Page 1 of 54UNIQUE ENGINEERING
Table of Contents02 C.E.O Massage
03 About Us
04 Mission Statement
05 Organization Structure
06 Operation & Services
07 Quality Policy
09 Health and Safety Policy
11 Environmental Policy
13 Ongoing Projects
16 Completed Projects
38 Upcoming Projects
39 Equipment List
45 Projects Gallery
54 Our Client
Page 2 of 54UNIQUE ENGINEERING
C.E.O Message
Unique Construction & Engineering Services(Pvt.) Limited (UE) provide services inProcurement and construction activities. Ourstrength is vested on experienced, competent,committed and dedicated team and largeinventory of latest equipment and machinery.
We strive to add value to our clients byunderstanding their requirements andendeavoring to meet the same economically withgood workman ship and in safe workingenvironment. Our all operations have requisiteQuality, Health & Safety and Environmentcertifications.(ISO 9001: 2008, ISO 14001 and OHSAS18001). We also registered in PakistanEngineering Council (PEC) as Contractor underLicense No. 01624.
A strong commitment to quality, professionalapproach, and understanding the Clients need isalways been our priority which give usconfidence and lead us to successfully won thetrust of world renowned organizations in Oil &Gas field.
Ayaz AhmedChief Executive Officer
Page 3 of 54UNIQUE ENGINEERING
About Us
Unique Construction and Engineering Services (Pvt.) Limited formerly Unique
Enterprises (UE) established in 2007, since then we followed a steady path of growth in
the field of civil construction with the most efficient time saving and cost effective
approach.
Since 2007 UE was doing business specifically in civil construction works but from
2013 we have broaden our scope of work and now we are doing Mechanical, Electrical
& Instrumentation projects in Oil and Gas sector.
We emphasize on team work for the provision of excellent services and to achieve the
targeted goals on time by planning, managing and controlling all aspects of projects.
Our company is equipped with the competent team of multi-disciplined professional
including the Engineers, Supervisors and Foremen backed by the latest equipment,
machinery and tools.
Page 4 of 54UNIQUE ENGINEERING
Our Mission
To be undisputed leaders in Mechanical, Civil and Electrical &Instrumentation projects.
Provide professional services and solutions to our clients.
Stay profitable in growth.
Page 5 of 54UNIQUE ENGINEERING
Organization Structure
Head
Offi
ce
Site
Page 6 of 54UNIQUE ENGINEERING
Operation & Services
Procurement
Civil Construction
Mechanical Fabrication and Erection
Cross Country Flow line
E & I Works
Plant Commissioning
Manpower Supply
Page 7 of 54UNIQUE ENGINEERING
Quality Policy
We the management of Unique Construction and EngineeringServices (Pvt.) Limited will endeavor to satisfy the requirements ofits Clients and ensure that the facilities:
a) Comply with Specification
b) Recognizes the importance of Quality Management.
c) Ensures that all employees, suppliers and subcontractors areaware of the requirements of the Quality System and are advisedthat compliance with these requirements is mandatory.
d) Effective use of Management Review, Training & Auditing, bringsimprovements in its operating efficiencies for the mutual benefit ofits customers, suppliers and employees.
e) Review Quality Management System annually and set objectivesand targets for continual improvement. Review and revise thispolicy as necessary at regular intervals.
Page 8 of 54UNIQUE ENGINEERING
Quality Policy
Page 9 of 54UNIQUE ENGINEERING
Health & Safety Policy
The management of Unique Construction & Engineering Services(Pvt.) Limited gives the highest priority to ensuring that our ownemployees, and all other employees working on sites managed bythe company, can work safely and healthy, and remain free frominjury. The aim of this policy is to;
a) Ensure the prevention of injury and ill-health of its employees andall other persons who may be affected by its activities byimplementation of occupational health and safety managementsystem.
b) We comply with the applicable regulations and laws associated withoccupational health and safety.
c) Ensure that this policy is documented, communicated, implementedand maintained by all persons working for and on behalf of UniqueConstruction & Engineering Services (Pvt) Limited.
d) Provide sufficient information, instruction, training and supervisionto enable employees to avoid hazards and to contribute positivelyto the health and safety of themselves and others at work.
e) This occupational health and safety policy shall be reviewedannually and updated to any changing circumstances.
