PETROL PUMP AUTOMATION AND MONITORING SYSTEM
PROJECT TITLE
Pankaj Singh 1
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
PROJECT TITLE
The title of the project is “Petrol Pump Automation & Monitoring
System (PPAMS)”.
This software is design to automate the task of petrol pump spread across in
different cities of Uttar Pradesh.
The main features of this software are as follows :-
1. Reliable
2. Accuracy
3. Fault Tolerant
4. Fast
5. Operating System Independent
Pankaj Singh 2
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
INTRODUCTION
Pankaj Singh 3
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
INTRODUCTION
“Petrol Pump Automation and Monitoring System” is a computer based
information system is design to handle the manual record housekeeping of the
organization.
The organization is involved in the following activities at their city wise
distribution center :-
1. Management of the Employee :-
Employee Appointment
Employee Attendance
Employee Salary
Employee Shifts
2. Management of the Fuel :-
Hourly bases Underground Tankers status Monitoring.
Pankaj Singh 4
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
According to the Underground Tankers status a fuel type order is
placed to the Headquarter.
3. Management of Fuel Supply :-
On receiving the order a supply is generated against the order.
Government fuel Depos supply is track down.
Payment of the supply is done.
The oil Tankers reaches the Petrol Station.
The Petrol Pump sends an acknowledgement to the Headquarter.
4. Management of Report :-
The above mention business cycle generates and consumes different
kinds of data at different levels from different users.
Therefore the business cycle produces different kinds of relevant
reports such as :-
Centre wise sales reports.
Center wise order reports.
Centre wise pending order reports.
Centre wise Employee reports.
Centre wise Supply reports.
Pankaj Singh 5
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
OBJECTIVE
Pankaj Singh 6
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
OBJECTIVE
Petrol Pump Automation and Monitoring System (PPAMS) is design to
automate the following areas of the organization.
They are as follows :-
1. Employee Management :-
PPAMS automate the task of employee record creation,
modification, deletion and retrievals.
PPAMS also automate the task of employee attendance and his/her
salary management.
PPAMS also allocates the working shifts of each bunch of employee.
2. Fuel Order Management :-
PPAMS is designed in such a manner that human machine
interaction becomes the key process area for PPAMS success.
Pankaj Singh 7
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Therefore the PPAMS collects the underground Tankers status at
every one hour bases and can generate Fuel Order sub sequentially .
“The Branch Manager is responsible for generating Fuel Order to the
Headquarter.”
3. Fuel Supply Management :-
PPAMS generates a Fuel Supply order to the Government Depos
immediately on receiving the Fuel order from the centre.
PPAMS also generates Payment details against the Supply.
PPAMS also records the Supply Receipts on supply fulfillment on
the centre.
PPAMS can also store the supply acknowledgement record from the
centre.
4. Report Management :-
PPAMS is designed to give the reports regarding the entire system at
different levels of business process and time such as :-
Employee Reports
Centre wise Order Reports
Centre wise Sales Reports
Centre wise Supply Reports
Overall System Reports
Concise Reports on Mobile Phones
5. PPAMS Security Management :-
Pankaj Singh 8
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
PPAMS is design in such a manner that certain business task can be done
only by certain PPAMS User.
One such Security measure is :-
User Creation & Modification
User Permissions
PPAMS Locking & Unlocking mechanism of business transaction.
Log file is also maintained on day to day basis for entire system
process. Using object Serialization and Deserialization.
Pankaj Singh 9
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
PROJECT CATEGORY
Project Category- [RDBMS]
Relational Database Management System
Pankaj Singh 10
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
E.F Codd introduced the concept of relational model in 1970.
Commercially available RDBMS are Oracle, Ms-Sql Server, Sybase, Ingress, and
Informix etc.
