other measures is expected to reduce following publication of the revised TSRGD in 2015. Costs can be further reduced if these measures are implemented as part of routine maintenance programmes.

    5.12Cyclists will also benefit from network-wide 20mph limits and supporting low-cost speed reducing measures.

    Key priorities to unlock barriers5.13Some targeted infrastructure projects can be disproportionately effective at unlocking barriers on the network. These can include:

    • crossings of river, rail, road barriers that can provide major improvements in connectivity and journey time between otherwise isolated parts of a network

    • cycle routes and parking to support development sites

    • cycle routes to connect to improvements delivered by other transport infrastructure enhancements – routes to new stations; links to cycle routes created by highway or bus priority schemes

    Opportunistic delivery5.14Parts of a cycling network may be delivered as part of major land use developments, public transport or highway schemes. A cycling network plan is helpful in ensuring that these schemes include high standard cycling facilities that fit with the wider cycling network and that planning officers identify opportunities for these developments to fund parts of the cycling network.

    5.16It is recommended that a design brief for cycling and walking infrastructure is required for larger developments (>500 dwellings or 10,000 sq m of B1 uses) which will include:

    • high quality cycling routes within the development site

    • enhancement of existing cycle routes leading to and around the sites

    • cycle parking standards commensurate with usage targets

    5.17This is particularly useful where more than one developer is involved in developing a site.

    5.18Routine asset management programmes provide an opportunity to implement and enhance parts of cycling network as described in section 7.

  • 23December 2014

    Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    Budget5.19Budgets for delivery of the cycling network may be defined using a combination of the following:

    • best practice investment per capita per annum

    • available funding sources

    • total network cost estimate / acceptable delivery timeframe

    5.20Per capita investment rates: The Cycling England Cycling City and Towns (CCT) programme delivered a step change in investment in cycling in 18 settlements over a three to six year period, investing at rates that were comparable with the per capita spend in other European cities which have successfully increased cycle usage. Figure 5.1 shows how the CCT investment (DfT grant plus match funding) in York and in Greater Bristol (£13.33 per capita per annum in both cities) compares with other European cities that have achieved high cycling mode share. The investment rates include infrastructure and smarter choices programmes.

    5.21The Mayor of London’s 2013 Vision for Cycling in London3 allocates spending at £12.50 per capita per annum on average for 13 years from 2014, with the average annual spend over the first three years at £16.50 per person.

    5.22The 2013 report of the All Party Parliamentary Cycling Group, ‘Get Britain Cycling’4 recommends create a cycling budget of at least £10 per person per year, increasing to £20.

    Table 5.1 Comparison of cycling levels and spend

    City Population Cycling

    mode share

    (all journeys)

    Annual spend

    per capita

    Funding details

    Basel 190,000 17% £11.23 1988-1994 over 7

    years for Kanton

    Basel-Stadt

    Ghent 231,000 15% £7.89 1994-2000

    Strasbourg 480,000 12% £9.40

    Berlin 3,420,000 10% £4.14

    York 184,000 10% £13.33 Cycling City +

    match funding

    2008-2011

    Bristol 410,000 5% £13.33 Cycling City +

    match funding

    2008-2011

    3 The Mayor’s Vision for Cycling in London - An Olympic Legacy for all Londoners, Greater London Authority, March 2013

    4 Get Britain Cycling – Summary & Recommendations, All Party Parliamentary Cycling Group, April 2013

    Source: A public health vision for cycling in Bristol 2010 - 2020

  • Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    24 December 2014

    Direction signing, Leighton Linslade

    5.23Available funding sources will in part be determined by the priority given to cycling provision compared to other activities and responsibilities of the local authority / scheme promoter. Targets for cycling use can be helpful in defining these priorities.