Page 10 of 54UNIQUE ENGINEERING
Health & Safety Policy
Page 11 of 54UNIQUE ENGINEERING
Environmental Policy
a) Evaluate the environmental aspects of our activities and minimizewhere possible the resulting environmental impacts.
b) Implement systems and procedures to facilitate continualimprovement and review it annually for improvements.
c) Comply with applicable environmental legal and regulatoryrequirements as well as company policies and client requirements.
d) Encourage openness, dialogue and facilitate communicationregarding our environmental performance and our environmentalobjectives and targets.
f) Ensure that this policy is documented, communicated, implementedand maintained by all persons working for and on behalf of UniqueConstruction & Engineering Services (Pvt.) Limited.
Page 12 of 54UNIQUE ENGINEERING
Environmental Policy
Page 13 of 54UNIQUE ENGINEERING
Ongoing Projects
Project: Development of Gabar GarrisonClient: 25 Engineers Battalion Pano Akil (Pakistan Army)Location: Distt: Ghotki
Scope: Construction of Residential BuildingsConstruction of Office Building,Water Supply Network (HDPE Pipe)
Page 14 of 54UNIQUE ENGINEERING
Ongoing Projects
Project: Dismantling of Mehar-2 Wellhead LocationClient: OMV Maurice Energy Ltd.Location: Mehar (Sindh) Distt: Dadu
Scope: Dismantling of Piping and Pipe SupportsDismantling of C.I Skid and D.H. SkidDismantling of WH Control Panel and Solar ArraysDismantling of IR, GDR and Light pole
Page 15 of 54UNIQUE ENGINEERING
Ongoing Projects
Project: Construction of Sukkur – Multan MotorwayClient: China State Construction Engineering, ChinaLocation: Mirpur Mathelo Distt: Ghotki
Scope: Clearing, Grubbing, of ROWConstruction of Service Road,Construction of RCC Pipe Culverts,Earth Work for roadway.
Page 16 of 54UNIQUE ENGINEERING
Completed Projects
Project: Mehar-3 Wellhead Compression ProjectClient: OMV Maurice Energy Ltd.Location: Mehar (Sindh) Distt: Dadu
Scope: Erection of 10 MMSCF CompressorPrefabrication of Pipes/ Structures/ Supports,Extension of Existing Pipe Rack support,Civil works (Excavation, Foundations, Backfill, etc)Field work (Pipe/ Structure Installation, Hookup, Alignment etc)Electrical, Instrumentation and Control System WorkAssistance during Project Commissioning workHot & Cold Tie-in’s works during Mehar Plant shutdown
Page 17 of 54UNIQUE ENGINEERING
Completed ProjectsProject: KETWARO-01 Location Development Works
Client: Mari Petroleum Company Limited.Location: Ghotki (Sindh) Distt: Ghotki
Scope: Construction of Well location, Rig Camp Location Culverts etc.Cutting and Filling of Well SiteConstruction Cellar Pad, Rig Pad, Cutting Pits, Waste Pits,Construction of Flare Pits, Mud Pits,Installation of Fence around the Well site.Construction of Parking Area and Fuel Tank areaConstruction of 22 KM Access Road.
Project: Lamwari-1 Location Development Project
Client: OMV (Pakistan)Location: Choondiko (Sindh) Distt: Khairpur
Scope: Construction of Well Location, Rig Camp Location Culverts etc.Cutting and Filling of Well SiteConstruction Cellar Pad, Rig Pad, Cutting Pits, Waste Pits,Construction of Flare Pits, Mud Pits,Installation of Fence around the Well site.Construction of Parking Area and Fuel Tank areaConstruction of 3 KM new access roadRepair of 20 KM existing access road.
Page 18 of 54UNIQUE ENGINEERING
Completed Projects
Project: Construction of Miano -19 Well Location & Wellhead DevelopmentProject, laying of 2.4 KM 6” Dia Flowline and 7.5 Km 12 Core FOC
Client: OMV (PAKISTAN)Location: Khanpur Mahar (Sindh) Distt: GhotkiPeriod: 45 Days (Year 2015/2016)Scope: Construction of Access Road, Rig Camp Location etc.
Construction of pits & Installation of Fence around the Well site.Prefabrication of Pipes/ Structures/ SupportsCivil works (Excavation, Foundation, Backfill, etc)Field work (Pipe/ Structure Installation, Hookup, Alignment etc)Instrumentation and Control System WorkInstallation and Commissioning of Equipment (Wellhead Coolers,Wellhead Control Panels, C.I Skid, Sour Gas Skid etc)Laying of 6” dia 2.4 Km flowline from Miano-19 to Miano-01 Tie-in.Laying of 7.5 Km 12 core Fiber Optic Cable from Miano 19 to Miano-9including splicing, jointing and OTDR complete in all respect.
