Methodology. System Overview. Location. Limitations. Client Preferences. Greengineering is a model that takes in information provided by the user (location, building height, budget, building weight limit, and available surface area) and outputs the most efficient turbines. - PowerPoint PPT Presentation
Citation preview
System Overview
ResultsGraphical User Interface
GREENGINEERING:MATLAB Model that helps users
select appropriate turbine based on their project
limitations and locationUniversity of Pennsylvania
School of Engineering and Applied Science
ABSTRACT: As fossil fuel supplies are depleting at increasing rates, wind energy is gaining popularity as a clean and renewable power source. However, choosing a turbine appropriate for a given location and needs is a lengthy and expensive process. Furthermore, lack of knowledge and resources can result in an inefficient selection. Recent examples of poor turbine choices have resulted in lack of power generation and high costs.
Greengineering aims to simplify the process of selecting an appropriate turbine to meet the client’s specifications. The focus is on urban areas in the United States to allow for individuals and small institutions to install turbines. The model runs in MATLAB and has an easy-to-use graphical user interface. To additionally simplify the Greengineering experience, the information required to run the model is readily available to the user and requires minimal research.
The model includes a database of turbines and wind data for numerous cities in the United States. After the user has chosen a location, the model runs by filtering out turbines that would be unacceptable based on budget, building weight capacity, available area and power generation requirement. The output of the model gives the client the best turbine(s) for the given preferences, along with accompanying statistics to facilitate the final choice.
AUTHORSShahid Bosan
Dara ElassAarti Kochhar Divya Singhal
ADVISORSDr. Peter Scott
Mr. Walter Sobkiw
DEMO TIMESThursday April 21, 2010
9:00-10:30AM2:30-3:00PM
Acknowledgments
Methodology
LocationLocation LimitationsLimitations Client Preferences
Client Preferences
ModelModel
Optimal Turbine(s)Optimal
Turbine(s)Power OutputPower Output Total CostTotal Cost Total
SavingsTotal
Savings
Wind Data
Algorithm
This project could not have been completed without the help of a number of people. We would especially like to thank our advisors, Dr. Scott and Mr. Sobkiw for their continuous support throughout the year. We would also like to thank Professor Laker and Dr. Watrous for their encouragement and valuable advice. Lastly we would like to thank the Engineering Dean’s Advisory Board for helping us conceive the project.
After all the preferences and project limitations of the user have been entered, the model will run and output the appropriate turbines for the selected location. A sample output has been shown on Figure 4. As shown below the output will contain:Specifications of the wind turbineTotal cost, savings, and power generation of the turbinePicture and power curve of the turbine
Greengineering is a model that takes in information provided by the user (location, building height, budget, building weight limit, and available surface area) and outputs the most efficient turbines.
Key Features:The user selects the city in which he/she wants to install the turbine. The model contains wind data for the 50 most populated cities in the United States as well as several Universities. Limitations and client preferences are compared to turbines from a large database of 50 urban wind turbines.A final list of 1-3 optimal wind turbines are provided to the user, with specifications such as price, weight, and swept area. Total power generated, total cost, and total savings are also provided to the user.For those interested, there is an option of looking at pictures of potential turbines, as well as their respective power curves.
A high level diagram of the system is given on Figure 1.
In order to make it easier for the user to input the data, a graphical user interface (GUI) was created. The GUI asks the user to complete four steps in order to obtain requirements that are needed to run the model so that the optimal turbine can be selected. An image of the homepage is shown below (Figure 2) as is an image of one of the input steps (Figure 3).
Figure 1
Figure 2
Figure 3
Figure 4
Accesses wind data for location
Calculates wind for the entered
height in location
Accesses turbine database
Is client budget
max. > P?
Is max. wind velocity ≤ COS ?
Is min. wind velocity ≥ CIS ?
Is client weight limit ≥ W ?
Is client swept area ≥ S ?
Reject turbine
Reject turbine
Reject turbine
Reject turbine
Reject turbine
Optimal list of turbinesOptimal list of turbines
No
No
No
No
No
Yes
Yes
Yes
Yes
Yes
P = Price of Turbine COS = Cut-out-speedCIS = Cut-in-speedW = Weight of TurbineS = Swept Area of Turbine
In order to output the appropriate turbines, the model compares the limitations and client preferences with all of the turbines in the turbine database. For each of these selected turbines, the following is calculated:The optimal number of turbines that should be installed The total power output per annumTotal cost and savings per annum
Based on the power generated the best three turbines are outputted.