    5.24Budgets should cover:

    • planning, design and consultation

    • capital costs of network construction

    • costs of supporting smarter choices programmes (education, training, promotion)

    • monitoring

    • maintenance, upgrade and enhancement of the cycling network

    Programme5.25The implementation programme will be determined by:

    • targets for cycle use

    • transport plan priorities

    • budget and funding cycles

    6. Stage 4: Detailed design, construction & publicity

    Detailed design and construction6.1Detailed design and construction considerations are described in the chapters on:

    • streets and roads (chapter 4)

    • traffic free routes: conceptual design (chapter 5)

    • traffic free routes: detailed design (chapter 6)

    • signing (chapter 11)

    • cycle parking (chapter 12)

    The detailed design process may identify unexpected costs, commonly around buried services, which affect the programme budget, phasing or potentially the design concept.

    6.2A wayfinding strategy is an essential element of the network development. It serves both to help existing cycle users navigate and to publicise cycling as an option to car users.

  • 25December 2014

    Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    6.3Wayfinding measures will include destination signing (including road markings), internet based and paper maps, and increasingly internet-based journey planning tools. Route branding, usually colour coded such as the Aylesbury gemstone routes, can help with route recognition and defining the network hierarchy. A key task is to define a consistent set of destinations. Further information is included in Chapter 11 and in Sustrans Technical Information Note 5: cycle network signing.

    Public engagement programme6.4To maximise increases in cycle use, cycle network development should be accompanied by a smarter choices programme of investment in cycle training, publicity and promotion. This can include the following:

    6.5Information:

    • cycle route maps and web-based journey planners

    • targeted information to schools and employers about the cycling support available

    • one-to-one travel planning

    • information about cycle locks, carrying luggage on bikes and what to wear

    6.6Publicity:

    • regular use and endorsement by high profile figures including council, public health and business leaders

    • media releases (new routes, success stories)

    • route launch events

    • cycling related competitions and challenges

    6.7Education:

    • cycle training for adults and children

    • cycle maintenance training

    • web-based FAQs

    • coordination with public health programmes and exercise on referral

    6.8Support:

    • free loan bikes (including folding and electric bikes)

    • deals with bike shops

    • support for employers (site audit, match funding and design help to deliver cycle parking, lockers/drying facilities, showers)

    • employer support for cycle to work bike purchase schemes and support for free taxi home for employees in the event of urgent need

    Route branding, Aylesbury

    Launch event, St Neots

  • Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    26 December 2014

    6.9The engagement programme can be targeted on employers and places of education served by the new cycling infrastructure, particularly where the infrastructure delivery follows an area-wide or corridor-based approach or is targeted on major journey attractors. Education institutions and employers have established mechanisms for contacting the target audience(s).

    6.10Engagement can be particularly effective where there are new controls on car parking, associated with a business expanding or relocating or accompanying the introduction of residents; parking or other car demand management programmes. It is likely to be cost-effective in these instances to promote and support cycling as part of a smarter choices programme that addresses other travel options; public transport, walking, car sharing and motorcycling.

    6.11Community engagement with residents can be more challenging to deliver cost-effectively, because it can be harder to identify receptive audiences and maintain support. Local champions in community groups can provide a helpful starting point.

    7. Stage 5: Monitor, evaluate, maintain and upgrade7.1The cycle network plan will need to adapt to information from monitoring and evaluation of early phases of the network development, which can identify important route enhancements to increase capacity or overcome route deficiencies.

    7.2User feedback is a key input to the evolving plan.

    7.3Significant cost savings can be achieved if the network plan informs an authority’s highway asset management programme. Improvements such as widening cycle lanes, increasing the depth of advanced stop line reservoirs and implementing speed reducing measures such as removing centre lines can be delivered at minimal cost if undertaken as part of routine resurfacing or other maintenance.

    7.4More details are provided in the chapters on:

    • maintenance and management (chapter 15)

    • monitoring and evaluation (chapter 16)

    Solar powered automatic cycle counter, Swindon

  • 27December 2014

    Sustrans Design Manual • Chapter 2: Network planning for cyclists (2014, draft)

    8. ReferencesLondon Cycling Design Standards draft for consultation, Transport for London, June 2014

    Active Travel (Wales) Act 2013 draft Design Guidance, Welsh Government, May 2014

    The Mayor’s Vision for Cycling in London - An Olympic Legacy for all Londoners, Greater London Authority, March 2013