Page 19 of 54UNIQUE ENGINEERING
Completed Projects
Project: Dismantling of Miano -12 Wellhead & Retrieval of FlowlineClient: OMV (PAKISTAN)Location: Khanpur Mahar (Sindh) Distt: GhotkiPeriod: 30 Days (Year 2015)
Scope: Dismantling of Surface pipes/ structures/ SupportsDismantling of Instrumentation and Control System workDismantling of Light Poles and control cables, cable trays etc.Dismantling of equipment (Wellhead Coolers, Wellhead ControlPanels, C.I Skid, Sour Gas Skid etc)Retrieval of 6.5 Km 6” Dia flow line from Miano 12 to Khipro-01
Page 20 of 54UNIQUE ENGINEERING
Completed Projects
Project: Miano 15 Wellhead Compression ProjectClient: OMV (PAKISTAN)Location: Khanpur Mahar (Sindh) Distt: GhotkiPeriod: 50 Days (Year 2015)
Scope: Erection of 20 MMSCF CompressorErection of Compressor’s Cooler, Separator & Below Case SkidPrefabrication of Pipes/ Structures/ SupportsCivil works (Excavation, Foundation, Backfill, etc)Field work (Pipe/ Structure Installation, Hookup, Alignment etc)Instrumentation and Control System WorkAssistance during Project Commissioning WorkTie works during Plant shutdown
Page 21 of 54UNIQUE ENGINEERING
Completed Projects
Project: Miano 18 Wellhead Development Project
Client: OMV (PAKISTAN)
Location: Khanpur Mahar (Sindh) Distt: Ghotki
Period: 42 Days (Year 2015)
Scope: Prefabrication of Pipes/ Structures/ SupportsCivil works (Excavation, Foundation, Backfill, etc)Field work (Pipe/ Structure Installation, Hookup, Alignment etc)Instrumentation and Control System workInstallation and Commissioning of Equipment (Wellhead Coolers,Wellhead Control Panels, etc)
Page 22 of 54UNIQUE ENGINEERING
Completed Projects
Project: Laying 6” Dia Miano 18 to Miano 15 Flowline (1.5 KM)Client: OMV (PAKISTAN)Location: Khanpur Mahar (Sindh) Distt: GhotkiPeriod: 30 Days (Year 2015)
Scope: Civil Works (Flow Line ROW Development, etc)Flow Line Installation, Welding, Hydro Testing and CommissioningInstrumentation WorkAssistance during Project Commissioning workTie works at Miano 15
Page 23 of 54UNIQUE ENGINEERING
Completed Projects
Project: Laying 6” Dia Miano 15 to Miano 11 Flowline (Loopline) 5.5 KMClient: OMV (PAKISTAN)Location: Khanpur Mahar (Sindh)Distt: GhotkiPeriod: 50 Days (Year 2015)
Scope: Civil works (Flow Line ROW development, etc)Flow line Installation, Welding, Hydro Testing and CommissioningAssistance during Project commissioning work
Page 24 of 54UNIQUE ENGINEERING
Completed Projects
Project: Balance Civil Works of Mehar Gas FieldClient: OMV Maurice Energy Ltd.Location: Mehar (Sindh) Distt: DaduPeriod: 150 days (Year 2014)
Scope: Construction Laundry Building, Junior Accommodation, SeniorAccommodation, Masjid, Parking Shed, Workshop Building, Watchtowers, Recreation Building, Football ground etc.Water Supply Network, Sewerage NetworkInternal Roads, Footpath etc.Electrical, Telecommunication, Data Network InstallationExternal Lighting System and Installation of DBs.
Page 25 of 54UNIQUE ENGINEERING
Completed Projects
Project: Construction of Bridge on Mazarani RiverClient: OMV Maurice Energy Ltd.Location: Mehar (Sindh) Distt: DaduPeriod: 90 Days (Year 2014)
Scope: Pile, Footings, Piers works for BridgeConstruction of Installation of Pre-Stress GirderStone Pitching, Ancillary works etc.
