Transmission Planning Construction Outage Study Automation By Stew Nunn and Bill Robertson Transmission Planning, Planning and Engineering

System Operating Limit Construction Outage Study Automation Best Practices Final 20150407

Embed Size (px)

Citation preview

Page 1: System Operating Limit Construction Outage Study Automation Best Practices Final 20150407

Transmission Planning Construction Outage Study Automation

By Stew Nunn and Bill RobertsonTransmission Planning,

Planning and Engineering

Page 2: System Operating Limit Construction Outage Study Automation Best Practices Final 20150407

4.8.15 Best Practices Workshop Stew Nunn and Bill Robertson 2

Western Interconnection• A gigantic electrical machine• Serves electricity to 78 million

people• Peak power use 152,000 MW

Page 3: System Operating Limit Construction Outage Study Automation Best Practices Final 20150407

Southwest Outage 9/8/20116 Million Customers Without Power

Page 4: System Operating Limit Construction Outage Study Automation Best Practices Final 20150407

Work BackwardsUnderstand WECC

Requirements

Identify Alternatives

Hire and Train 10 new engineers

Automate Processes

Decision

Describe Desired Outcome

Page 5: System Operating Limit Construction Outage Study Automation Best Practices Final 20150407
Page 6: System Operating Limit Construction Outage Study Automation Best Practices Final 20150407

DeriveBetter Practices

EnhanceCurrent Practices

CreateNew Practices

UsePotential Practices

Innovate

Paths to Innovation

Page 7: System Operating Limit Construction Outage Study Automation Best Practices Final 20150407
Page 8: System Operating Limit Construction Outage Study Automation Best Practices Final 20150407

High Performance Computing

User Input

Multiple Scenarios

Program to Split Up Inputs

CPU 1

CPU 2

CPU 80

Program to Reassemble

Outputs

Page 9: System Operating Limit Construction Outage Study Automation Best Practices Final 20150407

50X Performance Increase

Page 10: System Operating Limit Construction Outage Study Automation Best Practices Final 20150407

Development Best Practices

• Work Backwards!• Define Application Boundaries• Eat Your Own Dog Food!

Page 11: System Operating Limit Construction Outage Study Automation Best Practices Final 20150407

Desired Outcome

Unfinished Features

Daily Comunication

Working Software

Real-Time Programming

Page 12: System Operating Limit Construction Outage Study Automation Best Practices Final 20150407

Summary

• Collaboration fuels successful innovation• Operational Excellence is transformational• Management’s trust makes it possible

Page 13: System Operating Limit Construction Outage Study Automation Best Practices Final 20150407

Questions?