airstrip approx. 1 km Halls Creek approx. 170 km Bloodwood (well) approx. 26 km 5 0 m c h l o ri ne 30 0 m bor e 3 0 0 m bo r e 8 5 m fue l s t o ra g e 8 5 m fu e l s t o r a g e 150 m industry 2 0 0 m p o w e r st a t i on 50 0 m w a s t e wa t e r p ond 5 0 m w a s t e w a t e r p u m p s t a t i o n KAYILI LUDA ROAD PALMER STREET CHUNGULLA LOOP TJURABALAN CANNING STOCK ROUTE SCHOOL AVENUE FIRST TANAMI WOLA ST LINGILINGI KURURRUNGKU ST STREET KAYILI TANAMI STREET STREET STREET STREET ROAD STREET LOOP FIRST STREET KARLA 88 69 93 101 955 26 1 84 2 3 94 87 12 21 98 4 70 5 68 9 11 16 74 8 6 67 19 18 31 73 7 22 83 97 85 79 99 95 96 35 20 32 17 53 78 52 23 80 10 64 90 63 81 77 51 66 28 82 60 61 62 50 33 40 14 72 56 34 13 15 45 121 89 38 54 46 43 75 57 42 578 49 58 44 29 47 76 55 27 48 59 30 123 65 24 91 100 39A 25 919 39B 36 106 92 122 bore Kururrungku Catholic Education Centre Kururrungku store office power station Kururrungku clinic contractors compound no go area no go area no go area no go area Billiluna Layout Plan 1 - Living Area 359,159 mE 7,837,669 mN 360,210 mE 7,836,788 mN Perth Broome Karratha Geraldton Port Hedland Kalgoorlie Kununurra Newman S Esperance NT SA location map Billiluna SHIRE OF HALLS CREEK N 0 50 100 150 Metres Western Australian Planning Commission Community Traditional Owners WAPC 22 September 2011 Local Government Layout Plan 1 endorsement 17 November 2011 24 July 2012 - It is the responsibility of the developer to ensure that all relevant consents, approvals, licences and clearances are in place prior to commencing physical works on the site. Organisations responsible for such matters may include land owner, local government, incorporated community council, native title representative body, Department of Environment Regulation, Aboriginal Cultural Materials Committee, Environmental Protection Authority, Department of Commerce, and the Department of Water. This layout plan does not constitute development approval. Settlement layout not derived from calculated dimensions. Cadastral data supplied by the Western Australian Land Information Authority (Licence LI 782-2015-1). Extraction date of cadastre 28/10/2016. Waterway land use based on 1% AEP flood depth, from the Billiluna Flood Risk Assessment May 2016 report. Construction and developer proponents to refer to report for site specific FFLs. Drinking water source protection area derived from the Billiluna (Mindibungu) Drinking Water Source Protection Plan, October 2010, commissioned by the Department of Housing. April 2015 aerial image provided by Landgate. Projection : MGA Zone 52, GDA 94 Map document: Billiluna LP1 Amd2 - Living Area.mxd Layout plan prepared by Department of Planning. © Western Australian Planning Commission Amendment 2 WAPC 24 October 2016 Amendment 2 endorsement Exclusion Boundary chlorine gas storage drinking water source wellhead protection zone fuel storage industry no go boundary power station wastewater Land Use commercial community industrial open space pedestrian access way public utility recreation residential road reserve waterway Land Administration 21 cadastre settlement layout (SL) lot & SL-lot number

T E R T S location map R - Western Australian Planning ... · str y 2 0 0 m p o w e r s t a t i o n 5 0 0 m w ... Sp rin gs Esp eranc NT SA location map Billiluna HIRE OF ... Pr oj

  • Upload
    letruc

  • View
    216

  • Download
    2

Embed Size (px)

Citation preview

Page 1: T E R T S location map R - Western Australian Planning ... · str y 2 0 0 m p o w e r s t a t i o n 5 0 0 m w ... Sp rin gs Esp eranc NT SA location map Billiluna HIRE OF ... Pr oj

airstr

ipap

prox.

1 km

Halls

Cree

kap

prox.

170 k

m

Blood

wood

(well

)ap

prox.