Page 26 of 54UNIQUE ENGINEERING
Completed Projects
Project: Construction of well location, Rig Camp site & Access Road Kohar-1Client: OMV Maurice Energy Ltd.Location: Mehar (Sindh) Distt: DaduPeriod: 35 Days (Year 2015)
Scope: Construction of Access Road, Rig Camp Location Culverts etc.Cutting and Filling of Well SiteConstruction Cellar Pad, Rig Pad, Cutting Pits, Waste Pits,Construction of Flare Pits, Mud Pits,Installation of Fence around the Well site.Construction of Parking Area and Fuel Tank area
Page 27 of 54UNIQUE ENGINEERING
Completed Projects
Project: Construction of Well Location, Rig Camp Site andAccess Road Miano 18
Client: OMV (PAKISTAN).Location: Khanpur Mahar (Sindh) Distt: GhotkiPeriod: 35 Days (Year 2015)
Scope: Construction of Access Road, Rig Camp Location Culverts etc.Cutting and Filling of Well siteConstruction Celler Pad, Rig Pad, Cutting Pits, Waste pits,Construction of Flare Pit, Mud Pits,Installation of Fence around the Well site.Construction of Parking Area and Fuel Tank area
Page 28 of 54UNIQUE ENGINEERING
Completed Projects
Project: Construction of well location, Rig Camp site andAccess Road Jaskani-1
Client: OMV (PAKISTAN).Location: Khanpur Mahar (Sindh) Distt: GhotkiPeriod: 45 Days (Year 2014)
Scope: Construction of Access Road, Rig Camp Location Culverts etc.Cutting and Filling of Well siteConstruction Celler Pad, Rig Pad, Cutting Pits, Waste Pits,Construction of Flare Pit, Mud Pits,Installation of Fence around the Well site.Construction of Parking Area and Fuel Tank area
Page 29 of 54UNIQUE ENGINEERING
Completed Projects
Project: Construction of well location, Rig Camp site & Access Road Mehar-3Client: OMV Maurice Energy Ltd.Location: Mehar (Sindh) Distt: DaduPeriod: 90 Days (Year 2011)
Scope: Construction of Access Road, Rig Camp Location Culverts etc.Cutting and Filling of well siteConstruction Celler Pad, Rig Pad, Cutting Pits, Waste Pits,Construction of Flare Pit, Mud Pits,Installation of Fence around the Well site.Construction of Parking Area and Fuel Tank area
Page 30 of 54UNIQUE ENGINEERING
Completed Projects
Project: Construction of well location, Rig Camp site & Access Road Sofia-2Client: OMV Maurice Energy Ltd.Location: Mehar (Sindh) Distt: DaduPeriod: 60 Days (Year 2012)
Scope: Construction of Access Road, Rig Camp Location Culverts etc.Cutting and Filling of Well SiteConstruction Celler Pad, Rig Pad, Cutting Pits, Waste Pits,Construction of Flare Pit, Mud Pits,Installation of Fence around the Well site.Construction of Parking Area and Fuel Tank area
Page 31 of 54UNIQUE ENGINEERING
List of Completed ProjectsS.NO PROJECT NAME DURATION PERIOD
1 Construction of Well location Mehar-3 & Rehabilitation works ofMehar-1 and Mehar-2 90 Days Oct-2011 To
Dec-2011
2 Construction of well location, Rig Camp & Access Road Sofiya-2Mehar. 60 Days Dec-2012 To
Feb-2012
3 Construction of well location, Rig Camp site & Access RoadRehan-2 (Mubarak Block). 35 Days 20 Feb-2013
To Mar-2013
4 Construction of well location, Rig Camp site & Access RoadRehmat-4 (Mubarak Block). 45 Days April-2013
To May-20135 Construction of well location Putra-1 45 Days 2008
6 Evaporation Pond at RGP. 30 Days 2008
