13
Atlanta BeltLine SW + SE Study Group: Southside Trail- West Construction January 16, 2020 @atlantabeltline @atlantabeltline @atlantabeltline

SW + SE Study · 16.01.2020  · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SW + SE Study · 16.01.2020  · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline

Atlanta BeltLine SW + SE Study

Group:

Southside Trail-West

Construction

January 16, 2020

@atlantabeltline

@atlantabeltline

@atlantabeltline

Page 2: SW + SE Study · 16.01.2020  · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline

Southside Trail

Updates

• Southside Trail-West Construction Update

• Meet the Contractor

• Construction FAQ

• Southside Trail-West Groundbreaking Event

Page 3: SW + SE Study · 16.01.2020  · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline

Meet the Contractor – Astra Group, Inc.

Jose Hasbun------

Project Manager

Page 4: SW + SE Study · 16.01.2020  · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline

Southside TrailWest

Construction

FAQHighlights

• Q: What hours is the contractor allowed to work?

• A: M-F 7AM – 7PM; Sat & Sun 9AM – 5PM (at

ABI’s discretion).

• Q: Are there any areas of the Southside Trail-West

that will be open during construction?

• A: No, due to massive grading that will require

cutting through an existing 20+ foot high

banked slope at Pittsburgh Yards.

Page 5: SW + SE Study · 16.01.2020  · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline

Southside TrailWest

Construction

FAQHighlights

• Q: Will community members be able to apply for

vacant positions on the construction project?

• A: Yes. Please contact Worksource Atlanta for

details.

• Q: Where will construction access points be

located?

• A: Construction vehicles will enter the corridor

from Allene Avenue and Pryor Road.

Page 6: SW + SE Study · 16.01.2020  · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline

SST-W Construction Extents

Page 7: SW + SE Study · 16.01.2020  · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline

SST-W Construction Closures

Page 8: SW + SE Study · 16.01.2020  · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline

Westside Trail Access from University Ave

Page 9: SW + SE Study · 16.01.2020  · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline

Detours along

University Avenue

[insert flyer]

Page 10: SW + SE Study · 16.01.2020  · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline

Southside Trail West

ConstructionInfo -

Updates

For general construction concerns, email:

[email protected]

Construction Emergencies:

Jose Hasbun – 205.903.6460

General Construction Questions:

678.757.4932

Beltline.org/southsidetrail

Page 11: SW + SE Study · 16.01.2020  · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline

Southside Trail-West Groundbreaking

Please join us!

Page 12: SW + SE Study · 16.01.2020  · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline

OtherUpcoming

AtlantaBeltLinePublic

Meetings

• SW Study Group Meeting – January 23nd

o Design of an access point in Westview

and West End

o The Ke’nekto 1492 Ralph David Abernathy Blvd SW

• 1st Quarterly Briefing – February 20th

o All Saints’ Episcopal Churcho 634 W Peachtree Street NW

Page 13: SW + SE Study · 16.01.2020  · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline

QUESTIONS?

Thank you!