In RDBMS data is represented in a simple Row-Column format. Each data
field is considered as column and each record is considered as a row of table. Any
truly RDBMS is relational if and only if complies with the 12 rules initiated by
E.F Codd known as Codd Commandments. One such rule is Integrity Rule, which
is crucial for any relational Database. A relational Modal consists of:
A set of Domains and Relations
Operations on Relations
Integrity Rules
Applying relational operations on tables and extracting desired tuples or rows or
record does data retrievals. The following are relational Operations are:
Projection
Selection
Cartesian Product
Joins (Left, Right, Inner)
Unions
Intersections / Difference / Divisions
Pankaj Singh 11
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
TOOLS &
PLATFORM
Pankaj Singh 12
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Tools and Platforms
Server side Components: Java Server Pages
In the world of web-accessible J2EE application Java server pages and
Servlets occupy a central position between enabled clients and application servers.
JSP and Servlets as working in the environment of the web container that provide
connection and services. By means of these connections, JSP and Servlets control
the presentation of data derived from operations on database to network-connected
clients. This client role is suggested in figure-
Client Presentation
HTML, Multimedia, XML Objects
Server presentation control
Binary files, Query, Result, XML
Business Logic
Binary files, Query, Result, XMLBack End Database
Pankaj Singh 13
Internet Aware Devices
Web Server / Web containerFiles Servlets Java Server Pages
Enterprise JavaBeans, JavaBeans JDBC Drivers
SQL Database, Object Database File System
Web BrowsersHTML pagesJava Applets
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Any J2EE server can execute Servlets and JSP pages but they can also run
by standalone Web Servers plugins. Servlets and JSP can be run with expensive
server software and hardware inside free web containers such as Apache Tomcat.
JSP is not limited to generating Hyper Text Markup Language (HTML)
pages. The technology generates content with Extensible Markup Language
(XML), Markup Extensible HTML (XHTML) formatting equally well.
Pankaj Singh 14
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Middleware : Java Database Connectivity (JDBC)
The JDBC API is designed to allow developers to create JAVA code that
can access almost any relational database without needing to continually rewrite
their code. Despite standards set by the ANSI committee, each database system
vendor has a unique way of connecting to its system. Any type of JAVA code,
including JAVA Servlets, JSP Pages, Enterprise JAVA Beans and plain JAVA
classes can use JDBC.
The JDBC API was first introduced with release 1.1 of JDK. JDK 1.5
contains JDBC 3.0 which of the composed of the JAVA.SQL and JAVAX.SQL
packages. JDBC provides application developers with a single API that is uniform
and database independent. The API provides a standard to write to, as well as
standard that takes all of the various application ensigns into account.
The API database independence is due to set of JAVA interfaces that are
implemented by a driver. The driver takes care of translating the standard JDBC
calls into the specific calls required by the database it supports. The application is
written once and then moved to the various drivers. The application remains the
same; the driver change. Driver may be used to develops the middle tire of a
multi-tier database design. In addition to providing developers with a uniform and
database independent framework, JDBC also provides a means of allowing
developers to retain the specific functionally that their database vendor offers.
JDBC drivers must support ANSI SQL-2 entry level, but JDBC allows to
Pankaj Singh 15
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
developers passing query strings directly to the connected driver. These strings
may or may not be ANSI SQL or SQL at all. The use of these strings is up to
underlying driver.
JDBC is not a derivative of Microsoft’s open database connectivity
(ODBC) specification. JDBC is written entirely in JAVA; ODBC is a ‘C’
interface. Both JDBC and ODBC however are based on the X/open SQL
command level interface (CLI). Javasoft provides a JDBC–ODBC bridges that
translate JDBC to ODBC this implementation alone with native methods is very
small and efficient.
Pankaj Singh 16
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Server Side Component : SERVLET
When we write any program either in Java or HTML we can see that each
command is doing, since it being done in front of you in the browser. In the case
of Servlet is quite different. Everything happens behind the curtain. You cannot
see what is happening. Thus, Servlet is kind of software which on the side of
server. This is written in Java and extends the functionality of a server. As we
know that applets run inside of a Java-enabled browser enabled server. On the
contrary, Servlets do not display a graphical interface to the user. Only the result
of the servlet’s processing are returned to the clients, in the form of HTML.
It can also be said the servlets are Java classes that confirm to a specific
interface that can be invoked from the server. The functionality provided by the
servlets is not restricted the web servers. Any servers that support the Servlet API
may be enhanced through servlets. The servlets API is specification develop by
SUN that defines the classes and interfaces used to create and execute the servlets.
