Folie 1T-PARC prep visit > A.hausold > 05 Oct 2007
T-PARC 2008
operations meeting April 2008
DLR research flight facilities
T-Parc prep visit > A.Hausold > 05. Oct 2007
Folie 2
Plans for the DLR Falcon operation during T-PARC
deployment time in Japan: 25 August - 4 October 2008
flight hours in Japan: 90
Planned transfer route:Germany-Moscow-Surgut-Bratsk-Khabarovsk-Japan – joint research program under discussion
main scientific goals: improved typhoon track predictioninvestigation of extra-tropical transition of trop. cyclonespotential of lidar for operational future observing system
contact persons:[email protected] (PI)[email protected] (CO-PI)[email protected] (aircraft operations)
max. range of DLR Falcon: 1500 NMmax altitude: 12.8 km (42.000 ft)
500 NM
1000 NM
1500 NM
T-Parc prep visit > A.Hausold > 05. Oct 2007
Folie 3
DLR Falcon 20-E5, D-CMETGeneral
Engines Garrett TFE 731-5BR-2C
Minimum CrewVFR: 2 PilotsIFR: 2 Pilots
Electrical Experimental PowerDC: 28V / max. 600AAC: 220V / 50 Hz
Pressurized Cabin yes
Masses
max. Takeoff Mass 13 755 kg 30 325 lbs
max. Landing Mass 13 100 kg 28 880 lbs
max. Zero Fuel Mass 10 200 kg 22 490 lbs
max. Fuel 4 006 kg 8 832 lbs
Performance
Altitude [ft] 10 000 20 000 31 000 41 000
max. Range [NM] 1150 1500 1700 2000
max. Endurance [h:min] 04:10 04:15 04:45 05:00
max. Altitude 42 000 ft 12 800 m
max. Speed (VMO / MMO) 380 KCAS 0,865 Mach
Long Range Speed 410 KTAS 0,720 Mach
Takeoff Distance (MTOM, ISA, MSL) 2000 m 6562 ft
Communication
VHF 2
UHF 1
HF 1
Sat Iridium
T-Parc prep visit > A.Hausold > 05. Oct 2007
Folie 4
DLR Falcon 20-E5, D-CMET – special equipment
universal window interfaceat the right side offuselage (220 mm diam.)
4 hard points under the wings to carry up to 4 particle probes
1 hard point under the fuselage (external equip-ment, particle probes)
hardpoint for radiometer installation
meteorological sensor package (temperature, pressure, humidity, wind)
nose boom with flow angle sensor(CFK, 1.8 m length)
multiple temperature sensors and inlets for standard sensor package
2 coverable large openingsIn the bottom of fuselage(515 mm diameter)
large opening at the left side of fuselage (250 mm x 570 mm) 1 large opening on top
of fuselage (515 mm diam.)
4 openings on top of fuselage (80 mm diam.)
new generation engines with additional electrical generators (2x300A @ 28V)
T-Parc prep visit > A.Hausold > 05. Oct 2007
Folie 5
Instrumentation of DLR Falcon 20-E5
scanning coherent 2 µm Doppler lidar:conical scans with 24 positions 24 LOS observations (~30/54 s) vertical profile of 3-D wind vector
horiz. resolution 5 - 40 kmvert. resolution 100 m
range: 0.5-12 kmaccuracy: 0.5-1 m/s
first 4 wavelength water vapour DIAL worldwide~920-945 nm, 100 Hz, > 2 W parameter: water vapour molecule number
(+height of cloud tops) nadir pointing (zenith is possible)horiz. resolution: 2 - 40 kmvert. resolution: 300 - 500 maccuracy: 5-10 %
Doppler lidar20° off nadir
dropsondes,u, v, t, rh, p DIAL
High spectral resolution lidar (HSRL) measuring aerosols
T-Parc prep visit > A.Hausold > 05. Oct 2007
Folie 6
DLR Team
2 Pilots1 Aircraft engineer1 Aircraft team manager2 persons for data acquisition
Lidar scientists and techniciansMeteorologistsDLR project leader---------------------------------------------6-23 persons on site
office space:for 10-15 persons(with internet access, telephone etc.)Separate room for data download and preprocessing facilities; in total 2-3 rooms
lodging and offices at the airport are preferred
Aircraft operation - general
Aircraft-equipment and crew-rating:fully IFR for International Operation, RNAV, RVSM, Long RangePilots holding ATP-License
Refuelling (Jet A1):single point or gravityfuel-carnets from ESSO/BP/SHELL/Multi-Service
Type of operation:non-commercial, private, arial workfully unrestricted civil registration and operationno Diplo-Clearance-Application (valid only forstate or military aircraft)Classified security level
Survival Equipment:Life Raft, Life Vests, ELT Transmitter + Radio
T-Parc prep visit > A.Hausold > 05. Oct 2007
Folie 7
Aircraft ground requirements
• hangar - mainly to avoid large temperature changes of the lidars: 21.5 x 24.5 x 6.5 m (width, depth, height, incl. buffer);
~ 19.5 m (incl. noseboom)
~ 1
6.4
mO
vera
ll w
ings
pan
5.4 m tail height
T-Parc prep visit > A.Hausold > 05. Oct 2007
Folie 8
Aircraft ground requirements
• ground power:- 28VDC 500A continuous power, 1000A for engine start standard 28Volt DC external power recepticle
- for use of DLR‘s ground power: 400V@50Hz 3Phase 32Amps
external power receptible
32 Amps 3phase 400 V receptible32 Amps 3phase 400 V plug
T-Parc prep visit > A.Hausold > 05. Oct 2007
Folie 9
Desired operation
• Targeted observations based on sensitive area predictions and meteorological weather phenomena
• Launch of dropsondes
• Flight routes off-airways
• Flight level 270 - 370
• Night time / weekend operation
• Access to aircraft for crew / scientists also during night time / weekends
• overnight stop at Okinawa (Kadena AB (RODN) or Naha airport (ROAH))
• Refueling stop at Iwo Jima (RJAW) ??
• Refueling stops at civil / (military?) airports in Taiwan, Japan, South Korea, Russia (only during transfer flight)
T-Parc prep visit > A.Hausold > 05. Oct 2007
Folie 10
Limitations
Aircraft:
• Max. crosswind component during take-off and landing: 20 (25) kts• max. flight altitude: FL 420 – can only be reached at end of the flight for 45 – 60 minutes – initial climb to FL 350/360, stay there for about 1.5 hrs, then continue climb to FL 380, stay there for a while, then final climb• has to be parked inside hangar before taifun may hit – especially important for deployment in Kadena (also not close alternate airport!)• max. range: strongly depends on wind and availability of suitable alternate airport, 1200 – 1500 NM
Crew duty times (defined by law):
• day-off after 6 days at the latest• normal duty time: 10 hrs, then 10 hrs rest time; can be extended to max. 14 hrs (max. 8 hrs in total in 7 days); rest time grows accordingly