System Test Status ReportR. D’Alessandro
1
TIB System Test TIB System Test Report Report
• Where were we …..,• Mechanics (layer 3 prototype)• Mother Cable & Interconnect Board• System Test Setup (TIB)• Results from the TIB System Test
System Test Status ReportR. D’Alessandro
2
TIB system test TIB system test (July (July 2002)2002)
• Not only for PS but “evolving” into a fully fledged mechanical and electrical test– NEEDS optical decoupling to achieve
meaningful results
• At first we needed a relatively good understanding of an optical system compared to a copper one:– Many measurements made, we gained
full confidence.– Thanks to Roberto Cecchi for TIST.
System Test Status ReportR. D’Alessandro
3
La baraLa bara
CCU25
DOH
Power distribution PCB
System Test Status ReportR. D’Alessandro
4Input/Output temporary connections on the back of module carrier
Final Kapton cable could be even shorter than this one
Short distance APV-AOH
Brico & FlexibilityBrico & Flexibility
System Test Status ReportR. D’Alessandro
5
MechanicsMechanics
•Prepared by Pisa•Layer 3 mock-up•Up to 4 cooling loops (12 modules)•Final dimensions
System Test Status ReportR. D’Alessandro
6
Mother Cable (1)Mother Cable (1)
System Test Status ReportR. D’Alessandro
7
Mother cable (2)Mother cable (2)
System Test Status ReportR. D’Alessandro
8
Interconnect boardInterconnect board
•Connects up to 4 MC•Redundancy implemented•Distributes also LV and HV•Jumper disable of Hard Reset
System Test Status ReportR. D’Alessandro
9
What went on the What went on the mechanical structuremechanical structure
• 3 modules: 180, 168, 177 (14 APV25)• 3 Analog OptoHybrids (3 fibres each)
• 50 Ohms termination (100 Ohms in the future)
• 1 CCU25 + DOH + Interconnect Board• Mother Cable with slight mods.• Power: Caen (counting room)
prototype • 150 m cable LIC (100m Outer + 50m Inner)• 40 uF TOTAL LOAD CAPACITORS!• Battery for the control loop (5V for the DOH)
System Test Status ReportR. D’Alessandro
10
CablesCables
System Test Status ReportR. D’Alessandro
11
CCU25
AOH
Fibre SPAGHETTI!
Cooling loops
DLink
3Modules 3Modules (complete (complete MC)MC)
System Test Status ReportR. D’Alessandro
12
Results Results
• Bias = 200 V on 3 modules simultaneously
• <1 microA total for the 3 modules• HV test with 1 module to 300V, on MC
without modules to 450V• Able to read out pedestals and noise
on all 3 modules at the same time• Calibration one module at a time
System Test Status ReportR. D’Alessandro
13
PedestalsPedestals
deconv
peak
Strip no.
Strip no.
AD
C
valu
e
AD
C
valu
e
System Test Status ReportR. D’Alessandro
14
Common mode noiseCommon mode noise
Module 180
Module 177200V biasnon-inv, peak
ADC channels
ADC channels
System Test Status ReportR. D’Alessandro
15
50nF cap
22k
Bias line
Analog optohybrid
TIB System test in Florence
System Test Status ReportR. D’Alessandro
16
New New TIB hybrid TIB hybrid layout (layout (DecDec. . 202002 02
v11)v11) Bias ring
DCU input
From J.
D. Bers
t
System Test Status ReportR. D’Alessandro
17
First and last strip ~12 ADC counts
Unbonded strips
2 noisy neighbours
TIB HV 300V on ARC Peak-Inverter on
System Test Status ReportR. D’Alessandro
18
Edge effect reduced
Furthermore only one strip is now affected
…also the common mode is reduced
Same module but with 50nF capacitor to ground
System Test Status ReportR. D’Alessandro
19
Same module on sys-Same module on sys-testtest
Module 180 without cap
Module 177 with capPeak mode
System Test Status ReportR. D’Alessandro
20
Signal shapesSignal shapesA
DC
valu
e
AD
C
valu
e
ns
ns
System Test Status ReportR. D’Alessandro
21
Noise distribution Noise distribution (1)(1)
Peak modeNoise very lowCMN is lower still
S/N ratioPeak ~ 65Ical=80!
ADC channels
System Test Status ReportR. D’Alessandro
22
Noise distribution Noise distribution (2)(2)
Deconv mode
S/N ratioDeconv ~ 52Ical=80!
ADC channels
System Test Status ReportR. D’Alessandro
23
LV behaviourLV behaviour
HARD RES (14 APVs + 9 Lasers)
V=280 mV
2.5V
200 mV/div200 us/div
10 mV/div20 us/div
Noise on 2.5V line
System Test Status ReportR. D’Alessandro
24
ConclusionsConclusions• So far we have witnessed an excellent
behaviour of the system. • Mother Cable is very well thought out,
signals are clean, voltage drops negligeable. (Thanks to Giuseppe De Robertis)
• The interconnect board has delivered at first go. (Thanks to Roberto Ciaranfi)
• This Pisa-Florence common endeavour is getting along fine (incredible though this might seem)
System Test Status ReportR. D’Alessandro
25
FutureFuture• Need to go to 4 strings (12
modules)– MC are being loaded with components
• Test redundancy (2nd DOH and CCU25s from CERN)
• AOHs will be modified (100 Ohms)• We have started Xdaq migration.• This mock-up will be upgraded,
while a new one is under construction ready for the next MC type.
• New MC being designed (final version …)
• DOM (DOH carrier) design underway
System Test Status ReportR. D’Alessandro
26
Interconnect Board Interconnect Board (redundancy is implemented)(redundancy is implemented)