In fact Servlets provide a broad framework for creating applications that
implement the request response methodology. If a browser sends a request to the
server, the server may forwards the request to a Servlet. At the point the Servlet
can the process the request, through Database access or any other means, and
constructs an appropriate response (usually in HTML) that is returned to the client.
Pankaj Singh 17
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Web Server Tool :Apache Tomcat 6.0
To run the Servlet and JSP you need to install a Web server with a Java
Servlet and JSP server engine. There are many Servlet and JSP engine from which
to choose, ranging from the Apache Jakarta Tomcat project to large-scale
enterprise application servers such as BEA Web logic server and Iplanet
application server. Fortunately, Java is standardized, and any Servlet and JSP
engine that is compliant with the Servlet 2.3 and JSP 1.2 Specification should be
compatible. Regardless of which of these products you choose to use, the code
and deployment descriptors should require little, if any changes. Because Apache
Tomcat is free, of high quality and is the official references implementation for the
Servlet and JSP application.
Tomcat 6.0 is pure Java implementation that contains a Web server
in addition to the Java Web server environment. Production system usually use
Tomcat with a separate Web server, Such as Apache Web server.
Pankaj Singh 18
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Client or Server Side Scripting Tool: - JavaScript
JavaScript can generate HTML dynamically on the client. This is a useful
capability, but only handles situations where the dynamic information is based on
the client's environment. With the exception of cookies, HTTP and form
submission data is not available to JavaScript. And, since it runs on the client,
JavaScript can't access server-side resources like databases, catalogs, pricing
information, and the like.
Static HTML. Regular HTML, of course, cannot contain dynamic
information. JSP is so easy and convenient that it is quite feasible to augment
HTML pages that only benefit marginally by the insertion of small amounts of
dynamic data. Previously, the cost of using dynamic data would preclude its use in
all but the most valuable instances.
Pankaj Singh 19
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Front End Tool : HTML
HTML is a language for describing how pages of text, graphics and other
information are organized, formatted and linked together. By 1993, almost 100
computers throughout the world were equipped to serve up HTML pages. Those
interlinked pages were dubbed the World Wide Web (WWW), and several web
browser programs had been written to allow people to view web pages. Because
the popularity of the Web, a few programmers was Mare Andresen; he went on to
become rich and famous, selling one of the world’s most popular Web browser,
Netscape Navigator.
Today HTML pages are the standard interface to the internet. They can
include animated graphics, sound and video complete interactive programs, and
good old fashioned text. Millions of Web pages are retrieve each day from
thousand of Web server computers around the world.
The Web is on the verge of becoming a mass-market medium, as high
speed internet connection through TV cables, modernized phone lines and direct
satellite feeds become common place.
Pankaj Singh 20
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
MySQL Database Management System
MySQL, the most popular Open Source SQL database management system,
is developed, distributed, and supported by MySQL AB. MySQL AB is a
commercial company, founded by the MySQL developers. It is a second
generation Open Source Company that unites Open Source values and
methodology with a successful business model.
MySQL is a database management system.
A database is a structured collection of data. It may be anything from a
simple shopping list to a picture gallery or the vast amounts of information in a
corporate network. To add, access, and process data stored in a computer database,
you need a database management system such as MySQL Server. Since computers
are very good at handling large amounts of data, database management systems
play a central role in computing, as standalone utilities or as parts of other
applications.
MySQL is a relational database management system.
A relational database stores data in separate tables rather than putting all the
data in one big storeroom. This adds speed and flexibility. The SQL part of
“MySQL” stands for “Structured Query Language.” SQL is the most common
Pankaj Singh 21
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
standardized language used to access databases and is defined by the ANSI/ISO
SQL Standard. The SQL standard has been evolving since 1986 and several
versions exist. In this manual, “SQL-92” refers to the standard released in 1992,
“SQL: 1999” refers to the standard released in 1999, and “SQL: 2003” refers to
the current version of the standard. We use the phrase “the SQL standard” to mean
the current version of the SQL Standard at any time.