7 Construction of OMV residence Camp at Mehar Block. 30 Days 2012
8 Construction of Box Culverts at Mehar Block. 45 Days 2013
9 Water Supply Scheme for Community at Mehar. 30 Days 2013
10 Construction of Water well bore at RGP (Mubarak Block). 25 Days 2013
11 Civil Works at Camp RGP (Mubarak Block). 35 Days 2013
12 Construction of well location, Rig Camp site & Access RoadJaskani-1 45 Days 2014
13 Construction of well location, Rig Camp site & Access RoadMiano-18 35 Days 2014
14 Balance Civil Work of Mehar Gas Field 150 Days 2014/2015
15 Construction of Bridge on Mazarani River 90 Days 2015
16 Construction of well location, Rig Camp site & Access RoadKohar-1 35 Days 2015
17 Miano-18 Wellhead Development Project 42 days 2015
18 Laying 6” Dia Miano 18 to Miano 15 Flowline (1.5 KM) 30 days 2015
19 Laying 6” Dia Miano 15 to Miano 11 Flowline (Loopline) 5.5KM 50 days 2015
20 Construction of well location, Rig Camp site & Access RoadMiano 19 45 Days 2015
20 Miano 15 Wellhead Compression Project 50 Days 2015
21 Dismantling of Miano -12 Wellhead 30 Days 2015
22 Miano-19 Wellhead Development Project, laying of 2.4 KM 6”Dia Flow line and 7.5 Km 12 Core Fiber Optic Cable 45 Days 2015/2016
Page 32 of 54UNIQUE ENGINEERING
List of Completed Projects
S.NO PROJECT NAME DURATION PERIOD
23 Construction of well location & Access Road Khetwaro-1 45 Days 2015/2016
24 Construction of well location, Rig Camp & Access RoadLamwari-1 45 days 2016
25
Mehar-03 Wellhead Compression Project, including Civil, Works,Piping Works, Pipe Supports, Steel Structure, 10MMSCFDCompressor Erection, Commissioning supports, Electrical andInstruments Works, Hot and Cold tie-in’s during Mehar PlantShudtown.
72 Days 2016
26 Development of Gabar Garrison 04 Months In Progress
27 Construction of Multan-Sukkur Motorway 06 Months In Progress
28 Dismantling & Reinstallation of Mehar-2 Wellhead 45 Days In Progress
Page 33 of 54UNIQUE ENGINEERING
Completion Certificates
Page 34 of 54UNIQUE ENGINEERING
Completion Certificates
Page 35 of 54UNIQUE ENGINEERING
Completion Certificates
Page 36 of 54UNIQUE ENGINEERING
Completion Certificates
Page 37 of 54UNIQUE ENGINEERING
Contract Award Letter
Page 38 of 54UNIQUE ENGINEERING
Upcoming ProjectsProject: Sofia-2 Wellhead Development Project
Client: OMV Maurice Energy Ltd.Location: Mehar (Sindh) Distt: Dadu
Scope: Prefabrication of Pipes/ Structures/ SupportsCivil works (Excavation, Foundation, Backfill, etc)Field work (Pipe/ Structure Installation, Hookup, Alignment etc)Instrumentation and Control System WorkInstallation and Commissioning of Equipment (Wellhead Coolers,Wellhead Control Panels, etc)Laying of Flowline & Fiber Optic Cable
Project: Lamwari-1 Wellhead Development Project
Client: OMV (Pakistan)Location: Choondiko (Sindh) Distt: Khairpur
Scope: Prefabrication of Pipes/ Structures/ SupportsCivil works (Excavation, Foundation, Backfill, etc)Field work (Pipe/ Structure Installation, Hookup, Alignment etc)Instrumentation and Control System WorkInstallation and Commissioning of Equipment (Wellhead Coolers,Wellhead Control Panels, etc)Laying of Flowline & Fiber Optic Cable
