26
System Test Status Report R. D’Alessandro 1 TIB System Test TIB System Test Report Report • Where were we ….., • Mechanics (layer 3 prototype) • Mother Cable & Interconnect Board • System Test Setup (TIB) • Results from the TIB System Test

System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

Embed Size (px)

Citation preview

Page 1: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

1

TIB System Test TIB System Test Report Report

• Where were we …..,• Mechanics (layer 3 prototype)• Mother Cable & Interconnect Board• System Test Setup (TIB)• Results from the TIB System Test

Page 2: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

2

TIB system test TIB system test (July (July 2002)2002)

• Not only for PS but “evolving” into a fully fledged mechanical and electrical test– NEEDS optical decoupling to achieve

meaningful results

• At first we needed a relatively good understanding of an optical system compared to a copper one:– Many measurements made, we gained

full confidence.– Thanks to Roberto Cecchi for TIST.

Page 3: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

3

La baraLa bara

CCU25

DOH

Power distribution PCB

Page 4: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

4Input/Output temporary connections on the back of module carrier

Final Kapton cable could be even shorter than this one

Short distance APV-AOH

Brico & FlexibilityBrico & Flexibility

Page 5: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

5

MechanicsMechanics

•Prepared by Pisa•Layer 3 mock-up•Up to 4 cooling loops (12 modules)•Final dimensions

Page 6: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

6

Mother Cable (1)Mother Cable (1)

Page 7: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

7

Mother cable (2)Mother cable (2)

Page 8: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

8

Interconnect boardInterconnect board

•Connects up to 4 MC•Redundancy implemented•Distributes also LV and HV•Jumper disable of Hard Reset

Page 9: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

9

What went on the What went on the mechanical structuremechanical structure

• 3 modules: 180, 168, 177 (14 APV25)• 3 Analog OptoHybrids (3 fibres each)

• 50 Ohms termination (100 Ohms in the future)

• 1 CCU25 + DOH + Interconnect Board• Mother Cable with slight mods.• Power: Caen (counting room)

prototype • 150 m cable LIC (100m Outer + 50m Inner)• 40 uF TOTAL LOAD CAPACITORS!• Battery for the control loop (5V for the DOH)

Page 10: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

10

CablesCables

Page 11: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

11

CCU25

AOH

Fibre SPAGHETTI!

Cooling loops

DLink

3Modules 3Modules (complete (complete MC)MC)

Page 12: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

12

Results Results

• Bias = 200 V on 3 modules simultaneously

• <1 microA total for the 3 modules• HV test with 1 module to 300V, on MC

without modules to 450V• Able to read out pedestals and noise

on all 3 modules at the same time• Calibration one module at a time

Page 13: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

13

PedestalsPedestals

deconv

peak

Strip no.

Strip no.

AD

C

valu

e

AD

C

valu

e

Page 14: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

14

Common mode noiseCommon mode noise

Module 180

Module 177200V biasnon-inv, peak

ADC channels

ADC channels

Page 15: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

15

50nF cap

22k

Bias line

Analog optohybrid

TIB System test in Florence

Page 16: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

16

New New TIB hybrid TIB hybrid layout (layout (DecDec. . 202002 02

v11)v11) Bias ring

DCU input

From J.

D. Bers

t

Page 17: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

17

First and last strip ~12 ADC counts

Unbonded strips

2 noisy neighbours

TIB HV 300V on ARC Peak-Inverter on

Page 18: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

18

Edge effect reduced

Furthermore only one strip is now affected

…also the common mode is reduced

Same module but with 50nF capacitor to ground

Page 19: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

19

Same module on sys-Same module on sys-testtest

Module 180 without cap

Module 177 with capPeak mode

Page 20: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

20

Signal shapesSignal shapesA

DC

valu

e

AD

C

valu

e

ns

ns

Page 21: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

21

Noise distribution Noise distribution (1)(1)

Peak modeNoise very lowCMN is lower still

S/N ratioPeak ~ 65Ical=80!

ADC channels

Page 22: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

22

Noise distribution Noise distribution (2)(2)

Deconv mode

S/N ratioDeconv ~ 52Ical=80!

ADC channels

Page 23: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

23

LV behaviourLV behaviour

HARD RES (14 APVs + 9 Lasers)

V=280 mV

2.5V

200 mV/div200 us/div

10 mV/div20 us/div

Noise on 2.5V line

Page 24: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

24

ConclusionsConclusions• So far we have witnessed an excellent

behaviour of the system. • Mother Cable is very well thought out,

signals are clean, voltage drops negligeable. (Thanks to Giuseppe De Robertis)

• The interconnect board has delivered at first go. (Thanks to Roberto Ciaranfi)

• This Pisa-Florence common endeavour is getting along fine (incredible though this might seem)

Page 25: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

25

FutureFuture• Need to go to 4 strings (12

modules)– MC are being loaded with components

• Test redundancy (2nd DOH and CCU25s from CERN)

• AOHs will be modified (100 Ohms)• We have started Xdaq migration.• This mock-up will be upgraded,

while a new one is under construction ready for the next MC type.

• New MC being designed (final version …)

• DOM (DOH carrier) design underway

Page 26: System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System

System Test Status ReportR. D’Alessandro

26

Interconnect Board Interconnect Board (redundancy is implemented)(redundancy is implemented)