MySQL software is Open Source.
Open Source means that it is possible for anyone to use and modify the
software. Anybody can download the MySQL software from the Internet and use
it without paying anything. The MySQL software uses the GPL (GNU General
Public License), http://www.fsf.org/licenses/, to define what you may and may not
do with the software in different situations. The MySQL Database Server is very
fast, reliable, and easy to use.
MySQL Server was originally developed to handle large databases much
faster than existing solutions and has been successfully used in highly demanding
production environments for several years. Although under constant development,
MySQL Server today offers a rich and useful set of functions. Its connectivity,
speed, and security make MySQL Server highly suited for accessing databases on
the Internet.
Pankaj Singh 22
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
MySQL Server works in client/server or embedded systems.
The MySQL Database Software is a client/server system that consists of a
multi-threaded SQL server that supports different backend, several different client
programs and libraries, administrative tools, and a wide range of application
programming interfaces (APIs).
We also provide MySQL Server as an embedded multi-threaded library that
you can link into your application to get a smaller, faster, easier-to-manage
product.
Pankaj Singh 23
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
HARDWARE & SOFTWARE
REQUIREMENT
Pankaj Singh 24
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Hardware Requirements :-
Hardware Minimum Requirement Recommended
RAM 128MB 512MB
Hard Disk 20GB 80GB or Above
Monitor 14” VGA 15”
CD-Drive 32x 52x R/W
Floppy-Drive 1.44MB 1.44MB
Keyboard Standard Standard/Extended
Mouse Serial Serial/Scroll
Processor Pentium-3 Pentium Dual-Co
Pankaj Singh 25
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Software Requirements :-
Programming language J2SE1.5 or above and HTML
Supporting package Library My SQL JDBC Driver 5.1 Beta
Web Server Tomcat 5.0 or Above
Back-End Software MySQL Server 5.0
For Documentation MS-Office XP 2003
For Reports HTML, XHTML
Operating System Any Operating System with JRE
Pankaj Singh 26
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
PROBLEM DEFINITION
Pankaj Singh 27
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
PROBLEM DEFINITION
The main problem in the existing system is that the system is completely
manual and is absolutely not efficient in terms of the time effort spent by the
management to set the work of employees & distribution and order of the fuel on
different centre.
Present PPAMS requires plenty of manual work done and tedious PEN-
PAPER work which is
Complicated
More error prone
Time consuming
Prone to leak and
Hard to manage properly
Therefore need arises to replace the system with alternative option
i.e. using computerized procedure for managing Employee database, Setting of
their work and shifting and also managing the attendance, Evaluation of Fuel
Status on hourly and then order to the Headquarter. We had proposed this system
for automation of Petrol Pump System. In this system we had assigned different
type of work to the Employee. The Branch Manger maintains all Employee work
and make their salary on the basis of their attendance and work. Every centre have
Pankaj Singh 28
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
the Branch Manger who is responsible to give the report day-to-day to the
Headquarter for daily sale of Fuel and also give the acknowledgement about the
Fuel Status in Underground tankers.
MAIN PROBLEMS WITH EXISTING SYSTEM
Some of the main problems with existing system are:
One problem is in this system that check the Fuel Status hourly in the
Under Ground Tankers and the problem is that to determine the Fuel Order
Stage.
Second problem in the existing manual system was that to manage the
Fuel Supply on the Centre at the time.
Third major problem was the security of the existing system. Due to the
involvement of different medium in the process of Fuel Supply/Order there
always remains the possibility of data leakage
That’s why the need of a secure environment for Fuel Supply/Order process
was required. This project deals with the Petrol Pump Automation & Monitoring
process with in quick time, secure and error free environment. It contains the
databank of no. of Centre in different Cities.
Pankaj Singh 29
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
LIMITATIONS
Although this system is being followed since many years but it is not very
fruitful and effective. Manual system whatever fast can not compete with
machines that so like computers. There are a lot of activities since schedule to
manage the Petrol Pump work to evaluation and final report. For all these
activities there some limitations is not handled by computers like:
It was a very time consuming process that which job is allotted to which
employee for this finalize the employee shifts, attendance and working
hour.