Page 39 of 54UNIQUE ENGINEERING
Equipment List
Sr# DESCRIPTION
HEAVY EQUIPMENTS
CRANES & FORK LIFTER Ton1 Hydraulic Crane 45 KATO 12 Hydraulic Crane 22 KATO 13 Hydraulic Crane 10 KATO 14 Crane 2 KATO 15 Fork Lifter 8 TOYOTA 1
DOZER, LOADER & GRADERS
1 Dozer D-8K CAT 22 Dozer D-4 CAT 13 Wheel Loader 950B CAT 14 Wheel Loader TCM 25 Wheel Grader GD-22 KOMATSU 1
EXCAVATORS1 Chain Excavators UH-02 HITACHI 52 Wheel Excavators EX-125 HITACHI 2
PIPE LAYER / SIDE BOOMS & BENDING MACHINE1 Pipelayer -561 CAT 12 Pipelayer -571 CAT 33 Pipelayer 572 CAT 24 Hydraulic Pipe Bending Machine 6'' ~ 20'' CAT 1
LIGHT EQUIPMENT
POWER GENERATOR KVA1 Power Generator 165 CAT 12 Power Generator 165 CUMINS 13 Power Generator 125 Japan 1
4 Power Generator 100 Get 1
5 Power Generator 60 DENYO 16 Power Generator 45 DENYO 17 Power Generator 35 MEIDEN 18 Power Generator 25 AIRMAN 29 Power Generator 20 YANMAR 1
10 Power Generator 20 Mets 111 Power Generator 25 DENYO 1
EQUIPMENT / TOOL SUMMARYTOTALCAPACITY MAKE
3
4
Page 40 of 54UNIQUE ENGINEERING
Equipment List
Sr# DESCRIPTIONWELDING EQUIPMENTS / TOOLS
INVERTEC WELDING MACHINE1 Electric Invertec LINCOLN 5
DIESEL WELDING MACHINE
1 Welding Machine GAW-80SS + Air Compressor 10BarWM-001 DENYO
12 Welding Machine DENYO 43 Welding Machine Miller Bobcat 24 Welding Machine LINCOLN 11
GRINDERS1 Angle Grinders 9" AEG 352 Baby Grinders 4" AEG 303 Pencil Grinder AEG 144 Power Cutter / Bench Grinder 14" AEG 1
ELECTRODE BAKING OVEN1 Electrode Baking Oven EBO-01 (Hussain Power Hot work) 100Kg 300
Centegrade1
2 Electrode Portable Oven/Desicator 5Kg. (Hussain Power Hot Work) 10
CUTTING,BENDING & BEVELING MACHINES1 Steel Bar Cutting Machine BCM-001 GQ-40 12 Steel Bar Bending Machine BBM-001 GW-40 1
3 Chain Beveling Machine CBM-001 4" ~ 20" 1
WATER BOZER, TRACTOR & TRUCKS Lit
1 Water Bozer 20000 ISUZU 1
4 Water Bozer 15000 ISUZU 1
2 Water Bozer 18000 ISUZU 2
5 Tractor with Front Blade & Trolley BELARUS 2
7 Dumper TKR-525 1
PUMPS & AIR COMPRESSOR
1 Hydrotesting Pump with NRV 1" 5000 Psi 1
2 Jetting / Filling Pump 4" with Flowmeter 4'' 1
3 Electric Water Filling Pump 2''x 2'' 1
4 Air Compressor 250 CFM 1
5 Air Compressor 350 CFM 1
6 De-watering Pump 3'' x 3'' HIDELS 1
7 De-watering Pump HIDELS 3
EQUIPMENT / TOOL SUMMARYTOTALCAPACITY MAKE
284
3
Page 41 of 54UNIQUE ENGINEERING
Equipment List
Sr# DESCRIPTIONMIXTURE MACHINES & BATCHING PLANT
1 Mixture Machine MM-01 4
2 Batching Plant Complete Unit 0.5 m3 GLOBAL 1
COMPACTOR & VIBRATORS
1 Frog Compactor 55 MT 3
2 Roller Compactor 1 Ton 1
3 Roller Vibrator Compactor H.D 2
4 Vibrator R175A 1
5 Vibrator PETROL Japan 1
6 Electric Vibrator Makita Makita 1
7 Petrol Vibrator China 1
8 Electric Vibrator China 1
Miscellaneous / Others
DRILL / TIGHTENING MACHINES
1 Hilti Drill 24mm 12 Heavy Duety Drill Machine 0-24 mm 13 Screw Tightening Machine Dewalt 2
LIGHTING TOWERS & ELECTRONICS SAFETY SIGNS
1 Lighting Tower with 1-Lamp & 2-Mercury Lights 3Mtrs Hight& Power Generator YANMAR Japan Petrol 1
2 Lighting Tower with 4-Flood Lights 5Mtrs Hight & PowerGenerator DENYO Japan Diesel
1
3 Electronic Safety Signs with Moving Red Signal Lights &Power Generator DENYO Japan Diesel 1
VEHICLES