26 km

50 m chlorine300 m bore

300

m bore

85 mfuel storage

85m

fuel s

to rag

e

150 m industry

200m power station

500 m wastewater pond

50 m wastewater pump statio

n

KAYILI

LUDA

ROAD

PALM

ER

STREET

CHUNGULLA

LOOP

TJURABALAN

CANNING STOCK ROUTE

SCHOOL

AVEN

UE

FIRST TANAMI

WOLA ST

LINGI

LINGI

KURU

RRUN

GKU

ST

STRE

ET

KAYIL

I TANAMI

STRE

ET

STREET STRE

ET

STRE

ET

ROAD

STRE

ET

LOOP

FIRST

STREET

KARL

A

88

69

93

101

955

26

1

84

23

94

87

12

21

984

70

5

68

9

11

16

74

8

6

67

19

18

31

73

7

22

83

97

85

7999

95

96

35 20

32

17

53

78

52

23

80

10

64

90

63

81

77

51

66

28

82

606162

50

33

40

14

72

56

34

13

15

45

121

89

38

54

4643

75

57

42

578

49

58

44

29

47

76

55

27

48

5930

123

65

24

91

100

39A

25

919

39B

36106

92

122

bore

Kururrungku CatholicEducation CentreKururrungku

store

office

powerstation

Kururrungkuclinic

contractorscompound

no go area

no go area

no go area

no go area

BillilunaLayout Plan 1- Living Area

359,159 mE

7,837,669 mN

360,210 mE

7,836,788 mN

Perth

Broome

Karratha

Geraldton

Port Hedland

Kalgoorlie

Kununurra

NewmanAli ce

Sp rin gs

Esperance

NT

SA

location map

BillilunaSHIRE OFHALLS CREEK

N0 50 100 150

Metres

WesternAustralianPlanningCommission

Community

Traditional OwnersWAPC

22 September 2011Local Government

Layout Plan 1 endorsement

17 November 2011

24 July 2012-

It is the responsibility of the developer to ensure that all relevant consents,approvals, licences and clearances are in place prior to commencing physicalworks on the site. Organisations responsible for such matters may include landowner, local government, incorporated community council, native titlerepresentative body, Department of Environment Regulation, Aboriginal CulturalMaterials Committee, Environmental Protection Authority, Department of Commerce,and the Department of Water.

This layout plan does not constitute development approval.

Settlement layout not derived from calculated dimensions.

Cadastral data supplied by the Western Australian Land Information Authority(Licence LI 782-2015-1). Extraction date of cadastre 28/10/2016.Waterway land use based on 1% AEP flood depth, from the Billiluna Flood RiskAssessment May 2016 report. Construction and developer proponents to referto report for site specific FFLs.Drinking water source protection area derived from the Billiluna (Mindibungu)Drinking Water Source Protection Plan, October 2010, commissioned by theDepartment of Housing.April 2015 aerial image provided by Landgate.Projection : MGA Zone 52, GDA 94Map document: Billiluna LP1 Amd2 - Living Area.mxdLayout plan prepared by Department of Planning.© Western Australian Planning Commission

Amendment 2WAPC 24 October 2016

Amendment 2 endorsement

Exclusion Boundarychlorine gas storagedrinking water source wellhead protection zonefuel storageindustryno go boundarypower stationwastewater

Land Usecommercialcommunityindustrialopen spacepedestrianaccess way

public utilityrecreationresidentialroad reservewaterway

Land Administration

21cadastresettlement layout (SL) lot & SL-lot number

Page 2: T E R T S location map R - Western Australian Planning ... · str y 2 0 0 m p o w e r s t a t i o n 5 0 0 m w ... Sp rin gs Esp eranc NT SA location map Billiluna HIRE OF ... Pr oj