There was no provision of finalization of work type before going for the
employee designation.
This manual system was not so efficient for the any modifications during
the final phase of manage the employee work and Petrol Pump Service.
Pankaj Singh 30
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
PRELIMINARY INVESTIGATION
In this phase the actual requirement of the users is identified. It is an
iterative process. The overall structure is remains dependent on it. Without the
exact the requirement identification of the new system it remains the maximum
plausibility of the project failure in its initial phases.
From the user point of view problems investigated are
To allot more than one work to an employee.
Delay in Fuel Supply on the petrol pump centre.
Avoid to make the more order to the different depo.
Time difference/time lapsed in the supply of fuel.
From Organization point of view problems investigated are
Distribute the fuel on the centre according to their priority.
Avoid to order the fuel to the government depo without checking the
fuel status in the underground tankers.
Avoid pending of fuel supply payments.
Report Generation.
Pankaj Singh 31
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
System Requirements Identification
After project request from a company and finding the system requirement
clearly
Clarify and understand the project request.
Determine the size of the project.
Assess cost and benefits of alternative approaches.
Determine the technical and operational feasibility of alternative
approaches.
Pankaj Singh 32
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
REQUIREMENT SPECIFICATION
Pankaj Singh 33
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
REQUIREMENT ANALYSIS AND SPECIFICATION
Requirement Gathering and Analysis
The goal of the requirement gathering activity is to collect all relevant
information from the customer regarding the product to be developed with a view
to clearly understanding the customer requirements and weeding out the
incompleteness and inconsistencies in these requirements.
The requirements analysis activity is begun by collecting all relevant data
regarding the product from the users of the product and from the customer through
interviews and discussions. We had collected information in this regards by
questioning employee and the Administrator.
We met employee and discussed the problems faced by them in completion
of different types of work on petrol pump.
-Main problems faced by employee are to finalize the fuel type then order
to the headquarter..
-To go through the same work type for next set of work.
-To calculate total work completed.
-To evaluate the salary on the basis of work completion.
Pankaj Singh 34
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
We questioned administrator also and collected all their difficulties such as
-delay in fuel supply/order.
-Time spend in finding that which centre’s fuel selling is more than
other centre.
-Wait for the acknowledgement from the centre that fuel is received.
Now we have enough information about the requirement of employee and
administrator. As per the above information gathered we made System
Requirement Specification.
Pankaj Singh 35
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
PROJECT PLANNING & SCHEDULING
Pankaj Singh 36
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Project Planning
Success of most organizations depends upon clear examination of the
project or activities for the achievement of an objective within stipulated time and
cost. Management is then required to determine detailed activities and their
relationships, to estimate resources required and time needed to complete these
activities as per schedule, and to monitor and control the time and cost of the
project
Network analysis is a technique concerned with minimizing the over-all
project costs. PERT is a popular type of network analysis used in modern
management. PERT is a technique, which is useful in system planning. The
planning of any project involves the listing of various jobs that have to be
performed to complete the project. Requirements of men, material and equipment
are drawn up along with the estimates of costs and durations for the various jobs,
in the process of planning. The most important requirement for using PERT is the
breaking up of the project into jobs or activities and determining the order of
precedence for these jobs that is deciding which jobs are to be completed before
another can be started.
Pankaj Singh 37
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
The next step is to draw a picture or graph, which illustrates the jobs
outlining the predecessor and successor relations among them. The major tasks in
this system are listed below: -
ActivityDescription
Immediately Preceding activity
Expected time of
completionA Reading and understanding user-requirements - 15 days
B System conceptualization A 15 days
C System development and coding B 30 days
D Testing subroutines and controls C 15 days
E System implementation D 15 days
F Documentation E 30 days
G Fully developed system F 30 days
Total Time 150 Days
Pankaj Singh 38
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
PERT CHART
The jobs are shown as arrows leading from one circle in the figure to another.