1 Prado TOYOTA 45 Pick-up Double Cabin 4x4 TOYOTA 27 Trucks 6Wheeler ISUZU ISUZU 18 Coaster TOYOTA 19 Hiace Van TOYOTA 2
11 Van (Ambulance) TOYOTA 213 Mobile Office Container ISUZU Auction-2012 ISUZU 1
EQUIPMENT / TOOL SUMMARYTOTALCAPACITY MAKE
Roller 3
Page 42 of 54UNIQUE ENGINEERING
Equipment List
Equipment List
CAPACITY MAKE
Sr# DESCRIPTION
SURVEY EQUIPMENTS / TOOLS1 Digital Level Machine SOKKIA SDL-50 12 Automatic Survey Level Machine PENTEX AP-128 13 Automatic Survey Level Machine PENTEX AP-281 14 Digital Level Machine SOKKIA S20 15 Electronic Theodolite Machine DT5A 16 Digital TOTAL STATION PENTEX R205NE 17 Target with Rod 18 Prism with Rod 1
LIFTING , STRINING & LOWERING TOOLS
1 Lifting Beam 35Ton 6Mtrs. 12 Lifting Beam 25Ton 6Mtrs. 13 Lifting Beam 15Ton 7Mtrs. 1
HYDROTESTING EQUIPMENT / TOOLS
1 Pressure Recorder 0~3000 Psi 1
2 Temprature Recorder 0~200C 13 Thermometer 0~600C 14 Stop Watch 15 Pressure Guages, Safety Valves, NRV & Fittings etc. 0
SANDBLASTING & PAINTING EQUIPMENT / TOOLS
1 Sandblasting Pot with Accessories CLAMCO 12 Paint Spray Gun with Accessories 1
PIPE CLAMP & HOLIDAY DETECTORS
1 External Clamps 6" 4
2 External Clamps 8" 2
5 Holiday Detector with 6" & 8" Rings 5000KW 1MECHANICAL & GENERAL WORK TOOLS
1 Vernier Caliper 6" 12 Digital Vernier Caliper 6" 13 Air Blower 14 Fabrication / Mechanical Jack 125 Fabrication Stand 126 Cutting Torch 27 Argon Torch 48 Argon Regulator 69 D.A Regulator 4
TOOLS SUMMARYTOTAL
Page 43 of 54UNIQUE ENGINEERING
CAPACITY MAKE
Sr# DESCRIPTION10 Oxygen Regulator 411 Cold / Pipe Cutter 1/2" to 2" 212 Cold / Pipe Cutter 2" to 4" 113 Alphabetic Punch (AtoZ) 6mm 114 Number Punch (0 to 9) 6mm 115 Wire Sling 3/4" x 25' 416 Wire Sling 1/2" x 25' 417 Shackle Bow Type 8.5Ton 8.5 Ton 418 Shackle Bow Type 6.5Ton 6.5 Ton 419 Shackle Bow Type 4-3/4Ton 4-3/4 Ton 420 Shackle Bow Type 3-1/4Ton 3-1/4 Ton 421 Lifting Hoock 5Ton 5 Ton 422 Web- Sling 5Ton 4Mtr D/P 5 Ton 223 Web- Sling 4Ton 4Mtr 4 Ton 224 Web- Sling 2Ton 4Mtr 2 Ton 225 Web- Sling 2Ton 2Mtr 2 Ton 226 Pipe Wrench 36" 227 Pipe Wrench 18" 228 Pipe Wrench 12" 2
29 Adjustable Wrench 24" 2
30 Adjustable Wrench 18" 2
31 Adjustable Wrench 12" 10
32 M.S Hammer 20Lbs 2
33 M.S Hammer 16Lbs 2
34 M.S Hammer 12Lbs 2
35 M.S Hammer 8Lbs DIN1042 One end Chipping 2
36 M.S Hammer 4Lbs 2
37 M.S Hammer 2Lbs Ball & Flate Face 4
38 Brass Hammer 20Lbs 2
39 Brass Hammer 15Lbs 2
40 Brass Hammer 12Lbs 2
41 Brass Hammer 8Lbs 2
42 Brass Hammer 4Lbs 2
43 Carpenter Hammer 4
44 Plier 4
45 Screw Driver Flate Face 10" 4
46 Screw Driver Philps 10" 4
47 Star Screw Driver Set 10 Pcs. 2
48 Hyd. Crimping Tool with Dies 1
49 Cable Cutter 1
50 Cable Knife 4
51 Scissor 2
52 Combination Spanner Set 6mm to 32mm 1
53 Socket Set 1/2" drive 08mm to 32mm 1
54 Socket Set 3/4" drive 19mm to 50mm 1
55 H.D Open Spanner 6mm to 22mm (08Pcs.) 1
56 Alen Key set 1mm to 10mm 2
57 Hand Level 12" 10
TOOLS SUMMARYTOTAL
Equipment List
Page 44 of 54UNIQUE ENGINEERING
Equipment List
CAPACITY MAKE
Sr# DESCRIPTION58 Hand Level 18" 10
59 Hand Level 24" 6
60 Tri-Square 12" 10
61 Tri-Square 24" 10
62 Divider 12" 2
63 Center Puch 10
64 Cylinder Key 1065 M.S Chiesel 8" & 10" Mix 05+ 05 10
