Case Study
-Oil Refinery Barrancabermeja —
Ultrafiltra�on & Reverse Osmosis
Plant
Oil & GasOil & GasOil & GasOil & Gas
OverviewOverviewOverviewOverview
As part of ECOPETROL’s Industrial Services Master Plan (ISMP) - in Spanish, Plan Maestro de Servicios
Industriales (PMSI) - which was undertaking at Barrancabermeja Refinery and Petrochemical Complex, a
new brackish water desalination plant was installed and integrated to exiting water treatment plants to
produce high quality boiler feed water as well as potable water meeting the project specifications.
Following an international public bid and qualification process, our company, SWT, was the selected
qualified system supplier to provide the advanced water treatment plant-system using a combination of
Ultrafiltration (UF) and Reverse Osmosis (RO) technology processes.
We are very proud of our involvement in this project.
www.SafBonWater.com
In line with Ecopetrol’s refining productivity strategic objectives and its environmental approach, the ISMP
was conceived as a necessary investment to sustain them.
The ISMP included the upgrade & expansion of the main industrial auxiliary services, such as water, air,
electricity, and steam production, to improve the reliability of their generation, to maximize
efficiency and to reduce environmental impact.
The new UF/RO plant is one piece of this envisioned plan which contributes to these goals, especially with
regard of managing the water resource. Our company has worked closely with our client and local partner
to overcome challenges, such as space limitations, and provided a solution which met or exceeded the
project’s requirements in terms of local sourcing, water quality, and water production levels (for current
and future conditions), among others .
At a glance At a glance At a glance At a glance
Stakeholder:Stakeholder:Stakeholder:Stakeholder:
Owner/Client: Empresa Colombiana de Petróleos S.A.Owner/Client: Empresa Colombiana de Petróleos S.A.Owner/Client: Empresa Colombiana de Petróleos S.A.Owner/Client: Empresa Colombiana de Petróleos S.A.
(ECOPETROL)(ECOPETROL)(ECOPETROL)(ECOPETROL)
OwnerOwnerOwnerOwner’’’’s Engineer: Consor6um s Engineer: Consor6um s Engineer: Consor6um s Engineer: Consor6um TechnipFMC / TechnipFMC / TechnipFMC / TechnipFMC / Tipiel Tipiel Tipiel Tipiel SASASASA
Loca6on: Barrancabermeja, Santander Department Loca6on: Barrancabermeja, Santander Department Loca6on: Barrancabermeja, Santander Department Loca6on: Barrancabermeja, Santander Department ----
ColombiaColombiaColombiaColombia
Applica6on: Boiler feed water and potable water Applica6on: Boiler feed water and potable water Applica6on: Boiler feed water and potable water Applica6on: Boiler feed water and potable water
produc6on for the Refinery complexproduc6on for the Refinery complexproduc6on for the Refinery complexproduc6on for the Refinery complex
Contract type: Equipment Supply (EP)Contract type: Equipment Supply (EP)Contract type: Equipment Supply (EP)Contract type: Equipment Supply (EP)
Contract date: 2009Contract date: 2009Contract date: 2009Contract date: 2009
StartStartStartStart----up date: up date: up date: up date: 2013 | Equip. Delivery: 20102013 | Equip. Delivery: 20102013 | Equip. Delivery: 20102013 | Equip. Delivery: 2010
Flow rate: UF 10.08 MGD | BWRO 6.48 MGDFlow rate: UF 10.08 MGD | BWRO 6.48 MGDFlow rate: UF 10.08 MGD | BWRO 6.48 MGDFlow rate: UF 10.08 MGD | BWRO 6.48 MGD
Technology: UF, Technology: UF, Technology: UF, Technology: UF, BWRO BWRO BWRO BWRO
The ChallengeThe ChallengeThe ChallengeThe Challenge
www.SafBonWater.com
The Solu6onThe Solu6onThe Solu6onThe Solu6on Our executed EP contract included engineering design, fabrication,
and supply of Ultrafiltration (UF) and Brackish Water Reverse Osmosis
(BWRO) Systems as well as the ancillary equipment and supporting
operational systems, such as chemical dosing skid, UF and RO cleaning system, and PLC control systems.
Installation supervision, system testing, commissioning & start-up, and operator training services were
provided by our field service team.
The design of UF/RO plant was carried out considering
current and future conditions with the aim/intention of:
♦ achieve the greatest operating flexibility,
♦ install and put into operation the new units without
affecting the operation of the Refinery,
♦ have a plant ready for future service, when existing
dual media filters, and softening unit are eventually
put out of operation.
The UF system consists of three 3 trains. Each UF train
Includes eight (8) submerged skids using PVDF hollow
fiber membrane with a capacity of 2333 GPM to cater to the flow conditions
(Min., Nor., Max.) and a recovery of 95%. A UF pilot study at the site was
conducted by our team to finalize and confirm the design of UF full scale
system. We included the UF membranes for the future expansion to ensure
a lower loading rate for the current phase, hence extending the membrane life.
The RO unit is a skid-mounted double pass BWRO system with three (3) trains
and an overall recovery of 75 %. Each RO train has a capacity, at present, of 1374 GPM with
additional extra slots for future pressure vessels to be added to the system for an increase flow production
of 1500 GPM. The system is designed in a manner where
the first and second RO passes are interlocked to run and
shut down simultaneously.
To address the limited space, the entire UF/RO Plant was
laid out in the same building, distributed on two (2) floor
levels. The RO trains were
designed to minimize the
plant footprint by stacking
the pressure vessels skids
on top of each other.
www.SafBonWater.com Edi�on: Mar.2021
PDFPDFPDFPDF
Selected ParametersSelected ParametersSelected ParametersSelected Parameters
• UF Filtrate flow 2,333 GPM per UF train • Permeate TDS 0.31 mg/L (82 Fo) | 0.43mg/L (93 Fo)
• UF Recovery 95% • Permeate flow 1,374 GPM per RO train; 1,500 GPM per RO train (future)
• Feed Water TDS 237.8 mg/L aIer UF • RO Recovery 77.5% (1P) | 87 %(2P)
((((Ecopetrol) Ecopetrol) Ecopetrol) Ecopetrol) ““““With this investment With this investment With this investment With this investment
we not only improve the quality we not only improve the quality we not only improve the quality we not only improve the quality
of our industrial process water and of our industrial process water and of our industrial process water and of our industrial process water and
drinking water, but we are also more drinking water, but we are also more drinking water, but we are also more drinking water, but we are also more
friendly with our environmentfriendly with our environmentfriendly with our environmentfriendly with our environment."."."."
Translated from Spanish Source: h$ps://www.vanguardia.com- July 13 2013