Pankaj Singh 39
1
2A.Reading&understan ding user-req. reuserreq.rreqrereqrequirements-req.requirements-rererererreqrerequirements.customer enquiries
3B.System conceptualization
4C. System dev.and coding
5
D.Testing subroutines and controls 6
E. System implementation
F.Documentation
7
G.Fully developed system
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
The circles are nodes and denote the completion of particular jobs.
The node where the arrow depicting a job ends will be the initial point for the
arrow showing the succeeding job.
DFD AND ER- DIAGRAM
Pankaj Singh 40
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Context Level DFD
Pankaj Singh 41
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Level – 1 Explosion of “Petrol Pump Automation And Monitoring System”
Pankaj Singh 42
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Level – 2 Explosion of Module No. 1.1 “Fuel Sales Management”
Pankaj Singh 43
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Level – 2 Explosion of Module No. 1.2 “Fuel Order Management System”
Pankaj Singh 44
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Level – 2 Explosion of Module No. 1.3 “Fuel Supply Management System”
Pankaj Singh 45
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Level – 2 Explosion of Module No. 1.4 “Fuel Distribution Process”
Pankaj Singh 46
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Level – 2 Explosion of Module No. 1.5 “Employee Management System”
Pankaj Singh 47
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Level – 2 Explosion of Module 1.6 “System Security Management System”
Pankaj Singh 48
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Pankaj Singh 49
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
ER- Diagram
Pankaj Singh 50
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
MODULE DESCRIPTION
Pankaj Singh 51
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Petrol Pump Automation & Monitoring System is divided into six
functionally independent modules.
They are as follows :-
1. Daily Fuel Sales Management (Centre Wise)
2. Fuel Order Management (Centre Wise)
3. Supply Management
4. Fuel Distribution Management (Centre Wise)
5. Employee Management (Centre Wise)
6. Security Management
User Management (Centre Wise)
Transaction Security Mechanism (System)
Log File Management
Pankaj Singh 52
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
DATA STRUCTURE
Pankaj Singh 53
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
DATA STRUCTURE OF THE DATABASE
1. Headquarter Master:- This table Store the information about the
Headquarter.
Name Type Size DescriptionHeadquarterId Number 5 Primary Key
HeadquarterName Varchar 50HeadquarterAddress Varchar 100
Proprieter Varchar 50ContactNo Number 10
2. Centre Master:- This table Store the information about the Centre.
Name Type Size DescriptionCentreId Number 5 Primary Key
CentreName Varchar 50CentreAddress Varchar 100CentreIncharge Varchar 50
ContactNo Number 10
Pankaj Singh 54
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
3. Fuel Master:- This table Store the information about the Fuel.
Name Type Size DescriptionFuelId Number 5 Primary Key
FuelName Varchar 50FuelRate Number 5
4. Underground Tanker Master:- This table Store the information about the
Tankers.
Name Type Size DescriptionTakerId Number 5 Primary KeyFuelId Number 5 Reference: Fuel Master
CentreId Number 5 Reference: Centre Master
5. OilTankersTruck Master:- This table Store the information about the
Truck.
Name Type Size DescriptionTruckId Number 5 Primary Key
DriverName Varchar 50Capacity Number 10
6. Government Depo Master:- This table Store the information about the
Depo.
Name Type Size DescriptionDepoId Number 5 Primary Key
DepoName Varchar 50DepoAddress Varchar 100
ContactNo Number 10
Pankaj Singh 55
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
7. Underground Tanker Master:- This table Store the information about the
Employee.
Name Type Size DescriptionEmployeeId Number 5 Primary Key
CentreId Number 5 Reference: Centre MasterEmployeeName Varchar 50
EmployeeAddress Varchar 100Designation Varchar 50BasicSalary Number 10ContactNo Number 10
8. Business Constraint Master:- This table Store the information about the
Business.