66 Half Round File 12" with PVC Handle 20
67 Round File 12" with PVC Handle 668 Sparking Lighter 269 Crowbar / M.S Bari 1" dia x 6' Flate Face 270 Hacksaw Frame 371 Wooden Saw 272 Tin Cutter Medium & Small 273 Silicon Gun 1
74 Revit Gun 1
75 Pipe Vice 1
76 Bench Vice 177 Heating Torch (For Flowline / Pipe Joint Heating) 478 Manual Hooter with Stand 179 Electric Hooter 180 Fire Extinguisher DCP 6Kgs 1081 Fire Extinguisher CO2 5Kgs 582 Ear Muff 183 Waste Segregation Drums 484 Fire Proof Blanket 285 Smoke Alarm 5086 Fire Fighting Hose with Nozzle 2.5mm x 100' 487 Safety Harness Belt 1488 Maga-phone 189 Digital Clamp Meter 190 Multimeter 191 Combination Spanner Set 192 Socket Set 193 Screw Drivers Set. 194 Star Screw Driver Set 195 Hand Drill Machines 0~12mm 296 Alen Key set 197 Electric Plier 198 Noze Plier 199 Cutter Plier 1100 Crimping Plier (for e-net cabling connectors) 1101 Chain Block 1Ton 2102 Chain Block 1-1/2Ton 1103 Chain Block 2Ton 1104 Scaffolding Material 01 Lot.
TOOLS SUMMARYTOTAL
Page 45 of 54UNIQUE ENGINEERING
Projects Gallery
Inspection of Bridge is in progress Laying of Asphalt on Road in progress
Cleaning of Shoulder is in progress Incentive Award to Workers
Concrete for Bridge Pre-Stressing of Bridge Girder
Page 46 of 54UNIQUE ENGINEERING
Projects Gallery
Control Pannel Shed Wellhead Cooler
Duplex Piping Welding Installation of PSVs
Fabrication of Duplex Piping Fabrication of CS Piping
Page 47 of 54UNIQUE ENGINEERING
Projects Gallery
Concrete of Internal Drain Concrete of Bridge Girder
C.I Skid Foundation Light Pole Foundation
Excavation for Celler Pad Steel Fixing of Pre-Stress Girder
Page 48 of 54UNIQUE ENGINEERING
Projects Gallery
Flowline ROW Flowline ROW Grading
Flowline Stringing Flowline Stringing
Fabrication of Flowline Welding of Flowline
Page 49 of 54UNIQUE ENGINEERING
Projects Gallery
Sand Blasting of CS Piping Sand Blasting of CS Piping
Errection of wellhead Compressor Errection of Wellhead Cooler
Errection of Compressor Cooler Errection of Sour Gas Skid
Page 50 of 54UNIQUE ENGINEERING
Projects Gallery
Errection Hydrulic Pannel Installation of Instrument Cables
Dressing of Cables in Trench FOC spilcing & Jointing
Installation of Cable TrayTermination of Cables in ControlPannel
Page 51 of 54UNIQUE ENGINEERING
Projects Gallery
Errection of Piping Erection of Cooler Structure
Erection of Cooler Structure Errectoin of Sample Bottle
Fabrication & Errection of EyeWash Shower
Erection of Steel Structure
Page 52 of 54UNIQUE ENGINEERING
Projects Gallery
Fabrication & Erection of ShedsFabrication & Installation ofFence
Construction of Rig Road Cutting of Rock for Road Works
Filling for Well Location Grading of Location
Page 53 of 54UNIQUE ENGINEERING
Projects Gallery
Masjid at Mehar Gas Field Compaction of External Roads
A Bird eye view of Residentialarea of MGF (Mehar Gas Field) Installation of Road Signs
Wearing Cours on Internal Roads TP Road Marking on Roads
Page 54 of 54UNIQUE ENGINEERING
Our Client
OMV (Pakistan) Exploration GmbH
OMV Maurice Energy Ltd
Petronas Carigali (Pakistan) Ltd
Petroleum Exploration (Pvt) Limited
Mari Petroleum Company (Pvt) Limited