BillilunaLayout Plan 1

- Context

wastewaterponds

airstrip

cemetery

no go area

no go area

no go area

no go area

rubbishtip

powerstation

rubbishtip

812

104

105

655

808

103

813

102

THIRD

TANAMI

ROAD

CANNING STOCK R

OUTE

FIRST

STREET

STREET

TJURABALAN

ROAD500 mwastewater pond

20 00 mru bbish tip

1000 m x 500 m airstrip

2000 m rub

bish tip

Perth

Broome

Karratha

Geraldton

Port Hedland

Kalgoorlie

Kununurra

NewmanAli ce

Sp rin gs

Esperance

NT

SA

location map

BillilunaSHIRE OFHALLS CREEK

357,110 mE

7,840,131 mN

362,273 mE

7,835,794 mN

N0 200 400 600 800

Metres

Amendment 2

Community

Traditional OwnersWAPC

22 September 2011Local Government

Layout Plan 1 endorsement

17 November 2011

24 July 2012-

WesternAustralianPlanningCommission

It is the responsibili ty of the developer to ensure that all relevant consents,approvals, licences and clearances are in place prior to commencing physicalworks on the site. Organisations responsible for such matters may include landowner, local government, incorporated community council, native titlerepresentative body, Department of Environment Regulation, Aboriginal CulturalMaterials Committee, Environmental Protection Authority, Department of Commerce,and the Department of Water.

This layout plan does not constitute development approval.

WAPC 24 October 2016Amendment 2 endorsement

Cadastral data supplied by the Western Australian Land Information Authority(Licence LI 782-2015-1). Extraction date of cadastre 28/10/2016.Waterway land use based on 1% AEP flood depth, from the Billiluna Flood RiskAssessment May 2016 report. Construction and developer proponents to referto report for site specific FFLs.Drinking water source protection area derived from the Billiluna (Mindibungu)Drinking Water Source Protection Plan, October 2010, commissioned by theDepartment of Housing.April 2015 aerial image provided by Landgate.Projection : MGA Zone 52, GDA 94Map document: Billiluna LP1 Amd2 - Context.mxdLayout plan prepared by Department of Planning.© Western Australian Planning Commission

Exclusion Boundaryno go boundaryutilitywastewater

Featuresas-constructed miscellaneous features

Land Use

public utilityrecreationresidentialroad reservewaterway

commercialcommunity

industrialopen space

drinking watersource wellheadprotection area

pedestrianaccess way

Land Administration

21

cadastrerecommended settlement zonesettlement layout (SL) lot & SL-lot number

Settlement layout not derived from calculated dimensions.

Page 3: T E R T S location map R - Western Australian Planning ... · str y 2 0 0 m p o w e r s t a t i o n 5 0 0 m w ... Sp rin gs Esp eranc NT SA location map Billiluna HIRE OF ... Pr oj

BillilunaLayout Plan 1

- Land Ownership

Lot 331UCL

Lot 14Pastoral lease PL N049659

Carranya

Lot 13Pastoral lease PL N049567

Billiluna

Lot 13Pastoral lease PL N049567

Billiluna

Lot 7Crown reserve 38974Aboriginal Lands Trust

Lot 14Pastoral lease PL N049659

Carranya

Billiluna

Tana

mi R

d

Cann

ing St

ock R

oute

Track

Tana

mi R

d

Perth

Broome

Karratha

Geraldton

Port Hedland

Kalgoorlie

Kununurra

NewmanAli ce

Sp rin gs

Esperance

NT

SA

location map

BillilunaSHIRE OFHALLS CREEK

353,587 mE

7,843,371 mN

365,984 mE

7,833,075 mN

N0 500 1,000 1,500

Metres

Amendment 2

Community

Traditional OwnersWAPC

22 September 2011Local Government

Layout Plan 1 endorsement

17 November 2011

24 July 2012-

It is the responsibility of the developer to ensure that allrelevant consents, approvals, licences and clearances are inplace prior to commencing physical works on the site.Organisations responsible for such matters may include landowner, local government, incorporated community council,native title representative body, Department of EnvironmentRegulation, Aboriginal Cultural Materials Committee,Environmental Protection Authority, Department of Commerce,and the Department of Water.

This layout plan does not constitute development approval.

Settlement layout lots are not derived from calculateddimensions.

Cadastral data supplied by the Western Australian LandInformation Authority (Licence LI 782-2015-1).Extraction date of cadastre 28/10/2016.Projection : MGA Zone 52, GDA 94Map document : Billiluna LP1 Amd2 - Land Ownership.mxdLayout plan prepared by Department of Planning.© Western Australian Planning Commission

WAPC 24 October 2016Amendment 2 endorsement

Land Ownershipcrown reservepastoral leaseunallocated crown land

Land Administrationcadastrerecommended settlement zonesettlement layout lot

Featuresmain roadtrack