Name Type Size DescriptionConstraintId Number 5 Primary Key
ConstraintName Varchar 50ConstraintValue Number 10
9. Supply Transaction:- This table Store the information about the Supply.
Name Type Size DescriptionSupplyId Number 5 Primary KeyOrderId Number 5 Reference: Order TransactionCentreId Number 5 Reference: Centre Master
DateofSupply DateQuantity Number 10
10. Order Transaction:- This table Store the information about the Order.
Name Type Size DescriptionOrderId Number 5 Primary KeyFuelId Number 5 Reference: Fuel Master
CentreId Number 5 Reference: Centre MasterStatus Varchar 10
Quantity Number 10
Pankaj Singh 56
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
11. Acknowledgement Transaction:- This table Store the information about
the Acknowledgement.
Name Type Size DescriptionAcknowledgementId Number 5 Primary Key
OrderlId Number 5 Reference: Order TransactionDate Date
12. Shift Transaction:- This table Store the information about the Employee
Shift.
Name Type Size DescriptionShiftId Number 5 Primary Key
EmployeeId Number 5 Reference: Employee MasterFromDate Date
ToDate DateStartTime Date/TimeEndTime Date/Time
13. Attendance Transaction:- This table Store the information about the
Employee Attendance.
Name Type Size DescriptionAttendanceId Number 5 Primary KeyEmployeeId Number 5 Reference: Employee Master
Date DateStatus Varchar 10
Pankaj Singh 57
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
14. Salary Transaction:- This table Store the information about the Employee
Salary.
Name Type Size DescriptionSalaryId Number 5 Primary Key
EmployeeId Number 5 Reference: Employee MasterDate Date
Advance Number 10Balance Number 10NetPay Number 10
Deduction Number 10
15. Receipt Transaction:- This table Store the information about the Supply
Receipt.
Name Type Size DescriptionReceiptId Number 5 Primary KeySupplyId Number 5 Reference: Supply Transaction
ReceiptNumber Number 5ReceiptDate Date
16. Attendance Transaction:- This table Store the information about the
Payment to the Depo.
Name Type Size DescriptionPaymentId Number 5 Primary KeyReceiptId Number 5 Reference: Receipt Transaction
Modeofpayment Varchar 10Amount Number 10
Cheque/DraftNo Number 5
Pankaj Singh 58
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
17. Customer Bill Transaction:- This table Store the information about the
Customer’s Bill.
Name Type Size DescriptionBillNo Number 5 Primary KeyFuelId Number 5 Reference: Fuel Master
VehicleNo Number 5Billdate DateQuantity Number 10
18. User Master Configuration:- This table Store the information about the
User Login.
Name Type Size DescriptionUserId Number 5 Primary KeyName Varchar 50
Password Varchar 10
19. SuperUser Master:-This table Store the information about the Super User.
Name Type Size DescriptionLockMode Varchar 10Password Varchar 10
20. System Log Master Configuration:- This table Store the information
about the User, Who logged in to the System.
Name Type Size DescriptionLogId Number 5 Primary Key
LogText Varchar 50LogDate DateLogTime Date/Time
Pankaj Singh 59
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
PROCESS LOGIC
Pankaj Singh 60
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Process Logic Of Each Module :-
1) Process Logic of Module No. 1.1 “Fuel Sales Management”.
Step-1 Start
Step- 2 Enter Fuel Details
Step- 3 Get Fuel Rate from Database
Step- 4 Calculate Fuel Sales Details
Step- 5 Save Fuel Sale Details
Step- 6 Generate Fuel Sales Bill
Step- 7 If another Transaction go to Step-2
Step- 8 Stop.
2) Process Logic of Module No. 1.2 “Fuel Order Management”.
Step-1 Start
Step- 2 Get Under Ground Tanker Status
Step- 3 Enter Under Ground Tanker Status in to Database
Step- 4 If Under Ground Tankers Status under specified level.
Step- 5 Then Generate Order for the Fuel Type
Pankaj Singh 61
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Step- 6 EndIf
Step- 7 Enter Order Distribution Acknowledgement into Database
Step- 8 If Order Report required then Enter Criteria and generate Report
Step- 9 Stop.
3) Process Logic of Module No. 1.3 “Supply Management System”.
Step-1 Start
Step- 2 Manipulate Government Depo Data into Database
Step- 3 Obtain Centre Wise Order Details
Step- 4 Generate Centre Wise Supply Details against Centre Order
Step- 5 Generate Supply Order to Government Depo and Supply Details
Step- 6 Generate Supply receipts at each Supply
Step- 7 Generate Payments Slips against Receipts at each Supply.
Step- 8 Generate Supply Report based on some Criteria.
Step- 9 Stop.
4) Process Logic of Module No. 1.4 “Fuel Distribution Management”.
Step-1 Start
Step- 2 Accept Centre Details from Database and User
Step- 3 Generate Distribution List Centre Wise.
Step- 4 Generate Distribution Report.
Step- 5 Stop.
Pankaj Singh 62
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
5) Process Logic of Module No. 1.5 “Employee Management”.
Step-1 Start
Step- 2 Create, Update, Search, Delete Employee details from Database
Step- 3 Generate Salary at each Employee Centre Wise
Step-4 Accept Attendance at Employee Centre Wise.
Step-5 Generate Shift Management List Centre Wise.
Step-6 Generate Employee Report Centre Wise based on Criteria
Step-7 Stop.
6) Process Logic of Module No. 1.6 “System Security Manager”.
Step-1 Start
Step- 2 User Login, Criteria, Updation, Deletion is done.
Step- 3 Upon any such above activity a Long centre is done by System Log
Manger.
Step-4 Upon any Transaction done in the System the System Log Manager
records the Transaction Details with Mechanism at Object Serialization.
(java.io.serializable)
(Using Object OutputStream Class)
Pankaj Singh 63
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Step-5 Enter System can be Locked/ Ubnlocked through System Lock
Manager which is Recorded into Log File by System Log Manager.
Step-6 System Log report can be obtained on Criteria by System Log
Report Generator.
Step-7 Stop.
Pankaj Singh 64
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
REPORT
Pankaj Singh 65
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
List of Report that are likely to be Generated :-
1. Employee Related Reports
Centre Wise Employee List
Centre Wise Employee Shift Report
Centre Wise Employee Salary Report
Centre Wise Employee Attendance Report
Note:-Employee can also see his Salary, Attendance and Shift Report on Mobile
Phone also.
2. Order Management Report
Centre Wise Order Report
Daily Basis
Weekly Basis
Monthly Basis
Centre Wise Under Ground Tankers Report
Hourly Basis
Daily Basis
Note :- Owner can see this report on Mobile Phone also.
3. Supply Management Report
Centre Wise Supply Report
Hourly Basis
Daily Basis
Weekly Basis
Monthly Basis
Centre Wise Distribution Report
List Government Depo Report
Pankaj Singh 66
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Receipts Report Centre Wise
Hourly Basis
12 Hour Basis
Daily Basis
Weekly Basis
Monthly Basis
4. System Log File Report
5. Transaction Lock Report
Pankaj Singh 67
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Implementation of Security Mechanism at Various Levels :-
1) User Creation and Permission
2) Transaction Locking Mechanism
3) Application Locking Mechanism
Pankaj Singh 68
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
Future Scope and Further Enhancement of the Project :-
1) This software is design on the basis of single server and multiple
clients. Therefore this software can be further design to run on
multiple servers with fulfledge computing scalability.
2) This application is design keeping in mind the database vendor
changes. Therefore backend change does not effect the application
logic.
3) This software can also be extended to be accessed on mobile phones
more comprehensively.
Pankaj Singh 69
PETROL PUMP AUTOMATION AND MONITORING SYSTEM
BIBLIOGRAPHY
Books for Front- End Tool (J2EE):-
WROX Publication’s Book J2EE for Beginner.
Java-2 Complete Reference By- Herbert Schildt.
Books for Back- End Tool (MySQL) :-
SQL, PL/SQL The Programming Language of Oracle 3rd Edition By- Ivon
Bayross.
Books for System Analysis and Designing :-
Analysis and Design of Information System By- V. Rajaraman.
Analysis and Design of Information System By- James A Senn.
Structure Analysis and System Specification By- Tom De Marco.
The Practical Guide to Structure Design By- Page Jone Meilir.
Managing the Structure Technique By- Edward Yourdon.
System Analysis, Designing and Development By- Perry Edwards.
Pankaj Singh 70